| issue date = 04/18/1983
| issue date = 04/18/1983
| title = Application for Amend to Licenses DPR-58 & DPR-74 Changing Tech Spec Figure 6.2.2 Re Facility Organization by Deleting Senior Operator License from Operations Superintendent Licensed Functions
| title = Application for Amend to Licenses DPR-58 & DPR-74 Changing Tech Spec Figure 6.2.2 Re Facility Organization by Deleting Senior Operator License from Operations Superintendent Licensed Functions
| author name = HERING R F
| author name = Hering R
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name = DENTON H R
| addressee name = Denton H
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000315, 05000316
| docket = 05000315, 05000316
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:REGULATRYINFORMATION DISTRIBUTIO SYSTEM(RIDS)ACCESSION NBR:8300260 6DOC~DATE+83/00/18NORIZED;YESDOCKET'gFACIL:50315DonaldC,CookNuclearPowerPlant~Uni~t1~IndianaL0500031550316DonaldO,CookNuclearPowerPlantiUnit2iIndiana805000316AUTHINANEAUTHORAFFILIATION HERINGiR,F<
{{#Wiki_filter:REGULAT RY INFORMATION DISTRIBUTIO SYSTEM (RIDS)
Indiana8MichiganElectricCo~RECIP~NAMERECIPIENT AFFILIATION DENTONiH~R
ACCESSION NBR:8300260 6
~OfficeofNucl'earReactorRegulationgDirector
DOC ~ DATE+ 83/00/18 NO RIZED; YES DOCKET'g FACIL:50 315 Donald C,
Cook Nuclear Power Plant~
Uni~t 1~ Indiana L
05000315 50 316 Donald O,
Cook Nuclear Power Planti Unit 2i Indiana 8
05000316 AUTH INANE AUTHOR AFFILIATION HERINGiR,F<
Indiana 8 Michigan Electric Co ~
RECIP ~ NAME RECIPIENT AFFILIATION DENTONiH~R ~
Office of Nucl'ear Reactor Regul ationg Director


==SUBJECT:==
==SUBJECT:==
Application foramendtoLicesnesDPR~58,&DPR74changingTechSpecFigure6,2'refacilityorganiration by,deletingsenior'perator licensefromoperations superintenden't licesned.functions, DISTRIBUTION CODE:A001S'COPIESRECEIYED+LTR
Application for amend to Licesnes DPR~58,
'NCLgSIZE!"++TITlE:ORSubmittal:
& DPR 74 changing Tech Spec Figure 6,2 '
GeneralDistributionN0TEs:~/cled.+4/,too@RECIPIENT IDCODE/NAME NRRORB1BC01COPIESCTTRENCL77RECIPIENT IDCODE/NAME COPIESLT~TRENCLINTERNAL:
re facility organiration by, deleting senior'perator license from operations superintenden't licesned.functions, DISTRIBUTION CODE:
ELD/HDS3NRR/DLDIRNRA/METBEXTERNAL+
A001S
ACRSNRCPDRNTlSOQ09021011111611NRR/DE/MTEB NRR/DL/ORAB NRR/DSI/RAB RGN3LPDRNSIC0305111011TOTAlNUMBEROFCOPIESREQUIRED:
'COPIES RECEIYED+LTR
LTTR26ENCL20
'NCL g
,(Ihwjh4IIIlIIiii,i''ttt(iIIVIhwNgr()hrI>>If'ii'if4lih>>(IlII0httw(t)hiitI4IIgl,k'0,~ttii~4t,IHeeHoJlHt(yllI'I)Ih'1Ih'"Iitr>i(rfA(hi'iiIlhIiw(IilI'hlrPealillIt'IwilwLil44,4hhWIIilIKit"I444114IWH INDIANALMICHIGANELECTRICCOMPANYP.O.BOX18BOWLINGGREENSTATIONNEWYORK,N.Y.10004April18,1983AEP:NRC:0659ADonaldC.CookNuclearPlantUnitNos.1and2DocketNos.50-315and50-316LicenseNos.DPR-58andDPR-74TECHNICAL SPECIFICATION CHANGEREQUESTFACILITYSTAFFREQUIREMENTS Mr.Harold,R.Denton,DirectorOfficeofNuclearReactorRegulation U.S.NuclearRegulatory Commission Washington, D.C.20555
SIZE! "++
TITlE:
OR Submittal:
General Distr ibution N0TEs: ~/cled.+
4/, too@
RECIPIENT ID CODE/NAME NRR ORB1 BC 01 COPIES CTTR ENCL 7
7 RECIPIENT ID CODE/NAME COPIES LT~TR ENCL INTERNAL: ELD/HDS3 NRR/DL DIR NRA
/METB EXTERNAL+ ACRS NRC PDR NTlS OQ 09 02 1
0 1
1 1
1 1
6 1
1 NRR/DE/MTEB NRR/DL/ORAB NRR/DSI/RAB RGN3 LPDR NSIC 03 05 1
1 1
0 1
1 TOTAl NUMBER OF COPIES REQUIRED:
LTTR 26 ENCL 20


==DearMr.Denton:==
,( Ihwj h
ThisletteramendsoneoftheTechnical Specification (T/S)changerequestscontained inourletterNo.AEP:NRC:0659, datedMarch29,1982.Morespecifically, ChangeNo.3ofthatletterrequested thatanewspecification (T/S6.3.2)beissuedtoaccommodate thesituation ofthethennewCookPlantOperations Superintendent.
4 I
Thepreviously proposedT/S6.3.2wouldhavealloweda"fulltimeassistant" holdingaSROlicensetoperformtheOperations Superintendent's "licensed functions."
I Il I I
Inthisletterwearerequesting, first,achangetoT/SFigure6.2.2(Facility Organization) bydeletingtheSOL(SeniorOperatorLicense)intheOperations Superintendent's identification box.Secondly, wearerequesting achangetoT/S6.3.1toincludethestatement.
iii,i'
"and(3)theOperations Superintendent whoshallnotberequiredtoholdaFacilitySeniorReactorOperator's License."
'ttt(
TheAttachment tothislettercontainstherevisedT/Spages.J)hQ/ItshouldbenotedthattheattachedamendedpagesreflectthechangesPbeingproposedinthisletter,aswellasthosechangespreviously r4'roposed inourletterNo.AEP:NRC:0659.'ll changesareindicated byverticalbarsontherighthandmarginofthepageos/I,00.0oPresently, ourOperations Superintendent, whohaspreviously heldaSOLatanotherfacility, doesnothavehisSOLforourPlant.Heisscheduled toacquirehisSOLforourPlantpriortoOctober1,1983.However,uponreviewofthecurrentT/Srequirement wefeelthat.8304380368 830418IIIPDRADOCK050003is,IP...,.PDR 4\IIPl1I C~~Mr.HaroldR.onARC:0659Atherequirement isundulyrestrictive andinconflictwithnormalmanagerial prerogatives whichareusedtoassurethequalityofoursupervisory personnel.
i II V I hw Ng r() hr I>>
Thisargumenthasbeenrecentlysupported byanOakRidgestudy(asdescribed intheOctober18,1982,issueofINSIDENRC)whichsurveyedthenuclearindustry(including NRCpersonnel) onthesubjectofmanagerial licensing.
If'ii'if 4
Thisstudydepictedastrongopposition totheenforcement ofmanagerial licensing, andsupported insteadtohavetheNRCencourage theindustrytoassuremanagerial qualitybyestablishing standards ontherecruitment,
li h
: training, andassessment ofmanagers.
>> ( I l II 0 httw (t ) hi it I 4 I Ig l,
Furthermore, Revision3toNUREG-0452
k' 0,
("StandardTechnical Specifications forWestinghouse Pressurized WaterReactors"
~ tt ii
)doesnotrequirethatthefacility's Operations Superintendent betheholderofaSOL.Webelieve,basedonalloftheabove,thattherequested T/Schangeswillnotdegradethequalityofmanagement attheCookPlantandwillnotendangerthehealthandsafetyofthepublic.Weinterpret theproposedT/Schangestoconstitute ClassIandClassIIAmendments.
~
Therefore, wehaveenclosedacheckforonethousandsixhundreddollars($1,600).TheseproposedchangeshavebeenreviewedbythePlantNuclearSafetyReviewCommittee (PNSRC)andwillbereviewedbytheNuclearSafetyandDesignReviewCommittee (NSDRC)atitsnextmeeting.Thisdocumenthasbeenpreparedfollowing Corporate Procedures whichincorporate areasonable setofcontrolstoensureitsaccuracyandcompleteness priortosignature bytheundersigned.
4t,IH ee H
Verytrulyyours,R,F,HeringVicePresident cc:JohnE.Dolan-ColumbusM.P.AlexichR.W.Jurgensen W.G.Smith,Jr.-BridgmanR.C.CallenG.CharnoffNRCResidentInspector atCookPlant-Bridgman gnat~h1lt-h"e.t'Iall/hI~-hC~7'0~<FFh}}
o Jl H
t(y ll I
'I
)Ih
'1 Ih'" I it r >
i(r fA(hi
'ii I
lh I
i w(
Ii l I'h lr Pea lil l I
t
'I w
ilw L il 44, 4 hh WI I
il IK it "I
44 411 4
I WH
 
INDIANA L MICHIGAN ELECTRIC COMPANY P. O.
BOX 18 BOWLING GREEN STATION NEW YORK, N. Y. 10004 April 18, 1983 AEP:NRC: 0659A Donald C.
Cook Nuclear Plant Unit Nos.
1 and 2
Docket Nos. 50-315 and 50-316 License Nos.
DPR-58 and DPR-74 TECHNICAL SPECIFICATION CHANGE REQUEST FACILITY STAFF REQUIREMENTS Mr. Harold, R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
 
==Dear Mr. Denton:==
This letter amends one of the Technical Specification (T/S) change requests contained in our letter No. AEP:NRC:0659, dated March 29, 1982.
More specifically, Change No.
3 of that letter requested that a new specification (T/S 6.3.2) be issued to accommodate the situation of the then new Cook Plant Operations Superintendent.
The previously proposed T/S 6.3.2 would have allowed a "full time assistant" holding a SRO license to perform the Operations Superintendent's "licensed functions."
In this letter we are requesting, first, a change to T/S Figure 6.2.2 (Facility Organization) by deleting the SOL (Senior Operator License) in the Operations Superintendent's identification box.
: Secondly, we are requesting a
change to T/S 6.3.1 to include the statement.
"and (3) the Operations Superintendent who shall not be required to hold a Facility Senior Reactor Operator's License."
The Attachment to this letter contains the revised T/S pages.
J)hQ /
It should be noted that the attached amended pages reflect the changes P
being proposed in this letter, as well as those changes previously r
4'roposed in our letter No. AEP:NRC:0659.'ll changes are indicated by vertical bars on the right hand margin of the pageos
/I,00.0o Presently, our Operations Superintendent, who has previously held a SOL at another facility, does not have his SOL for our Plant.
He is scheduled to acquire his SOL for our Plant prior to October 1, 1983.
: However, upon review of the current T/S requirement we feel that.
8304380368 830418 I
II PDR ADOCK 050003is
,IP...,
PDR
 
4
\\
I I
P l1 I
 
C
~
~
Mr. Harold R.
on A
RC:0659A the requirement is unduly restrictive and in conflict with normal managerial prerogatives which are used to assure the quality of our supervisory personnel.
This argument has been recently supported by an Oak Ridge study (as described in the October 18, 1982, issue of INSIDE NRC) which surveyed the nuclear industry (including NRC personnel) on the subject of managerial licensing.
This study depicted a strong opposition to the enforcement of managerial licensing, and supported instead to have the NRC encourage the industry to assure managerial quality by establishing standards on the recruitment, training, and assessment of managers.
Furthermore, Revision 3 to NUREG-0452
("Standard Technical Specifications for Westinghouse Pressurized Water Reactors" ) does not require that the facility's Operations Superintendent be the holder of a SOL.
We believe, based on all of the above, that the requested T/S changes will not degrade the quality of management at the Cook Plant and will not endanger the health and safety of the public.
We interpret the proposed T/S changes to constitute Class I and Class II Amendments.
Therefore, we have enclosed a check for one thousand six hundred dollars
($1,600).
These proposed changes have been reviewed by the Plant Nuclear Safety Review Committee (PNSRC) and will be reviewed by the Nuclear Safety and Design Review Committee (NSDRC) at its next meeting.
This document has been prepared following Corporate Procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
Very truly yours, R, F, Hering Vice President cc:
John E. Dolan - Columbus M. P. Alexich R.
W. Jurgensen W. G. Smith, Jr. - Bridgman R. C. Callen G. Charnoff NRC Resident Inspector at Cook Plant Bridgman
 
gnat
~ h 1
lt -h" e
.t
'I all
/
h I ~
h C
~
7'0 ~ <
F F
h}}

Latest revision as of 16:24, 7 January 2025

Application for Amend to Licenses DPR-58 & DPR-74 Changing Tech Spec Figure 6.2.2 Re Facility Organization by Deleting Senior Operator License from Operations Superintendent Licensed Functions
ML17320A475
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/18/1983
From: Hering R
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML17320A476 List:
References
AEP:NRC:0659A, AEP:NRC:659A, NUDOCS 8304260368
Download: ML17320A475 (6)


Text

REGULAT RY INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:8300260 6

DOC ~ DATE+ 83/00/18 NO RIZED; YES DOCKET'g FACIL:50 315 Donald C,

Cook Nuclear Power Plant~

Uni~t 1~ Indiana L

05000315 50 316 Donald O,

Cook Nuclear Power Planti Unit 2i Indiana 8

05000316 AUTH INANE AUTHOR AFFILIATION HERINGiR,F<

Indiana 8 Michigan Electric Co ~

RECIP ~ NAME RECIPIENT AFFILIATION DENTONiH~R ~

Office of Nucl'ear Reactor Regul ationg Director

SUBJECT:

Application for amend to Licesnes DPR~58,

& DPR 74 changing Tech Spec Figure 6,2 '

re facility organiration by, deleting senior'perator license from operations superintenden't licesned.functions, DISTRIBUTION CODE:

A001S

'COPIES RECEIYED+LTR

'NCL g

SIZE! "++

TITlE:

OR Submittal:

General Distr ibution N0TEs: ~/cled.+

4/, too@

RECIPIENT ID CODE/NAME NRR ORB1 BC 01 COPIES CTTR ENCL 7

7 RECIPIENT ID CODE/NAME COPIES LT~TR ENCL INTERNAL: ELD/HDS3 NRR/DL DIR NRA

/METB EXTERNAL+ ACRS NRC PDR NTlS OQ 09 02 1

0 1

1 1

1 1

6 1

1 NRR/DE/MTEB NRR/DL/ORAB NRR/DSI/RAB RGN3 LPDR NSIC 03 05 1

1 1

0 1

1 TOTAl NUMBER OF COPIES REQUIRED:

LTTR 26 ENCL 20

,( Ihwj h

4 I

I Il I I

iii,i'

'ttt(

i II V I hw Ng r() hr I>>

If'ii'if 4

li h

>> ( I l II 0 httw (t ) hi it I 4 I Ig l,

k' 0,

~ tt ii

~

4t,IH ee H

o Jl H

t(y ll I

'I

)Ih

'1 Ih'" I it r >

i(r fA(hi

'ii I

lh I

i w(

Ii l I'h lr Pea lil l I

t

'I w

ilw L il 44, 4 hh WI I

il IK it "I

44 411 4

I WH

INDIANA L MICHIGAN ELECTRIC COMPANY P. O.

BOX 18 BOWLING GREEN STATION NEW YORK, N. Y. 10004 April 18, 1983 AEP:NRC: 0659A Donald C.

Cook Nuclear Plant Unit Nos.

1 and 2

Docket Nos. 50-315 and 50-316 License Nos.

DPR-58 and DPR-74 TECHNICAL SPECIFICATION CHANGE REQUEST FACILITY STAFF REQUIREMENTS Mr. Harold, R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Denton:

This letter amends one of the Technical Specification (T/S) change requests contained in our letter No. AEP:NRC:0659, dated March 29, 1982.

More specifically, Change No.

3 of that letter requested that a new specification (T/S 6.3.2) be issued to accommodate the situation of the then new Cook Plant Operations Superintendent.

The previously proposed T/S 6.3.2 would have allowed a "full time assistant" holding a SRO license to perform the Operations Superintendent's "licensed functions."

In this letter we are requesting, first, a change to T/S Figure 6.2.2 (Facility Organization) by deleting the SOL (Senior Operator License) in the Operations Superintendent's identification box.

Secondly, we are requesting a

change to T/S 6.3.1 to include the statement.

"and (3) the Operations Superintendent who shall not be required to hold a Facility Senior Reactor Operator's License."

The Attachment to this letter contains the revised T/S pages.

J)hQ /

It should be noted that the attached amended pages reflect the changes P

being proposed in this letter, as well as those changes previously r

4'roposed in our letter No. AEP:NRC:0659.'ll changes are indicated by vertical bars on the right hand margin of the pageos

/I,00.0o Presently, our Operations Superintendent, who has previously held a SOL at another facility, does not have his SOL for our Plant.

He is scheduled to acquire his SOL for our Plant prior to October 1, 1983.

However, upon review of the current T/S requirement we feel that.

8304380368 830418 I

II PDR ADOCK 050003is

,IP...,

PDR

4

\\

I I

P l1 I

C

~

~

Mr. Harold R.

on A

RC:0659A the requirement is unduly restrictive and in conflict with normal managerial prerogatives which are used to assure the quality of our supervisory personnel.

This argument has been recently supported by an Oak Ridge study (as described in the October 18, 1982, issue of INSIDE NRC) which surveyed the nuclear industry (including NRC personnel) on the subject of managerial licensing.

This study depicted a strong opposition to the enforcement of managerial licensing, and supported instead to have the NRC encourage the industry to assure managerial quality by establishing standards on the recruitment, training, and assessment of managers.

Furthermore, Revision 3 to NUREG-0452

("Standard Technical Specifications for Westinghouse Pressurized Water Reactors" ) does not require that the facility's Operations Superintendent be the holder of a SOL.

We believe, based on all of the above, that the requested T/S changes will not degrade the quality of management at the Cook Plant and will not endanger the health and safety of the public.

We interpret the proposed T/S changes to constitute Class I and Class II Amendments.

Therefore, we have enclosed a check for one thousand six hundred dollars

($1,600).

These proposed changes have been reviewed by the Plant Nuclear Safety Review Committee (PNSRC) and will be reviewed by the Nuclear Safety and Design Review Committee (NSDRC) at its next meeting.

This document has been prepared following Corporate Procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.

Very truly yours, R, F, Hering Vice President cc:

John E. Dolan - Columbus M. P. Alexich R.

W. Jurgensen W. G. Smith, Jr. - Bridgman R. C. Callen G. Charnoff NRC Resident Inspector at Cook Plant Bridgman

gnat

~ h 1

lt -h" e

.t

'I all

/

h I ~

h C

~

7'0 ~ <

F F

h