ML17341B170: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML17341B170 | | number = ML17341B170 | ||
| issue date = 12/07/2017 | | issue date = 12/07/2017 | ||
| title = | | title = Response to Notice of Violation (NRC Inspection Report 05000483/2017007) | ||
| author name = Farnholtz T | | author name = Farnholtz T | ||
| author affiliation = NRC/RGN-IV/DRS | | author affiliation = NRC/RGN-IV/DRS | ||
| addressee name = Diya F | | addressee name = Diya F | ||
| Line 21: | Line 21: | ||
Mr. Fadi Diya, Senior Vice President | Mr. Fadi Diya, Senior Vice President | ||
and Chief Nuclear Officer Ameren Missouri | and Chief Nuclear Officer | ||
Ameren Missouri | |||
Callaway Plant | Callaway Plant | ||
P.O. Box 620 | P.O. Box 620 | ||
Fulton, MO 65251 | Fulton, MO 65251 | ||
SUBJECT: CALLAWAY PLANT - RESPONSE TO NOTICE OF VIOLATION (NRC INSPECTION REPORT 05000483/2017007) | |||
SUBJECT: CALLAWAY PLANT - RESPONSE TO NOTICE OF VIOLATION | |||
(NRC INSPECTION REPORT 05000483/2017007) | |||
Dear Mr. Diya: | Dear Mr. Diya: | ||
On August 28, 2017, the U.S. Nuclear Regulatory Commission (NRC) cited Union Electric | |||
On August 28, 2017, the U.S. Nuclear Regulatory Commission (NRC) cited Union Electric | |||
Company for failure to restore compliance for a Technical Specification 5.4.1.a. violation | Company for failure to restore compliance for a Technical Specification 5.4.1.a. violation | ||
associated with the failure to perform preventative maintenance procedures to verify the | associated with the failure to perform preventative maintenance procedures to verify the | ||
operation and timing of the engineered safety feature transformer XNBOl load tap changer at the Callaway Plant. The Notice of Violation (Notice), enclosed within NRC Inspection Report 05000458/2017007 (ML17283A392), required you to respond in writing within 30 days. | operation and timing of the engineered safety feature transformer XNBOl load tap changer | ||
at the Callaway Plant. The Notice of Violation (Notice), enclosed within NRC Inspection | |||
Report 05000458/2017007 (ML17283A392), required you to respond in writing within 30 days. | |||
You responded to the Notice by letter, dated November 1, 2017 (ML17306A103). In your | You responded to the Notice by letter, dated November 1, 2017 (ML17306A103). In your | ||
response, you stated that the timing of engineered safety feature transformer XNBOl load tap changer was successfully tested on October 20, 2017, thus resolving the technical issue associated with the violation for not previously verifying the operation and timing of the load tap changer. You also responded that timing testing of engineered safety feature | response, you stated that the timing of engineered safety feature transformer XNBOl load tap | ||
changer was successfully tested on October 20, 2017, thus resolving the technical issue | |||
associated with the violation for not previously verifying the operation and timing of the load | |||
tap changer. You also responded that timing testing of engineered safety feature | |||
transformers XNBOl and XNB02 load tap changers will continue to be performed on a routine | transformers XNBOl and XNB02 load tap changers will continue to be performed on a routine | ||
basis, going forward. The letter also indicated that you are reviewing any NRC violations received since October 2015 for jobs that you are crediting for restoring compliance. The basis | basis, going forward. The letter also indicated that you are reviewing any NRC violations | ||
for selecting October 2015 was that this was the last time a comprehensive pre-Problem Identification and Resolution (Pl&R) inspection self-assessment was performed. In that assessment, the timeliness of corrective actions for NRC violations prior to October 2015 had | received since October 2015 for jobs that you are crediting for restoring compliance. The basis | ||
for selecting October 2015 was that this was the last time a comprehensive pre-Problem | |||
Identification and Resolution (Pl&R) inspection self-assessment was performed. In that | |||
assessment, the timeliness of corrective actions for NRC violations prior to October 2015 had | |||
been evaluated. | been evaluated. | ||
We have reviewed your response letter and find that it meets the requirements of | |||
10 CFR 2.201. The adequacy of your corrective actions to the Notice will be reviewed and, if | |||
found acceptable, will be closed in the resident inspector integrated inspection report. | |||
F. Diya | |||
2 | |||
This letter will be made available for public inspection and copying at | |||
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in | |||
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. | |||
Sincerely, | |||
/RA/ | |||
Thomas R. Farnholtz, Chief | |||
Engineering Branch 1 | |||
Division of Reactor Safety | Division of Reactor Safety | ||
Docket No. 50-483 License No. NPF-30 | Docket No. 50-483 | ||
License No. NPF-30 | |||
Electronic Distribution for Callaway Plant | Electronic Distribution for Callaway Plant | ||
ML17341B170 SUNSI Review ADAMS: | ML17341B170 | ||
SUNSI Review | |||
ADAMS: | |||
Non-Publicly Available | |||
Non-Sensitive | |||
Keyword: | |||
By: RAK | |||
Yes No | |||
Publicly Available | |||
Sensitive | |||
NRC-002 | |||
OFFICE | |||
SRI/EB1 | |||
C/EB1 | |||
C/PBB | |||
C:EB1 | |||
NAME | |||
RKopriva | |||
TFarnholtz | |||
NTaylor | |||
TFarnholtz | |||
SIGNATURE | |||
/RA/ TRF for | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
DATE | |||
12/7/17 | |||
12/7/17 | |||
12/7/17 | |||
12/7/17 | 12/7/17 | ||
}} | }} | ||
Latest revision as of 12:24, 7 January 2025
| ML17341B170 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 12/07/2017 |
| From: | Thomas Farnholtz Division of Reactor Safety IV |
| To: | Diya F Ameren Missouri |
| References | |
| IR 2017007 | |
| Download: ML17341B170 (3) | |
See also: IR 05000483/2017007
Text
December 7, 2017
Mr. Fadi Diya, Senior Vice President
and Chief Nuclear Officer
Ameren Missouri
Callaway Plant
P.O. Box 620
Fulton, MO 65251
SUBJECT: CALLAWAY PLANT - RESPONSE TO NOTICE OF VIOLATION
(NRC INSPECTION REPORT 05000483/2017007)
Dear Mr. Diya:
On August 28, 2017, the U.S. Nuclear Regulatory Commission (NRC) cited Union Electric
Company for failure to restore compliance for a Technical Specification 5.4.1.a. violation
associated with the failure to perform preventative maintenance procedures to verify the
operation and timing of the engineered safety feature transformer XNBOl load tap changer
at the Callaway Plant. The Notice of Violation (Notice), enclosed within NRC Inspection
Report 05000458/2017007 (ML17283A392), required you to respond in writing within 30 days.
You responded to the Notice by letter, dated November 1, 2017 (ML17306A103). In your
response, you stated that the timing of engineered safety feature transformer XNBOl load tap
changer was successfully tested on October 20, 2017, thus resolving the technical issue
associated with the violation for not previously verifying the operation and timing of the load
tap changer. You also responded that timing testing of engineered safety feature
transformers XNBOl and XNB02 load tap changers will continue to be performed on a routine
basis, going forward. The letter also indicated that you are reviewing any NRC violations
received since October 2015 for jobs that you are crediting for restoring compliance. The basis
for selecting October 2015 was that this was the last time a comprehensive pre-Problem
Identification and Resolution (Pl&R) inspection self-assessment was performed. In that
assessment, the timeliness of corrective actions for NRC violations prior to October 2015 had
been evaluated.
We have reviewed your response letter and find that it meets the requirements of
10 CFR 2.201. The adequacy of your corrective actions to the Notice will be reviewed and, if
found acceptable, will be closed in the resident inspector integrated inspection report.
F. Diya
2
This letter will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket No. 50-483
License No. NPF-30
Electronic Distribution for Callaway Plant
SUNSI Review
ADAMS:
Non-Publicly Available
Non-Sensitive
Keyword:
By: RAK
Yes No
Publicly Available
Sensitive
OFFICE
SRI/EB1
C/EB1
C/PBB
C:EB1
NAME
RKopriva
TFarnholtz
NTaylor
TFarnholtz
SIGNATURE
/RA/ TRF for
/RA/
/RA/
/RA/
DATE
12/7/17
12/7/17
12/7/17
12/7/17