| number = ML15345A263
| number = ML15345A263
| issue date = 12/10/2015
| issue date = 12/10/2015
| title = Ltr 12/10/15 LaSalle County Station, Units 1 and 2 - Request for Information for an NRC Triennial Baseline Component Design Bases Inspection; Inspection Report 05000373/2016007; 05000374/2016007 (Nja)
| title = Request for Information for an NRC Triennial Baseline Component Design Bases Inspection; Inspection Report 05000373/2016007; 05000374/2016007 (Nja)
| author name = Lipa C A
| author name = Lipa C
| author affiliation = NRC/RGN-III/DRS/EB2
| author affiliation = NRC/RGN-III/DRS/EB2
| addressee name = Hanson B C
| addressee name = Hanson B
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000373, 05000374
| docket = 05000373, 05000374
Line 14: Line 14:
| page count = 8
| page count = 8
}}
}}
See also: [[followed by::IR 05000373/2016007]]
See also: [[see also::IR 05000373/2016007]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
REGION III 2443 WARRENVILLE RD. SUIT
REGION III  
E 210 LISLE, IL  60532
2443 WARRENVILLE RD. SUITE 210
-4352   December 10, 2015
LISLE, IL  60532-4352  
  Mr. Bryan C. Hanson
Senior VP, Exelon Generation Company, LLC
President and CNO, Exelon Nuclear
4300 Winfield Road
   
   
Warrenville, IL  60555
SUBJECT:  LASALLE COUNTY STATION, UNITS 1 AND 2
- REQUEST FOR INFORMATION FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION
; INSPECTION REPORT 05000 373/20 1 6007; 05000 374/20 1 6007 Dear Mr. Hanson: On April 11, 2016
, the U. S. Nuclear Regulatory Commission (NRC) will begin a
triennial baseline Component Design Bases Inspection (CDBI) at
the La Salle County Station, Units 1
and 2.  This inspection will be performed in accordance with NRC Baseline Inspection Procedure 71111.21. The CDBI focuses on the design, maintenance, and operation of risk
-significant components
associated with one or more accident scenario or systems.  The components to be reviewed during this baseline inspection will be identified during the in-office preparation week that occurs prior to the first onsite inspection
week.  In addition, operating experience issues, associated with the component samples, will also
be selected for review.  The inspection team may request scenarios to be performed on the simulator.  This request would require support from you
r simulator staff to validate scenarios, simulator time, and a crew to perform the actions which would most likely occur during the second onsite week.  The team will work closely with your staff early on during the inspection process to ensure this activity can be accomplished with minimal impact.
The inspection will include three weeks onsite.  The inspection team will consist of six NRC inspectors, of which five will focus on engineering/maintenance
and one on operations.  The current inspection schedule is as follows: 
Onsite weeks:
April 11 - 15, 2016; April 25 - 29, 2016; and  May 9 - 13, 2016. 
B. Hanson -2- The team will be preparing for the inspection, mainly during the week of
April 4 - 8, 2016, as discussed in the enclosure.
Experience with previous baseline design inspections of similar depth and length has shown that th is type of inspection is
extremely resource intensive, both for the NRC inspectors and the licensee staff.  In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for information needed for the inspection.
It is important that all of these documents are up
-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of
the inspection.  Insofar as possible, this information should be provided electronically to the lead inspector.  The information request has been divided into three groups:
  The first group lists information necessary for our initial inspection scoping activities.  This information should be provide d to the lead inspector no later than
February 29, 2016.  By March 11, 2016, the lead inspector will communicate the initial selected set of approximately
2 0 components
.  The second group of documents requested is
those items needed to support our in
-office preparation activities.  This set of documents, including the calculations associated with the initial selected components, should be provided to the lead inspector
at the Regional Office no
later than March 30, 2016.  During the inoffice preparation activities, the team may identify additional information needed to support the inspection.
  The last group includes the additional information above
, as well as plant specific reference material.  This information should be available to the team onsite on April 11, 2016.  It is also requested that corrective action documents and/or questions developed during the inspection be provided to the lead inspector as the documents are generated. 
The lead inspector for this inspection is
Néstor J. Féliz
-Adorno.  We understand that our licensing contact for this inspection is
Dwi Murray
of your organization.  If there are any questions about the inspection or the material requested in the enclosure, please contact
the lead inspector at (630) 829-9739 , or via e-mail at Nestor.Feliz
-Adorno@nrc.gov
. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.   
B. Hanson -3- In accordance with Title 10 of the Code of Federal Regulations
(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy
of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the
NRC's Agencywide
Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerel y,  /RA/  Christine A. Lipa , Chie f Engineering Branch 2
   
   
Division of Reactor Safety
December 10, 2015
Docket Nos. 50
-373; 50-374 License Nos. NPF
-11; NPF-18 Enclosure:
Information Request for
CDBI  cc:  Distribution via LISTSERV
 
COMPONENT DESIGN BASES INSPECTION REQUEST FOR INFORMATION
Enclosure Inspection Report:
05000 373/20 1 6007; 05000 374/20 1 6007 Inspection Dates:
April 11 - 15, 2016; April 25 - 29, 2016; and  May 9 - 13, 2016. Inspection Procedure:
IP 71111.21 "Component Design Bases Inspection"
Lead Inspector:
Néstor J. Féliz
-Adorno , Senior Reactor Engineer, DRS
  (630) 829-9739 Nestor.Feliz
-Adorno@nrc.gov
I. Information Requested Prior to the Onsite Information Gathering/Inspection Week
The following information is requested by
February 29, 2016 , or sooner, to facilitate inspection
preparation.  If you have any questions regarding this information, please call the team leader as soon as possible.  Unless stated otherwise, please provide the information electronically in "pdf" files, Excel, or other searchable formats, preferably
on some portable electronic media (e.g., CD-ROM, DVD, etc.).  The portable electronic media should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use.  Information in "lists" should contain enough information to be easily
understood by someone who has knowledge of light water reactor technology.
1. Risk-ranking of top
2 50 components from your site specific probabilistic safety analysis (PSA) sorted by Risk
-Achievement Worth (RAW).  Include values for Birnbaum Importance, Risk
-Reduction Worth, and Fussell
-Veseley (as applicable).
2. Risk-ranking of top 100 containment
-related components (i.e. ,Large Early Release Frequency) from your site specific PSA sorted by
RAW. 3. Provide a list of the top 200 cut
-sets from your PSA.
4. Provide a list of the top 100 cut-sets for each initiator modeled in the P
SA that contributes more than 5
percent to the baseline plant core damage frequency.
5. Copies of PSA "system notebooks" and latest PSA summary document.
6. List of time critical operator actions.  Identify those actions that do not have job performance measures.
7. Provide copies of the emergency operating procedures
. 8. If you have an External Events or Fire PSA Model, provide the information requested in Items 1 and 2 for external events and fire.  Provide narrative description of each coded event (including fire, flood zone description)
. 9. Electronic copy of the site Individual Plant Examination of External Events , if available.
 
COMPONENT DESIGN BASES INSPECTION REQUEST FOR INFORMATION
2 10. Any pre-existing evaluation or list of components and associated calculations with low design margins, (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design required output, heat exchangers close to rated design heat removal etc.). 11. List of available design (setup) margins in both the
open and closed direction (identify safety
-related direction) for valves
in the Motor-Operated Valve
and Air-Operated Valve Programs
.  Identify the basis for how the margin was determin ed. 12. List of high
-risk Maintenance Rule systems/components based on engineering
or expert panel judgment
(i.e., those systems/components not identified in the
P S A). 13. Structures, systems, and components in the Maintenance Rule (a)(1) category
for the last
3 years. 14. Site top ten issues list (if applicable)
. 15. A list of operating experience evaluations for the last
3 years. 16. Information of any common cause failure of components experienced in the last 5 years at your facility
. 17. List of Root Cause Evaluations associated with component failures or design issues initiated/completed in the last
5 years. 18. List of open operability evaluations.
19. List of components/systems considered operable but degraded/nonconforming.
20. Current management and engineering organizational chart
. 21. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications, Technical Specifications Bases, and Technical Requirements Manual. 22. Major one line electrical drawings (ac and dc) and key diagrams (paper copies).
23. Electronic copy of Piping and Instrumentation Drawing
s (P&IDs), including the table of content
(if available).
II. Information Requested (for the approximate 20 selected components) to be
Available by
March 30, 2016, (will be reviewed by the team in the Regional office during the week of April 4 - 8, 2016). This information
should be separated for each selected component, especially if provided electronically (e.g., folder with component name that includes calculations,
condition reports, maintenance history, etc
.). 1. List of condition reports (corrective action documents) associated with each of the selected components for the last
6 years. 
COMPONENT DESIGN BASES INSPECTION REQUEST FOR INFORMATION
3 2. The maintenance history
(corrective, preventive, and elective)
associated with each of the selected components
for the last
10 years.  Identify frequency of preventive maintenance activities.
3. Copies of calculations associated with each of the selected components (if not previously provided), excluding data files.  Please review the calculations and also provide copies of important referenced material (such as drawings, engineering requests, and vendor letters).  Pipe stress calculations
are excluded from this request.
4. System Health Reports, System Descriptions, Design Basis Documents, and/or Training Lesson Plans associated with each of the selected components.
5. A list of modifications, including equivalency evaluations and setpoint changes, associated with each of the selected components
.  This list should include a descriptive paragraph on the
purpose of the modification.  Please ensure this list only includes design completed (not canceled) modifications.
6. Copies of operability evaluations (open/closed for last 3 years) associated with each of the selected components and plans for restoring operability, if applicable
. 7. Copies of selected operator work
-around evaluations associated with each of the selected components and plans for resolution, if applicable.
8. Copies of any open temporary modifications associated with each of the selected components, if applicable.
9. Trend data on the selected electrical/mechanical components' performance for last 3 years (For example, pumps' performance including in
-service testing, other vibration monitoring, oil sample results, etc., for valves:
stroke time and leak rate results, etc.
). 10. Provide copies of the normal and abnormal operating procedures associated with the selected components
and selected scenarios
. 11. A copy of any internal/external self
-assessments and associated corrective action documents generated in preparation for the inspection
. 12. Copy of latest completed tests and surveillances for each component
, for example:  Pumps:  comprehensive test, quarterly test, flow balance, etc.
  Valves:  stroke time testing, diagnostic testing, leak testing, interlocks, etc.  Heat Exchangers/room coolers
:  thermal performance, clean/inspect, fan flows, etc.
Acceptance criteria basis calculations should also be included.
13. A copy of engineering/operations related audits completed in the last 2 years.
 
COMPONENT DESIGN BASES INSPECTION REQUEST FOR INFORMATION
4 III. Additional Information to
be Provided on April 11, 2016, On site (for final selected components)
1. During the in
-office preparation activities, the team will be making final selections and may identify additional information needed to support the inspection.  The lead inspector will
provide a list of the additional information needed during the week of April 4 - 8, 2016. 2. Schedule of any testing/maintenance activities to be conducted on the selected components during the three onsite inspection weeks.
3. One complete set of P&IDs (paper copies)
. IV. Information Requested to be Provided Throughout the Inspection
1. Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection
. 2. Copies of the list of questions submitted by the team
members and the status/resolution of the information requested (provide daily during the inspection
to each team member)
. 3. Reference materials.  (make available if needed during all on
-site weeks):
  Individual Plant Examination/Probabilistic Risk Assessment
Report;  Procurement documents for components selected (verify retrievable);
  Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
  Vendor manuals.
If you have questions regarding the information requested, please contact the lead inspector.
 
  B. Hanson -3- In accordance with Title 10 of the Code of Federal Regulations
(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy
of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,  /RA/  Christine A. Lipa, Chie f Engineering Branch 2
   
   
Division of Reactor Safety
Docket Nos. 50
-373; 50-374 License Nos. NPF
-11; NPF-18 Enclosure:
Information Request for CDBI  cc:  Distribution via LISTSERV
DISTRIBUTION
: Janelle Jessie
   
   
RidsNrrDorlLpl3
Mr. Bryan C. Hanson
-2 Resource
Senior VP, Exelon Generation Company, LLC
   RidsNrrPMLaSalle
President and CNO, Exelon Nuclear
  RidsNrrDirsIrib Resource
4300 Winfield Road
Cynthia Pederson
Warrenville, IL  60555
SUBJECT:  LASALLE COUNTY STATION, UNITS 1 AND 2 - REQUEST FOR INFORMATION
FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES
INSPECTION; INSPECTION REPORT 05000373/2016007; 05000374/2016007
Dear Mr. Hanson:
On April 11, 2016, the U. S. Nuclear Regulatory Commission (NRC) will begin a triennial
baseline Component Design Bases Inspection (CDBI) at the LaSalle County Station, Units 1
and 2.  This inspection will be performed in accordance with NRC Baseline Inspection
Procedure 71111.21.
The CDBI focuses on the design, maintenance, and operation of risk-significant components
associated with one or more accident scenario or systems.  The components to be reviewed
during this baseline inspection will be identified during the in-office preparation week that occurs
prior to the first onsite inspection week.  In addition, operating experience issues, associated
with the component samples, will also be selected for review.  The inspection team may request
scenarios to be performed on the simulator.  This request would require support from your
simulator staff to validate scenarios, simulator time, and a crew to perform the actions which
would most likely occur during the second onsite week.  The team will work closely with your
staff early on during the inspection process to ensure this activity can be accomplished with
minimal impact.
The inspection will include three weeks onsite.  The inspection team will consist of six NRC
inspectors, of which five will focus on engineering/maintenance and one on operations.  The
current inspection schedule is as follows:    
Onsite weeks:
April 11 - 15, 2016;
April 25 - 29, 2016; and  
May 9 - 13, 2016.
   
   
Darrell Roberts
 
Richard Skokowski
B. Hanson
Allan Barker
-2-
Carole Ariano
The team will be preparing for the inspection, mainly during the week of April 4 - 8, 2016,
Linda Linn
as discussed in the enclosure.
DRPIII DRSIII Jim Clay Carmen Olteanu
Experience with previous baseline design inspections of similar depth and length has shown
  ADAMS Accession Number ML15345A263
that this type of inspection is extremely resource intensive, both for the NRC inspectors and the
  Publicly Available
licensee staff.  In order to minimize the inspection impact on the site and to ensure a productive
  Non-Publicly Available
inspection for both parties, we have enclosed a request for information needed for the
  Sensitive  Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
inspection.
OFFICE RIII  RIII  RIII  RIII  NAME NFeliz-Adorno:cl CLipa   DATE 12/10/15 12/10/15   OFFICIAL RECORD COPY
It is important that all of these documents are up-to-date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection.  Insofar as possible, this information should be provided electronically to the lead
inspector.  The information request has been divided into three groups:
*
The first group lists information necessary for our initial inspection scoping activities. 
This information should be provided to the lead inspector no later than February 29,
2016.  By March 11, 2016, the lead inspector will communicate the initial selected set of
approximately 20 components.
*
The second group of documents requested is those items needed to support our in-
office preparation activities.  This set of documents, including the calculations associated
with the initial selected components, should be provided to the lead inspector at the
Regional Office no later than March 30, 2016.  During the inoffice preparation activities,
the team may identify additional information needed to support the inspection.
*
The last group includes the additional information above, as well as plant specific
reference material.  This information should be available to the team onsite on April 11,
2016.  It is also requested that corrective action documents and/or questions developed
during the inspection be provided to the lead inspector as the documents are generated. 
The lead inspector for this inspection is Néstor J. Féliz-Adorno.  We understand that our
licensing contact for this inspection is Dwi Murray of your organization.  If there are any
questions about the inspection or the material requested in the enclosure, please contact
the lead inspector at (630) 829-9739, or via e-mail at Nestor.Feliz-Adorno@nrc.gov.
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number. 
 
B. Hanson
-3-
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter, its enclosure, and your response (if any) will be available electronically for public
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management System (ADAMS). 
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
/RA/
Christine A. Lipa, Chief
Engineering Branch 2
Division of Reactor Safety 
Docket Nos. 50-373; 50-374
License Nos. NPF-11; NPF-18
Enclosure:
Information Request for CDBI 
cc:  Distribution via LISTSERV
 
COMPONENT DESIGN BASES INSPECTION REQUEST FOR INFORMATION
Enclosure
Inspection Report:
05000373/2016007; 05000374/2016007
Inspection Dates:
April 11 - 15, 2016;
April 25 - 29, 2016; and 
May 9 - 13, 2016.
Inspection Procedure:
IP 71111.21 Component Design Bases Inspection
Lead Inspector:
Néstor J. Féliz-Adorno, Senior Reactor Engineer, DRS 
(630) 829-9739
Nestor.Feliz-Adorno@nrc.gov
I.
Information Requested Prior to the Onsite Information Gathering/Inspection Week
The following information is requested by February 29, 2016, or sooner, to facilitate
inspection preparation.  If you have any questions regarding this information, please
call the team leader as soon as possible.  Unless stated otherwise, please provide the
information electronically in pdf files, Excel, or other searchable formats, preferably
on some portable electronic media (e.g., CD-ROM, DVD, etc.).  The portable electronic
media should contain descriptive names, and be indexed and hyperlinked to facilitate
ease of use.  Information in lists should contain enough information to be easily
understood by someone who has knowledge of light water reactor technology.
1.
Risk-ranking of top 250 components from your site specific probabilistic
safety analysis (PSA) sorted by Risk-Achievement Worth (RAW).  Include
values for Birnbaum Importance, Risk-Reduction Worth, and Fussell-Veseley
(as applicable).
2.
Risk-ranking of top 100 containment-related components (i.e. ,Large Early
Release Frequency) from your site specific PSA sorted by RAW.
3.
Provide a list of the top 200 cut-sets from your PSA.
4.
Provide a list of the top 100 cut-sets for each initiator modeled in the PSA that
contributes more than 5 percent to the baseline plant core damage frequency.
5.
Copies of PSA system notebooks and latest PSA summary document.
6.
List of time critical operator actions.  Identify those actions that do not have job
performance measures.
7.
Provide copies of the emergency operating procedures.
8.
If you have an External Events or Fire PSA Model, provide the information
requested in Items 1 and 2 for external events and fire.  Provide narrative
description of each coded event (including fire, flood zone description).
9.
Electronic copy of the site Individual Plant Examination of External Events,
if available.
 
COMPONENT DESIGN BASES INSPECTION REQUEST FOR INFORMATION
2
10.
Any pre-existing evaluation or list of components and associated calculations
with low design margins, (i.e., pumps closest to the design limit for flow or
pressure, diesel generator close to design required output, heat exchangers
close to rated design heat removal etc.).
11.
List of available design (setup) margins in both the open and closed direction
(identify safety-related direction) for valves in the Motor-Operated Valve and
Air-Operated Valve Programs.  Identify the basis for how the margin was
determined.
12.
List of high-risk Maintenance Rule systems/components based on engineering
or expert panel judgment (i.e., those systems/components not identified in the
PSA).
13.
Structures, systems, and components in the Maintenance Rule (a)(1) category
for the last 3 years.
14.
Site top ten issues list (if applicable).
15.
A list of operating experience evaluations for the last 3 years.
16.
Information of any common cause failure of components experienced in the last
5 years at your facility.
17.
List of Root Cause Evaluations associated with component failures or design
issues initiated/completed in the last 5 years.
18.
List of open operability evaluations.
19.
List of components/systems considered operable but degraded/nonconforming.
20.
Current management and engineering organizational chart.
21.
Electronic copies of Updated Final Safety Analysis Report, Technical
Specifications, Technical Specifications Bases, and Technical Requirements
Manual.
22.
Major one line electrical drawings (ac and dc) and key diagrams (paper copies).
23.
Electronic copy of Piping and Instrumentation Drawings (P&IDs), including the
table of content (if available).
II.
Information Requested (for the approximate 20 selected components) to be
Available by March 30, 2016, (will be reviewed by the team in the Regional
office during the week of April 4 - 8, 2016).
This information should be separated for each selected component, especially if
provided electronically (e.g., folder with component name that includes calculations,
condition reports, maintenance history, etc.).
1.
List of condition reports (corrective action documents) associated with each of
the selected components for the last 6 years.
 
COMPONENT DESIGN BASES INSPECTION REQUEST FOR INFORMATION
3
2.
The maintenance history (corrective, preventive, and elective) associated with
each of the selected components for the last 10 years.  Identify frequency of
preventive maintenance activities.
3.
Copies of calculations associated with each of the selected components (if not
previously provided), excluding data files.  Please review the calculations and
also provide copies of important referenced material (such as drawings,
engineering requests, and vendor letters).  Pipe stress calculations are excluded
from this request.
4.
System Health Reports, System Descriptions, Design Basis Documents, and/or
Training Lesson Plans associated with each of the selected components.
5.
A list of modifications, including equivalency evaluations and setpoint changes,
associated with each of the selected components.  This list should include a
descriptive paragraph on the purpose of the modification.  Please ensure this list
only includes design completed (not canceled) modifications.
6.
Copies of operability evaluations (open/closed for last 3 years) associated with
each of the selected components and plans for restoring operability, if applicable.
7.
Copies of selected operator work-around evaluations associated with each of the
selected components and plans for resolution, if applicable.
8.
Copies of any open temporary modifications associated with each of the selected
components, if applicable.
9.
Trend data on the selected electrical/mechanical components performance for
last 3 years (For example, pumps performance including in-service testing, other
vibration monitoring, oil sample results, etc., for valves:  stroke time and leak rate
results, etc.).
10.
Provide copies of the normal and abnormal operating procedures associated with
the selected components and selected scenarios.
11.
A copy of any internal/external self-assessments and associated corrective
action documents generated in preparation for the inspection.
12.
Copy of latest completed tests and surveillances for each component, for
example:
*
Pumps:  comprehensive test, quarterly test, flow balance, etc. 
*
Valves:  stroke time testing, diagnostic testing, leak testing, interlocks, etc.
*
Heat Exchangers/room coolers:  thermal performance, clean/inspect, fan
flows, etc.
Acceptance criteria basis calculations should also be included.
13.
A copy of engineering/operations related audits completed in the last 2 years.
 
COMPONENT DESIGN BASES INSPECTION REQUEST FOR INFORMATION
4
III.
Additional Information to be Provided on April 11, 2016, Onsite (for final selected
components) 
1.
During the in-office preparation activities, the team will be making final selections
and may identify additional information needed to support the inspection.  The
lead inspector will provide a list of the additional information needed during the
week of April 4 - 8, 2016.
2.
Schedule of any testing/maintenance activities to be conducted on the selected
components during the three onsite inspection weeks.
3.
One complete set of P&IDs (paper copies).
IV.
Information Requested to be Provided Throughout the Inspection
1.
Copies of any corrective action documents generated as a result of the teams
questions or queries during this inspection.
2.
Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily during the inspection
to each team member).
3.
Reference materials.  (make available if needed during all on-site weeks):
*
Individual Plant Examination/Probabilistic Risk Assessment Report;
*
Procurement documents for components selected (verify retrievable);
*
Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
*
Vendor manuals.
If you have questions regarding the information requested, please contact the lead inspector.
 
B. Hanson
-3-
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter, its enclosure, and your response (if any) will be available electronically for public
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management System (ADAMS). 
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
/RA/
Christine A. Lipa, Chief
Engineering Branch 2
Division of Reactor Safety 
Docket Nos. 50-373; 50-374
License Nos. NPF-11; NPF-18
Enclosure:
Information Request for CDBI 
cc:  Distribution via LISTSERV
DISTRIBUTION:
Janelle Jessie
RidsNrrDorlLpl3-2 Resource 
RidsNrrPMLaSalle
RidsNrrDirsIrib Resource
Cynthia Pederson
Darrell Roberts  
Richard Skokowski  
Allan Barker  
Carole Ariano  
Linda Linn  
DRPIII  
DRSIII  
Jim Clay  
Carmen Olteanu  
ADAMS Accession Number ML15345A263  
Publicly Available  
Non-Publicly Available  
Sensitive  
  Non-Sensitive  
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy  
OFFICE  
RIII  
   
RIII  
   
RIII  
   
RIII  
   
NAME  
NFeliz-Adorno:cl  
CLipa  
DATE  
12/10/15  
12/10/15  
OFFICIAL RECORD COPY
}}
}}

Latest revision as of 06:07, 10 January 2025

Request for Information for an NRC Triennial Baseline Component Design Bases Inspection; Inspection Report 05000373/2016007; 05000374/2016007 (Nja)
ML15345A263
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 12/10/2015
From: Christine Lipa
NRC/RGN-III/DRS/EB2
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2016007
Download: ML15345A263 (8)


See also: IR 05000373/2016007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

December 10, 2015

Mr. Bryan C. Hanson

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2 - REQUEST FOR INFORMATION

FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES

INSPECTION; INSPECTION REPORT 05000373/2016007; 05000374/2016007

Dear Mr. Hanson:

On April 11, 2016, the U. S. Nuclear Regulatory Commission (NRC) will begin a triennial

baseline Component Design Bases Inspection (CDBI) at the LaSalle County Station, Units 1

and 2. This inspection will be performed in accordance with NRC Baseline Inspection

Procedure 71111.21.

The CDBI focuses on the design, maintenance, and operation of risk-significant components

associated with one or more accident scenario or systems. The components to be reviewed

during this baseline inspection will be identified during the in-office preparation week that occurs

prior to the first onsite inspection week. In addition, operating experience issues, associated

with the component samples, will also be selected for review. The inspection team may request

scenarios to be performed on the simulator. This request would require support from your

simulator staff to validate scenarios, simulator time, and a crew to perform the actions which

would most likely occur during the second onsite week. The team will work closely with your

staff early on during the inspection process to ensure this activity can be accomplished with

minimal impact.

The inspection will include three weeks onsite. The inspection team will consist of six NRC

inspectors, of which five will focus on engineering/maintenance and one on operations. The

current inspection schedule is as follows:

Onsite weeks:

April 11 - 15, 2016;

April 25 - 29, 2016; and

May 9 - 13, 2016.

B. Hanson

-2-

The team will be preparing for the inspection, mainly during the week of April 4 - 8, 2016,

as discussed in the enclosure.

Experience with previous baseline design inspections of similar depth and length has shown

that this type of inspection is extremely resource intensive, both for the NRC inspectors and the

licensee staff. In order to minimize the inspection impact on the site and to ensure a productive

inspection for both parties, we have enclosed a request for information needed for the

inspection.

It is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The information request has been divided into three groups:

The first group lists information necessary for our initial inspection scoping activities.

This information should be provided to the lead inspector no later than February 29,

2016. By March 11, 2016, the lead inspector will communicate the initial selected set of

approximately 20 components.

The second group of documents requested is those items needed to support our in-

office preparation activities. This set of documents, including the calculations associated

with the initial selected components, should be provided to the lead inspector at the

Regional Office no later than March 30, 2016. During the inoffice preparation activities,

the team may identify additional information needed to support the inspection.

The last group includes the additional information above, as well as plant specific

reference material. This information should be available to the team onsite on April 11,

2016. It is also requested that corrective action documents and/or questions developed

during the inspection be provided to the lead inspector as the documents are generated.

The lead inspector for this inspection is Néstor J. Féliz-Adorno. We understand that our

licensing contact for this inspection is Dwi Murray of your organization. If there are any

questions about the inspection or the material requested in the enclosure, please contact

the lead inspector at (630) 829-9739, or via e-mail at Nestor.Feliz-Adorno@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

B. Hanson

-3-

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter, its enclosure, and your response (if any) will be available electronically for public

inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA/

Christine A. Lipa, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-373; 50-374

License Nos. NPF-11; NPF-18

Enclosure:

Information Request for CDBI

cc: Distribution via LISTSERV

COMPONENT DESIGN BASES INSPECTION REQUEST FOR INFORMATION

Enclosure

Inspection Report: 05000373/2016007; 05000374/2016007

Inspection Dates:

April 11 - 15, 2016;

April 25 - 29, 2016; and

May 9 - 13, 2016.

Inspection Procedure:

IP 71111.21 Component Design Bases Inspection

Lead Inspector:

Néstor J. Féliz-Adorno, Senior Reactor Engineer, DRS

(630) 829-9739

Nestor.Feliz-Adorno@nrc.gov

I.

Information Requested Prior to the Onsite Information Gathering/Inspection Week

The following information is requested by February 29, 2016, or sooner, to facilitate

inspection preparation. If you have any questions regarding this information, please

call the team leader as soon as possible. Unless stated otherwise, please provide the

information electronically in pdf files, Excel, or other searchable formats, preferably

on some portable electronic media (e.g., CD-ROM, DVD, etc.). The portable electronic

media should contain descriptive names, and be indexed and hyperlinked to facilitate

ease of use. Information in lists should contain enough information to be easily

understood by someone who has knowledge of light water reactor technology.

1.

Risk-ranking of top 250 components from your site specific probabilistic

safety analysis (PSA) sorted by Risk-Achievement Worth (RAW). Include

values for Birnbaum Importance, Risk-Reduction Worth, and Fussell-Veseley

(as applicable).

2.

Risk-ranking of top 100 containment-related components (i.e. ,Large Early

Release Frequency) from your site specific PSA sorted by RAW.

3.

Provide a list of the top 200 cut-sets from your PSA.

4.

Provide a list of the top 100 cut-sets for each initiator modeled in the PSA that

contributes more than 5 percent to the baseline plant core damage frequency.

5.

Copies of PSA system notebooks and latest PSA summary document.

6.

List of time critical operator actions. Identify those actions that do not have job

performance measures.

7.

Provide copies of the emergency operating procedures.

8.

If you have an External Events or Fire PSA Model, provide the information

requested in Items 1 and 2 for external events and fire. Provide narrative

description of each coded event (including fire, flood zone description).

9.

Electronic copy of the site Individual Plant Examination of External Events,

if available.

COMPONENT DESIGN BASES INSPECTION REQUEST FOR INFORMATION

2

10.

Any pre-existing evaluation or list of components and associated calculations

with low design margins, (i.e., pumps closest to the design limit for flow or

pressure, diesel generator close to design required output, heat exchangers

close to rated design heat removal etc.).

11.

List of available design (setup) margins in both the open and closed direction

(identify safety-related direction) for valves in the Motor-Operated Valve and

Air-Operated Valve Programs. Identify the basis for how the margin was

determined.

12.

List of high-risk Maintenance Rule systems/components based on engineering

or expert panel judgment (i.e., those systems/components not identified in the

PSA).

13.

Structures, systems, and components in the Maintenance Rule (a)(1) category

for the last 3 years.

14.

Site top ten issues list (if applicable).

15.

A list of operating experience evaluations for the last 3 years.

16.

Information of any common cause failure of components experienced in the last

5 years at your facility.

17.

List of Root Cause Evaluations associated with component failures or design

issues initiated/completed in the last 5 years.

18.

List of open operability evaluations.

19.

List of components/systems considered operable but degraded/nonconforming.

20.

Current management and engineering organizational chart.

21.

Electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, Technical Specifications Bases, and Technical Requirements

Manual.

22.

Major one line electrical drawings (ac and dc) and key diagrams (paper copies).

23.

Electronic copy of Piping and Instrumentation Drawings (P&IDs), including the

table of content (if available).

II.

Information Requested (for the approximate 20 selected components) to be

Available by March 30, 2016, (will be reviewed by the team in the Regional

office during the week of April 4 - 8, 2016).

This information should be separated for each selected component, especially if

provided electronically (e.g., folder with component name that includes calculations,

condition reports, maintenance history, etc.).

1.

List of condition reports (corrective action documents) associated with each of

the selected components for the last 6 years.

COMPONENT DESIGN BASES INSPECTION REQUEST FOR INFORMATION

3

2.

The maintenance history (corrective, preventive, and elective) associated with

each of the selected components for the last 10 years. Identify frequency of

preventive maintenance activities.

3.

Copies of calculations associated with each of the selected components (if not

previously provided), excluding data files. Please review the calculations and

also provide copies of important referenced material (such as drawings,

engineering requests, and vendor letters). Pipe stress calculations are excluded

from this request.

4.

System Health Reports, System Descriptions, Design Basis Documents, and/or

Training Lesson Plans associated with each of the selected components.

5.

A list of modifications, including equivalency evaluations and setpoint changes,

associated with each of the selected components. This list should include a

descriptive paragraph on the purpose of the modification. Please ensure this list

only includes design completed (not canceled) modifications.

6.

Copies of operability evaluations (open/closed for last 3 years) associated with

each of the selected components and plans for restoring operability, if applicable.

7.

Copies of selected operator work-around evaluations associated with each of the

selected components and plans for resolution, if applicable.

8.

Copies of any open temporary modifications associated with each of the selected

components, if applicable.

9.

Trend data on the selected electrical/mechanical components performance for

last 3 years (For example, pumps performance including in-service testing, other

vibration monitoring, oil sample results, etc., for valves: stroke time and leak rate

results, etc.).

10.

Provide copies of the normal and abnormal operating procedures associated with

the selected components and selected scenarios.

11.

A copy of any internal/external self-assessments and associated corrective

action documents generated in preparation for the inspection.

12.

Copy of latest completed tests and surveillances for each component, for

example:

Pumps: comprehensive test, quarterly test, flow balance, etc.

Valves: stroke time testing, diagnostic testing, leak testing, interlocks, etc.

Heat Exchangers/room coolers: thermal performance, clean/inspect, fan

flows, etc.

Acceptance criteria basis calculations should also be included.

13.

A copy of engineering/operations related audits completed in the last 2 years.

COMPONENT DESIGN BASES INSPECTION REQUEST FOR INFORMATION

4

III.

Additional Information to be Provided on April 11, 2016, Onsite (for final selected

components)

1.

During the in-office preparation activities, the team will be making final selections

and may identify additional information needed to support the inspection. The

lead inspector will provide a list of the additional information needed during the

week of April 4 - 8, 2016.

2.

Schedule of any testing/maintenance activities to be conducted on the selected

components during the three onsite inspection weeks.

3.

One complete set of P&IDs (paper copies).

IV.

Information Requested to be Provided Throughout the Inspection

1.

Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

2.

Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the inspection

to each team member).

3.

Reference materials. (make available if needed during all on-site weeks):

Individual Plant Examination/Probabilistic Risk Assessment Report;

Procurement documents for components selected (verify retrievable);

Plant procedures (normal, abnormal, emergency, surveillance, etc.); and

Vendor manuals.

If you have questions regarding the information requested, please contact the lead inspector.

B. Hanson

-3-

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter, its enclosure, and your response (if any) will be available electronically for public

inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA/

Christine A. Lipa, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-373; 50-374

License Nos. NPF-11; NPF-18

Enclosure:

Information Request for CDBI

cc: Distribution via LISTSERV

DISTRIBUTION:

Janelle Jessie

RidsNrrDorlLpl3-2 Resource

RidsNrrPMLaSalle

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Jim Clay

Carmen Olteanu

ADAMS Accession Number ML15345A263

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE

RIII

RIII

RIII

RIII

NAME

NFeliz-Adorno:cl

CLipa

DATE

12/10/15

12/10/15

OFFICIAL RECORD COPY