ML16090A346: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML16090A346
| number = ML16090A346
| issue date = 03/30/2016
| issue date = 03/30/2016
| title = Big Rock ISFSI - Financial Test for Decommissioning Funding Parent Guarantees for the Year Ending December 31, 2015, Per 10 CFR Part 30 App. a
| title = ISFSI - Financial Test for Decommissioning Funding Parent Guarantees for the Year Ending December 31, 2015, Per 10 CFR Part 30 App. a
| author name = McCann J F
| author name = Mccann J
| author affiliation = Entergy Nuclear Operations, Inc
| author affiliation = Entergy Nuclear Operations, Inc
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Entergy Nuclear Operations, Inc 1340 Echeclon Parkway Jackson, MS 39213 Tel   601-368-5667 John F. McCann Vice President  
{{#Wiki_filter:Entergy Nuclear Operations, Inc 1340 Echeclon Parkway Jackson, MS 39213 Tel 601-368-5667 John F. McCann Vice President - Regulatory Assurance ENOC-16-00007 March 30, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  
- Regulatory Assurance ENOC-16-00007 March 30, 2016   ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555
-0001  


==SUBJECT:==
==SUBJECT:==
Financial Test for Decommissioning Funding Parent Guarantees for the year ending December 31, 201 5 per       10 CFR Part 30 App. A Big Rock Point ISFSI         Docket Nos. 50-155 / 72-043     License No. DPR
Financial Test for Decommissioning Funding Parent Guarantees for the year ending December 31, 2015 per 10 CFR Part 30 App. A Big Rock Point ISFSI Docket Nos. 50-155 / 72-043 License No. DPR-6  
-6  


==Dear Sir or Madam:==
==Dear Sir or Madam:==
This letter provides the documents to support the continued use of a parent company guarantee to provide financial assurance of decommissioning funds for the Big Rock Point Independent Spent Fuel Storage Installation (ISFSI), pursuant to 10 CFR 50.75(e)(1)(iii)(B).
This letter provides the documents to support the continued use of a parent company guarantee to provide financial assurance of decommissioning funds for the Big Rock Point Independent Spent Fuel Storage Installation (ISFSI), pursuant to 10 CFR 50.75(e)(1)(iii)(B).
The licensee requested that Entergy Corporation's independent certified public accountant, Deloitte & Touche, LLP, evaluate the company's off
The licensee requested that Entergy Corporations independent certified public accountant, Deloitte & Touche, LLP, evaluate the companys off-balance sheet transactions and provide an opinion on whether those transactions could materially adversely affect the companys ability to pay for decommissioning costs, as required by 10 CFR 30 Appendix A. Deloitte & Touche, LLP stated that it does not provide opinions of that nature. Nevertheless, Entergy Corporations management has concluded that the amount of decommissioning-related parent guarantees at issue is very small as compared to the balance sheet amounts, and in its opinion, off-balance sheet transactions would not be expected to affect the companys ability to pay for decommissioning costs. The companys off-balance sheet transactions are described in its Securities and Exchange Commission filings, in particular, its 10-Q and 10-K filings.
-balance sheet transactions and provide an opinion on whether those transactions could materially adversely affect the company's ability to pay for decommissioning costs, as required by 10 CFR 30 Appendix A
Entergy Corporation previously had provided a $40 million guarantee in support of Vermont Yankee decommissioning financial assurance. Because the $40 million guarantee for Entergy Nuclear Vermont Yankee, LLC, is no longer needed for financial assurance, by {{letter dated|date=December 19, 2014|text=letter dated December 19, 2014}}, Entergy Corporation gave notice that it was canceling the $40 million guarantee effective 120 days after receipt of the notice by the NRC and Entergy Nuclear Vermont Yankee, LLC (Accession No. ML14358A252). In a letter from the NRC to Entergy Nuclear Operations, Inc, and Vermont Yankee Nuclear Power Station dated April 21, 2015, the NRC determined that Entergy Corporation had complied with the general requirements of 10 CFR 30 Appendix A (III)(A) and granted Entergy Corporation the right to cancel the $40 million
. Deloitte & Touche, LLP stated that it does not provide opinions of that nature. Nevertheless, Entergy Corporation's management has concluded that the amount of decommissioning
-related parent guarantees at issue is very small as compared to the balance sheet amounts
, and in its opinion, off
-balance sheet transactions would not be expected to affect the company's ability to pay for decommissioning costs. The company's off
-balance sheet transactions are described in its Securities and Exchange Commission filings, in particular, its 10
-Q and 10-K filings.


Entergy Corporation previously had provided a $40 million guarantee in support of Vermont Yankee decommissioning financial assurance. Because the $40 million guarantee for Entergy Nuclear Vermont Yankee, LLC, is no longer needed for financial assurance, by letter dated December 19, 2014, Entergy Corporation gave notice that it was canceling the $40 million guarantee effective 120 days after receipt of the notice by the NRC and Entergy Nuclear Vermont Yankee, LLC (Accession No. ML14358A252). In a letter from the NRC to Entergy Nuclear Operations, Inc
ENOC-16-00007 Page 2 of 6 parent company guarantee for Vermont Yankee (Accession No. ML15107A074). The Vermont Yankee parent company guarantee has been cancelled.
, and Vermont Yankee Nuclear Power Station dated April 21, 2015, the NRC determined that Entergy Corporation had complied with the general requirements of 10 CFR 30 Appendix A (III)(A) and granted Entergy Corporation the right to cancel the
There are no new commitments made in this letter. If you have any questions, please contact Mr. Guy Davant, Manager, Fleet Licensing Programs, 601-368-5756.
$40 million
Sincerely, JFM / ghd / ljs Attachments: 1. Entergy Corporation Parent Guarantee for Fiscal Year Ending 12/31/2015
 
: 2. Independent Accountants Report on Applying Agreed-Upon Procedures cc:
ENOC-16-00007 Page 2 of 6     parent company guarantee for Vermont Yankee (Accession No. ML15107A074).
Mr. J. A. Aluise (ENT)
The Vermont Yankee parent company guarantee has been cancelled.
Mr. C. Bakken (ECH)
There are no new commitments made in this letter. If you have any questions, please contact Mr. Guy Davant, Manager, Fleet Licensing Programs, 601
-368-5756. Sincerely
,   JFM / ghd / ljs Attachments:
: 1. Entergy Corporation Parent Guarantee for Fiscal Year Ending 12/31/2015
: 2. Independent Accountant's Report on Applying Agreed
-Upon Procedures cc: Mr. J. A. Aluise (ENT) Mr. C. Bakken (ECH)
Mr. B. E. Green (TMBR)
Mr. B. E. Green (TMBR)
Mr. D. J. Mannai (WPO)
Mr. D. J. Mannai (WPO)
Mr. T. G. Mitchell (ECH
Mr. T. G. Mitchell (ECH)
) Mr. L. Jager Smith (ECH)
Mr. L. Jager Smith (ECH)
Mr. C. J. Wamser (VTY)
Mr. C. J. Wamser (VTY)
Mr. A. J. Vitale (PAL)
Mr. A. J. Vitale (PAL)
Mr. J. A. Ventosa (ECH)
Mr. J. A. Ventosa (ECH)
Mr. T. Ngau (ECH)
Mr. T. Ngau (ECH)
USNRC Regional Administrator, Region I USNRC Regional Administrator, Region III USNRC Project Manager, Palisades USNRC Project Manager, Big Rock Point USNRC Project Manager, Vermont Yankee USNRC Resident Inspector, Vermont Yankee Michigan Department of Environmental Quality Michigan Public Service Commission Vermont Department of Public Service Downs Rachlin Martin PLLC / St. Johnsbury, VT


USNRC Regional Administrator, Region I USNRC Regional Administrator, Region III USNRC Project Manager, Palisades USNRC Project Manager, Big Rock Point USNRC Project Manager, Vermont Yankee USNRC Resident Inspector, Vermont Yankee Michigan Department of Environmental Quality Michigan Public Service Commission Vermont Department of Public Service Downs Rachlin Martin PLLC
ENOC-16-00007 Entergy Corporation Parent Guarantee for Fiscal Year Ending 12/31/2015
/ St. Johnsbury, VT


ENOC-16-00007 Attachment 1 Entergy Corporation Parent Guarantee for Fiscal Year Ending 12/31/2015
March 14, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington DC 20555-0001  
 
March 14, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington DC 20555
-0001


==Subject:==
==Subject:==
 
Entergy Corporation Parent - Guarantee of Funds for Decommissioning: Letter from Chief Financial Officer to Demonstrate Financial Assurance I am the chief financial officer of Entergy Corporation, 639 Loyola Avenue, New Orleans, LA 70113, a corporation. This letter is in support of this firms use of the financial test to demonstrate financial assurance, as specified in Title 10, Part 50, of the Code of Federal Regulations (10 CFR Part 50).
Entergy Corporation Parent  
- Guarantee of Funds for Decommissioning: Letter from Chief Financial Officer to Demonstrate Financial Assurance
 
I am the chief financial officer of Entergy Corporation, 639 Loyola Avenue, New Orleans, LA 70113, a corporation. This letter is in support of this firm's use of the financial test to demonstrate financial assurance, as specified in Title 10, Part 50, of the Code of Federal Regulations (10 CFR Part 50).
 
This firm guarantees, through the parent company guarantee submitted to demonstrate compliance under 10 CFR Part 50, the decommissioning of the following facility owned or operated by subsidiaries of this firm. The current cost estimate or certified amount for decommissioning, and the amount being guaranteed, is shown for the facility:
This firm guarantees, through the parent company guarantee submitted to demonstrate compliance under 10 CFR Part 50, the decommissioning of the following facility owned or operated by subsidiaries of this firm. The current cost estimate or certified amount for decommissioning, and the amount being guaranteed, is shown for the facility:
Name of   Location of Current   Amount Being Facility   Facility   Cost Estimate Guaranteed Big Rock Point Independent Spent Fuel Storage Installation License Nos. DPR
Name of Location of Current Amount Being Facility Facility Cost Estimate Guaranteed Big Rock Point Independent Spent Fuel Storage Installation License Nos. DPR-06, SFGL-16 Charlevoix, MI  
-06, SFGL-16   Charlevoix, MI
$ 2,430,0001  
  $   2,430,0001 $ 5,000,000 Entergy Corporation is required to file a Form 10
$ 5,000,000 Entergy Corporation is required to file a Form 10-K with the U.S. Securities and Exchange Commission for the latest fiscal year.
-K with the U.S. Securities and Exchange Commission for the latest fiscal year.
The fiscal year of Entergy Corporation ends on December 31st. The figures for the following items (Financial Test II) marked with an asterisk are derived from Entergy Corporation's independently audited, year-end financial statements and footnotes for the latest completed fiscal year, ended December 31, 2015.
 
I hereby certify that the content of this letter is true and correct to the best of my knowledge.
The fiscal year of Entergy Corporation ends on December 31 st. The figures for the following items (Financial Test II) marked with an asterisk are derived from Entergy Corporation's independently audited, year
Andrew S. Marsh Executive Vice President and Chief Financial Officer Date 1 See 10 CFR §72.30 filing for Big Rock Point, dated December 17, 2015, Accession No. ML15351A524  
-end financial statements and footnotes for the latest completed fiscal year, ended December 31, 2015
. I hereby certify that the content of this letter is true and correct to the best of my knowledge.
_____________________________
Andrew S. Marsh Executive Vice President and Chief Financial Officer
________________________
Date 1 See 10 CFR §72.30 filing for Big Rock Point, dated December 17, 2015, Accession No. ML15351A524


FINANCIAL TEST: ALTERNATIVE II (10 CFR Part 30 App. A. Section II A.2.)
FINANCIAL TEST: ALTERNATIVE II (10 CFR Part 30 App. A. Section II A.2.)
Entergy Corporation Parent Guarantee of Funds For Decommissioning Dollars in thousands
Entergy Corporation Parent Guarantee of Funds For Decommissioning Dollars in thousands
: 1. Guaranteed amount for Big Rock Point Independent Spent Fuel Storage Installation, License Nos. DPR-06, SFGL-16 (total cost of all cost estimates should be stated in paragraphs above)
: 1.
  $5,000 2. Current rating of most recent bond issuance of this firm Rating Baa3 corpora te credit rating as of October 9, 2015 Name of rating service Moody's  3. Date of issuance of bond July 1, 2015
Guaranteed amount for Big Rock Point Independent Spent Fuel Storage Installation, License Nos. DPR-06, SFGL-16 (total cost of all cost estimates should be stated in paragraphs above)  
: 4. Date of maturity of bond July 22, 2022
$5,000
 
: 2.
*5. Tangible net worth** (if any portion of estimates for decommissioning is included in total liabilities on your firm's financial statements, you may add the amount of that portion to this line)  
Current rating of most recent bond issuance of this firm Rating Baa3 corporate credit rating as of October 9, 2015 Name of rating service Moodys
    $9,186,191   *6. Total assets in United States (required only if less than 90 percent of firm's assets are located in the United States)             N/A Yes No 7. Is line 5 at least $21,000?
: 3.
X
Date of issuance of bond July 1, 2015
: 4.
Date of maturity of bond July 22, 2022  
*5.
Tangible net worth** (if any portion of estimates for decommissioning is included in total liabilities on your firms financial statements, you may add the amount of that portion to this line)  
$9,186,191  
*6.
Total assets in United States (required only if less than 90 percent of firms assets are located in the United States)
N/A Yes No
: 7. Is line 5 at least $21,000?
X
: 8. Is line 5 at least 6 times line 1?
: 8. Is line 5 at least 6 times line 1?
X
X
: 9. Are at least 90 percent of firm's assets located in the United States? If not, complete line 10.
: 9. Are at least 90 percent of firms assets located in the United States? If not, complete line 10.
X 10. Is line 6 at least 6 times line 1?
X
N/A
: 10. Is line 6 at least 6 times line 1?
: 11. Is the rating specified on line 2 "BBB" (including adjustments of + and  
N/A
-) or better (if issued by Standard & Poor's) or "Baa" (including adjustments of 1, 2, or 3) or better (if issued by Moody's)?
: 11. Is the rating specified on line 2 BBB (including adjustments of + and -) or better (if issued by Standard & Poors) or Baa (including adjustments of 1, 2, or 3) or better (if issued by Moodys)?
X   __________
X
* Denotes figures derived from financial statements.
* Denotes figures derived from financial statements.  
** Tangible net worth is defined as net worth minus goodwill, patents, trademarks, and copyrights.
** Tangible net worth is defined as net worth minus goodwill, patents, trademarks, and copyrights.  
 
RECONCILING SCHEDULE ENTERGY CORPORATION YEAR ENDED DECEMBER 31, 2015 Dollars in thousands Per    Recon-  Per  Line Number in    Financial ciling  CFO's CFO's Letter Statements Items  Letter  Total Assets
        $44,647,681    Less: Total Current Liabilities (3,089,958)


Less: Total Non
RECONCILING SCHEDULE ENTERGY CORPORATION YEAR ENDED DECEMBER 31, 2015 Dollars in thousands Per Recon-Per Line Number in Financial ciling CFOs CFOs Letter Statements Items Letter Total Assets
-Current Liabilities (31,982,747)
$44,647,681 Less: Total Current Liabilities (3,089,958)
Less: Total Non-Current Liabilities (31,982,747)
Less: Goodwill (377,172)
Less: Goodwill (377,172)
Less: Net Book Value of Big Rock Point (11,613)
Tangible Net Worth
$ 9,186,191
$ 9,186,191


Less: Net Book Value of Big Rock Point (11,613)      Tangible Net Worth    $ 9,186,191  $ 9,186,191 ENOC-16-00007 Attachment 2 Independent Accountant's Report on Applying Agreed
ENOC-16-00007 Independent Accountants Report on Applying Agreed-Upon Procedures  
-Upon Procedures


Entergy Nuclear Operations, Inc 1340 Echeclon Parkway Jackson, MS 39213 Tel   601-368-5667 John F. McCann Vice President  
Entergy Nuclear Operations, Inc 1340 Echeclon Parkway Jackson, MS 39213 Tel 601-368-5667 John F. McCann Vice President - Regulatory Assurance ENOC-16-00007 March 30, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  
- Regulatory Assurance ENOC-16-00007 March 30, 2016   ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555
-0001  


==SUBJECT:==
==SUBJECT:==
Financial Test for Decommissioning Funding Parent Guarantees for the year ending December 31, 201 5 per       10 CFR Part 30 App. A Big Rock Point ISFSI         Docket Nos. 50-155 / 72-043     License No. DPR
Financial Test for Decommissioning Funding Parent Guarantees for the year ending December 31, 2015 per 10 CFR Part 30 App. A Big Rock Point ISFSI Docket Nos. 50-155 / 72-043 License No. DPR-6  
-6  


==Dear Sir or Madam:==
==Dear Sir or Madam:==
This letter provides the documents to support the continued use of a parent company guarantee to provide financial assurance of decommissioning funds for the Big Rock Point Independent Spent Fuel Storage Installation (ISFSI), pursuant to 10 CFR 50.75(e)(1)(iii)(B).
This letter provides the documents to support the continued use of a parent company guarantee to provide financial assurance of decommissioning funds for the Big Rock Point Independent Spent Fuel Storage Installation (ISFSI), pursuant to 10 CFR 50.75(e)(1)(iii)(B).
The licensee requested that Entergy Corporation's independent certified public accountant, Deloitte & Touche, LLP, evaluate the company's off
The licensee requested that Entergy Corporations independent certified public accountant, Deloitte & Touche, LLP, evaluate the companys off-balance sheet transactions and provide an opinion on whether those transactions could materially adversely affect the companys ability to pay for decommissioning costs, as required by 10 CFR 30 Appendix A. Deloitte & Touche, LLP stated that it does not provide opinions of that nature. Nevertheless, Entergy Corporations management has concluded that the amount of decommissioning-related parent guarantees at issue is very small as compared to the balance sheet amounts, and in its opinion, off-balance sheet transactions would not be expected to affect the companys ability to pay for decommissioning costs. The companys off-balance sheet transactions are described in its Securities and Exchange Commission filings, in particular, its 10-Q and 10-K filings.
-balance sheet transactions and provide an opinion on whether those transactions could materially adversely affect the company's ability to pay for decommissioning costs, as required by 10 CFR 30 Appendix A
Entergy Corporation previously had provided a $40 million guarantee in support of Vermont Yankee decommissioning financial assurance. Because the $40 million guarantee for Entergy Nuclear Vermont Yankee, LLC, is no longer needed for financial assurance, by {{letter dated|date=December 19, 2014|text=letter dated December 19, 2014}}, Entergy Corporation gave notice that it was canceling the $40 million guarantee effective 120 days after receipt of the notice by the NRC and Entergy Nuclear Vermont Yankee, LLC (Accession No. ML14358A252). In a letter from the NRC to Entergy Nuclear Operations, Inc, and Vermont Yankee Nuclear Power Station dated April 21, 2015, the NRC determined that Entergy Corporation had complied with the general requirements of 10 CFR 30 Appendix A (III)(A) and granted Entergy Corporation the right to cancel the $40 million
. Deloitte & Touche, LLP stated that it does not provide opinions of that nature. Nevertheless, Entergy Corporation's management has concluded that the amount of decommissioning
-related parent guarantees at issue is very small as compared to the balance sheet amounts
, and in its opinion, off
-balance sheet transactions would not be expected to affect the company's ability to pay for decommissioning costs. The company's off
-balance sheet transactions are described in its Securities and Exchange Commission filings, in particular, its 10
-Q and 10-K filings.


Entergy Corporation previously had provided a $40 million guarantee in support of Vermont Yankee decommissioning financial assurance. Because the $40 million guarantee for Entergy Nuclear Vermont Yankee, LLC, is no longer needed for financial assurance, by letter dated December 19, 2014, Entergy Corporation gave notice that it was canceling the $40 million guarantee effective 120 days after receipt of the notice by the NRC and Entergy Nuclear Vermont Yankee, LLC (Accession No. ML14358A252). In a letter from the NRC to Entergy Nuclear Operations, Inc
ENOC-16-00007 Page 2 of 6 parent company guarantee for Vermont Yankee (Accession No. ML15107A074). The Vermont Yankee parent company guarantee has been cancelled.
, and Vermont Yankee Nuclear Power Station dated April 21, 2015, the NRC determined that Entergy Corporation had complied with the general requirements of 10 CFR 30 Appendix A (III)(A) and granted Entergy Corporation the right to cancel the
There are no new commitments made in this letter. If you have any questions, please contact Mr. Guy Davant, Manager, Fleet Licensing Programs, 601-368-5756.
$40 million
Sincerely, JFM / ghd / ljs Attachments: 1. Entergy Corporation Parent Guarantee for Fiscal Year Ending 12/31/2015
 
: 2. Independent Accountants Report on Applying Agreed-Upon Procedures cc:
ENOC-16-00007 Page 2 of 6     parent company guarantee for Vermont Yankee (Accession No. ML15107A074).
Mr. J. A. Aluise (ENT)
The Vermont Yankee parent company guarantee has been cancelled.
Mr. C. Bakken (ECH)
There are no new commitments made in this letter. If you have any questions, please contact Mr. Guy Davant, Manager, Fleet Licensing Programs, 601
-368-5756. Sincerely
,   JFM / ghd / ljs Attachments:
: 1. Entergy Corporation Parent Guarantee for Fiscal Year Ending 12/31/2015
: 2. Independent Accountant's Report on Applying Agreed
-Upon Procedures cc: Mr. J. A. Aluise (ENT) Mr. C. Bakken (ECH)
Mr. B. E. Green (TMBR)
Mr. B. E. Green (TMBR)
Mr. D. J. Mannai (WPO)
Mr. D. J. Mannai (WPO)
Mr. T. G. Mitchell (ECH
Mr. T. G. Mitchell (ECH)
) Mr. L. Jager Smith (ECH)
Mr. L. Jager Smith (ECH)
Mr. C. J. Wamser (VTY)
Mr. C. J. Wamser (VTY)
Mr. A. J. Vitale (PAL)
Mr. A. J. Vitale (PAL)
Mr. J. A. Ventosa (ECH)
Mr. J. A. Ventosa (ECH)
Mr. T. Ngau (ECH)
Mr. T. Ngau (ECH)
USNRC Regional Administrator, Region I USNRC Regional Administrator, Region III USNRC Project Manager, Palisades USNRC Project Manager, Big Rock Point USNRC Project Manager, Vermont Yankee USNRC Resident Inspector, Vermont Yankee Michigan Department of Environmental Quality Michigan Public Service Commission Vermont Department of Public Service Downs Rachlin Martin PLLC / St. Johnsbury, VT


USNRC Regional Administrator, Region I USNRC Regional Administrator, Region III USNRC Project Manager, Palisades USNRC Project Manager, Big Rock Point USNRC Project Manager, Vermont Yankee USNRC Resident Inspector, Vermont Yankee Michigan Department of Environmental Quality Michigan Public Service Commission Vermont Department of Public Service Downs Rachlin Martin PLLC
ENOC-16-00007 Entergy Corporation Parent Guarantee for Fiscal Year Ending 12/31/2015
/ St. Johnsbury, VT


ENOC-16-00007 Attachment 1 Entergy Corporation Parent Guarantee for Fiscal Year Ending 12/31/2015
March 14, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington DC 20555-0001  
 
March 14, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington DC 20555
-0001


==Subject:==
==Subject:==
 
Entergy Corporation Parent - Guarantee of Funds for Decommissioning: Letter from Chief Financial Officer to Demonstrate Financial Assurance I am the chief financial officer of Entergy Corporation, 639 Loyola Avenue, New Orleans, LA 70113, a corporation. This letter is in support of this firms use of the financial test to demonstrate financial assurance, as specified in Title 10, Part 50, of the Code of Federal Regulations (10 CFR Part 50).
Entergy Corporation Parent  
- Guarantee of Funds for Decommissioning: Letter from Chief Financial Officer to Demonstrate Financial Assurance
 
I am the chief financial officer of Entergy Corporation, 639 Loyola Avenue, New Orleans, LA 70113, a corporation. This letter is in support of this firm's use of the financial test to demonstrate financial assurance, as specified in Title 10, Part 50, of the Code of Federal Regulations (10 CFR Part 50).
 
This firm guarantees, through the parent company guarantee submitted to demonstrate compliance under 10 CFR Part 50, the decommissioning of the following facility owned or operated by subsidiaries of this firm. The current cost estimate or certified amount for decommissioning, and the amount being guaranteed, is shown for the facility:
This firm guarantees, through the parent company guarantee submitted to demonstrate compliance under 10 CFR Part 50, the decommissioning of the following facility owned or operated by subsidiaries of this firm. The current cost estimate or certified amount for decommissioning, and the amount being guaranteed, is shown for the facility:
Name of   Location of Current   Amount Being Facility   Facility   Cost Estimate Guaranteed Big Rock Point Independent Spent Fuel Storage Installation License Nos. DPR
Name of Location of Current Amount Being Facility Facility Cost Estimate Guaranteed Big Rock Point Independent Spent Fuel Storage Installation License Nos. DPR-06, SFGL-16 Charlevoix, MI  
-06, SFGL-16   Charlevoix, MI
$ 2,430,0001  
  $   2,430,0001 $ 5,000,000 Entergy Corporation is required to file a Form 10
$ 5,000,000 Entergy Corporation is required to file a Form 10-K with the U.S. Securities and Exchange Commission for the latest fiscal year.
-K with the U.S. Securities and Exchange Commission for the latest fiscal year.
The fiscal year of Entergy Corporation ends on December 31st. The figures for the following items (Financial Test II) marked with an asterisk are derived from Entergy Corporation's independently audited, year-end financial statements and footnotes for the latest completed fiscal year, ended December 31, 2015.
 
I hereby certify that the content of this letter is true and correct to the best of my knowledge.
The fiscal year of Entergy Corporation ends on December 31 st. The figures for the following items (Financial Test II) marked with an asterisk are derived from Entergy Corporation's independently audited, year
Andrew S. Marsh Executive Vice President and Chief Financial Officer Date 1 See 10 CFR §72.30 filing for Big Rock Point, dated December 17, 2015, Accession No. ML15351A524  
-end financial statements and footnotes for the latest completed fiscal year, ended December 31, 2015
. I hereby certify that the content of this letter is true and correct to the best of my knowledge.
_____________________________
Andrew S. Marsh Executive Vice President and Chief Financial Officer
________________________
Date 1 See 10 CFR §72.30 filing for Big Rock Point, dated December 17, 2015, Accession No. ML15351A524


FINANCIAL TEST: ALTERNATIVE II (10 CFR Part 30 App. A. Section II A.2.)
FINANCIAL TEST: ALTERNATIVE II (10 CFR Part 30 App. A. Section II A.2.)
Entergy Corporation Parent Guarantee of Funds For Decommissioning Dollars in thousands
Entergy Corporation Parent Guarantee of Funds For Decommissioning Dollars in thousands
: 1. Guaranteed amount for Big Rock Point Independent Spent Fuel Storage Installation, License Nos. DPR-06, SFGL-16 (total cost of all cost estimates should be stated in paragraphs above)
: 1.
  $5,000 2. Current rating of most recent bond issuance of this firm Rating Baa3 corpora te credit rating as of October 9, 2015 Name of rating service Moody's  3. Date of issuance of bond July 1, 2015
Guaranteed amount for Big Rock Point Independent Spent Fuel Storage Installation, License Nos. DPR-06, SFGL-16 (total cost of all cost estimates should be stated in paragraphs above)  
: 4. Date of maturity of bond July 22, 2022
$5,000
 
: 2.
*5. Tangible net worth** (if any portion of estimates for decommissioning is included in total liabilities on your firm's financial statements, you may add the amount of that portion to this line)  
Current rating of most recent bond issuance of this firm Rating Baa3 corporate credit rating as of October 9, 2015 Name of rating service Moodys
    $9,186,191   *6. Total assets in United States (required only if less than 90 percent of firm's assets are located in the United States)             N/A Yes No 7. Is line 5 at least $21,000?
: 3.
X
Date of issuance of bond July 1, 2015
: 4.
Date of maturity of bond July 22, 2022  
*5.
Tangible net worth** (if any portion of estimates for decommissioning is included in total liabilities on your firms financial statements, you may add the amount of that portion to this line)  
$9,186,191  
*6.
Total assets in United States (required only if less than 90 percent of firms assets are located in the United States)
N/A Yes No
: 7. Is line 5 at least $21,000?
X
: 8. Is line 5 at least 6 times line 1?
: 8. Is line 5 at least 6 times line 1?
X
X
: 9. Are at least 90 percent of firm's assets located in the United States? If not, complete line 10.
: 9. Are at least 90 percent of firms assets located in the United States? If not, complete line 10.
X 10. Is line 6 at least 6 times line 1?
X
N/A
: 10. Is line 6 at least 6 times line 1?
: 11. Is the rating specified on line 2 "BBB" (including adjustments of + and  
N/A
-) or better (if issued by Standard & Poor's) or "Baa" (including adjustments of 1, 2, or 3) or better (if issued by Moody's)?
: 11. Is the rating specified on line 2 BBB (including adjustments of + and -) or better (if issued by Standard & Poors) or Baa (including adjustments of 1, 2, or 3) or better (if issued by Moodys)?
X   __________
X
* Denotes figures derived from financial statements.
* Denotes figures derived from financial statements.  
** Tangible net worth is defined as net worth minus goodwill, patents, trademarks, and copyrights.
** Tangible net worth is defined as net worth minus goodwill, patents, trademarks, and copyrights.  
 
RECONCILING SCHEDULE ENTERGY CORPORATION YEAR ENDED DECEMBER 31, 2015 Dollars in thousands Per    Recon-  Per  Line Number in    Financial ciling  CFO's CFO's Letter Statements Items  Letter  Total Assets
        $44,647,681    Less: Total Current Liabilities (3,089,958)


Less: Total Non
RECONCILING SCHEDULE ENTERGY CORPORATION YEAR ENDED DECEMBER 31, 2015 Dollars in thousands Per Recon-Per Line Number in Financial ciling CFOs CFOs Letter Statements Items Letter Total Assets
-Current Liabilities (31,982,747)
$44,647,681 Less: Total Current Liabilities (3,089,958)
Less: Total Non-Current Liabilities (31,982,747)
Less: Goodwill (377,172)
Less: Goodwill (377,172)
Less: Net Book Value of Big Rock Point (11,613)
Tangible Net Worth
$ 9,186,191
$ 9,186,191


Less: Net Book Value of Big Rock Point (11,613)      Tangible Net Worth    $ 9,186,191  $ 9,186,191 ENOC-16-00007 Attachment 2 Independent Accountant's Report on Applying Agreed
ENOC-16-00007 Independent Accountants Report on Applying Agreed-Upon Procedures}}
-Upon Procedures}}

Latest revision as of 02:01, 10 January 2025

ISFSI - Financial Test for Decommissioning Funding Parent Guarantees for the Year Ending December 31, 2015, Per 10 CFR Part 30 App. a
ML16090A346
Person / Time
Site: Big Rock Point  File:Consumers Energy icon.png
Issue date: 03/30/2016
From: Mccann J
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
ENOC-16-00007
Download: ML16090A346 (7)


Text

Entergy Nuclear Operations, Inc 1340 Echeclon Parkway Jackson, MS 39213 Tel 601-368-5667 John F. McCann Vice President - Regulatory Assurance ENOC-16-00007 March 30, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Financial Test for Decommissioning Funding Parent Guarantees for the year ending December 31, 2015 per 10 CFR Part 30 App. A Big Rock Point ISFSI Docket Nos. 50-155 / 72-043 License No. DPR-6

Dear Sir or Madam:

This letter provides the documents to support the continued use of a parent company guarantee to provide financial assurance of decommissioning funds for the Big Rock Point Independent Spent Fuel Storage Installation (ISFSI), pursuant to 10 CFR 50.75(e)(1)(iii)(B).

The licensee requested that Entergy Corporations independent certified public accountant, Deloitte & Touche, LLP, evaluate the companys off-balance sheet transactions and provide an opinion on whether those transactions could materially adversely affect the companys ability to pay for decommissioning costs, as required by 10 CFR 30 Appendix A. Deloitte & Touche, LLP stated that it does not provide opinions of that nature. Nevertheless, Entergy Corporations management has concluded that the amount of decommissioning-related parent guarantees at issue is very small as compared to the balance sheet amounts, and in its opinion, off-balance sheet transactions would not be expected to affect the companys ability to pay for decommissioning costs. The companys off-balance sheet transactions are described in its Securities and Exchange Commission filings, in particular, its 10-Q and 10-K filings.

Entergy Corporation previously had provided a $40 million guarantee in support of Vermont Yankee decommissioning financial assurance. Because the $40 million guarantee for Entergy Nuclear Vermont Yankee, LLC, is no longer needed for financial assurance, by letter dated December 19, 2014, Entergy Corporation gave notice that it was canceling the $40 million guarantee effective 120 days after receipt of the notice by the NRC and Entergy Nuclear Vermont Yankee, LLC (Accession No. ML14358A252). In a letter from the NRC to Entergy Nuclear Operations, Inc, and Vermont Yankee Nuclear Power Station dated April 21, 2015, the NRC determined that Entergy Corporation had complied with the general requirements of 10 CFR 30 Appendix A (III)(A) and granted Entergy Corporation the right to cancel the $40 million

ENOC-16-00007 Page 2 of 6 parent company guarantee for Vermont Yankee (Accession No. ML15107A074). The Vermont Yankee parent company guarantee has been cancelled.

There are no new commitments made in this letter. If you have any questions, please contact Mr. Guy Davant, Manager, Fleet Licensing Programs, 601-368-5756.

Sincerely, JFM / ghd / ljs Attachments: 1. Entergy Corporation Parent Guarantee for Fiscal Year Ending 12/31/2015

2. Independent Accountants Report on Applying Agreed-Upon Procedures cc:

Mr. J. A. Aluise (ENT)

Mr. C. Bakken (ECH)

Mr. B. E. Green (TMBR)

Mr. D. J. Mannai (WPO)

Mr. T. G. Mitchell (ECH)

Mr. L. Jager Smith (ECH)

Mr. C. J. Wamser (VTY)

Mr. A. J. Vitale (PAL)

Mr. J. A. Ventosa (ECH)

Mr. T. Ngau (ECH)

USNRC Regional Administrator, Region I USNRC Regional Administrator, Region III USNRC Project Manager, Palisades USNRC Project Manager, Big Rock Point USNRC Project Manager, Vermont Yankee USNRC Resident Inspector, Vermont Yankee Michigan Department of Environmental Quality Michigan Public Service Commission Vermont Department of Public Service Downs Rachlin Martin PLLC / St. Johnsbury, VT

ENOC-16-00007 Entergy Corporation Parent Guarantee for Fiscal Year Ending 12/31/2015

March 14, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington DC 20555-0001

Subject:

Entergy Corporation Parent - Guarantee of Funds for Decommissioning: Letter from Chief Financial Officer to Demonstrate Financial Assurance I am the chief financial officer of Entergy Corporation, 639 Loyola Avenue, New Orleans, LA 70113, a corporation. This letter is in support of this firms use of the financial test to demonstrate financial assurance, as specified in Title 10, Part 50, of the Code of Federal Regulations (10 CFR Part 50).

This firm guarantees, through the parent company guarantee submitted to demonstrate compliance under 10 CFR Part 50, the decommissioning of the following facility owned or operated by subsidiaries of this firm. The current cost estimate or certified amount for decommissioning, and the amount being guaranteed, is shown for the facility:

Name of Location of Current Amount Being Facility Facility Cost Estimate Guaranteed Big Rock Point Independent Spent Fuel Storage Installation License Nos. DPR-06, SFGL-16 Charlevoix, MI

$ 2,430,0001

$ 5,000,000 Entergy Corporation is required to file a Form 10-K with the U.S. Securities and Exchange Commission for the latest fiscal year.

The fiscal year of Entergy Corporation ends on December 31st. The figures for the following items (Financial Test II) marked with an asterisk are derived from Entergy Corporation's independently audited, year-end financial statements and footnotes for the latest completed fiscal year, ended December 31, 2015.

I hereby certify that the content of this letter is true and correct to the best of my knowledge.

Andrew S. Marsh Executive Vice President and Chief Financial Officer Date 1 See 10 CFR §72.30 filing for Big Rock Point, dated December 17, 2015, Accession No. ML15351A524

FINANCIAL TEST: ALTERNATIVE II (10 CFR Part 30 App. A.Section II A.2.)

Entergy Corporation Parent Guarantee of Funds For Decommissioning Dollars in thousands

1.

Guaranteed amount for Big Rock Point Independent Spent Fuel Storage Installation, License Nos. DPR-06, SFGL-16 (total cost of all cost estimates should be stated in paragraphs above)

$5,000

2.

Current rating of most recent bond issuance of this firm Rating Baa3 corporate credit rating as of October 9, 2015 Name of rating service Moodys

3.

Date of issuance of bond July 1, 2015

4.

Date of maturity of bond July 22, 2022

  • 5.

Tangible net worth** (if any portion of estimates for decommissioning is included in total liabilities on your firms financial statements, you may add the amount of that portion to this line)

$9,186,191

  • 6.

Total assets in United States (required only if less than 90 percent of firms assets are located in the United States)

N/A Yes No

7. Is line 5 at least $21,000?

X

8. Is line 5 at least 6 times line 1?

X

9. Are at least 90 percent of firms assets located in the United States? If not, complete line 10.

X

10. Is line 6 at least 6 times line 1?

N/A

11. Is the rating specified on line 2 BBB (including adjustments of + and -) or better (if issued by Standard & Poors) or Baa (including adjustments of 1, 2, or 3) or better (if issued by Moodys)?

X

  • Denotes figures derived from financial statements.
    • Tangible net worth is defined as net worth minus goodwill, patents, trademarks, and copyrights.

RECONCILING SCHEDULE ENTERGY CORPORATION YEAR ENDED DECEMBER 31, 2015 Dollars in thousands Per Recon-Per Line Number in Financial ciling CFOs CFOs Letter Statements Items Letter Total Assets

$44,647,681 Less: Total Current Liabilities (3,089,958)

Less: Total Non-Current Liabilities (31,982,747)

Less: Goodwill (377,172)

Less: Net Book Value of Big Rock Point (11,613)

Tangible Net Worth

$ 9,186,191

$ 9,186,191

ENOC-16-00007 Independent Accountants Report on Applying Agreed-Upon Procedures

Entergy Nuclear Operations, Inc 1340 Echeclon Parkway Jackson, MS 39213 Tel 601-368-5667 John F. McCann Vice President - Regulatory Assurance ENOC-16-00007 March 30, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Financial Test for Decommissioning Funding Parent Guarantees for the year ending December 31, 2015 per 10 CFR Part 30 App. A Big Rock Point ISFSI Docket Nos. 50-155 / 72-043 License No. DPR-6

Dear Sir or Madam:

This letter provides the documents to support the continued use of a parent company guarantee to provide financial assurance of decommissioning funds for the Big Rock Point Independent Spent Fuel Storage Installation (ISFSI), pursuant to 10 CFR 50.75(e)(1)(iii)(B).

The licensee requested that Entergy Corporations independent certified public accountant, Deloitte & Touche, LLP, evaluate the companys off-balance sheet transactions and provide an opinion on whether those transactions could materially adversely affect the companys ability to pay for decommissioning costs, as required by 10 CFR 30 Appendix A. Deloitte & Touche, LLP stated that it does not provide opinions of that nature. Nevertheless, Entergy Corporations management has concluded that the amount of decommissioning-related parent guarantees at issue is very small as compared to the balance sheet amounts, and in its opinion, off-balance sheet transactions would not be expected to affect the companys ability to pay for decommissioning costs. The companys off-balance sheet transactions are described in its Securities and Exchange Commission filings, in particular, its 10-Q and 10-K filings.

Entergy Corporation previously had provided a $40 million guarantee in support of Vermont Yankee decommissioning financial assurance. Because the $40 million guarantee for Entergy Nuclear Vermont Yankee, LLC, is no longer needed for financial assurance, by letter dated December 19, 2014, Entergy Corporation gave notice that it was canceling the $40 million guarantee effective 120 days after receipt of the notice by the NRC and Entergy Nuclear Vermont Yankee, LLC (Accession No. ML14358A252). In a letter from the NRC to Entergy Nuclear Operations, Inc, and Vermont Yankee Nuclear Power Station dated April 21, 2015, the NRC determined that Entergy Corporation had complied with the general requirements of 10 CFR 30 Appendix A (III)(A) and granted Entergy Corporation the right to cancel the $40 million

ENOC-16-00007 Page 2 of 6 parent company guarantee for Vermont Yankee (Accession No. ML15107A074). The Vermont Yankee parent company guarantee has been cancelled.

There are no new commitments made in this letter. If you have any questions, please contact Mr. Guy Davant, Manager, Fleet Licensing Programs, 601-368-5756.

Sincerely, JFM / ghd / ljs Attachments: 1. Entergy Corporation Parent Guarantee for Fiscal Year Ending 12/31/2015

2. Independent Accountants Report on Applying Agreed-Upon Procedures cc:

Mr. J. A. Aluise (ENT)

Mr. C. Bakken (ECH)

Mr. B. E. Green (TMBR)

Mr. D. J. Mannai (WPO)

Mr. T. G. Mitchell (ECH)

Mr. L. Jager Smith (ECH)

Mr. C. J. Wamser (VTY)

Mr. A. J. Vitale (PAL)

Mr. J. A. Ventosa (ECH)

Mr. T. Ngau (ECH)

USNRC Regional Administrator, Region I USNRC Regional Administrator, Region III USNRC Project Manager, Palisades USNRC Project Manager, Big Rock Point USNRC Project Manager, Vermont Yankee USNRC Resident Inspector, Vermont Yankee Michigan Department of Environmental Quality Michigan Public Service Commission Vermont Department of Public Service Downs Rachlin Martin PLLC / St. Johnsbury, VT

ENOC-16-00007 Entergy Corporation Parent Guarantee for Fiscal Year Ending 12/31/2015

March 14, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington DC 20555-0001

Subject:

Entergy Corporation Parent - Guarantee of Funds for Decommissioning: Letter from Chief Financial Officer to Demonstrate Financial Assurance I am the chief financial officer of Entergy Corporation, 639 Loyola Avenue, New Orleans, LA 70113, a corporation. This letter is in support of this firms use of the financial test to demonstrate financial assurance, as specified in Title 10, Part 50, of the Code of Federal Regulations (10 CFR Part 50).

This firm guarantees, through the parent company guarantee submitted to demonstrate compliance under 10 CFR Part 50, the decommissioning of the following facility owned or operated by subsidiaries of this firm. The current cost estimate or certified amount for decommissioning, and the amount being guaranteed, is shown for the facility:

Name of Location of Current Amount Being Facility Facility Cost Estimate Guaranteed Big Rock Point Independent Spent Fuel Storage Installation License Nos. DPR-06, SFGL-16 Charlevoix, MI

$ 2,430,0001

$ 5,000,000 Entergy Corporation is required to file a Form 10-K with the U.S. Securities and Exchange Commission for the latest fiscal year.

The fiscal year of Entergy Corporation ends on December 31st. The figures for the following items (Financial Test II) marked with an asterisk are derived from Entergy Corporation's independently audited, year-end financial statements and footnotes for the latest completed fiscal year, ended December 31, 2015.

I hereby certify that the content of this letter is true and correct to the best of my knowledge.

Andrew S. Marsh Executive Vice President and Chief Financial Officer Date 1 See 10 CFR §72.30 filing for Big Rock Point, dated December 17, 2015, Accession No. ML15351A524

FINANCIAL TEST: ALTERNATIVE II (10 CFR Part 30 App. A.Section II A.2.)

Entergy Corporation Parent Guarantee of Funds For Decommissioning Dollars in thousands

1.

Guaranteed amount for Big Rock Point Independent Spent Fuel Storage Installation, License Nos. DPR-06, SFGL-16 (total cost of all cost estimates should be stated in paragraphs above)

$5,000

2.

Current rating of most recent bond issuance of this firm Rating Baa3 corporate credit rating as of October 9, 2015 Name of rating service Moodys

3.

Date of issuance of bond July 1, 2015

4.

Date of maturity of bond July 22, 2022

  • 5.

Tangible net worth** (if any portion of estimates for decommissioning is included in total liabilities on your firms financial statements, you may add the amount of that portion to this line)

$9,186,191

  • 6.

Total assets in United States (required only if less than 90 percent of firms assets are located in the United States)

N/A Yes No

7. Is line 5 at least $21,000?

X

8. Is line 5 at least 6 times line 1?

X

9. Are at least 90 percent of firms assets located in the United States? If not, complete line 10.

X

10. Is line 6 at least 6 times line 1?

N/A

11. Is the rating specified on line 2 BBB (including adjustments of + and -) or better (if issued by Standard & Poors) or Baa (including adjustments of 1, 2, or 3) or better (if issued by Moodys)?

X

  • Denotes figures derived from financial statements.
    • Tangible net worth is defined as net worth minus goodwill, patents, trademarks, and copyrights.

RECONCILING SCHEDULE ENTERGY CORPORATION YEAR ENDED DECEMBER 31, 2015 Dollars in thousands Per Recon-Per Line Number in Financial ciling CFOs CFOs Letter Statements Items Letter Total Assets

$44,647,681 Less: Total Current Liabilities (3,089,958)

Less: Total Non-Current Liabilities (31,982,747)

Less: Goodwill (377,172)

Less: Net Book Value of Big Rock Point (11,613)

Tangible Net Worth

$ 9,186,191

$ 9,186,191