IR 05000293/2018410: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (9 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML18171A066 | | number = ML18171A066 | ||
| issue date = 06/20/2018 | | issue date = 06/20/2018 | ||
| title = | | title = Baseline Security Inspection Report 05000293/2018410 (Letter Only) | ||
| author name = | | author name = Mckinley R | ||
| author affiliation = NRC/RGN-I/DRS/PSB1 | | author affiliation = NRC/RGN-I/DRS/PSB1 | ||
| addressee name = Sullivan B | | addressee name = Sullivan B | ||
| Line 9: | Line 9: | ||
| docket = 05000293 | | docket = 05000293 | ||
| license number = DPR-035 | | license number = DPR-035 | ||
| contact person = McKinley | | contact person = McKinley R | ||
| document report number = IR 2018410 | | document report number = IR 2018410 | ||
| document type = Inspection Report, Letter | | document type = Inspection Report, Letter | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter | {{#Wiki_filter:June 20, 2018 | ||
==SUBJECT:== | |||
PILGRIM NUCLEAR POWER STATION - BASELINE SECURITY INSPECTION REPORT 05000293/2018410 | |||
SUBJECT: PILGRIM NUCLEAR POWER STATION - BASELINE SECURITY INSPECTION REPORT 05000293/2018410 | |||
==Dear Mr. Sullivan:== | ==Dear Mr. Sullivan:== | ||
On May 16, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Pilgrim Nuclear Power Station and discussed the results of this inspection with Mr. Steve Sarver, Security Manager, and other members of your staff. The results of this inspection are documented in the enclosed report. | On May 16, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Pilgrim Nuclear Power Station and discussed the results of this inspection with Mr. Steve Sarver, Security Manager, and other members of your staff. The results of this inspection are documented in the enclosed report. | ||
NRC inspectors documented one finding of very low security significance (Green) in this report | NRC inspectors documented one finding of very low security significance (Green) in this report. | ||
This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy. | |||
Power Station. | If you contest this violation or its significance, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Pilgrim Nuclear Power Station. | ||
A cross-cutting aspect was assigned to the finding in the area of Problem Identification and Resolution. Specifically, Pilgrim failed to take effective corrective actions to address issues in a timely manner commensurate with their safety significance [P.3]. | A cross-cutting aspect was assigned to the finding in the area of Problem Identification and Resolution. Specifically, Pilgrim failed to take effective corrective actions to address issues in a timely manner commensurate with their safety significance [P.3]. | ||
| Line 44: | Line 36: | ||
Enclosure(s) transmitted herewith contain(s) Sensitive, Unclassified, Non-Safeguards Information. When separated from the Enclosure(s), the transmittal document is decontrolled. If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I and the NRC resident inspector at the Pilgrim Nuclear Power Station. | Enclosure(s) transmitted herewith contain(s) Sensitive, Unclassified, Non-Safeguards Information. When separated from the Enclosure(s), the transmittal document is decontrolled. If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I and the NRC resident inspector at the Pilgrim Nuclear Power Station. | ||
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the | This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRCs Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. | ||
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response | However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). | ||
Sincerely,/RA/ | Sincerely, | ||
/RA/ | |||
Plant Support Branch | Raymond R. McKinley, Chief Plant Support Branch Division of Reactor Safety | ||
Docket No. 50-293 License No. DPR-35 | |||
Enclosure: | |||
Inspection Report 05000293/2018410 | Inspection Report 05000293/2018410 w/Attachment: Supplementary Information | ||
cc w/o encl; w/o OUO-SRI: | |||
Distribution via ListServ | |||
cc w/o encl; w/o OUO-SRI: Distribution via ListServ | |||
cc w/encl; w/OUO-SRI: | cc w/encl; w/OUO-SRI: | ||
S. Sarver, Protective Services Department Section Manager J. Giarrusso, SLO, Massachusetts Emergency | S. Sarver, Protective Services Department Section Manager J. Giarrusso, SLO, Massachusetts Emergency Management Agency (MEMA) | ||
Management Agency (MEMA) | |||
ML18171A066 (Cover letter) ADAMS ACCESSION NUMBER: ML18171A070 (Cover letter w/enclosure) | ML18171A066 (Cover letter) | ||
ADAMS ACCESSION NUMBER: ML18171A070 (Cover letter w/enclosure) | |||
Cover Letter SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter w/ Enclosure SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRS RI/DRP RI/DRS NAME J Bream S McCarver D Caron A Dimitriadis R McKinley DATE 05/11/2018 05/30/2018 06/13/2018 06/13/2018 06/15/2018 | Cover Letter SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter w/ Enclosure SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRS RI/DRP RI/DRS NAME J Bream S McCarver D Caron A Dimitriadis R McKinley DATE 05/11/2018 05/30/2018 06/13/2018 06/13/2018 06/15/2018 | ||
}} | }} | ||
Latest revision as of 18:15, 5 January 2025
| ML18171A066 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 06/20/2018 |
| From: | Raymond Mckinley Plant Support Branch 1 |
| To: | Brian Sullivan Entergy Nuclear Operations |
| McKinley R | |
| References | |
| IR 2018410 | |
| Download: ML18171A066 (3) | |
Text
June 20, 2018
SUBJECT:
PILGRIM NUCLEAR POWER STATION - BASELINE SECURITY INSPECTION REPORT 05000293/2018410
Dear Mr. Sullivan:
On May 16, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Pilgrim Nuclear Power Station and discussed the results of this inspection with Mr. Steve Sarver, Security Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.
NRC inspectors documented one finding of very low security significance (Green) in this report.
This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest this violation or its significance, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Pilgrim Nuclear Power Station.
A cross-cutting aspect was assigned to the finding in the area of Problem Identification and Resolution. Specifically, Pilgrim failed to take effective corrective actions to address issues in a timely manner commensurate with their safety significance [P.3].
Enclosure(s) transmitted herewith contain(s) Sensitive, Unclassified, Non-Safeguards Information. When separated from the Enclosure(s), the transmittal document is decontrolled. If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I and the NRC resident inspector at the Pilgrim Nuclear Power Station.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRCs Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/
Raymond R. McKinley, Chief Plant Support Branch Division of Reactor Safety
Docket No. 50-293 License No. DPR-35
Enclosure:
Inspection Report 05000293/2018410 w/Attachment: Supplementary Information
cc w/o encl; w/o OUO-SRI:
Distribution via ListServ
cc w/encl; w/OUO-SRI:
S. Sarver, Protective Services Department Section Manager J. Giarrusso, SLO, Massachusetts Emergency Management Agency (MEMA)
ML18171A066 (Cover letter)
ADAMS ACCESSION NUMBER: ML18171A070 (Cover letter w/enclosure)
Cover Letter SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter w/ Enclosure SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRS RI/DRP RI/DRS NAME J Bream S McCarver D Caron A Dimitriadis R McKinley DATE 05/11/2018 05/30/2018 06/13/2018 06/13/2018 06/15/2018