| number = ML14085A250
| number = ML14085A250
| issue date = 03/24/2014
| issue date = 03/24/2014
| title = River Bend Station - Notification of NRC Component Design Bases Inspection (05000458/2014007) and Initial Request for Information
| title = Notification of NRC Component Design Bases Inspection (05000458/2014007) and Initial Request for Information
| author name = Farnholtz T R
| author name = Farnholtz T
| author affiliation = NRC/RGN-IV/DRS/EB-1
| author affiliation = NRC/RGN-IV/DRS/EB-1
| addressee name = Olson E
| addressee name = Olson E
Line 14: Line 14:
| page count = 7
| page count = 7
}}
}}
See also: [[followed by::IR 05000458/2014007]]
See also: [[see also::IR 05000458/2014007]]


=Text=
=Text=
{{#Wiki_filter:March 24, 2014  
{{#Wiki_filter:March 24, 2014  
  Mr. Eric Olson  Site Vice President  
   
Entergy Operations, Inc.   
Mr. Eric Olson  
   Site Vice President  
Entergy Operations, Inc.  
   
River Bend Station  
River Bend Station  
 
5485 US Highway 61N  
5485 US Highway 61N St. Francisville, LA  70775  
St. Francisville, LA  70775  
SUBJECT:
RIVER BEND STATION - NOTIFICATION OF NRC COMPONENT DESIGN
BASES INSPECTION (05000458/2014007) AND INITIAL REQUEST FOR
INFORMATION
   
   
SUBJECT: RIVER BEND STATION - NOTIFICATION OF NRC COMPONENT DESIGN BASES INSPECTION (05000458/2014007)
Dear Mr. Olson:  
AND INITIAL REQUEST FOR INFORMATION
Dear Mr. Olson:  
 
   
   
On July 8, 2014, the NRC will begin a triennial baseline Component Design Bases Inspection at  
On July 8, 2014, the NRC will begin a triennial baseline Component Design Bases Inspection at  
the River Bend Station.  A seven person team will perform this inspection using NRC Inspection  
the River Bend Station.  A seven person team will perform this inspection using NRC Inspection  
Procedure 71111.21, "Component Design Bases Inspection."
Procedure 71111.21, Component Design Bases Inspection.  
  The inspection focuses on components and operator actions that have high risk and low design  
   
The inspection focuses on components and operator actions that have high risk and low design  
margins.  The samples reviewed during this inspection will be identified during an information  
margins.  The samples reviewed during this inspection will be identified during an information  
gathering visit and during the subsequent in-office preparation week.  In addition, a number of  
gathering visit and during the subsequent in-office preparation week.  In addition, a number of  
operating experience issues will also be selected for review.   
operating experience issues will also be selected for review.   
  The inspection will include an information gathering site visit by the team leader and a senior  
   
The inspection will include an information gathering site visit by the team leader and a senior  
reactor analyst, and three weeks of onsite inspection by the team.  The inspection team will  
reactor analyst, and three weeks of onsite inspection by the team.  The inspection team will  
consist of seven members; a team leader, four
consist of seven members; a team leader, four NRC inspectors, and two contractors.  Five of  
NRC inspectors, and two contractors.  Five of the members will focus on engineering and one on operations.  The current inspection schedule  
the members will focus on engineering and one on operations.  The current inspection schedule  
 
is as follows:  
is as follows:  
  Onsite Information Gathering Visit:  July 8, 2014  
   
Onsite Information Gathering Visit:  July 8, 2014  
Preparation Week: July 14-18, 2014  
Preparation Week: July 14-18, 2014  
Onsite Weeks:  July 21-25, 2014; August 4-8, 2014; and August 18-22, 2014  
Onsite Weeks:  July 21-25, 2014; August 4-8, 2014; and August 18-22, 2014  
  The purpose of the information gathering visit is to meet with members of your staff to identify potential risk-significant systems, components, and operator actions.  The team leader will also request a tour of the plant with members of your operations staff and probabilistic safety  
   
The purpose of the information gathering visit is to meet with members of your staff to identify  
potential risk-significant systems, components, and operator actions.  The team leader will also  
request a tour of the plant with members of your operations staff and probabilistic safety  
assessment staff.  During the onsite weeks, several days of time will be needed on the plant-
assessment staff.  During the onsite weeks, several days of time will be needed on the plant-
referenced simulator in order to facilitate the development of operator action-based scenarios.   
referenced simulator in order to facilitate the development of operator action-based scenarios.   
Additional information and documentation needed to support the inspection will be identified during the inspection, including interviews with engineering managers, engineers, and probabilistic safety assessment staff.   
Additional information and documentation needed to support the inspection will be identified  
during the inspection, including interviews with engineering managers, engineers, and  
probabilistic safety assessment staff.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD.
ARLINGTON, TX  76011-4511
   


    UNITED STATES
E. Olson
NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX  76011-4511
- 2 -  
   
E. Olson - 2 -
   
   
  Our experience with these inspections has shown that they are extremely resource intensive, both for the NRC inspectors and the licensee staff.   
   
In order to minimize the inspection impact on the site and to ensure a productive inspection, we have enclosed a request for information  
Our experience with these inspections has shown that they are extremely resource intensive,  
both for the NRC inspectors and the licensee staff.  In order to minimize the inspection impact  
on the site and to ensure a productive inspection, we have enclosed a request for information  
needed for the inspection.  The request has been divided into three groups.  The first group lists  
needed for the inspection.  The request has been divided into three groups.  The first group lists  
information necessary for the information gathering visit and for general preparation.  This  
information necessary for the information gathering visit and for general preparation.  This  
information should be available to the regional office no later than June 23, 2014.  Insofar as possible, this information should be provided electronically to the team leader.  Since the inspection will be concentrated on high risk/low margin components, calculations associated  
information should be available to the regional office no later than June 23, 2014.  Insofar as  
possible, this information should be provided electronically to the team leader.  Since the  
inspection will be concentrated on high risk/low margin components, calculations associated  
with your list of high risk components should be available to review during the information  
with your list of high risk components should be available to review during the information  
gathering visit to assist in our selection of components based on available design margin.   
gathering visit to assist in our selection of components based on available design margin.   
  The second group of documents requested are those items that the team will need access to during the preparation week in order to finalize the samples to be inspected.  The third group  
   
lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection.  It is requested that this information be provided to the lead inspector as the  
The second group of documents requested are those items that the team will need access to  
information is generated during the inspection.  Additional requests by inspectors will be made throughout all three onsite weeks for specific documents needed to complete the review of that component/selection.  It is important that all of these documents are up to date and complete in  
during the preparation week in order to finalize the samples to be inspected.  The third group  
lists information necessary to aid the inspection team in tracking issues identified as a result of  
the inspection.  It is requested that this information be provided to the lead inspector as the  
information is generated during the inspection.  Additional requests by inspectors will be made  
throughout all three onsite weeks for specific documents needed to complete the review of that  
component/selection.  It is important that all of these documents are up to date and complete in  
order to minimize the number of additional documents requested during the preparation and/or  
order to minimize the number of additional documents requested during the preparation and/or  
the onsite portions of the inspection.  In order to facilitate the inspection, we request that a  
the onsite portions of the inspection.  In order to facilitate the inspection, we request that a  
contact individual be assigned to each inspector to ensure information requests, questions, and  
contact individual be assigned to each inspector to ensure information requests, questions, and  
concerns are addressed in a timely manner.   
concerns are addressed in a timely manner.   
  The lead inspector for this inspection is Gerond A. George.  We understand that our licensing  
   
engineer contact for this inspection is Kristi Huffstatler.
The lead inspector for this inspection is Gerond A. George.  We understand that our licensing  
  If there are any questions about the inspection or the requested materials, please contact the lead inspector by telephone at  
engineer contact for this inspection is Kristi Huffstatler. If there are any questions about the  
 
inspection or the requested materials, please contact the lead inspector by telephone at  
817-200-1562 or by e-mail at Gerond.George@nrc.gov.   
817-200-1562 or by e-mail at Gerond.George@nrc.gov.   
  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be  
   
made available electronically for  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be  
public inspection in the NRC Pub
made available electronically for public inspection in the NRC Public Document Room or from  
lic Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
the Publicly Available Records (PARS) component of NRCs document system (ADAMS).   
(the Public Electronic Reading Room).  
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the  
  Sincerely,  
Public Electronic Reading Room).  
  /RA/  Thomas R. Farnholtz, Chief Engineering Branch 1  
   
 
Sincerely,  
   
/RA/  
   
Thomas R. Farnholtz, Chief  
Engineering Branch 1  
Division of Reactor Safety  
Division of Reactor Safety  
   
   
   
   
Docket:  50-548 License:  NPF-47  
Docket:  50-548  
License:  NPF-47  
   
   
Enclosure:  Component Design Bases Inspection Request for Information  
Enclosure:  Component Design Bases Inspection Request for Information  
Electronic Distribution to River Bend Station


E. Olson
- 3 -
   
   
Electronic Distribution to River Bend Station
 
 
E. Olson - 3 - 
   
   
Electronic distribution by RIV
Electronic distribution by RIV:
: Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Steven.Reynolds@nrc.gov)  
Regional Administrator (Marc.Dapas@nrc.gov)  
Deputy Regional Administrator (Steven.Reynolds@nrc.gov)  
DRP Director (Kriss.Kennedy@nrc.gov)  
DRP Director (Kriss.Kennedy@nrc.gov)  
DRP Deputy Director (Troy.Pruett@nrc.gov)  
DRP Deputy Director (Troy.Pruett@nrc.gov)  
Acting DRS Director (Jeff.Clark@nrc.gov)  
Acting DRS Director (Jeff.Clark@nrc.gov)  
Acting DRS Deputy Director (Geoffrey.Miller@nrc.gov) Senior Resident Inspector (Grant.Larkin@nrc.gov) Resident Inspector (Andy.Barrett@nrc.gov)  
Acting DRS Deputy Director (Geoffrey.Miller@nrc.gov)  
Senior Resident Inspector (Grant.Larkin@nrc.gov)  
Resident Inspector (Andy.Barrett@nrc.gov)  
RBS Administrative Assistant (Lisa.Day@nrc.gov)  
RBS Administrative Assistant (Lisa.Day@nrc.gov)  
Branch Chief, DRP/C (Don.Allen@nrc.gov)   
Branch Chief, DRP/C (Don.Allen@nrc.gov)   
Senior Project Engineer (Ray.Azua@nrc.gov)  
Senior Project Engineer (Ray.Azua@nrc.gov)  
Project Engineer (Paul.Nizov@nrc.gov) Project Engineer (Michael.Langelier@nrc.gov)  
Project Engineer (Paul.Nizov@nrc.gov)  
Project Engineer (Michael.Langelier@nrc.gov)  
Public Affairs Officer (Victor.Dricks@nrc.gov)  
Public Affairs Officer (Victor.Dricks@nrc.gov)  
Public Affairs Officer (Lara.Uselding@nrc.gov)  
Public Affairs Officer (Lara.Uselding@nrc.gov)  
 
Project Manager (Alan.Wang@nrc.gov)  
Project Manager (Alan.Wang@nrc.gov) Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)  
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)  
 
RITS Coordinator (Marisa.Herrera@nrc.gov)  
ACES (R4Enforcement.Resource@nrc.gov)  
ACES (R4Enforcement.Resource@nrc.gov)  
Regional Counsel (Karla.Fuller@nrc.gov)  
Regional Counsel (Karla.Fuller@nrc.gov)  
Technical Support Assistant (Loretta.Williams@nrc.gov)  
Technical Support Assistant (Loretta.Williams@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV/ETA: OEDO (Ernesto.Quinones@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
RIV/ETA: OEDO (Ernesto.Quinones@nrc.gov)  
   
   
R:\\_REACTORS\\RBS\\2014\\RBS2014007-RFI-GAG.pdf
ML14085A250 
SUNSI Review
Initials:
Non-Sensitive
Sensitive
Publicly Available
Non-Publicly Available
RI:EB1
C:EB1
   
   
GGeorge
TFarnholtz
   
   
 
/RA/
/RA/
   
   
3/14/14
3/24/14
   
   
OFFICIAL RECORD COPY 
   
   
 
T-Telephone 
E-Email
   
   
F-Fax
   
   
R:\_REACTORS\RBS\2014\RBS2014007-RFI-GAG.pdf ML14085A250    SUNSI Review Initials:  Non-Sensitive
Sensitive  Publicly Available
Non-Publicly Available RI:EB1 C:EB1  GGeorge TFarnholtz  /RA/ /RA/  3/14/14 3/24/14  OFFICIAL RECORD COPY  T-Telephone  E-Email  F-Fax
 
  - 1 - Enclosure
Initial Request for Information
Component Design Bases Inspection River Bend Station
Inspection Report:  05000548/2014007 


   
   
Information Gathering Dates:  July 8, 2014
   
   
Inspection Dates: July 21-25, 2014; August 4-8, 2014; and August 18-22,  
- 1 -
2014   
Enclosure
Inspection Procedure: IP 71111.21, "Component Design Bases Inspection"
 
Initial Request for Information
Component Design Bases Inspection
River Bend Station
Inspection Report: 
05000548/2014007 
Information Gathering Dates:
July 8, 2014
Inspection Dates:
July 21-25, 2014; August 4-8, 2014; and August 18-22,  
2014  
   
Inspection Procedure:  
IP 71111.21, Component Design Bases Inspection  
Lead Inspector:
Gerond A. George, Senior Reactor Inspector
I.
Information Requested Prior to Information Gathering Visit (July 8, 2014) 
   
   
Lead Inspector:  Gerond A. George, Senior Reactor Inspector
The following information (Section I of this enclosure) should be sent to the Region IV  
  I. Information Requested Prior to Information Gathering Visit (July 8, 2014)
office in hard copy or electronic format (compact disc or Certrec IMS preferred), to the  
  The following information (Section I of this enclosure) should be sent to the Region IV office in hard copy or electronic format (compact disc or Certrec IMS preferred), to the attention of Gerond A. George, by June 23, 2014, to facilitate the reduction in the items  
attention of Gerond A. George, by June 23, 2014, to facilitate the reduction in the items  
to be selected for a final list following the information gathering visit.  The inspection  
to be selected for a final list following the information gathering visit.  The inspection  
team will finalize the selected list during the prep week using the additional documents  
team will finalize the selected list during the prep week using the additional documents  
requested in Section II of this enclosure.  The specific items selected from the lists shall  
requested in Section II of this enclosure.  The specific items selected from the lists shall  
be available and ready for review on the day  
be available and ready for review on the day indicated in this request.  *Please provide  
indicated in this request.  *Please provide requested documentation electronically in "pdf" files, Excel, or other searchable formats, if possible.  The information should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use.  Information in "lists" should contain enough  
requested documentation electronically in pdf files, Excel, or other searchable formats,  
if possible.  The information should contain descriptive names, and be indexed and  
hyperlinked to facilitate ease of use.  Information in "lists" should contain enough  
information to be easily understood by someone who has knowledge of boiling water  
information to be easily understood by someone who has knowledge of boiling water  
reactor technology.  If requested documents are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation during the first day of the onsite inspection.   
reactor technology.  If requested documents are large and only hard copy formats are  
  1. An excel spreadsheet of equipment basic events (with definitions) including  
available, please inform the inspector(s), and provide subject documentation during the  
importance measures sorted by risk ac
first day of the onsite inspection.   
hievement worth (RAW) and Fussell-Vesely (FV) from your internal events probabilistic risk assessment (PRA).  Include basic events with RAW value of 1.3 or greater.   
   
  2. Provide a list of the top 500 cut-sets from your PRA.   
1. An excel spreadsheet of equipment basic events (with definitions) including  
  3. Copies of PRA "system notebooks," and the latest PRA summary document.  
importance measures sorted by risk achievement worth (RAW) and Fussell-Vesely  
  4. An excel spreadsheet of PRA human action basic events or risk ranking of operator actions from your site specific PSA sorted  
(FV) from your internal events probabilistic risk assessment (PRA).  Include basic  
by RAW and FV.  Provide copies of your human reliability worksheets for these items.   
events with RAW value of 1.3 or greater.   
   
2. Provide a list of the top 500 cut-sets from your PRA.   
   
3. Copies of PRA system notebooks, and the latest PRA summary document.  
   
4. An excel spreadsheet of PRA human action basic events or risk ranking of operator  
actions from your site specific PSA sorted by RAW and FV.  Provide copies of your  
human reliability worksheets for these items.   
5. List of procedures used to accomplish operator actions associated with the basic
events in your PRA.
6. A list of all time-critical operator actions in procedures.
7. If you have an external events or fire PSA model, provide the information requested
in items 1-4 for external events and fire.


  5. List of procedures used to accomplish operator actions associated with the basic events in your PRA.
   
  6. A list of all time-critical operator actions in procedures.
   
7. If you have an external events or fire PSA model, provide the information requested in items 1-4 for external events and fire. 
- 2 -  
  - 2 - Enclosure
Enclosure
  8. Any pre-existing evaluation or list of components and associated calculations with low design margins, (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design required output, heat exchangers close to rated design heat removal, etc.).  
 
9. List of high risk maintenance rule systems/components and functions; based on engineering or expert panel judgment.  
8. Any pre-existing evaluation or list of components and associated calculations with  
 
low design margins, (i.e., pumps closest to the design limit for flow or pressure,  
10. Structure, system, and components in the Maintenance Rule (a)(1) category.  
diesel generator close to design required output, heat exchangers close to rated  
  11. Site top 10 issues list.  
design heat removal, etc.).  
  12. A list of operating experience evaluations for the last 3 years.   
  13. List of any common-cause failure evaluation of components in the last 5 years.  
9. List of high risk maintenance rule systems/components and functions; based on  
  14. List of root cause evaluations associated with component failures or design issues initiated/completed in the last 3 years.   
engineering or expert panel judgment.  
  15. A list of permanent and temporary modifications for the previous 3 years.   
  16. List of current "operator work arounds/burdens."
10. Structure, system, and components in the Maintenance Rule (a)(1) category.  
  17. A copy of any internal/external self-assessments and associated corrective action documents generated in preparation for the inspection.   
   
  18. A copy of engineering/operations related audits completed in the last 2 years.  
11. Site top 10 issues list.  
  19. Current management and engineering organizational charts.   
   
  20. List of licensee contacts for the inspection team with pager or phone numbers.  
12. A list of operating experience evaluations for the last 3 years.   
  II. Information Requested to be Available on First Day of Preparation Week  
   
13. List of any common-cause failure evaluation of components in the last 5 years.  
   
14. List of root cause evaluations associated with component failures or design issues  
initiated/completed in the last 3 years.   
   
15. A list of permanent and temporary modifications for the previous 3 years.   
   
16. List of current operator work arounds/burdens.  
   
17. A copy of any internal/external self-assessments and associated corrective action  
documents generated in preparation for the inspection.   
   
18. A copy of engineering/operations related audits completed in the last 2 years.  
   
19. Current management and engineering organizational charts.   
   
20. List of licensee contacts for the inspection team with pager or phone numbers.  
   
II.  
Information Requested to be Available on First Day of Preparation Week  
(July 14, 2014)  
(July 14, 2014)  
  1. An electronic copy of the Design Bases Documents for the selected components.  
   
  2. An electronic copy of the System Health notebooks for the selected components.  
1. An electronic copy of the Design Bases Documents for the selected components.  
  3. List of condition reports (corrective action documents) associated with each of the selected components for the last 5 years.  
   
  4. The corrective maintenance history associated with each of the selected components for the last 5 years.   
2. An electronic copy of the System Health notebooks for the selected components.  
 
   
5. Copies of calculations associated with each of the selected components (if not previously provided), excluding data files.  Please review the calculations and also provide copies of reference material (such as drawings, engineering requests, and  
3. List of condition reports (corrective action documents) associated with each of the  
 
selected components for the last 5 years.  
   
4. The corrective maintenance history associated with each of the selected components  
for the last 5 years.   
5. Copies of calculations associated with each of the selected components (if not  
previously provided), excluding data files.  Please review the calculations and also  
provide copies of reference material (such as drawings, engineering requests, and  
vendor letters).  
vendor letters).  
6. Copies of operability evaluations associated with each of the selected components
and plans for restoring operability, if applicable. 


  6. Copies of operability evaluations associated with each of the selected components and plans for restoring operability, if applicable. 
   
  - 3 - Enclosure
  7. Copies of selected operator work-around evaluations associated with each of the selected components and plans for resolution, if applicable.  
- 3 -  
  8. Lists of any open temporary modifications associated with each of the selected  
Enclosure
7. Copies of selected operator work-around evaluations associated with each of the  
selected components and plans for resolution, if applicable.  
   
8. Lists of any open temporary modifications associated with each of the selected  
components, if applicable.  
components, if applicable.  
9. Trend data on the selected electrical/mechanical components performance for last 3
years (for example, pumps performance including in-service testing, other vibration
monitoring, oil sample results, etc., as applicable).
10. List of motor operated valves (MOVs) in the program, design margin and risk
ranking.
11. List of air operated valves (AOVs) in the valve program, design and risk ranking.
12. Mechanical piping drawings for:
*
Engineered safety features
*
Emergency core cooling systems
*
Emergency diesel generators
13. Electrical one-line drawings for:
 
*
Offsite power/switchyard supplies
*
Normal AC power systems
*
Emergency AC/DC power systems including
*
120VAC power, and
*
125VDC/24VDC safety class systems
III.
Information Requested to be provided throughout the inspection.
1. Copies of any corrective action documents generated as a result of the teams
questions or queries during this inspection.
2. Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily during the inspection to
each team member).
3. Reference materials (available electronically and as needed during all onsite weeks):
*
General set of plant drawings
*
IPE/IPEEE/PRA report
*
Procurement documents for components selected
*
Plant procedures (normal, abnormal, emergency, surveillance, etc.)
*
Technical Specifications
*
Updated Final Safety Analysis Report
*
Vendor manuals


9. Trend data on the selected electrical/mechanical components' performance for last 3 years (for example, pumps' performance including in-service testing, other vibration monitoring, oil sample results, etc., as applicable).
10. List of motor operated valves (MOVs) in the program, design margin and risk ranking.
11. List of air operated valves (AOVs) in the valve program, design and risk ranking.
12. Mechanical piping drawings for:
* Engineered safety features
* Emergency core cooling systems
* Emergency diesel generators
13. Electrical one-line drawings for:
  * Offsite power/switchyard supplies
* Normal AC power systems
* Emergency AC/DC power systems including
* 120VAC power, and
* 125VDC/24VDC safety class systems
  III. Information Requested to be provided throughout the inspection.
  1. Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection.
2. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member).
3. Reference materials (available electronically and as needed during all onsite weeks):
* General set of plant drawings
* IPE/IPEEE/PRA report
* Procurement documents for components selected
* Plant procedures (normal, abnormal, emergency, surveillance, etc.)
* Technical Specifications
* Updated Final Safety Analysis Report
* Vendor manuals
 
 
  - 4 - Enclosure
Inspector Contact Information:
   
   
Gerond A. George Senior Reactor Inspector  
- 4 -
Enclosure
Inspector Contact Information:
Gerond A. George  
Senior Reactor Inspector  
(817)200-1562  
(817)200-1562  
Gerond.George@nrc.gov  
Gerond.George@nrc.gov  
   
   
   
   
Mailing Address:  
Mailing Address:  
  U.S. NRC, Region IV  
   
 
U.S. NRC, Region IV  
Attn:  Gerond A. George
Attn:  Gerond A. George  
1600 East Lamar Blvd.  
1600 East Lamar Blvd.  
Arlington, TX 76011-4511
Arlington, TX 76011-4511
}}
}}

Latest revision as of 22:29, 10 January 2025

Notification of NRC Component Design Bases Inspection (05000458/2014007) and Initial Request for Information
ML14085A250
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/24/2014
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Olson E
Entergy Operations
G. George
References
IR-14-007
Download: ML14085A250 (7)


See also: IR 05000458/2014007

Text

March 24, 2014

Mr. Eric Olson

Site Vice President

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION - NOTIFICATION OF NRC COMPONENT DESIGN

BASES INSPECTION (05000458/2014007) AND INITIAL REQUEST FOR

INFORMATION

Dear Mr. Olson:

On July 8, 2014, the NRC will begin a triennial baseline Component Design Bases Inspection at

the River Bend Station. A seven person team will perform this inspection using NRC Inspection

Procedure 71111.21, Component Design Bases Inspection.

The inspection focuses on components and operator actions that have high risk and low design

margins. The samples reviewed during this inspection will be identified during an information

gathering visit and during the subsequent in-office preparation week. In addition, a number of

operating experience issues will also be selected for review.

The inspection will include an information gathering site visit by the team leader and a senior

reactor analyst, and three weeks of onsite inspection by the team. The inspection team will

consist of seven members; a team leader, four NRC inspectors, and two contractors. Five of

the members will focus on engineering and one on operations. The current inspection schedule

is as follows:

Onsite Information Gathering Visit: July 8, 2014

Preparation Week: July 14-18, 2014

Onsite Weeks: July 21-25, 2014; August 4-8, 2014; and August 18-22, 2014

The purpose of the information gathering visit is to meet with members of your staff to identify

potential risk-significant systems, components, and operator actions. The team leader will also

request a tour of the plant with members of your operations staff and probabilistic safety

assessment staff. During the onsite weeks, several days of time will be needed on the plant-

referenced simulator in order to facilitate the development of operator action-based scenarios.

Additional information and documentation needed to support the inspection will be identified

during the inspection, including interviews with engineering managers, engineers, and

probabilistic safety assessment staff.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511

E. Olson

- 2 -

Our experience with these inspections has shown that they are extremely resource intensive,

both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact

on the site and to ensure a productive inspection, we have enclosed a request for information

needed for the inspection. The request has been divided into three groups. The first group lists

information necessary for the information gathering visit and for general preparation. This

information should be available to the regional office no later than June 23, 2014. Insofar as

possible, this information should be provided electronically to the team leader. Since the

inspection will be concentrated on high risk/low margin components, calculations associated

with your list of high risk components should be available to review during the information

gathering visit to assist in our selection of components based on available design margin.

The second group of documents requested are those items that the team will need access to

during the preparation week in order to finalize the samples to be inspected. The third group

lists information necessary to aid the inspection team in tracking issues identified as a result of

the inspection. It is requested that this information be provided to the lead inspector as the

information is generated during the inspection. Additional requests by inspectors will be made

throughout all three onsite weeks for specific documents needed to complete the review of that

component/selection. It is important that all of these documents are up to date and complete in

order to minimize the number of additional documents requested during the preparation and/or

the onsite portions of the inspection. In order to facilitate the inspection, we request that a

contact individual be assigned to each inspector to ensure information requests, questions, and

concerns are addressed in a timely manner.

The lead inspector for this inspection is Gerond A. George. We understand that our licensing

engineer contact for this inspection is Kristi Huffstatler. If there are any questions about the

inspection or the requested materials, please contact the lead inspector by telephone at

817-200-1562 or by e-mail at Gerond.George@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

made available electronically for public inspection in the NRC Public Document Room or from

the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-548

License: NPF-47

Enclosure: Component Design Bases Inspection Request for Information

Electronic Distribution to River Bend Station

E. Olson

- 3 -

Electronic distribution by RIV:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Steven.Reynolds@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

Acting DRS Director (Jeff.Clark@nrc.gov)

Acting DRS Deputy Director (Geoffrey.Miller@nrc.gov)

Senior Resident Inspector (Grant.Larkin@nrc.gov)

Resident Inspector (Andy.Barrett@nrc.gov)

RBS Administrative Assistant (Lisa.Day@nrc.gov)

Branch Chief, DRP/C (Don.Allen@nrc.gov)

Senior Project Engineer (Ray.Azua@nrc.gov)

Project Engineer (Paul.Nizov@nrc.gov)

Project Engineer (Michael.Langelier@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Alan.Wang@nrc.gov)

Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Ernesto.Quinones@nrc.gov)

R:\\_REACTORS\\RBS\\2014\\RBS2014007-RFI-GAG.pdf

ML14085A250

SUNSI Review

Initials:

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

RI:EB1

C:EB1

GGeorge

TFarnholtz

/RA/

/RA/

3/14/14

3/24/14

OFFICIAL RECORD COPY

T-Telephone

E-Email

F-Fax

- 1 -

Enclosure

Initial Request for Information

Component Design Bases Inspection

River Bend Station

Inspection Report: 05000548/2014007

Information Gathering Dates:

July 8, 2014

Inspection Dates:

July 21-25, 2014; August 4-8, 2014; and August 18-22,

2014

Inspection Procedure:

IP 71111.21, Component Design Bases Inspection

Lead Inspector:

Gerond A. George, Senior Reactor Inspector

I.

Information Requested Prior to Information Gathering Visit (July 8, 2014)

The following information (Section I of this enclosure) should be sent to the Region IV

office in hard copy or electronic format (compact disc or Certrec IMS preferred), to the

attention of Gerond A. George, by June 23, 2014, to facilitate the reduction in the items

to be selected for a final list following the information gathering visit. The inspection

team will finalize the selected list during the prep week using the additional documents

requested in Section II of this enclosure. The specific items selected from the lists shall

be available and ready for review on the day indicated in this request. *Please provide

requested documentation electronically in pdf files, Excel, or other searchable formats,

if possible. The information should contain descriptive names, and be indexed and

hyperlinked to facilitate ease of use. Information in "lists" should contain enough

information to be easily understood by someone who has knowledge of boiling water

reactor technology. If requested documents are large and only hard copy formats are

available, please inform the inspector(s), and provide subject documentation during the

first day of the onsite inspection.

1. An excel spreadsheet of equipment basic events (with definitions) including

importance measures sorted by risk achievement worth (RAW) and Fussell-Vesely

(FV) from your internal events probabilistic risk assessment (PRA). Include basic

events with RAW value of 1.3 or greater.

2. Provide a list of the top 500 cut-sets from your PRA.

3. Copies of PRA system notebooks, and the latest PRA summary document.

4. An excel spreadsheet of PRA human action basic events or risk ranking of operator

actions from your site specific PSA sorted by RAW and FV. Provide copies of your

human reliability worksheets for these items.

5. List of procedures used to accomplish operator actions associated with the basic

events in your PRA.

6. A list of all time-critical operator actions in procedures.

7. If you have an external events or fire PSA model, provide the information requested

in items 1-4 for external events and fire.

- 2 -

Enclosure

8. Any pre-existing evaluation or list of components and associated calculations with

low design margins, (i.e., pumps closest to the design limit for flow or pressure,

diesel generator close to design required output, heat exchangers close to rated

design heat removal, etc.).

9. List of high risk maintenance rule systems/components and functions; based on

engineering or expert panel judgment.

10. Structure, system, and components in the Maintenance Rule (a)(1) category.

11. Site top 10 issues list.

12. A list of operating experience evaluations for the last 3 years.

13. List of any common-cause failure evaluation of components in the last 5 years.

14. List of root cause evaluations associated with component failures or design issues

initiated/completed in the last 3 years.

15. A list of permanent and temporary modifications for the previous 3 years.

16. List of current operator work arounds/burdens.

17. A copy of any internal/external self-assessments and associated corrective action

documents generated in preparation for the inspection.

18. A copy of engineering/operations related audits completed in the last 2 years.

19. Current management and engineering organizational charts.

20. List of licensee contacts for the inspection team with pager or phone numbers.

II.

Information Requested to be Available on First Day of Preparation Week

(July 14, 2014)

1. An electronic copy of the Design Bases Documents for the selected components.

2. An electronic copy of the System Health notebooks for the selected components.

3. List of condition reports (corrective action documents) associated with each of the

selected components for the last 5 years.

4. The corrective maintenance history associated with each of the selected components

for the last 5 years.

5. Copies of calculations associated with each of the selected components (if not

previously provided), excluding data files. Please review the calculations and also

provide copies of reference material (such as drawings, engineering requests, and

vendor letters).

6. Copies of operability evaluations associated with each of the selected components

and plans for restoring operability, if applicable.

- 3 -

Enclosure

7. Copies of selected operator work-around evaluations associated with each of the

selected components and plans for resolution, if applicable.

8. Lists of any open temporary modifications associated with each of the selected

components, if applicable.

9. Trend data on the selected electrical/mechanical components performance for last 3

years (for example, pumps performance including in-service testing, other vibration

monitoring, oil sample results, etc., as applicable).

10. List of motor operated valves (MOVs) in the program, design margin and risk

ranking.

11. List of air operated valves (AOVs) in the valve program, design and risk ranking.

12. Mechanical piping drawings for:

Engineered safety features

Emergency core cooling systems

Emergency diesel generators

13. Electrical one-line drawings for:

Offsite power/switchyard supplies

Normal AC power systems

Emergency AC/DC power systems including

120VAC power, and

125VDC/24VDC safety class systems

III.

Information Requested to be provided throughout the inspection.

1. Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

2. Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the inspection to

each team member).

3. Reference materials (available electronically and as needed during all onsite weeks):

General set of plant drawings

IPE/IPEEE/PRA report

Procurement documents for components selected

Plant procedures (normal, abnormal, emergency, surveillance, etc.)

Technical Specifications

Updated Final Safety Analysis Report

Vendor manuals

- 4 -

Enclosure

Inspector Contact Information:

Gerond A. George

Senior Reactor Inspector

(817)200-1562

Gerond.George@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Gerond A. George

1600 East Lamar Blvd.

Arlington, TX 76011-4511