ML16057A123: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 02/26/2016
| issue date = 02/26/2016
| title = Cy 2015 Baseline Completion
| title = Cy 2015 Baseline Completion
| author name = Pruett T W
| author name = Pruett T
| author affiliation = NRC/RGN-IV/DRP
| author affiliation = NRC/RGN-IV/DRP
| addressee name = Morris S A
| addressee name = Morris S
| addressee affiliation = NRC/NRR/DIRS
| addressee affiliation = NRC/NRR/DIRS
| docket = 05000285
| docket = 05000285
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:CONTACT: Eric A. Ruesch, RIV/DRS   817-200-1126 February 26, 2016
{{#Wiki_filter:CONTACT: Eric A. Ruesch, RIV/DRS 817-200-1126 February 26, 2016 MEMORANDUM TO: Scott A. Morris, Director Division of Inspection and Regional Support Office of Nuclear Reactor Regulation FROM:
Troy W. Pruett, Director/RA/
Division of Reactor Projects Region IV


MEMORANDUM TO: Scott A. Morris, Director Division of Inspection and Regional Support Office of Nuclear Reactor Regulation FROM: Troy W. Pruett, Director/RA/ Division of Reactor Projects Region IV
==SUBJECT:==
CY 2015 BASELINE INSPECTION COMPLETION During calendar year 2015, Region IV completed the baseline inspection program at all regional reactor licensees subject to the Reactor Oversight Process (ROP). Attached is a table which provides the completion status of individual baseline procedures (IR Report 8a). Please note that this data includes only activities for which the region had responsibility; those portions of the baseline inspection program for which other Nuclear Regulatory Commission organizations are responsible are not included.
The Fort Calhoun Station was transitioned from the Inspection Manual Chapter (IMC) 0305 ROP to IMC 0350 oversight effective December 11, 2011. The station remained in IMC 0350 oversight until April 1, 2015. Inspection activities at Fort Calhoun Station during the first quarter of calendar year 2015 were managed by the IMC 0350 process; the minimum inspection requirements of the ROP did not apply until April 1.
If you have any questions or desire additional details, please contact me at 817-200-1248.
 
==Enclosure:==
Baseline Inspection Completion by Site (IR Report 8a) cc w/enclosure:
M. Scott, RI J. Clark, RIV M. Franke, RII R. Lantz, RIV P. Louden, RIII T. Hipschman, RIV M. Dapas, RIV J. Peralta, NRR K. Kennedy, RIV N. Sanfilippo, NRR A. Vegel, RIV
 
SUNSI Review By: ERuesch ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword:
RGN-002 OFFICE DRS/IPAT TL:DRS/IPAT D:DRS D:DRP NAME ERuesch THipschman AVegel TPruett SIGNATURE
/RA/
/RA/
/RA/
/RA/
DATE 2/25/16 2/25/16 2/25/16 2/26/16
 
Page:
Page 1 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Arkansas Nuclear One (ANO) 7111101 Adverse Weather Protection Annually 5
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2
2 Complete 7111105A Fire Protection - Annual Annually 2
1 Complete 7111105Q Fire Protection - Quarterly Annually 18 16 Complete 7111105T Fire Protection [Triennial]
Triennial 0
4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3
3 Complete 7111107A Heat Sink Performance Annually 1
1 Complete 7111107T Heat Sink Performance Triennial 3
2 Complete 7111108P Inservice Inspection Activities - PWR Annually 3
1 Complete 7111111A Annual Review Annually 1
1 Complete 7111111B Licensed Operator Requalification Biennial 2
1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 17 8
Complete 7111112Q Maintenance Effectiveness Annually 8
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 15 14 Complete 7111115 Operability Determinations Annually 26 19 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 47 23 Complete completed in previous year(s) 7111118 Plant Modifications Annually 5
3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 3
2 Complete 7111121 Component Design Bases Inspection Triennial 0
15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams)
Triennial 0
10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0
6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 21 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 5
1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1
1 Complete 7111406 Drill Evaluation Annually 3
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 2 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Arkansas Nuclear One (ANO) 71124.02 Occupational ALARA Biennial 2
1 Complete 71124.03 Airbore Radioactivity Biennial 1
1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1
1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1
1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1
1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog.
Biennial 1
1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 2
1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 24 24 Complete 71151 Performance Indicator Verfication Annually 3
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
1 Complete 71152 PI&R Annually 7
6 Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete 71153 Followup of Events and NOED Annually 5
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 3 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Callaway (CALL) 7111101 Adverse Weather Protection Annually 4
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2
2 Complete 7111105A Fire Protection - Annual Annually 1
1 Complete 7111105Q Fire Protection - Quarterly Annually 18 16 Complete 7111105T Fire Protection [Triennial]
Triennial 0
4 Complete by reference iaw IMC 0306 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 10 3
Complete 7111106 Flood Protection Measures Annually 4
3 Complete 7111107A Heat Sink Performance Annually 1
1 Complete 7111107T Heat Sink Performance Triennial 0
2 Not Applicable completion not required during this inspection cycle 7111108P Inservice Inspection Activities - PWR Annually 0
1 Complete completed in previous year(s) 7111111A Annual Review Annually 0
1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1
1 Complete 7111111Q Licensed Operator Requalification Annually 8
8 Complete 7111112Q Maintenance Effectiveness Annually 8
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 18 14 Complete 7111115 Operability Determinations Annually 17 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0
23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 3
3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 2
2 Complete 7111121 Component Design Bases Inspection Triennial 26 15 Complete completed in previous year(s) 7111121M CDBI (Teams)
Triennial 0
10 Complete 7111121N CDBI Programs Triennial 0
6 Complete 7111122 Surveillance Testing Annually 18 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 4
1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1
1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 4 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Callaway (CALL) 71124.02 Occupational ALARA Biennial 2
1 Complete 71124.03 Airbore Radioactivity Biennial 1
1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1
1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1
1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1
1 Complete 71124.07 Rad. Environ. Monitoring Prog.
Biennial 1
1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1
1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
1 Complete 71152 PI&R Annually 6
6 Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 4
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 5 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Cooper (CNS) 7111101 Adverse Weather Protection Annually 6
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 13 12 Complete 7111104S Equipment Alignment Semiannually 2
2 Complete 7111105A Fire Protection - Annual Annually 1
1 Complete 7111105Q Fire Protection - Quarterly Annually 17 16 Complete 7111105T Fire Protection [Triennial]
Triennial 0
4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3
3 Complete 7111107A Heat Sink Performance Annually 1
1 Complete 7111107T Heat Sink Performance Triennial 3
2 Complete 7111108G Inservice Inspection Activities - BWR Annually 0
1 Complete completed in previous year(s) 7111111A Annual Review Annually 0
1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1
1 Complete 7111111Q Licensed Operator Requalification Annually 8
8 Complete 7111112Q Maintenance Effectiveness Annually 9
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 17 14 Complete 7111115 Operability Determinations Annually 18 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0
23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 6
3 Complete 7111119 Post Maintenance Testing Annually 22 20 Complete 7111120 Refueling and Other Outage Activities Annually 1
2 Complete by reference iaw IMC 0306 7111121 Component Design Bases Inspection Triennial 22 15 Complete 7111121M CDBI (Teams)
Triennial 0
10 Complete 7111121N CDBI Programs Triennial 0
6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 16 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 8
1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 2
1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 6 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Cooper (CNS) 71124.02 Occupational ALARA Biennial 2
1 Complete 71124.03 Airbore Radioactivity Biennial 1
1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1
1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1
1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1
1 Complete 71124.07 Rad. Environ. Monitoring Prog.
Biennial 1
1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1
1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
1 Complete 71152 PI&R Annually 8
6 Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete 71153 Followup of Events and NOED Annually 6
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 7 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Comanche Peak (CP) 7111101 Adverse Weather Protection Annually 4
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 13 12 Complete 7111104S Equipment Alignment Semiannually 2
2 Complete 7111105A Fire Protection - Annual Annually 1
1 Complete 7111105Q Fire Protection - Quarterly Annually 17 16 Complete 7111105T Fire Protection [Triennial]
Triennial 6
4 Complete completed in previous year(s) 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 3
3 Complete 7111107A Heat Sink Performance Annually 1
1 Complete 7111107T Heat Sink Performance Triennial 4
2 Complete completed in previous year(s) 7111108P Inservice Inspection Activities - PWR Annually 1
1 Complete 7111111A Annual Review Annually 0
1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1
1 Complete 7111111Q Licensed Operator Requalification Annually 8
8 Complete 7111112Q Maintenance Effectiveness Annually 8
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 16 14 Complete 7111115 Operability Determinations Annually 22 19 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0
23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 3
3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 1
2 Complete by reference iaw IMC 0306 7111121 Component Design Bases Inspection Triennial 22 15 Complete 7111121M CDBI (Teams)
Triennial 0
10 Complete 7111121N CDBI Programs Triennial 0
6 Complete 7111122 Surveillance Testing Annually 18 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 2
1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1
1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 8 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Comanche Peak (CP) 71124.02 Occupational ALARA Biennial 2
1 Complete 71124.03 Airbore Radioactivity Biennial 1
1 Complete 71124.04 Occupational Dose Assessment Biennial 1
1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1
1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1
1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog.
Biennial 1
1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1
1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 24 24 Complete 71151 Performance Indicator Verfication Annually 3
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
1 Complete 71152 PI&R Annually 6
6 Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete 71153 Followup of Events and NOED Annually 9
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 9 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Diablo Canyon (DIAB) 7111101 Adverse Weather Protection Annually 6
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2
2 Complete 7111105A Fire Protection - Annual Annually 2
1 Complete 7111105Q Fire Protection - Quarterly Annually 17 16 Complete 7111105T Fire Protection [Triennial]
Triennial 0
4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 4
3 Complete 7111107A Heat Sink Performance Annually 1
1 Complete 7111107T Heat Sink Performance Triennial 0
2 Not Applicable completion not required during this inspection cycle 7111108P Inservice Inspection Activities - PWR Annually 1
1 Complete 7111111A Annual Review Annually 1
1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1
1 Complete 7111111Q Licensed Operator Requalification Annually 10 8
Complete 7111112Q Maintenance Effectiveness Annually 8
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 20 14 Complete 7111115 Operability Determinations Annually 19 19 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 43 23 Complete completed in previous year(s) 7111118 Plant Modifications Annually 7
3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 2
2 Complete 7111121 Component Design Bases Inspection Triennial 0
15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams)
Triennial 0
10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0
6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 24 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 16 1
Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1
1 Complete 7111406 Drill Evaluation Annually 4
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 10 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Diablo Canyon (DIAB) 71124.02 Occupational ALARA Biennial 2
1 Complete 71124.03 Airbore Radioactivity Biennial 1
1 Complete 71124.04 Occupational Dose Assessment Biennial 1
1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1
1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1
1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog.
Biennial 1
1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1
1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 24 24 Complete 71151 Performance Indicator Verfication Annually 3
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
1 Complete 71152 PI&R Annually 7
6 Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 10 1
Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 11 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Fort Calhoun (FCS) 7111101 Adverse Weather Protection Annually 7
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 15 12 Complete 7111104S Equipment Alignment Semiannually 3
2 Complete 7111105A Fire Protection - Annual Annually 1
1 Complete 7111105Q Fire Protection - Quarterly Annually 22 16 Complete 7111105T Fire Protection [Triennial]
Triennial 0
4 Complete by reference iaw IMC 0306 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 5
3 Complete 7111106 Flood Protection Measures Annually 4
3 Complete 7111107A Heat Sink Performance Annually 2
1 Complete 7111107T Heat Sink Performance Triennial 3
2 Complete completed in previous year(s) 7111108P Inservice Inspection Activities - PWR Annually 1
1 Complete 7111111A Annual Review Annually 1
1 Complete 7111111B Licensed Operator Requalification Biennial 2
1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 13 8
Complete 7111112Q Maintenance Effectiveness Annually 9
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 19 14 Complete 7111115 Operability Determinations Annually 49 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0
23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 5
3 Complete 7111119 Post Maintenance Testing Annually 24 20 Complete 7111120 Refueling and Other Outage Activities Annually 2
2 Complete 7111121 Component Design Bases Inspection Triennial 22 15 Complete 7111121M CDBI (Teams)
Triennial 0
10 Complete 7111121N CDBI Programs Triennial 0
6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 19 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 10 1
Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1
1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 12 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Fort Calhoun (FCS) 71124.02 Occupational ALARA Biennial 2
1 Complete 71124.03 Airbore Radioactivity Biennial 1
1 Complete 71124.04 Occupational Dose Assessment Biennial 2
1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1
1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1
1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog.
Biennial 1
1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1
1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
1 Complete 71152 PI&R Annually 12 6
Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete 71153 Followup of Events and NOED Annually 19 1
Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 13 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Grand Gulf (GG) 7111101 Adverse Weather Protection Annually 6
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2
2 Complete 7111105A Fire Protection - Annual Annually 1
1 Complete 7111105Q Fire Protection - Quarterly Annually 21 16 Complete 7111105T Fire Protection [Triennial]
Triennial 4
4 Complete completed in previous year(s) 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 4
3 Complete 7111107A Heat Sink Performance Annually 1
1 Complete 7111107T Heat Sink Performance Triennial 0
2 Not Applicable completion not required during this inspection cycle 7111108G Inservice Inspection Activities - BWR Annually 0
1 Complete completed in previous year(s) 7111111A Annual Review Annually 0
1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1
1 Complete 7111111Q Licensed Operator Requalification Annually 8
8 Complete 7111112Q Maintenance Effectiveness Annually 8
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 15 14 Complete 7111115 Operability Determinations Annually 18 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0
23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 4
3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 0
2 Complete full sample not available 7111121 Component Design Bases Inspection Triennial 22 15 Complete 7111121M CDBI (Teams)
Triennial 0
10 Complete 7111121N CDBI Programs Triennial 0
6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 23 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 0
1 Complete opportunity to apply full procedure not available 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1
1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 14 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Grand Gulf (GG) 71124.02 Occupational ALARA Biennial 2
1 Complete 71124.03 Airbore Radioactivity Biennial 1
1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1
1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1
1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1
1 Complete 71124.07 Rad. Environ. Monitoring Prog.
Biennial 1
1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1
1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
1 Complete 71152 PI&R Annually 6
6 Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete 71153 Followup of Events and NOED Annually 2
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 15 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Palo Verde (PALO) 7111101 Adverse Weather Protection Annually 4
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 3
2 Complete 7111105A Fire Protection - Annual Annually 1
1 Complete 7111105Q Fire Protection - Quarterly Annually 18 16 Complete 7111105T Fire Protection [Triennial]
Triennial 0
4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3
3 Complete 7111107A Heat Sink Performance Annually 1
1 Complete 7111107T Heat Sink Performance Triennial 4
2 Complete 7111108P Inservice Inspection Activities - PWR Annually 2
1 Complete 7111111A Annual Review Annually 1
1 Complete 7111111B Licensed Operator Requalification Biennial 2
1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 9
8 Complete 7111112Q Maintenance Effectiveness Annually 9
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 16 14 Complete 7111115 Operability Determinations Annually 24 22 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 54 23 Complete completed in previous year(s) 7111118 Plant Modifications Annually 4
3 Complete 7111119 Post Maintenance Testing Annually 21 20 Complete 7111120 Refueling and Other Outage Activities Annually 2
2 Complete 7111121 Component Design Bases Inspection Triennial 0
15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams)
Triennial 0
10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0
6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 22 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 5
1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1
1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 16 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Palo Verde (PALO) 71124.02 Occupational ALARA Biennial 2
1 Complete 71124.03 Airbore Radioactivity Biennial 1
1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1
1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1
1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1
1 Complete 71124.07 Rad. Environ. Monitoring Prog.
Biennial 1
1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1
1 Complete 71151 Performance Indicator Verfication Annually 35 35 Complete 71151 Performance Indicator Verfication Annually 3
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
1 Complete 71152 PI&R Annually 8
6 Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 9
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 17 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: River Bend (RBS) 7111101 Adverse Weather Protection Annually 4
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2
2 Complete 7111105A Fire Protection - Annual Annually 1
1 Complete 7111105Q Fire Protection - Quarterly Annually 17 16 Complete 7111105T Fire Protection [Triennial]
Triennial 0
4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3
3 Complete 7111107A Heat Sink Performance Annually 1
1 Complete 7111107T Heat Sink Performance Triennial 3
2 Complete completed in previous year(s) 7111108G Inservice Inspection Activities - BWR Annually 1
1 Complete 7111111A Annual Review Annually 1
1 Complete 7111111B Licensed Operator Requalification Biennial 1
1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 8
8 Complete 7111112Q Maintenance Effectiveness Annually 8
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 14 14 Complete 7111115 Operability Determinations Annually 16 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 38 23 Complete 7111118 Plant Modifications Annually 4
3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 2
2 Complete 7111121 Component Design Bases Inspection Triennial 26 15 Complete completed in previous year(s) 7111121M CDBI (Teams)
Triennial 0
10 Complete 7111121N CDBI Programs Triennial 0
6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 20 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 6
1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1
1 Complete 7111406 Drill Evaluation Annually 3
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 18 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: River Bend (RBS) 71124.02 Occupational ALARA Biennial 2
1 Complete 71124.03 Airbore Radioactivity Biennial 1
1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1
1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1
1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 2
1 Complete 71124.07 Rad. Environ. Monitoring Prog.
Biennial 1
1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1
1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
1 Complete 71152 PI&R Annually 6
6 Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete 71153 Followup of Events and NOED Annually 9
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 19 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: South Texas Project (STP) 7111101 Adverse Weather Protection Annually 6
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2
2 Complete 7111105A Fire Protection - Annual Annually 1
1 Complete 7111105Q Fire Protection - Quarterly Annually 21 16 Complete 7111105T Fire Protection [Triennial]
Triennial 5
4 Complete completed in previous year(s) 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 4
3 Complete 7111107A Heat Sink Performance Annually 1
1 Complete 7111107T Heat Sink Performance Triennial 4
2 Complete 7111108P Inservice Inspection Activities - PWR Annually 2
1 Complete 7111111A Annual Review Annually 1
1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1
1 Complete 7111111Q Licensed Operator Requalification Annually 8
8 Complete 7111112Q Maintenance Effectiveness Annually 8
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 20 14 Complete 7111115 Operability Determinations Annually 20 19 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 43 23 Complete 7111118 Plant Modifications Annually 5
3 Complete 7111119 Post Maintenance Testing Annually 21 20 Complete 7111120 Refueling and Other Outage Activities Annually 4
2 Complete 7111121 Component Design Bases Inspection Triennial 0
15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams)
Triennial 0
10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0
6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 23 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 7
1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1
1 Complete 7111406 Drill Evaluation Annually 3
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 20 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: South Texas Project (STP) 71124.02 Occupational ALARA Biennial 2
1 Complete 71124.03 Airbore Radioactivity Biennial 1
1 Complete 71124.04 Occupational Dose Assessment Biennial 1
1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1
1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1
1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog.
Biennial 1
1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1
1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 24 24 Complete 71151 Performance Indicator Verfication Annually 3
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
1 Complete 71152 PI&R Annually 6
6 Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 3
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 21 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Waterford (WAT) 7111101 Adverse Weather Protection Annually 5
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 14 12 Complete 7111104S Equipment Alignment Semiannually 2
2 Complete 7111105A Fire Protection - Annual Annually 1
1 Complete 7111105Q Fire Protection - Quarterly Annually 18 16 Complete 7111105T Fire Protection [Triennial]
Triennial 4
4 Complete 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3
3 Complete 7111107A Heat Sink Performance Annually 2
1 Complete 7111107T Heat Sink Performance Triennial 3
2 Complete completed in previous year(s) 7111108P Inservice Inspection Activities - PWR Annually 1
1 Complete completed in previous year(s) 7111111A Annual Review Annually 0
1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1
1 Complete 7111111Q Licensed Operator Requalification Annually 8
8 Complete 7111112Q Maintenance Effectiveness Annually 8
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 19 14 Complete 7111115 Operability Determinations Annually 18 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 37 23 Complete 7111118 Plant Modifications Annually 4
3 Complete 7111119 Post Maintenance Testing Annually 21 20 Complete 7111120 Refueling and Other Outage Activities Annually 1
2 Complete full sample not available 7111121 Component Design Bases Inspection Triennial 24 15 Complete completed in previous year(s) 7111121M CDBI (Teams)
Triennial 0
10 Complete 7111121N CDBI Programs Triennial 0
6 Complete 7111122 Surveillance Testing Annually 17 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 4
1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1
1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 22 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Waterford (WAT) 71124.02 Occupational ALARA Biennial 2
1 Complete 71124.03 Airbore Radioactivity Biennial 1
1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1
1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1
1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1
1 Complete 71124.07 Rad. Environ. Monitoring Prog.
Biennial 1
1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1
1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
1 Complete 71152 PI&R Annually 6
6 Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 6
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 23 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Wolf Creek (WC) 7111101 Adverse Weather Protection Annually 6
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 13 12 Complete 7111104S Equipment Alignment Semiannually 2
2 Complete 7111105A Fire Protection - Annual Annually 1
1 Complete 7111105Q Fire Protection - Quarterly Annually 20 16 Complete 7111105T Fire Protection [Triennial]
Triennial 8
4 Complete completed in previous year(s) 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 4
3 Complete 7111107A Heat Sink Performance Annually 2
1 Complete 7111107T Heat Sink Performance Triennial 0
2 Not Applicable completion not required during this inspection cycle 7111108P Inservice Inspection Activities - PWR Annually 1
1 Complete 7111111A Annual Review Annually 1
1 Complete 7111111B Licensed Operator Requalification Biennial 1
1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 8
8 Complete 7111112Q Maintenance Effectiveness Annually 8
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 19 14 Complete 7111115 Operability Determinations Annually 17 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 37 23 Complete 7111118 Plant Modifications Annually 4
3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 2
2 Complete 7111121 Component Design Bases Inspection Triennial 0
15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams)
Triennial 0
10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0
6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 18 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 4
1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1
1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 24 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Wolf Creek (WC) 71124.02 Occupational ALARA Biennial 2
1 Complete 71124.03 Airbore Radioactivity Biennial 1
1 Complete 71124.04 Occupational Dose Assessment Biennial 1
1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1
1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1
1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog.
Biennial 1
1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1
1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
1 Complete 71152 PI&R Annually 8
6 Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 5
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 25 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Columbia Generating Station (WNP) 7111101 Adverse Weather Protection Annually 4
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2
2 Complete 7111105A Fire Protection - Annual Annually 1
1 Complete 7111105Q Fire Protection - Quarterly Annually 16 16 Complete 7111105T Fire Protection [Triennial]
Triennial 7
4 Complete 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 4
3 Complete 7111107A Heat Sink Performance Annually 1
1 Complete 7111107T Heat Sink Performance Triennial 0
2 Not Applicable completion not required during this inspection cycle 7111108G Inservice Inspection Activities - BWR Annually 1
1 Complete 7111111A Annual Review Annually 0
1 Complete opportunity to apply full procedure not available 7111111B Licensed Operator Requalification Biennial 1
1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 8
8 Complete 7111112Q Maintenance Effectiveness Annually 8
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 15 14 Complete 7111115 Operability Determinations Annually 17 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 39 23 Complete completed in previous year(s) 7111118 Plant Modifications Annually 5
3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 1
2 Complete by reference iaw IMC 0306 7111121 Component Design Bases Inspection Triennial 0
15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams)
Triennial 0
10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0
6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 16 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 5
1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1
1 Complete 7111406 Drill Evaluation Annually 3
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 26 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Columbia Generating Station (WNP) 71124.02 Occupational ALARA Biennial 2
1 Complete 71124.03 Airbore Radioactivity Biennial 1
1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1
1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1
1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1
1 Complete 71124.07 Rad. Environ. Monitoring Prog.
Biennial 1
1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1
1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
1 Complete 71152 PI&R Annually 6
6 Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete 71153 Followup of Events and NOED Annually 7
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
CONTACT: Eric A. Ruesch, RIV/DRS 817-200-1126 February 26, 2016 MEMORANDUM TO: Scott A. Morris, Director Division of Inspection and Regional Support Office of Nuclear Reactor Regulation FROM:
Troy W. Pruett, Director/RA/
Division of Reactor Projects Region IV  


==SUBJECT:==
==SUBJECT:==
CY 2015 BASELINE INSPECTION COMPLETION  
CY 2015 BASELINE INSPECTION COMPLETION During calendar year 2015, Region IV completed the baseline inspection program at all regional reactor licensees subject to the Reactor Oversight Process (ROP). Attached is a table which provides the completion status of individual baseline procedures (IR Report 8a). Please note that this data includes only activities for which the region had responsibility; those portions of the baseline inspection program for which other Nuclear Regulatory Commission organizations are responsible are not included.
The Fort Calhoun Station was transitioned from the Inspection Manual Chapter (IMC) 0305 ROP to IMC 0350 oversight effective December 11, 2011. The station remained in IMC 0350 oversight until April 1, 2015. Inspection activities at Fort Calhoun Station during the first quarter of calendar year 2015 were managed by the IMC 0350 process; the minimum inspection requirements of the ROP did not apply until April 1.
If you have any questions or desire additional details, please contact me at 817-200-1248.
 
==Enclosure:==
Baseline Inspection Completion by Site (IR Report 8a) cc w/enclosure:
M. Scott, RI J. Clark, RIV M. Franke, RII R. Lantz, RIV P. Louden, RIII T. Hipschman, RIV M. Dapas, RIV J. Peralta, NRR K. Kennedy, RIV N. Sanfilippo, NRR A. Vegel, RIV
 
SUNSI Review By: ERuesch ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword:
RGN-002 OFFICE DRS/IPAT TL:DRS/IPAT D:DRS D:DRP NAME ERuesch THipschman AVegel TPruett SIGNATURE
/RA/
/RA/
/RA/
/RA/
DATE 2/25/16 2/25/16 2/25/16 2/26/16
 
Page:
Page 1 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Arkansas Nuclear One (ANO) 7111101 Adverse Weather Protection Annually 5
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2
2 Complete 7111105A Fire Protection - Annual Annually 2
1 Complete 7111105Q Fire Protection - Quarterly Annually 18 16 Complete 7111105T Fire Protection [Triennial]
Triennial 0
4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3
3 Complete 7111107A Heat Sink Performance Annually 1
1 Complete 7111107T Heat Sink Performance Triennial 3
2 Complete 7111108P Inservice Inspection Activities - PWR Annually 3
1 Complete 7111111A Annual Review Annually 1
1 Complete 7111111B Licensed Operator Requalification Biennial 2
1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 17 8
Complete 7111112Q Maintenance Effectiveness Annually 8
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 15 14 Complete 7111115 Operability Determinations Annually 26 19 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 47 23 Complete completed in previous year(s) 7111118 Plant Modifications Annually 5
3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 3
2 Complete 7111121 Component Design Bases Inspection Triennial 0
15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams)
Triennial 0
10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0
6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 21 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 5
1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1
1 Complete 7111406 Drill Evaluation Annually 3
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 2 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Arkansas Nuclear One (ANO) 71124.02 Occupational ALARA Biennial 2
1 Complete 71124.03 Airbore Radioactivity Biennial 1
1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1
1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1
1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1
1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog.
Biennial 1
1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 2
1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 24 24 Complete 71151 Performance Indicator Verfication Annually 3
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
1 Complete 71152 PI&R Annually 7
6 Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete 71153 Followup of Events and NOED Annually 5
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 3 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Callaway (CALL) 7111101 Adverse Weather Protection Annually 4
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2
2 Complete 7111105A Fire Protection - Annual Annually 1
1 Complete 7111105Q Fire Protection - Quarterly Annually 18 16 Complete 7111105T Fire Protection [Triennial]
Triennial 0
4 Complete by reference iaw IMC 0306 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 10 3
Complete 7111106 Flood Protection Measures Annually 4
3 Complete 7111107A Heat Sink Performance Annually 1
1 Complete 7111107T Heat Sink Performance Triennial 0
2 Not Applicable completion not required during this inspection cycle 7111108P Inservice Inspection Activities - PWR Annually 0
1 Complete completed in previous year(s) 7111111A Annual Review Annually 0
1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1
1 Complete 7111111Q Licensed Operator Requalification Annually 8
8 Complete 7111112Q Maintenance Effectiveness Annually 8
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 18 14 Complete 7111115 Operability Determinations Annually 17 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0
23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 3
3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 2
2 Complete 7111121 Component Design Bases Inspection Triennial 26 15 Complete completed in previous year(s) 7111121M CDBI (Teams)
Triennial 0
10 Complete 7111121N CDBI Programs Triennial 0
6 Complete 7111122 Surveillance Testing Annually 18 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 4
1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1
1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 4 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Callaway (CALL) 71124.02 Occupational ALARA Biennial 2
1 Complete 71124.03 Airbore Radioactivity Biennial 1
1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1
1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1
1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1
1 Complete 71124.07 Rad. Environ. Monitoring Prog.
Biennial 1
1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1
1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
1 Complete 71152 PI&R Annually 6
6 Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 4
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 5 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Cooper (CNS) 7111101 Adverse Weather Protection Annually 6
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 13 12 Complete 7111104S Equipment Alignment Semiannually 2
2 Complete 7111105A Fire Protection - Annual Annually 1
1 Complete 7111105Q Fire Protection - Quarterly Annually 17 16 Complete 7111105T Fire Protection [Triennial]
Triennial 0
4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3
3 Complete 7111107A Heat Sink Performance Annually 1
1 Complete 7111107T Heat Sink Performance Triennial 3
2 Complete 7111108G Inservice Inspection Activities - BWR Annually 0
1 Complete completed in previous year(s) 7111111A Annual Review Annually 0
1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1
1 Complete 7111111Q Licensed Operator Requalification Annually 8
8 Complete 7111112Q Maintenance Effectiveness Annually 9
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 17 14 Complete 7111115 Operability Determinations Annually 18 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0
23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 6
3 Complete 7111119 Post Maintenance Testing Annually 22 20 Complete 7111120 Refueling and Other Outage Activities Annually 1
2 Complete by reference iaw IMC 0306 7111121 Component Design Bases Inspection Triennial 22 15 Complete 7111121M CDBI (Teams)
Triennial 0
10 Complete 7111121N CDBI Programs Triennial 0
6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 16 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 8
1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 2
1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 6 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Cooper (CNS) 71124.02 Occupational ALARA Biennial 2
1 Complete 71124.03 Airbore Radioactivity Biennial 1
1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1
1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1
1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1
1 Complete 71124.07 Rad. Environ. Monitoring Prog.
Biennial 1
1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1
1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
1 Complete 71152 PI&R Annually 8
6 Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete 71153 Followup of Events and NOED Annually 6
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 7 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Comanche Peak (CP) 7111101 Adverse Weather Protection Annually 4
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 13 12 Complete 7111104S Equipment Alignment Semiannually 2
2 Complete 7111105A Fire Protection - Annual Annually 1
1 Complete 7111105Q Fire Protection - Quarterly Annually 17 16 Complete 7111105T Fire Protection [Triennial]
Triennial 6
4 Complete completed in previous year(s) 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 3
3 Complete 7111107A Heat Sink Performance Annually 1
1 Complete 7111107T Heat Sink Performance Triennial 4
2 Complete completed in previous year(s) 7111108P Inservice Inspection Activities - PWR Annually 1
1 Complete 7111111A Annual Review Annually 0
1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1
1 Complete 7111111Q Licensed Operator Requalification Annually 8
8 Complete 7111112Q Maintenance Effectiveness Annually 8
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 16 14 Complete 7111115 Operability Determinations Annually 22 19 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0
23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 3
3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 1
2 Complete by reference iaw IMC 0306 7111121 Component Design Bases Inspection Triennial 22 15 Complete 7111121M CDBI (Teams)
Triennial 0
10 Complete 7111121N CDBI Programs Triennial 0
6 Complete 7111122 Surveillance Testing Annually 18 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 2
1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1
1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 8 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Comanche Peak (CP) 71124.02 Occupational ALARA Biennial 2
1 Complete 71124.03 Airbore Radioactivity Biennial 1
1 Complete 71124.04 Occupational Dose Assessment Biennial 1
1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1
1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1
1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog.
Biennial 1
1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1
1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 24 24 Complete 71151 Performance Indicator Verfication Annually 3
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
1 Complete 71152 PI&R Annually 6
6 Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete 71153 Followup of Events and NOED Annually 9
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 9 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Diablo Canyon (DIAB) 7111101 Adverse Weather Protection Annually 6
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2
2 Complete 7111105A Fire Protection - Annual Annually 2
1 Complete 7111105Q Fire Protection - Quarterly Annually 17 16 Complete 7111105T Fire Protection [Triennial]
Triennial 0
4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 4
3 Complete 7111107A Heat Sink Performance Annually 1
1 Complete 7111107T Heat Sink Performance Triennial 0
2 Not Applicable completion not required during this inspection cycle 7111108P Inservice Inspection Activities - PWR Annually 1
1 Complete 7111111A Annual Review Annually 1
1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1
1 Complete 7111111Q Licensed Operator Requalification Annually 10 8
Complete 7111112Q Maintenance Effectiveness Annually 8
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 20 14 Complete 7111115 Operability Determinations Annually 19 19 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 43 23 Complete completed in previous year(s) 7111118 Plant Modifications Annually 7
3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 2
2 Complete 7111121 Component Design Bases Inspection Triennial 0
15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams)
Triennial 0
10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0
6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 24 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 16 1
Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1
1 Complete 7111406 Drill Evaluation Annually 4
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.


During calendar year 2015, Region IV completed the baseline inspection program at all regional reactor licensees subject to the Reactor Oversight Process (ROP). Attached is a table which provides the completion status of individual baseline procedures (IR Report 8a). Please note that this data includes only activities for which the region had responsibility; those portions of the baseline inspection program for which other Nuclear Regulatory Commission organizations are responsible are not included.
Page:
The Fort Calhoun Station was transitioned from the Inspection Manual Chapter (IMC) 0305 ROP to IMC 0350 oversight effective December 11, 2011. The station remained in IMC 0350 oversight until April 1, 2015. Inspection activities at Fort Calhoun Station during the first quarter of calendar year 2015 were managed by the IMC 0350 process; the minimum inspection requirements of the ROP did not apply until April 1. If you have any questions or desire additional details, please contact me at 817-200-1248.
Page 10 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Diablo Canyon (DIAB) 71124.02 Occupational ALARA Biennial 2
1 Complete 71124.03 Airbore Radioactivity Biennial 1
1 Complete 71124.04 Occupational Dose Assessment Biennial 1
1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1
1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1
1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog.
Biennial 1
1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1
1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 24 24 Complete 71151 Performance Indicator Verfication Annually 3
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
1 Complete 71152 PI&R Annually 7
6 Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 10 1
Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.


==Enclosure:==
Page:
Page 11 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Fort Calhoun (FCS) 7111101 Adverse Weather Protection Annually 7
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 15 12 Complete 7111104S Equipment Alignment Semiannually 3
2 Complete 7111105A Fire Protection - Annual Annually 1
1 Complete 7111105Q Fire Protection - Quarterly Annually 22 16 Complete 7111105T Fire Protection [Triennial]
Triennial 0
4 Complete by reference iaw IMC 0306 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 5
3 Complete 7111106 Flood Protection Measures Annually 4
3 Complete 7111107A Heat Sink Performance Annually 2
1 Complete 7111107T Heat Sink Performance Triennial 3
2 Complete completed in previous year(s) 7111108P Inservice Inspection Activities - PWR Annually 1
1 Complete 7111111A Annual Review Annually 1
1 Complete 7111111B Licensed Operator Requalification Biennial 2
1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 13 8
Complete 7111112Q Maintenance Effectiveness Annually 9
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 19 14 Complete 7111115 Operability Determinations Annually 49 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0
23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 5
3 Complete 7111119 Post Maintenance Testing Annually 24 20 Complete 7111120 Refueling and Other Outage Activities Annually 2
2 Complete 7111121 Component Design Bases Inspection Triennial 22 15 Complete 7111121M CDBI (Teams)
Triennial 0
10 Complete 7111121N CDBI Programs Triennial 0
6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 19 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 10 1
Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1
1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 12 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Fort Calhoun (FCS) 71124.02 Occupational ALARA Biennial 2
1 Complete 71124.03 Airbore Radioactivity Biennial 1
1 Complete 71124.04 Occupational Dose Assessment Biennial 2
1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1
1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1
1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog.
Biennial 1
1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1
1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
1 Complete 71152 PI&R Annually 12 6
Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete 71153 Followup of Events and NOED Annually 19 1
Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 13 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Grand Gulf (GG) 7111101 Adverse Weather Protection Annually 6
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2
2 Complete 7111105A Fire Protection - Annual Annually 1
1 Complete 7111105Q Fire Protection - Quarterly Annually 21 16 Complete 7111105T Fire Protection [Triennial]
Triennial 4
4 Complete completed in previous year(s) 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 4
3 Complete 7111107A Heat Sink Performance Annually 1
1 Complete 7111107T Heat Sink Performance Triennial 0
2 Not Applicable completion not required during this inspection cycle 7111108G Inservice Inspection Activities - BWR Annually 0
1 Complete completed in previous year(s) 7111111A Annual Review Annually 0
1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1
1 Complete 7111111Q Licensed Operator Requalification Annually 8
8 Complete 7111112Q Maintenance Effectiveness Annually 8
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 15 14 Complete 7111115 Operability Determinations Annually 18 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0
23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 4
3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 0
2 Complete full sample not available 7111121 Component Design Bases Inspection Triennial 22 15 Complete 7111121M CDBI (Teams)
Triennial 0
10 Complete 7111121N CDBI Programs Triennial 0
6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 23 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 0
1 Complete opportunity to apply full procedure not available 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1
1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 14 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Grand Gulf (GG) 71124.02 Occupational ALARA Biennial 2
1 Complete 71124.03 Airbore Radioactivity Biennial 1
1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1
1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1
1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1
1 Complete 71124.07 Rad. Environ. Monitoring Prog.
Biennial 1
1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1
1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
1 Complete 71152 PI&R Annually 6
6 Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete 71153 Followup of Events and NOED Annually 2
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 15 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Palo Verde (PALO) 7111101 Adverse Weather Protection Annually 4
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 3
2 Complete 7111105A Fire Protection - Annual Annually 1
1 Complete 7111105Q Fire Protection - Quarterly Annually 18 16 Complete 7111105T Fire Protection [Triennial]
Triennial 0
4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3
3 Complete 7111107A Heat Sink Performance Annually 1
1 Complete 7111107T Heat Sink Performance Triennial 4
2 Complete 7111108P Inservice Inspection Activities - PWR Annually 2
1 Complete 7111111A Annual Review Annually 1
1 Complete 7111111B Licensed Operator Requalification Biennial 2
1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 9
8 Complete 7111112Q Maintenance Effectiveness Annually 9
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 16 14 Complete 7111115 Operability Determinations Annually 24 22 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 54 23 Complete completed in previous year(s) 7111118 Plant Modifications Annually 4
3 Complete 7111119 Post Maintenance Testing Annually 21 20 Complete 7111120 Refueling and Other Outage Activities Annually 2
2 Complete 7111121 Component Design Bases Inspection Triennial 0
15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams)
Triennial 0
10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0
6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 22 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 5
1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1
1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 16 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Palo Verde (PALO) 71124.02 Occupational ALARA Biennial 2
1 Complete 71124.03 Airbore Radioactivity Biennial 1
1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1
1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1
1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1
1 Complete 71124.07 Rad. Environ. Monitoring Prog.
Biennial 1
1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1
1 Complete 71151 Performance Indicator Verfication Annually 35 35 Complete 71151 Performance Indicator Verfication Annually 3
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
1 Complete 71152 PI&R Annually 8
6 Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 9
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 17 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: River Bend (RBS) 7111101 Adverse Weather Protection Annually 4
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2
2 Complete 7111105A Fire Protection - Annual Annually 1
1 Complete 7111105Q Fire Protection - Quarterly Annually 17 16 Complete 7111105T Fire Protection [Triennial]
Triennial 0
4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3
3 Complete 7111107A Heat Sink Performance Annually 1
1 Complete 7111107T Heat Sink Performance Triennial 3
2 Complete completed in previous year(s) 7111108G Inservice Inspection Activities - BWR Annually 1
1 Complete 7111111A Annual Review Annually 1
1 Complete 7111111B Licensed Operator Requalification Biennial 1
1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 8
8 Complete 7111112Q Maintenance Effectiveness Annually 8
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 14 14 Complete 7111115 Operability Determinations Annually 16 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 38 23 Complete 7111118 Plant Modifications Annually 4
3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 2
2 Complete 7111121 Component Design Bases Inspection Triennial 26 15 Complete completed in previous year(s) 7111121M CDBI (Teams)
Triennial 0
10 Complete 7111121N CDBI Programs Triennial 0
6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 20 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 6
1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1
1 Complete 7111406 Drill Evaluation Annually 3
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page:
Page 18 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: River Bend (RBS) 71124.02 Occupational ALARA Biennial 2
1 Complete 71124.03 Airbore Radioactivity Biennial 1
1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1
1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1
1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 2
1 Complete 71124.07 Rad. Environ. Monitoring Prog.
Biennial 1
1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1
1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
1 Complete 71152 PI&R Annually 6
6 Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete 71153 Followup of Events and NOED Annually 9
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.


Baseline Inspection Completion by Site     (IR Report 8a) cc w/enclosure: M. Scott, RI J. Clark, RIV M. Franke, RII R. Lantz, RIV P. Louden, RIII T. Hipschman, RIV M. Dapas, RIV J. Peralta, NRR K. Kennedy, RIV N. Sanfilippo, NRR A. Vegel, RIV 
Page:
Page 19 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: South Texas Project (STP) 7111101 Adverse Weather Protection Annually 6
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2
2 Complete 7111105A Fire Protection - Annual Annually 1
1 Complete 7111105Q Fire Protection - Quarterly Annually 21 16 Complete 7111105T Fire Protection [Triennial]
Triennial 5
4 Complete completed in previous year(s) 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 4
3 Complete 7111107A Heat Sink Performance Annually 1
1 Complete 7111107T Heat Sink Performance Triennial 4
2 Complete 7111108P Inservice Inspection Activities - PWR Annually 2
1 Complete 7111111A Annual Review Annually 1
1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1
1 Complete 7111111Q Licensed Operator Requalification Annually 8
8 Complete 7111112Q Maintenance Effectiveness Annually 8
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 20 14 Complete 7111115 Operability Determinations Annually 20 19 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 43 23 Complete 7111118 Plant Modifications Annually 5
3 Complete 7111119 Post Maintenance Testing Annually 21 20 Complete 7111120 Refueling and Other Outage Activities Annually 4
2 Complete 7111121 Component Design Bases Inspection Triennial 0
15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams)
Triennial 0
10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0
6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 23 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 7
1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1
1 Complete 7111406 Drill Evaluation Annually 3
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.


SUNSI Review By:  ERuesch ADAMS  Yes    No  Publicly Available  Non-Publicly Available  Non-Sensitive  Sensitive Keyword: RGN-002 OFFICE DRS/IPAT TL:DRS/IPAT D:DRS D:DRP    NAME ERuesch THipschman AVegel TPruett    SIGNATURE /RA/ /RA/ /RA/ /RA/    DATE 2/25/16 2/25/16 2/25/16 2/26/16 Page:Page 1 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Arkansas Nuclear One (ANO)7111101Adverse Weather ProtectionAnnually54Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment  AlignmentSemiannually22Complete7111105AFire Protection -  AnnualAnnually21Complete7111105QFire Protection - QuarterlyAnnually1816Complete7111105TFire Protection [Triennial]Triennial04Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03Not Applicablecompletion not required during this inspection cycle7111106Flood Protection MeasuresAnnually33Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial32Complete7111108PInservice Inspection Activities - PWRAnnually31Complete7111111AAnnual ReviewAnnually11Complete7111111BLicensed Operator RequalificationBiennial21Completecompleted in previous year(s)7111111QLicensed Operator RequalificationAnnually178Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1514Complete7111115Operability DeterminationsAnnually2619Complete7111117TChanges, Tests, Exper, Perm ModsTriennial4723Completecompleted in previous year(s)7111118Plant ModificationsAnnually53Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually32Complete7111121Component Design Bases InspectionTriennial015Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually2114Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Complete7111403EP Organizational Staffing/AugmentationBiennial11Complete7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually51Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Complete7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:
Page:Page 2 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Arkansas Nuclear One (ANO)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Complete71124.05Radiation Monitoring InstrumentationBiennial11Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial21Completecompleted in previous year(s)71151Performance Indicator VerficationAnnually2424Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually76Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually51CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page 20 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Page:Page 3 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Callaway (CALL)7111101Adverse Weather ProtectionAnnually44Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment  AlignmentSemiannually22Complete7111105AFire Protection -  AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1816Complete7111105TFire Protection [Triennial]Triennial04Completeby reference iaw IMC 03067111105XFire Protection - NFPA 805 (Triennial)Triennial103Complete7111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial02Not Applicablecompletion not required during this inspection cycle7111108PInservice Inspection Activities - PWRAnnually01Completecompleted in previous year(s)7111111AAnnual ReviewAnnually01Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1814Complete7111115Operability DeterminationsAnnually1715Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023Not Applicablecompletion not required during this inspection cycle7111118Plant ModificationsAnnually33Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually22Complete7111121Component Design Bases InspectionTriennial2615Completecompleted in previous year(s)7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Complete7111122Surveillance TestingAnnually1814Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually41Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: South Texas Project (STP) 71124.02 Occupational ALARA Biennial 2
Page:Page 4 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Callaway (CALL)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial11Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Completecompleted in previous year(s)71153Followup of Events and NOEDAnnually41CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
1 Complete 71124.03 Airbore Radioactivity Biennial 1
Page:Page 5 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Cooper (CNS)7111101Adverse Weather ProtectionAnnually64Complete7111104Equipment Alignment (Quarterly)Annually1312Complete7111104SEquipment  AlignmentSemiannually22Complete7111105AFire Protection -  AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1716Complete7111105TFire Protection [Triennial]Triennial04Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03Not Applicablecompletion not required during this inspection cycle7111106Flood Protection MeasuresAnnually33Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial32Complete7111108GInservice Inspection Activities - BWRAnnually01Completecompleted in previous year(s)7111111AAnnual ReviewAnnually01Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually98Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1714Complete7111115Operability DeterminationsAnnually1815Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023Not Applicablecompletion not required during this inspection cycle7111118Plant ModificationsAnnually63Complete7111119Post Maintenance TestingAnnually2220Complete7111120Refueling and Other Outage ActivitiesAnnually12Completeby reference iaw IMC 03067111121Component Design Bases InspectionTriennial2215Complete7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually1614Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Complete7111403EP Organizational Staffing/AugmentationBiennial11Complete7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually81Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial21Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
1 Complete 71124.04 Occupational Dose Assessment Biennial 1
Page:Page 6 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Cooper (CNS)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial11Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually86Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually61CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1
Page:Page 7 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Comanche Peak (CP)7111101Adverse Weather ProtectionAnnually44Complete7111104Equipment Alignment (Quarterly)Annually1312Complete7111104SEquipment  AlignmentSemiannually22Complete7111105AFire Protection -  AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1716Complete7111105TFire Protection [Triennial]Triennial64Completecompleted in previous year(s)7111105XFire Protection - NFPA 805 (Triennial)Triennial03Completeby reference iaw IMC 03067111106Flood Protection MeasuresAnnually33Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial42Completecompleted in previous year(s)7111108PInservice Inspection Activities - PWRAnnually11Complete7111111AAnnual ReviewAnnually01Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1614Complete7111115Operability DeterminationsAnnually2219Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023Not Applicablecompletion not required during this inspection cycle7111118Plant ModificationsAnnually33Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually12Completeby reference iaw IMC 03067111121Component Design Bases InspectionTriennial2215Complete7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Complete7111122Surveillance TestingAnnually1814Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually21Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1
Page:Page 8 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Comanche Peak (CP)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Complete71124.04Occupational Dose AssessmentBiennial11Complete71124.05Radiation Monitoring InstrumentationBiennial11Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Completecompleted in previous year(s)71151Performance Indicator VerficationAnnually2424Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually91CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog.
Page:Page 9 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Diablo Canyon (DIAB)7111101Adverse Weather ProtectionAnnually64Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment  AlignmentSemiannually22Complete7111105AFire Protection -  AnnualAnnually21Complete7111105QFire Protection - QuarterlyAnnually1716Complete7111105TFire Protection [Triennial]Triennial04Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03Not Applicablecompletion not required during this inspection cycle7111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial02Not Applicablecompletion not required during this inspection cycle7111108PInservice Inspection Activities - PWRAnnually11Complete7111111AAnnual ReviewAnnually11Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually108Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually2014Complete7111115Operability DeterminationsAnnually1919Complete7111117TChanges, Tests, Exper, Perm ModsTriennial4323Completecompleted in previous year(s)7111118Plant ModificationsAnnually73Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually22Complete7111121Component Design Bases InspectionTriennial015Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually2414Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Complete7111403EP Organizational Staffing/AugmentationBiennial11Complete7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually161Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Complete7111406Drill EvaluationAnnually43Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Biennial 1
Page:Page 10 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Diablo Canyon (DIAB)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Complete71124.04Occupational Dose AssessmentBiennial11Complete71124.05Radiation Monitoring InstrumentationBiennial11Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Completecompleted in previous year(s)71151Performance Indicator VerficationAnnually2424Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually76Complete71152BPI&R (Biennial)Biennial11Completecompleted in previous year(s)71153Followup of Events and NOEDAnnually101CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1
Page:Page 11 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Fort Calhoun (FCS)7111101Adverse Weather ProtectionAnnually74Complete7111104Equipment Alignment (Quarterly)Annually1512Complete7111104SEquipment  AlignmentSemiannually32Complete7111105AFire Protection -  AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually2216Complete7111105TFire Protection [Triennial]Triennial04Completeby reference iaw IMC 03067111105XFire Protection - NFPA 805 (Triennial)Triennial53Complete7111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually21Complete7111107THeat Sink PerformanceTriennial32Completecompleted in previous year(s)7111108PInservice Inspection Activities - PWRAnnually11Complete7111111AAnnual ReviewAnnually11Complete7111111BLicensed Operator RequalificationBiennial21Completecompleted in previous year(s)7111111QLicensed Operator RequalificationAnnually138Complete7111112QMaintenance EffectivenessAnnually98Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1914Complete7111115Operability DeterminationsAnnually4915Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023Not Applicablecompletion not required during this inspection cycle7111118Plant ModificationsAnnually53Complete7111119Post Maintenance TestingAnnually2420Complete7111120Refueling and Other Outage ActivitiesAnnually22Complete7111121Component Design Bases InspectionTriennial2215Complete7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually1914Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually101Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 24 24 Complete 71151 Performance Indicator Verfication Annually 3
Page:Page 12 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Fort Calhoun (FCS)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Complete71124.04Occupational Dose AssessmentBiennial21Complete71124.05Radiation Monitoring InstrumentationBiennial11Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Completecompleted in previous year(s)71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually126Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually191CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
Page:Page 13 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Grand Gulf (GG)7111101Adverse Weather ProtectionAnnually64Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment  AlignmentSemiannually22Complete7111105AFire Protection -  AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually2116Complete7111105TFire Protection [Triennial]Triennial44Completecompleted in previous year(s)7111105XFire Protection - NFPA 805 (Triennial)Triennial03Completeby reference iaw IMC 03067111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial02Not Applicablecompletion not required during this inspection cycle7111108GInservice Inspection Activities - BWRAnnually01Completecompleted in previous year(s)7111111AAnnual ReviewAnnually01Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1514Complete7111115Operability DeterminationsAnnually1815Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023Not Applicablecompletion not required during this inspection cycle7111118Plant ModificationsAnnually43Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually02Completefull sample not available7111121Component Design Bases InspectionTriennial2215Complete7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually2314Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually01Completeopportunity to apply full procedure not available7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
1 Complete 71152 PI&R Annually 6
Page:Page 14 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Grand Gulf (GG)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial11Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually21CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
6 Complete 71152B PI&R (Biennial)
Page:Page 15 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Palo Verde (PALO)7111101Adverse Weather ProtectionAnnually44Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment  AlignmentSemiannually32Complete7111105AFire Protection -  AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1816Complete7111105TFire Protection [Triennial]Triennial04Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03Not Applicablecompletion not required during this inspection cycle7111106Flood Protection MeasuresAnnually33Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial42Complete7111108PInservice Inspection Activities - PWRAnnually21Complete7111111AAnnual ReviewAnnually11Complete7111111BLicensed Operator RequalificationBiennial21Completecompleted in previous year(s)7111111QLicensed Operator RequalificationAnnually98Complete7111112QMaintenance EffectivenessAnnually98Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1614Complete7111115Operability DeterminationsAnnually2422Complete7111117TChanges, Tests, Exper, Perm ModsTriennial5423Completecompleted in previous year(s)7111118Plant ModificationsAnnually43Complete7111119Post Maintenance TestingAnnually2120Complete7111120Refueling and Other Outage ActivitiesAnnually22Complete7111121Component Design Bases InspectionTriennial015Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually2214Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually51Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Biennial 1
Page:Page 16 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Palo Verde (PALO)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial11Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually3535Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually86Complete71152BPI&R (Biennial)Biennial11Completecompleted in previous year(s)71153Followup of Events and NOEDAnnually91CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 3
Page:Page 17 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:River Bend (RBS)7111101Adverse Weather ProtectionAnnually44Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment  AlignmentSemiannually22Complete7111105AFire Protection -  AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1716Complete7111105TFire Protection [Triennial]Triennial04Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03Not Applicablecompletion not required during this inspection cycle7111106Flood Protection MeasuresAnnually33Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial32Completecompleted in previous year(s)7111108GInservice Inspection Activities - BWRAnnually11Complete7111111AAnnual ReviewAnnually11Complete7111111BLicensed Operator RequalificationBiennial11Completecompleted in previous year(s)7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1414Complete7111115Operability DeterminationsAnnually1615Complete7111117TChanges, Tests, Exper, Perm ModsTriennial3823Complete7111118Plant ModificationsAnnually43Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually22Complete7111121Component Design Bases InspectionTriennial2615Completecompleted in previous year(s)7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually2014Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Complete7111403EP Organizational Staffing/AugmentationBiennial11Complete7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually61Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Complete7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 18 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:River Bend (RBS)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial21Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually91CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 19 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:South Texas Project (STP)7111101Adverse Weather ProtectionAnnually64Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment  AlignmentSemiannually22Complete7111105AFire Protection -  AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually2116Complete7111105TFire Protection [Triennial]Triennial54Completecompleted in previous year(s)7111105XFire Protection - NFPA 805 (Triennial)Triennial03Completeby reference iaw IMC 03067111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial42Complete7111108PInservice Inspection Activities - PWRAnnually21Complete7111111AAnnual ReviewAnnually11Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually2014Complete7111115Operability DeterminationsAnnually2019Complete7111117TChanges, Tests, Exper, Perm ModsTriennial4323Complete7111118Plant ModificationsAnnually53Complete7111119Post Maintenance TestingAnnually2120Complete7111120Refueling and Other Outage ActivitiesAnnually42Complete7111121Component Design Bases InspectionTriennial015Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually2314Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Complete7111403EP Organizational Staffing/AugmentationBiennial11Complete7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually71Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Complete7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 20 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:South Texas Project (STP)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Complete71124.04Occupational Dose AssessmentBiennial11Complete71124.05Radiation Monitoring InstrumentationBiennial11Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Completecompleted in previous year(s)71151Performance Indicator VerficationAnnually2424Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Completecompleted in previous year(s)71153Followup of Events and NOEDAnnually31CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 21 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Waterford (WAT)7111101Adverse Weather ProtectionAnnually54Complete7111104Equipment Alignment (Quarterly)Annually1412Complete7111104SEquipment  AlignmentSemiannually22Complete7111105AFire Protection -  AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1816Complete7111105TFire Protection [Triennial]Triennial44Complete7111105XFire Protection - NFPA 805 (Triennial)Triennial03Not Applicablecompletion not required during this inspection cycle7111106Flood Protection MeasuresAnnually33Complete7111107AHeat Sink PerformanceAnnually21Complete7111107THeat Sink PerformanceTriennial32Completecompleted in previous year(s)7111108PInservice Inspection Activities - PWRAnnually11Completecompleted in previous year(s)7111111AAnnual ReviewAnnually01Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1914Complete7111115Operability DeterminationsAnnually1815Complete7111117TChanges, Tests, Exper, Perm ModsTriennial3723Complete7111118Plant ModificationsAnnually43Complete7111119Post Maintenance TestingAnnually2120Complete7111120Refueling and Other Outage ActivitiesAnnually12Completefull sample not available7111121Component Design Bases InspectionTriennial2415Completecompleted in previous year(s)7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Complete7111122Surveillance TestingAnnually1714Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually41Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 22 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Waterford (WAT)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial11Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Completecompleted in previous year(s)71153Followup of Events and NOEDAnnually61CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 23 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Wolf Creek (WC)7111101Adverse Weather ProtectionAnnually64Complete7111104Equipment Alignment (Quarterly)Annually1312Complete7111104SEquipment  AlignmentSemiannually22Complete7111105AFire Protection -  AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually2016Complete7111105TFire Protection [Triennial]Triennial84Completecompleted in previous year(s)7111105XFire Protection - NFPA 805 (Triennial)Triennial03Completeby reference iaw IMC 03067111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually21Complete7111107THeat Sink PerformanceTriennial02Not Applicablecompletion not required during this inspection cycle7111108PInservice Inspection Activities - PWRAnnually11Complete7111111AAnnual ReviewAnnually11Complete7111111BLicensed Operator RequalificationBiennial11Completecompleted in previous year(s)7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1914Complete7111115Operability DeterminationsAnnually1715Complete7111117TChanges, Tests, Exper, Perm ModsTriennial3723Complete7111118Plant ModificationsAnnually43Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually22Complete7111121Component Design Bases InspectionTriennial015Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually1814Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually41Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 24 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Wolf Creek (WC)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Complete71124.04Occupational Dose AssessmentBiennial11Complete71124.05Radiation Monitoring InstrumentationBiennial11Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Completecompleted in previous year(s)71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually86Complete71152BPI&R (Biennial)Biennial11Completecompleted in previous year(s)71153Followup of Events and NOEDAnnually51CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 25 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Columbia Generating Station (WNP)7111101Adverse Weather ProtectionAnnually44Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment  AlignmentSemiannually22Complete7111105AFire Protection -  AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1616Complete7111105TFire Protection [Triennial]Triennial74Complete7111105XFire Protection - NFPA 805 (Triennial)Triennial03Completeby reference iaw IMC 03067111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial02Not Applicablecompletion not required during this inspection cycle7111108GInservice Inspection Activities - BWRAnnually11Complete7111111AAnnual ReviewAnnually01Completeopportunity to apply full procedure not available7111111BLicensed Operator RequalificationBiennial11Completecompleted in previous year(s)7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1514Complete7111115Operability DeterminationsAnnually1715Complete7111117TChanges, Tests, Exper, Perm ModsTriennial3923Completecompleted in previous year(s)7111118Plant ModificationsAnnually53Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually12Completeby reference iaw IMC 03067111121Component Design Bases InspectionTriennial015Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually1614Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Complete7111403EP Organizational Staffing/AugmentationBiennial11Complete7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually51Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Complete7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 26 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Columbia Generating Station (WNP)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial11Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually71CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
CONTACT: Eric A. Ruesch, RIV/DRS  817-200-1126 February 26, 2016 


MEMORANDUM TO: Scott A. Morris, Director Division of Inspection and Regional Support  Office of Nuclear Reactor Regulation FROM: Troy W. Pruett, Director/RA/  Division of Reactor Projects Region IV 
Page:
Page 21 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Waterford (WAT) 7111101 Adverse Weather Protection Annually 5
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 14 12 Complete 7111104S Equipment Alignment Semiannually 2
2 Complete 7111105A Fire Protection - Annual Annually 1
1 Complete 7111105Q Fire Protection - Quarterly Annually 18 16 Complete 7111105T Fire Protection [Triennial]
Triennial 4
4 Complete 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3
3 Complete 7111107A Heat Sink Performance Annually 2
1 Complete 7111107T Heat Sink Performance Triennial 3
2 Complete completed in previous year(s) 7111108P Inservice Inspection Activities - PWR Annually 1
1 Complete completed in previous year(s) 7111111A Annual Review Annually 0
1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1
1 Complete 7111111Q Licensed Operator Requalification Annually 8
8 Complete 7111112Q Maintenance Effectiveness Annually 8
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 19 14 Complete 7111115 Operability Determinations Annually 18 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 37 23 Complete 7111118 Plant Modifications Annually 4
3 Complete 7111119 Post Maintenance Testing Annually 21 20 Complete 7111120 Refueling and Other Outage Activities Annually 1
2 Complete full sample not available 7111121 Component Design Bases Inspection Triennial 24 15 Complete completed in previous year(s) 7111121M CDBI (Teams)
Triennial 0
10 Complete 7111121N CDBI Programs Triennial 0
6 Complete 7111122 Surveillance Testing Annually 17 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 4
1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1
1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.


==SUBJECT:==
Page:
CY 2015 BASELINE INSPECTION COMPLETION
Page 22 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Waterford (WAT) 71124.02 Occupational ALARA Biennial 2
1 Complete 71124.03 Airbore Radioactivity Biennial 1
1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1
1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1
1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1
1 Complete 71124.07 Rad. Environ. Monitoring Prog.
Biennial 1
1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1
1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
1 Complete 71152 PI&R Annually 6
6 Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 6
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.


During calendar year 2015, Region IV completed the baseline inspection program at all regional reactor licensees subject to the Reactor Oversight Process (ROP). Attached is a table which provides the completion status of individual baseline procedures (IR Report 8a). Please note that this data includes only activities for which the region had responsibility; those portions of the baseline inspection program for which other Nuclear Regulatory Commission organizations are responsible are not included.
Page:
The Fort Calhoun Station was transitioned from the Inspection Manual Chapter (IMC) 0305 ROP to IMC 0350 oversight effective December 11, 2011. The station remained in IMC 0350 oversight until April 1, 2015. Inspection activities at Fort Calhoun Station during the first quarter of calendar year 2015 were managed by the IMC 0350 process; the minimum inspection requirements of the ROP did not apply until April 1. If you have any questions or desire additional details, please contact me at 817-200-1248.
Page 23 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Wolf Creek (WC) 7111101 Adverse Weather Protection Annually 6
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 13 12 Complete 7111104S Equipment Alignment Semiannually 2
2 Complete 7111105A Fire Protection - Annual Annually 1
1 Complete 7111105Q Fire Protection - Quarterly Annually 20 16 Complete 7111105T Fire Protection [Triennial]
Triennial 8
4 Complete completed in previous year(s) 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 4
3 Complete 7111107A Heat Sink Performance Annually 2
1 Complete 7111107T Heat Sink Performance Triennial 0
2 Not Applicable completion not required during this inspection cycle 7111108P Inservice Inspection Activities - PWR Annually 1
1 Complete 7111111A Annual Review Annually 1
1 Complete 7111111B Licensed Operator Requalification Biennial 1
1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 8
8 Complete 7111112Q Maintenance Effectiveness Annually 8
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 19 14 Complete 7111115 Operability Determinations Annually 17 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 37 23 Complete 7111118 Plant Modifications Annually 4
3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 2
2 Complete 7111121 Component Design Bases Inspection Triennial 0
15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams)
Triennial 0
10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0
6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 18 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 4
1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1
1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.


==Enclosure:==
Page:
Page 24 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Wolf Creek (WC) 71124.02 Occupational ALARA Biennial 2
1 Complete 71124.03 Airbore Radioactivity Biennial 1
1 Complete 71124.04 Occupational Dose Assessment Biennial 1
1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1
1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1
1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog.
Biennial 1
1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1
1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
1 Complete 71152 PI&R Annually 8
6 Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 5
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.


Baseline Inspection Completion by Site     (IR Report 8a) cc w/enclosure: M. Scott, RI J. Clark, RIV M. Franke, RII R. Lantz, RIV P. Louden, RIII T. Hipschman, RIV M. Dapas, RIV J. Peralta, NRR K. Kennedy, RIV N. Sanfilippo, NRR A. Vegel, RIV 
Page:
Page 25 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Columbia Generating Station (WNP) 7111101 Adverse Weather Protection Annually 4
4 Complete 7111104 Equipment Alignment (Quarterly)
Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2
2 Complete 7111105A Fire Protection - Annual Annually 1
1 Complete 7111105Q Fire Protection - Quarterly Annually 16 16 Complete 7111105T Fire Protection [Triennial]
Triennial 7
4 Complete 7111105X Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 4
3 Complete 7111107A Heat Sink Performance Annually 1
1 Complete 7111107T Heat Sink Performance Triennial 0
2 Not Applicable completion not required during this inspection cycle 7111108G Inservice Inspection Activities - BWR Annually 1
1 Complete 7111111A Annual Review Annually 0
1 Complete opportunity to apply full procedure not available 7111111B Licensed Operator Requalification Biennial 1
1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 8
8 Complete 7111112Q Maintenance Effectiveness Annually 8
8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 15 14 Complete 7111115 Operability Determinations Annually 17 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 39 23 Complete completed in previous year(s) 7111118 Plant Modifications Annually 5
3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 1
2 Complete by reference iaw IMC 0306 7111121 Component Design Bases Inspection Triennial 0
15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams)
Triennial 0
10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0
6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 16 14 Complete 7111401 Exercise Evaluation Biennial 0
1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1
1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1
1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 5
1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1
1 Complete 7111406 Drill Evaluation Annually 3
3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1
1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.


SUNSI Review By:  ERuesch ADAMS  Yes    No  Publicly Available  Non-Publicly Available  Non-Sensitive  Sensitive Keyword: RGN-002 OFFICE DRS/IPAT TL:DRS/IPAT D:DRS D:DRP    NAME ERuesch THipschman AVegel TPruett    SIGNATURE /RA/ /RA/ /RA/ /RA/    DATE 2/25/16 2/25/16 2/25/16 2/26/16 Page:Page 1 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Arkansas Nuclear One (ANO)7111101Adverse Weather ProtectionAnnually54Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment  AlignmentSemiannually22Complete7111105AFire Protection -  AnnualAnnually21Complete7111105QFire Protection - QuarterlyAnnually1816Complete7111105TFire Protection [Triennial]Triennial04Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03Not Applicablecompletion not required during this inspection cycle7111106Flood Protection MeasuresAnnually33Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial32Complete7111108PInservice Inspection Activities - PWRAnnually31Complete7111111AAnnual ReviewAnnually11Complete7111111BLicensed Operator RequalificationBiennial21Completecompleted in previous year(s)7111111QLicensed Operator RequalificationAnnually178Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1514Complete7111115Operability DeterminationsAnnually2619Complete7111117TChanges, Tests, Exper, Perm ModsTriennial4723Completecompleted in previous year(s)7111118Plant ModificationsAnnually53Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually32Complete7111121Component Design Bases InspectionTriennial015Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually2114Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Complete7111403EP Organizational Staffing/AugmentationBiennial11Complete7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually51Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Complete7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:
Page:Page 2 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Arkansas Nuclear One (ANO)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Complete71124.05Radiation Monitoring InstrumentationBiennial11Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial21Completecompleted in previous year(s)71151Performance Indicator VerficationAnnually2424Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually76Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually51CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page 26 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Page:Page 3 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Callaway (CALL)7111101Adverse Weather ProtectionAnnually44Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment  AlignmentSemiannually22Complete7111105AFire Protection -  AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1816Complete7111105TFire Protection [Triennial]Triennial04Completeby reference iaw IMC 03067111105XFire Protection - NFPA 805 (Triennial)Triennial103Complete7111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial02Not Applicablecompletion not required during this inspection cycle7111108PInservice Inspection Activities - PWRAnnually01Completecompleted in previous year(s)7111111AAnnual ReviewAnnually01Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1814Complete7111115Operability DeterminationsAnnually1715Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023Not Applicablecompletion not required during this inspection cycle7111118Plant ModificationsAnnually33Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually22Complete7111121Component Design Bases InspectionTriennial2615Completecompleted in previous year(s)7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Complete7111122Surveillance TestingAnnually1814Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually41Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Columbia Generating Station (WNP) 71124.02 Occupational ALARA Biennial 2
Page:Page 4 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Callaway (CALL)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial11Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Completecompleted in previous year(s)71153Followup of Events and NOEDAnnually41CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
1 Complete 71124.03 Airbore Radioactivity Biennial 1
Page:Page 5 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Cooper (CNS)7111101Adverse Weather ProtectionAnnually64Complete7111104Equipment Alignment (Quarterly)Annually1312Complete7111104SEquipment  AlignmentSemiannually22Complete7111105AFire Protection -  AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1716Complete7111105TFire Protection [Triennial]Triennial04Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03Not Applicablecompletion not required during this inspection cycle7111106Flood Protection MeasuresAnnually33Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial32Complete7111108GInservice Inspection Activities - BWRAnnually01Completecompleted in previous year(s)7111111AAnnual ReviewAnnually01Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually98Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1714Complete7111115Operability DeterminationsAnnually1815Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023Not Applicablecompletion not required during this inspection cycle7111118Plant ModificationsAnnually63Complete7111119Post Maintenance TestingAnnually2220Complete7111120Refueling and Other Outage ActivitiesAnnually12Completeby reference iaw IMC 03067111121Component Design Bases InspectionTriennial2215Complete7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually1614Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Complete7111403EP Organizational Staffing/AugmentationBiennial11Complete7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually81Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial21Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1
Page:Page 6 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Cooper (CNS)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial11Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually86Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually61CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1
Page:Page 7 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Comanche Peak (CP)7111101Adverse Weather ProtectionAnnually44Complete7111104Equipment Alignment (Quarterly)Annually1312Complete7111104SEquipment  AlignmentSemiannually22Complete7111105AFire Protection -  AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1716Complete7111105TFire Protection [Triennial]Triennial64Completecompleted in previous year(s)7111105XFire Protection - NFPA 805 (Triennial)Triennial03Completeby reference iaw IMC 03067111106Flood Protection MeasuresAnnually33Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial42Completecompleted in previous year(s)7111108PInservice Inspection Activities - PWRAnnually11Complete7111111AAnnual ReviewAnnually01Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1614Complete7111115Operability DeterminationsAnnually2219Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023Not Applicablecompletion not required during this inspection cycle7111118Plant ModificationsAnnually33Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually12Completeby reference iaw IMC 03067111121Component Design Bases InspectionTriennial2215Complete7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Complete7111122Surveillance TestingAnnually1814Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually21Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1
Page:Page 8 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Comanche Peak (CP)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Complete71124.04Occupational Dose AssessmentBiennial11Complete71124.05Radiation Monitoring InstrumentationBiennial11Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Completecompleted in previous year(s)71151Performance Indicator VerficationAnnually2424Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually91CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
1 Complete 71124.07 Rad. Environ. Monitoring Prog.
Page:Page 9 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Diablo Canyon (DIAB)7111101Adverse Weather ProtectionAnnually64Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment  AlignmentSemiannually22Complete7111105AFire Protection -  AnnualAnnually21Complete7111105QFire Protection - QuarterlyAnnually1716Complete7111105TFire Protection [Triennial]Triennial04Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03Not Applicablecompletion not required during this inspection cycle7111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial02Not Applicablecompletion not required during this inspection cycle7111108PInservice Inspection Activities - PWRAnnually11Complete7111111AAnnual ReviewAnnually11Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually108Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually2014Complete7111115Operability DeterminationsAnnually1919Complete7111117TChanges, Tests, Exper, Perm ModsTriennial4323Completecompleted in previous year(s)7111118Plant ModificationsAnnually73Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually22Complete7111121Component Design Bases InspectionTriennial015Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually2414Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Complete7111403EP Organizational Staffing/AugmentationBiennial11Complete7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually161Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Complete7111406Drill EvaluationAnnually43Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Biennial 1
Page:Page 10 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Diablo Canyon (DIAB)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Complete71124.04Occupational Dose AssessmentBiennial11Complete71124.05Radiation Monitoring InstrumentationBiennial11Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Completecompleted in previous year(s)71151Performance Indicator VerficationAnnually2424Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually76Complete71152BPI&R (Biennial)Biennial11Completecompleted in previous year(s)71153Followup of Events and NOEDAnnually101CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1
Page:Page 11 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Fort Calhoun (FCS)7111101Adverse Weather ProtectionAnnually74Complete7111104Equipment Alignment (Quarterly)Annually1512Complete7111104SEquipment  AlignmentSemiannually32Complete7111105AFire Protection -  AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually2216Complete7111105TFire Protection [Triennial]Triennial04Completeby reference iaw IMC 03067111105XFire Protection - NFPA 805 (Triennial)Triennial53Complete7111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually21Complete7111107THeat Sink PerformanceTriennial32Completecompleted in previous year(s)7111108PInservice Inspection Activities - PWRAnnually11Complete7111111AAnnual ReviewAnnually11Complete7111111BLicensed Operator RequalificationBiennial21Completecompleted in previous year(s)7111111QLicensed Operator RequalificationAnnually138Complete7111112QMaintenance EffectivenessAnnually98Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1914Complete7111115Operability DeterminationsAnnually4915Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023Not Applicablecompletion not required during this inspection cycle7111118Plant ModificationsAnnually53Complete7111119Post Maintenance TestingAnnually2420Complete7111120Refueling and Other Outage ActivitiesAnnually22Complete7111121Component Design Bases InspectionTriennial2215Complete7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually1914Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually101Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3
Page:Page 12 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Fort Calhoun (FCS)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Complete71124.04Occupational Dose AssessmentBiennial21Complete71124.05Radiation Monitoring InstrumentationBiennial11Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Completecompleted in previous year(s)71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually126Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually191CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
3 Complete 71151 Performance Indicator Verfication Not Applicable 1
Page:Page 13 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Grand Gulf (GG)7111101Adverse Weather ProtectionAnnually64Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment  AlignmentSemiannually22Complete7111105AFire Protection -  AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually2116Complete7111105TFire Protection [Triennial]Triennial44Completecompleted in previous year(s)7111105XFire Protection - NFPA 805 (Triennial)Triennial03Completeby reference iaw IMC 03067111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial02Not Applicablecompletion not required during this inspection cycle7111108GInservice Inspection Activities - BWRAnnually01Completecompleted in previous year(s)7111111AAnnual ReviewAnnually01Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1514Complete7111115Operability DeterminationsAnnually1815Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023Not Applicablecompletion not required during this inspection cycle7111118Plant ModificationsAnnually43Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually02Completefull sample not available7111121Component Design Bases InspectionTriennial2215Complete7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually2314Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually01Completeopportunity to apply full procedure not available7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
1 Complete 71152 PI&R Annually 6
Page:Page 14 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Grand Gulf (GG)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial11Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually21CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
6 Complete 71152B PI&R (Biennial)
Page:Page 15 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Palo Verde (PALO)7111101Adverse Weather ProtectionAnnually44Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment  AlignmentSemiannually32Complete7111105AFire Protection -  AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1816Complete7111105TFire Protection [Triennial]Triennial04Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03Not Applicablecompletion not required during this inspection cycle7111106Flood Protection MeasuresAnnually33Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial42Complete7111108PInservice Inspection Activities - PWRAnnually21Complete7111111AAnnual ReviewAnnually11Complete7111111BLicensed Operator RequalificationBiennial21Completecompleted in previous year(s)7111111QLicensed Operator RequalificationAnnually98Complete7111112QMaintenance EffectivenessAnnually98Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1614Complete7111115Operability DeterminationsAnnually2422Complete7111117TChanges, Tests, Exper, Perm ModsTriennial5423Completecompleted in previous year(s)7111118Plant ModificationsAnnually43Complete7111119Post Maintenance TestingAnnually2120Complete7111120Refueling and Other Outage ActivitiesAnnually22Complete7111121Component Design Bases InspectionTriennial015Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually2214Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually51Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Biennial 1
Page:Page 16 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Palo Verde (PALO)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial11Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually3535Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually86Complete71152BPI&R (Biennial)Biennial11Completecompleted in previous year(s)71153Followup of Events and NOEDAnnually91CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
1 Complete 71153 Followup of Events and NOED Annually 7
Page:Page 17 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:River Bend (RBS)7111101Adverse Weather ProtectionAnnually44Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment  AlignmentSemiannually22Complete7111105AFire Protection -  AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1716Complete7111105TFire Protection [Triennial]Triennial04Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03Not Applicablecompletion not required during this inspection cycle7111106Flood Protection MeasuresAnnually33Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial32Completecompleted in previous year(s)7111108GInservice Inspection Activities - BWRAnnually11Complete7111111AAnnual ReviewAnnually11Complete7111111BLicensed Operator RequalificationBiennial11Completecompleted in previous year(s)7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1414Complete7111115Operability DeterminationsAnnually1615Complete7111117TChanges, Tests, Exper, Perm ModsTriennial3823Complete7111118Plant ModificationsAnnually43Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually22Complete7111121Component Design Bases InspectionTriennial2615Completecompleted in previous year(s)7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually2014Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Complete7111403EP Organizational Staffing/AugmentationBiennial11Complete7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually61Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Complete7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.}}
Page:Page 18 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:River Bend (RBS)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial21Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually91CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 19 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:South Texas Project (STP)7111101Adverse Weather ProtectionAnnually64Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment  AlignmentSemiannually22Complete7111105AFire Protection -  AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually2116Complete7111105TFire Protection [Triennial]Triennial54Completecompleted in previous year(s)7111105XFire Protection - NFPA 805 (Triennial)Triennial03Completeby reference iaw IMC 03067111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial42Complete7111108PInservice Inspection Activities - PWRAnnually21Complete7111111AAnnual ReviewAnnually11Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually2014Complete7111115Operability DeterminationsAnnually2019Complete7111117TChanges, Tests, Exper, Perm ModsTriennial4323Complete7111118Plant ModificationsAnnually53Complete7111119Post Maintenance TestingAnnually2120Complete7111120Refueling and Other Outage ActivitiesAnnually42Complete7111121Component Design Bases InspectionTriennial015Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually2314Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Complete7111403EP Organizational Staffing/AugmentationBiennial11Complete7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually71Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Complete7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 20 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:South Texas Project (STP)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Complete71124.04Occupational Dose AssessmentBiennial11Complete71124.05Radiation Monitoring InstrumentationBiennial11Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Completecompleted in previous year(s)71151Performance Indicator VerficationAnnually2424Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Completecompleted in previous year(s)71153Followup of Events and NOEDAnnually31CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 21 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Waterford (WAT)7111101Adverse Weather ProtectionAnnually54Complete7111104Equipment Alignment (Quarterly)Annually1412Complete7111104SEquipment  AlignmentSemiannually22Complete7111105AFire Protection -  AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1816Complete7111105TFire Protection [Triennial]Triennial44Complete7111105XFire Protection - NFPA 805 (Triennial)Triennial03Not Applicablecompletion not required during this inspection cycle7111106Flood Protection MeasuresAnnually33Complete7111107AHeat Sink PerformanceAnnually21Complete7111107THeat Sink PerformanceTriennial32Completecompleted in previous year(s)7111108PInservice Inspection Activities - PWRAnnually11Completecompleted in previous year(s)7111111AAnnual ReviewAnnually01Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1914Complete7111115Operability DeterminationsAnnually1815Complete7111117TChanges, Tests, Exper, Perm ModsTriennial3723Complete7111118Plant ModificationsAnnually43Complete7111119Post Maintenance TestingAnnually2120Complete7111120Refueling and Other Outage ActivitiesAnnually12Completefull sample not available7111121Component Design Bases InspectionTriennial2415Completecompleted in previous year(s)7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Complete7111122Surveillance TestingAnnually1714Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually41Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 22 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Waterford (WAT)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial11Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Completecompleted in previous year(s)71153Followup of Events and NOEDAnnually61CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 23 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Wolf Creek (WC)7111101Adverse Weather ProtectionAnnually64Complete7111104Equipment Alignment (Quarterly)Annually1312Complete7111104SEquipment  AlignmentSemiannually22Complete7111105AFire Protection -  AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually2016Complete7111105TFire Protection [Triennial]Triennial84Completecompleted in previous year(s)7111105XFire Protection - NFPA 805 (Triennial)Triennial03Completeby reference iaw IMC 03067111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually21Complete7111107THeat Sink PerformanceTriennial02Not Applicablecompletion not required during this inspection cycle7111108PInservice Inspection Activities - PWRAnnually11Complete7111111AAnnual ReviewAnnually11Complete7111111BLicensed Operator RequalificationBiennial11Completecompleted in previous year(s)7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1914Complete7111115Operability DeterminationsAnnually1715Complete7111117TChanges, Tests, Exper, Perm ModsTriennial3723Complete7111118Plant ModificationsAnnually43Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually22Complete7111121Component Design Bases InspectionTriennial015Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually1814Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually41Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 24 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Wolf Creek (WC)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Complete71124.04Occupational Dose AssessmentBiennial11Complete71124.05Radiation Monitoring InstrumentationBiennial11Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Completecompleted in previous year(s)71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually86Complete71152BPI&R (Biennial)Biennial11Completecompleted in previous year(s)71153Followup of Events and NOEDAnnually51CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 25 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Columbia Generating Station (WNP)7111101Adverse Weather ProtectionAnnually44Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment  AlignmentSemiannually22Complete7111105AFire Protection -  AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1616Complete7111105TFire Protection [Triennial]Triennial74Complete7111105XFire Protection - NFPA 805 (Triennial)Triennial03Completeby reference iaw IMC 03067111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial02Not Applicablecompletion not required during this inspection cycle7111108GInservice Inspection Activities - BWRAnnually11Complete7111111AAnnual ReviewAnnually01Completeopportunity to apply full procedure not available7111111BLicensed Operator RequalificationBiennial11Completecompleted in previous year(s)7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1514Complete7111115Operability DeterminationsAnnually1715Complete7111117TChanges, Tests, Exper, Perm ModsTriennial3923Completecompleted in previous year(s)7111118Plant ModificationsAnnually53Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually12Completeby reference iaw IMC 03067111121Component Design Bases InspectionTriennial015Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually1614Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Complete7111403EP Organizational Staffing/AugmentationBiennial11Complete7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually51Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Complete7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 26 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Columbia Generating Station (WNP)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial11Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually71CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.}}

Latest revision as of 02:49, 10 January 2025

Cy 2015 Baseline Completion
ML16057A123
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/26/2016
From: Troy Pruett
NRC/RGN-IV/DRP
To: Scott(Ois) Morris
Division of Inspection and Regional Support
E. Ruesch
References
Download: ML16057A123 (28)


Text

CONTACT: Eric A. Ruesch, RIV/DRS 817-200-1126 February 26, 2016 MEMORANDUM TO: Scott A. Morris, Director Division of Inspection and Regional Support Office of Nuclear Reactor Regulation FROM:

Troy W. Pruett, Director/RA/

Division of Reactor Projects Region IV

SUBJECT:

CY 2015 BASELINE INSPECTION COMPLETION During calendar year 2015, Region IV completed the baseline inspection program at all regional reactor licensees subject to the Reactor Oversight Process (ROP). Attached is a table which provides the completion status of individual baseline procedures (IR Report 8a). Please note that this data includes only activities for which the region had responsibility; those portions of the baseline inspection program for which other Nuclear Regulatory Commission organizations are responsible are not included.

The Fort Calhoun Station was transitioned from the Inspection Manual Chapter (IMC) 0305 ROP to IMC 0350 oversight effective December 11, 2011. The station remained in IMC 0350 oversight until April 1, 2015. Inspection activities at Fort Calhoun Station during the first quarter of calendar year 2015 were managed by the IMC 0350 process; the minimum inspection requirements of the ROP did not apply until April 1.

If you have any questions or desire additional details, please contact me at 817-200-1248.

Enclosure:

Baseline Inspection Completion by Site (IR Report 8a) cc w/enclosure:

M. Scott, RI J. Clark, RIV M. Franke, RII R. Lantz, RIV P. Louden, RIII T. Hipschman, RIV M. Dapas, RIV J. Peralta, NRR K. Kennedy, RIV N. Sanfilippo, NRR A. Vegel, RIV

SUNSI Review By: ERuesch ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword:

RGN-002 OFFICE DRS/IPAT TL:DRS/IPAT D:DRS D:DRP NAME ERuesch THipschman AVegel TPruett SIGNATURE

/RA/

/RA/

/RA/

/RA/

DATE 2/25/16 2/25/16 2/25/16 2/26/16

Page:

Page 1 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Arkansas Nuclear One (ANO) 7111101 Adverse Weather Protection Annually 5

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2

2 Complete 7111105A Fire Protection - Annual Annually 2

1 Complete 7111105Q Fire Protection - Quarterly Annually 18 16 Complete 7111105T Fire Protection [Triennial]

Triennial 0

4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3

3 Complete 7111107A Heat Sink Performance Annually 1

1 Complete 7111107T Heat Sink Performance Triennial 3

2 Complete 7111108P Inservice Inspection Activities - PWR Annually 3

1 Complete 7111111A Annual Review Annually 1

1 Complete 7111111B Licensed Operator Requalification Biennial 2

1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 17 8

Complete 7111112Q Maintenance Effectiveness Annually 8

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 15 14 Complete 7111115 Operability Determinations Annually 26 19 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 47 23 Complete completed in previous year(s) 7111118 Plant Modifications Annually 5

3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 3

2 Complete 7111121 Component Design Bases Inspection Triennial 0

15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams)

Triennial 0

10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0

6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 21 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 5

1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1

1 Complete 7111406 Drill Evaluation Annually 3

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 2 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Arkansas Nuclear One (ANO) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1

1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1

1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 2

1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 24 24 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 7

6 Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete 71153 Followup of Events and NOED Annually 5

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 3 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Callaway (CALL) 7111101 Adverse Weather Protection Annually 4

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2

2 Complete 7111105A Fire Protection - Annual Annually 1

1 Complete 7111105Q Fire Protection - Quarterly Annually 18 16 Complete 7111105T Fire Protection [Triennial]

Triennial 0

4 Complete by reference iaw IMC 0306 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 10 3

Complete 7111106 Flood Protection Measures Annually 4

3 Complete 7111107A Heat Sink Performance Annually 1

1 Complete 7111107T Heat Sink Performance Triennial 0

2 Not Applicable completion not required during this inspection cycle 7111108P Inservice Inspection Activities - PWR Annually 0

1 Complete completed in previous year(s) 7111111A Annual Review Annually 0

1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1

1 Complete 7111111Q Licensed Operator Requalification Annually 8

8 Complete 7111112Q Maintenance Effectiveness Annually 8

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 18 14 Complete 7111115 Operability Determinations Annually 17 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0

23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 3

3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 2

2 Complete 7111121 Component Design Bases Inspection Triennial 26 15 Complete completed in previous year(s) 7111121M CDBI (Teams)

Triennial 0

10 Complete 7111121N CDBI Programs Triennial 0

6 Complete 7111122 Surveillance Testing Annually 18 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 4

1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1

1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 4 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Callaway (CALL) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1

1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1

1 Complete 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1

1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 6

6 Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 4

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 5 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Cooper (CNS) 7111101 Adverse Weather Protection Annually 6

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 13 12 Complete 7111104S Equipment Alignment Semiannually 2

2 Complete 7111105A Fire Protection - Annual Annually 1

1 Complete 7111105Q Fire Protection - Quarterly Annually 17 16 Complete 7111105T Fire Protection [Triennial]

Triennial 0

4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3

3 Complete 7111107A Heat Sink Performance Annually 1

1 Complete 7111107T Heat Sink Performance Triennial 3

2 Complete 7111108G Inservice Inspection Activities - BWR Annually 0

1 Complete completed in previous year(s) 7111111A Annual Review Annually 0

1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1

1 Complete 7111111Q Licensed Operator Requalification Annually 8

8 Complete 7111112Q Maintenance Effectiveness Annually 9

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 17 14 Complete 7111115 Operability Determinations Annually 18 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0

23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 6

3 Complete 7111119 Post Maintenance Testing Annually 22 20 Complete 7111120 Refueling and Other Outage Activities Annually 1

2 Complete by reference iaw IMC 0306 7111121 Component Design Bases Inspection Triennial 22 15 Complete 7111121M CDBI (Teams)

Triennial 0

10 Complete 7111121N CDBI Programs Triennial 0

6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 16 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 8

1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 2

1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 6 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Cooper (CNS) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1

1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1

1 Complete 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1

1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 8

6 Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete 71153 Followup of Events and NOED Annually 6

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 7 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Comanche Peak (CP) 7111101 Adverse Weather Protection Annually 4

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 13 12 Complete 7111104S Equipment Alignment Semiannually 2

2 Complete 7111105A Fire Protection - Annual Annually 1

1 Complete 7111105Q Fire Protection - Quarterly Annually 17 16 Complete 7111105T Fire Protection [Triennial]

Triennial 6

4 Complete completed in previous year(s) 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 3

3 Complete 7111107A Heat Sink Performance Annually 1

1 Complete 7111107T Heat Sink Performance Triennial 4

2 Complete completed in previous year(s) 7111108P Inservice Inspection Activities - PWR Annually 1

1 Complete 7111111A Annual Review Annually 0

1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1

1 Complete 7111111Q Licensed Operator Requalification Annually 8

8 Complete 7111112Q Maintenance Effectiveness Annually 8

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 16 14 Complete 7111115 Operability Determinations Annually 22 19 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0

23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 3

3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 1

2 Complete by reference iaw IMC 0306 7111121 Component Design Bases Inspection Triennial 22 15 Complete 7111121M CDBI (Teams)

Triennial 0

10 Complete 7111121N CDBI Programs Triennial 0

6 Complete 7111122 Surveillance Testing Annually 18 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 2

1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1

1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 8 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Comanche Peak (CP) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete 71124.04 Occupational Dose Assessment Biennial 1

1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1

1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1

1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 24 24 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 6

6 Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete 71153 Followup of Events and NOED Annually 9

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 9 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Diablo Canyon (DIAB) 7111101 Adverse Weather Protection Annually 6

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2

2 Complete 7111105A Fire Protection - Annual Annually 2

1 Complete 7111105Q Fire Protection - Quarterly Annually 17 16 Complete 7111105T Fire Protection [Triennial]

Triennial 0

4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 4

3 Complete 7111107A Heat Sink Performance Annually 1

1 Complete 7111107T Heat Sink Performance Triennial 0

2 Not Applicable completion not required during this inspection cycle 7111108P Inservice Inspection Activities - PWR Annually 1

1 Complete 7111111A Annual Review Annually 1

1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1

1 Complete 7111111Q Licensed Operator Requalification Annually 10 8

Complete 7111112Q Maintenance Effectiveness Annually 8

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 20 14 Complete 7111115 Operability Determinations Annually 19 19 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 43 23 Complete completed in previous year(s) 7111118 Plant Modifications Annually 7

3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 2

2 Complete 7111121 Component Design Bases Inspection Triennial 0

15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams)

Triennial 0

10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0

6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 24 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 16 1

Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1

1 Complete 7111406 Drill Evaluation Annually 4

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 10 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Diablo Canyon (DIAB) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete 71124.04 Occupational Dose Assessment Biennial 1

1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1

1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1

1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 24 24 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 7

6 Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 10 1

Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 11 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Fort Calhoun (FCS) 7111101 Adverse Weather Protection Annually 7

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 15 12 Complete 7111104S Equipment Alignment Semiannually 3

2 Complete 7111105A Fire Protection - Annual Annually 1

1 Complete 7111105Q Fire Protection - Quarterly Annually 22 16 Complete 7111105T Fire Protection [Triennial]

Triennial 0

4 Complete by reference iaw IMC 0306 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 5

3 Complete 7111106 Flood Protection Measures Annually 4

3 Complete 7111107A Heat Sink Performance Annually 2

1 Complete 7111107T Heat Sink Performance Triennial 3

2 Complete completed in previous year(s) 7111108P Inservice Inspection Activities - PWR Annually 1

1 Complete 7111111A Annual Review Annually 1

1 Complete 7111111B Licensed Operator Requalification Biennial 2

1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 13 8

Complete 7111112Q Maintenance Effectiveness Annually 9

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 19 14 Complete 7111115 Operability Determinations Annually 49 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0

23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 5

3 Complete 7111119 Post Maintenance Testing Annually 24 20 Complete 7111120 Refueling and Other Outage Activities Annually 2

2 Complete 7111121 Component Design Bases Inspection Triennial 22 15 Complete 7111121M CDBI (Teams)

Triennial 0

10 Complete 7111121N CDBI Programs Triennial 0

6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 19 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 10 1

Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1

1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 12 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Fort Calhoun (FCS) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete 71124.04 Occupational Dose Assessment Biennial 2

1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1

1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1

1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 12 6

Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete 71153 Followup of Events and NOED Annually 19 1

Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 13 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Grand Gulf (GG) 7111101 Adverse Weather Protection Annually 6

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2

2 Complete 7111105A Fire Protection - Annual Annually 1

1 Complete 7111105Q Fire Protection - Quarterly Annually 21 16 Complete 7111105T Fire Protection [Triennial]

Triennial 4

4 Complete completed in previous year(s) 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 4

3 Complete 7111107A Heat Sink Performance Annually 1

1 Complete 7111107T Heat Sink Performance Triennial 0

2 Not Applicable completion not required during this inspection cycle 7111108G Inservice Inspection Activities - BWR Annually 0

1 Complete completed in previous year(s) 7111111A Annual Review Annually 0

1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1

1 Complete 7111111Q Licensed Operator Requalification Annually 8

8 Complete 7111112Q Maintenance Effectiveness Annually 8

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 15 14 Complete 7111115 Operability Determinations Annually 18 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0

23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 4

3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 0

2 Complete full sample not available 7111121 Component Design Bases Inspection Triennial 22 15 Complete 7111121M CDBI (Teams)

Triennial 0

10 Complete 7111121N CDBI Programs Triennial 0

6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 23 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 0

1 Complete opportunity to apply full procedure not available 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1

1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 14 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Grand Gulf (GG) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1

1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1

1 Complete 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1

1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 6

6 Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete 71153 Followup of Events and NOED Annually 2

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 15 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Palo Verde (PALO) 7111101 Adverse Weather Protection Annually 4

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 3

2 Complete 7111105A Fire Protection - Annual Annually 1

1 Complete 7111105Q Fire Protection - Quarterly Annually 18 16 Complete 7111105T Fire Protection [Triennial]

Triennial 0

4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3

3 Complete 7111107A Heat Sink Performance Annually 1

1 Complete 7111107T Heat Sink Performance Triennial 4

2 Complete 7111108P Inservice Inspection Activities - PWR Annually 2

1 Complete 7111111A Annual Review Annually 1

1 Complete 7111111B Licensed Operator Requalification Biennial 2

1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 9

8 Complete 7111112Q Maintenance Effectiveness Annually 9

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 16 14 Complete 7111115 Operability Determinations Annually 24 22 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 54 23 Complete completed in previous year(s) 7111118 Plant Modifications Annually 4

3 Complete 7111119 Post Maintenance Testing Annually 21 20 Complete 7111120 Refueling and Other Outage Activities Annually 2

2 Complete 7111121 Component Design Bases Inspection Triennial 0

15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams)

Triennial 0

10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0

6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 22 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 5

1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1

1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 16 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Palo Verde (PALO) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1

1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1

1 Complete 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1

1 Complete 71151 Performance Indicator Verfication Annually 35 35 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 8

6 Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 9

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 17 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: River Bend (RBS) 7111101 Adverse Weather Protection Annually 4

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2

2 Complete 7111105A Fire Protection - Annual Annually 1

1 Complete 7111105Q Fire Protection - Quarterly Annually 17 16 Complete 7111105T Fire Protection [Triennial]

Triennial 0

4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3

3 Complete 7111107A Heat Sink Performance Annually 1

1 Complete 7111107T Heat Sink Performance Triennial 3

2 Complete completed in previous year(s) 7111108G Inservice Inspection Activities - BWR Annually 1

1 Complete 7111111A Annual Review Annually 1

1 Complete 7111111B Licensed Operator Requalification Biennial 1

1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 8

8 Complete 7111112Q Maintenance Effectiveness Annually 8

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 14 14 Complete 7111115 Operability Determinations Annually 16 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 38 23 Complete 7111118 Plant Modifications Annually 4

3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 2

2 Complete 7111121 Component Design Bases Inspection Triennial 26 15 Complete completed in previous year(s) 7111121M CDBI (Teams)

Triennial 0

10 Complete 7111121N CDBI Programs Triennial 0

6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 20 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 6

1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1

1 Complete 7111406 Drill Evaluation Annually 3

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 18 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: River Bend (RBS) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1

1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 2

1 Complete 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1

1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 6

6 Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete 71153 Followup of Events and NOED Annually 9

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 19 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: South Texas Project (STP) 7111101 Adverse Weather Protection Annually 6

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2

2 Complete 7111105A Fire Protection - Annual Annually 1

1 Complete 7111105Q Fire Protection - Quarterly Annually 21 16 Complete 7111105T Fire Protection [Triennial]

Triennial 5

4 Complete completed in previous year(s) 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 4

3 Complete 7111107A Heat Sink Performance Annually 1

1 Complete 7111107T Heat Sink Performance Triennial 4

2 Complete 7111108P Inservice Inspection Activities - PWR Annually 2

1 Complete 7111111A Annual Review Annually 1

1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1

1 Complete 7111111Q Licensed Operator Requalification Annually 8

8 Complete 7111112Q Maintenance Effectiveness Annually 8

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 20 14 Complete 7111115 Operability Determinations Annually 20 19 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 43 23 Complete 7111118 Plant Modifications Annually 5

3 Complete 7111119 Post Maintenance Testing Annually 21 20 Complete 7111120 Refueling and Other Outage Activities Annually 4

2 Complete 7111121 Component Design Bases Inspection Triennial 0

15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams)

Triennial 0

10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0

6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 23 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 7

1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1

1 Complete 7111406 Drill Evaluation Annually 3

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 20 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: South Texas Project (STP) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete 71124.04 Occupational Dose Assessment Biennial 1

1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1

1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1

1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 24 24 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 6

6 Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 3

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 21 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Waterford (WAT) 7111101 Adverse Weather Protection Annually 5

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 14 12 Complete 7111104S Equipment Alignment Semiannually 2

2 Complete 7111105A Fire Protection - Annual Annually 1

1 Complete 7111105Q Fire Protection - Quarterly Annually 18 16 Complete 7111105T Fire Protection [Triennial]

Triennial 4

4 Complete 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3

3 Complete 7111107A Heat Sink Performance Annually 2

1 Complete 7111107T Heat Sink Performance Triennial 3

2 Complete completed in previous year(s) 7111108P Inservice Inspection Activities - PWR Annually 1

1 Complete completed in previous year(s) 7111111A Annual Review Annually 0

1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1

1 Complete 7111111Q Licensed Operator Requalification Annually 8

8 Complete 7111112Q Maintenance Effectiveness Annually 8

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 19 14 Complete 7111115 Operability Determinations Annually 18 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 37 23 Complete 7111118 Plant Modifications Annually 4

3 Complete 7111119 Post Maintenance Testing Annually 21 20 Complete 7111120 Refueling and Other Outage Activities Annually 1

2 Complete full sample not available 7111121 Component Design Bases Inspection Triennial 24 15 Complete completed in previous year(s) 7111121M CDBI (Teams)

Triennial 0

10 Complete 7111121N CDBI Programs Triennial 0

6 Complete 7111122 Surveillance Testing Annually 17 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 4

1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1

1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 22 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Waterford (WAT) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1

1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1

1 Complete 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1

1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 6

6 Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 6

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 23 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Wolf Creek (WC) 7111101 Adverse Weather Protection Annually 6

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 13 12 Complete 7111104S Equipment Alignment Semiannually 2

2 Complete 7111105A Fire Protection - Annual Annually 1

1 Complete 7111105Q Fire Protection - Quarterly Annually 20 16 Complete 7111105T Fire Protection [Triennial]

Triennial 8

4 Complete completed in previous year(s) 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 4

3 Complete 7111107A Heat Sink Performance Annually 2

1 Complete 7111107T Heat Sink Performance Triennial 0

2 Not Applicable completion not required during this inspection cycle 7111108P Inservice Inspection Activities - PWR Annually 1

1 Complete 7111111A Annual Review Annually 1

1 Complete 7111111B Licensed Operator Requalification Biennial 1

1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 8

8 Complete 7111112Q Maintenance Effectiveness Annually 8

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 19 14 Complete 7111115 Operability Determinations Annually 17 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 37 23 Complete 7111118 Plant Modifications Annually 4

3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 2

2 Complete 7111121 Component Design Bases Inspection Triennial 0

15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams)

Triennial 0

10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0

6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 18 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 4

1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1

1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 24 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Wolf Creek (WC) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete 71124.04 Occupational Dose Assessment Biennial 1

1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1

1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1

1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 8

6 Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 5

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 25 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Columbia Generating Station (WNP) 7111101 Adverse Weather Protection Annually 4

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2

2 Complete 7111105A Fire Protection - Annual Annually 1

1 Complete 7111105Q Fire Protection - Quarterly Annually 16 16 Complete 7111105T Fire Protection [Triennial]

Triennial 7

4 Complete 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 4

3 Complete 7111107A Heat Sink Performance Annually 1

1 Complete 7111107T Heat Sink Performance Triennial 0

2 Not Applicable completion not required during this inspection cycle 7111108G Inservice Inspection Activities - BWR Annually 1

1 Complete 7111111A Annual Review Annually 0

1 Complete opportunity to apply full procedure not available 7111111B Licensed Operator Requalification Biennial 1

1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 8

8 Complete 7111112Q Maintenance Effectiveness Annually 8

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 15 14 Complete 7111115 Operability Determinations Annually 17 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 39 23 Complete completed in previous year(s) 7111118 Plant Modifications Annually 5

3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 1

2 Complete by reference iaw IMC 0306 7111121 Component Design Bases Inspection Triennial 0

15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams)

Triennial 0

10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0

6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 16 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 5

1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1

1 Complete 7111406 Drill Evaluation Annually 3

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 26 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Columbia Generating Station (WNP) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1

1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1

1 Complete 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1

1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 6

6 Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete 71153 Followup of Events and NOED Annually 7

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

CONTACT: Eric A. Ruesch, RIV/DRS 817-200-1126 February 26, 2016 MEMORANDUM TO: Scott A. Morris, Director Division of Inspection and Regional Support Office of Nuclear Reactor Regulation FROM:

Troy W. Pruett, Director/RA/

Division of Reactor Projects Region IV

SUBJECT:

CY 2015 BASELINE INSPECTION COMPLETION During calendar year 2015, Region IV completed the baseline inspection program at all regional reactor licensees subject to the Reactor Oversight Process (ROP). Attached is a table which provides the completion status of individual baseline procedures (IR Report 8a). Please note that this data includes only activities for which the region had responsibility; those portions of the baseline inspection program for which other Nuclear Regulatory Commission organizations are responsible are not included.

The Fort Calhoun Station was transitioned from the Inspection Manual Chapter (IMC) 0305 ROP to IMC 0350 oversight effective December 11, 2011. The station remained in IMC 0350 oversight until April 1, 2015. Inspection activities at Fort Calhoun Station during the first quarter of calendar year 2015 were managed by the IMC 0350 process; the minimum inspection requirements of the ROP did not apply until April 1.

If you have any questions or desire additional details, please contact me at 817-200-1248.

Enclosure:

Baseline Inspection Completion by Site (IR Report 8a) cc w/enclosure:

M. Scott, RI J. Clark, RIV M. Franke, RII R. Lantz, RIV P. Louden, RIII T. Hipschman, RIV M. Dapas, RIV J. Peralta, NRR K. Kennedy, RIV N. Sanfilippo, NRR A. Vegel, RIV

SUNSI Review By: ERuesch ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword:

RGN-002 OFFICE DRS/IPAT TL:DRS/IPAT D:DRS D:DRP NAME ERuesch THipschman AVegel TPruett SIGNATURE

/RA/

/RA/

/RA/

/RA/

DATE 2/25/16 2/25/16 2/25/16 2/26/16

Page:

Page 1 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Arkansas Nuclear One (ANO) 7111101 Adverse Weather Protection Annually 5

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2

2 Complete 7111105A Fire Protection - Annual Annually 2

1 Complete 7111105Q Fire Protection - Quarterly Annually 18 16 Complete 7111105T Fire Protection [Triennial]

Triennial 0

4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3

3 Complete 7111107A Heat Sink Performance Annually 1

1 Complete 7111107T Heat Sink Performance Triennial 3

2 Complete 7111108P Inservice Inspection Activities - PWR Annually 3

1 Complete 7111111A Annual Review Annually 1

1 Complete 7111111B Licensed Operator Requalification Biennial 2

1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 17 8

Complete 7111112Q Maintenance Effectiveness Annually 8

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 15 14 Complete 7111115 Operability Determinations Annually 26 19 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 47 23 Complete completed in previous year(s) 7111118 Plant Modifications Annually 5

3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 3

2 Complete 7111121 Component Design Bases Inspection Triennial 0

15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams)

Triennial 0

10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0

6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 21 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 5

1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1

1 Complete 7111406 Drill Evaluation Annually 3

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 2 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Arkansas Nuclear One (ANO) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1

1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1

1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 2

1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 24 24 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 7

6 Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete 71153 Followup of Events and NOED Annually 5

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 3 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Callaway (CALL) 7111101 Adverse Weather Protection Annually 4

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2

2 Complete 7111105A Fire Protection - Annual Annually 1

1 Complete 7111105Q Fire Protection - Quarterly Annually 18 16 Complete 7111105T Fire Protection [Triennial]

Triennial 0

4 Complete by reference iaw IMC 0306 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 10 3

Complete 7111106 Flood Protection Measures Annually 4

3 Complete 7111107A Heat Sink Performance Annually 1

1 Complete 7111107T Heat Sink Performance Triennial 0

2 Not Applicable completion not required during this inspection cycle 7111108P Inservice Inspection Activities - PWR Annually 0

1 Complete completed in previous year(s) 7111111A Annual Review Annually 0

1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1

1 Complete 7111111Q Licensed Operator Requalification Annually 8

8 Complete 7111112Q Maintenance Effectiveness Annually 8

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 18 14 Complete 7111115 Operability Determinations Annually 17 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0

23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 3

3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 2

2 Complete 7111121 Component Design Bases Inspection Triennial 26 15 Complete completed in previous year(s) 7111121M CDBI (Teams)

Triennial 0

10 Complete 7111121N CDBI Programs Triennial 0

6 Complete 7111122 Surveillance Testing Annually 18 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 4

1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1

1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 4 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Callaway (CALL) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1

1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1

1 Complete 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1

1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 6

6 Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 4

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 5 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Cooper (CNS) 7111101 Adverse Weather Protection Annually 6

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 13 12 Complete 7111104S Equipment Alignment Semiannually 2

2 Complete 7111105A Fire Protection - Annual Annually 1

1 Complete 7111105Q Fire Protection - Quarterly Annually 17 16 Complete 7111105T Fire Protection [Triennial]

Triennial 0

4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3

3 Complete 7111107A Heat Sink Performance Annually 1

1 Complete 7111107T Heat Sink Performance Triennial 3

2 Complete 7111108G Inservice Inspection Activities - BWR Annually 0

1 Complete completed in previous year(s) 7111111A Annual Review Annually 0

1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1

1 Complete 7111111Q Licensed Operator Requalification Annually 8

8 Complete 7111112Q Maintenance Effectiveness Annually 9

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 17 14 Complete 7111115 Operability Determinations Annually 18 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0

23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 6

3 Complete 7111119 Post Maintenance Testing Annually 22 20 Complete 7111120 Refueling and Other Outage Activities Annually 1

2 Complete by reference iaw IMC 0306 7111121 Component Design Bases Inspection Triennial 22 15 Complete 7111121M CDBI (Teams)

Triennial 0

10 Complete 7111121N CDBI Programs Triennial 0

6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 16 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 8

1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 2

1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 6 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Cooper (CNS) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1

1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1

1 Complete 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1

1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 8

6 Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete 71153 Followup of Events and NOED Annually 6

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 7 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Comanche Peak (CP) 7111101 Adverse Weather Protection Annually 4

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 13 12 Complete 7111104S Equipment Alignment Semiannually 2

2 Complete 7111105A Fire Protection - Annual Annually 1

1 Complete 7111105Q Fire Protection - Quarterly Annually 17 16 Complete 7111105T Fire Protection [Triennial]

Triennial 6

4 Complete completed in previous year(s) 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 3

3 Complete 7111107A Heat Sink Performance Annually 1

1 Complete 7111107T Heat Sink Performance Triennial 4

2 Complete completed in previous year(s) 7111108P Inservice Inspection Activities - PWR Annually 1

1 Complete 7111111A Annual Review Annually 0

1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1

1 Complete 7111111Q Licensed Operator Requalification Annually 8

8 Complete 7111112Q Maintenance Effectiveness Annually 8

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 16 14 Complete 7111115 Operability Determinations Annually 22 19 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0

23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 3

3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 1

2 Complete by reference iaw IMC 0306 7111121 Component Design Bases Inspection Triennial 22 15 Complete 7111121M CDBI (Teams)

Triennial 0

10 Complete 7111121N CDBI Programs Triennial 0

6 Complete 7111122 Surveillance Testing Annually 18 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 2

1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1

1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 8 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Comanche Peak (CP) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete 71124.04 Occupational Dose Assessment Biennial 1

1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1

1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1

1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 24 24 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 6

6 Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete 71153 Followup of Events and NOED Annually 9

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 9 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Diablo Canyon (DIAB) 7111101 Adverse Weather Protection Annually 6

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2

2 Complete 7111105A Fire Protection - Annual Annually 2

1 Complete 7111105Q Fire Protection - Quarterly Annually 17 16 Complete 7111105T Fire Protection [Triennial]

Triennial 0

4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 4

3 Complete 7111107A Heat Sink Performance Annually 1

1 Complete 7111107T Heat Sink Performance Triennial 0

2 Not Applicable completion not required during this inspection cycle 7111108P Inservice Inspection Activities - PWR Annually 1

1 Complete 7111111A Annual Review Annually 1

1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1

1 Complete 7111111Q Licensed Operator Requalification Annually 10 8

Complete 7111112Q Maintenance Effectiveness Annually 8

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 20 14 Complete 7111115 Operability Determinations Annually 19 19 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 43 23 Complete completed in previous year(s) 7111118 Plant Modifications Annually 7

3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 2

2 Complete 7111121 Component Design Bases Inspection Triennial 0

15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams)

Triennial 0

10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0

6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 24 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 16 1

Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1

1 Complete 7111406 Drill Evaluation Annually 4

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 10 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Diablo Canyon (DIAB) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete 71124.04 Occupational Dose Assessment Biennial 1

1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1

1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1

1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 24 24 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 7

6 Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 10 1

Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 11 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Fort Calhoun (FCS) 7111101 Adverse Weather Protection Annually 7

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 15 12 Complete 7111104S Equipment Alignment Semiannually 3

2 Complete 7111105A Fire Protection - Annual Annually 1

1 Complete 7111105Q Fire Protection - Quarterly Annually 22 16 Complete 7111105T Fire Protection [Triennial]

Triennial 0

4 Complete by reference iaw IMC 0306 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 5

3 Complete 7111106 Flood Protection Measures Annually 4

3 Complete 7111107A Heat Sink Performance Annually 2

1 Complete 7111107T Heat Sink Performance Triennial 3

2 Complete completed in previous year(s) 7111108P Inservice Inspection Activities - PWR Annually 1

1 Complete 7111111A Annual Review Annually 1

1 Complete 7111111B Licensed Operator Requalification Biennial 2

1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 13 8

Complete 7111112Q Maintenance Effectiveness Annually 9

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 19 14 Complete 7111115 Operability Determinations Annually 49 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0

23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 5

3 Complete 7111119 Post Maintenance Testing Annually 24 20 Complete 7111120 Refueling and Other Outage Activities Annually 2

2 Complete 7111121 Component Design Bases Inspection Triennial 22 15 Complete 7111121M CDBI (Teams)

Triennial 0

10 Complete 7111121N CDBI Programs Triennial 0

6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 19 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 10 1

Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1

1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 12 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Fort Calhoun (FCS) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete 71124.04 Occupational Dose Assessment Biennial 2

1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1

1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1

1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 12 6

Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete 71153 Followup of Events and NOED Annually 19 1

Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 13 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Grand Gulf (GG) 7111101 Adverse Weather Protection Annually 6

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2

2 Complete 7111105A Fire Protection - Annual Annually 1

1 Complete 7111105Q Fire Protection - Quarterly Annually 21 16 Complete 7111105T Fire Protection [Triennial]

Triennial 4

4 Complete completed in previous year(s) 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 4

3 Complete 7111107A Heat Sink Performance Annually 1

1 Complete 7111107T Heat Sink Performance Triennial 0

2 Not Applicable completion not required during this inspection cycle 7111108G Inservice Inspection Activities - BWR Annually 0

1 Complete completed in previous year(s) 7111111A Annual Review Annually 0

1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1

1 Complete 7111111Q Licensed Operator Requalification Annually 8

8 Complete 7111112Q Maintenance Effectiveness Annually 8

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 15 14 Complete 7111115 Operability Determinations Annually 18 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0

23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 4

3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 0

2 Complete full sample not available 7111121 Component Design Bases Inspection Triennial 22 15 Complete 7111121M CDBI (Teams)

Triennial 0

10 Complete 7111121N CDBI Programs Triennial 0

6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 23 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 0

1 Complete opportunity to apply full procedure not available 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1

1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 14 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Grand Gulf (GG) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1

1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1

1 Complete 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1

1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 6

6 Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete 71153 Followup of Events and NOED Annually 2

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 15 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Palo Verde (PALO) 7111101 Adverse Weather Protection Annually 4

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 3

2 Complete 7111105A Fire Protection - Annual Annually 1

1 Complete 7111105Q Fire Protection - Quarterly Annually 18 16 Complete 7111105T Fire Protection [Triennial]

Triennial 0

4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3

3 Complete 7111107A Heat Sink Performance Annually 1

1 Complete 7111107T Heat Sink Performance Triennial 4

2 Complete 7111108P Inservice Inspection Activities - PWR Annually 2

1 Complete 7111111A Annual Review Annually 1

1 Complete 7111111B Licensed Operator Requalification Biennial 2

1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 9

8 Complete 7111112Q Maintenance Effectiveness Annually 9

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 16 14 Complete 7111115 Operability Determinations Annually 24 22 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 54 23 Complete completed in previous year(s) 7111118 Plant Modifications Annually 4

3 Complete 7111119 Post Maintenance Testing Annually 21 20 Complete 7111120 Refueling and Other Outage Activities Annually 2

2 Complete 7111121 Component Design Bases Inspection Triennial 0

15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams)

Triennial 0

10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0

6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 22 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 5

1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1

1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 16 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Palo Verde (PALO) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1

1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1

1 Complete 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1

1 Complete 71151 Performance Indicator Verfication Annually 35 35 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 8

6 Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 9

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 17 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: River Bend (RBS) 7111101 Adverse Weather Protection Annually 4

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2

2 Complete 7111105A Fire Protection - Annual Annually 1

1 Complete 7111105Q Fire Protection - Quarterly Annually 17 16 Complete 7111105T Fire Protection [Triennial]

Triennial 0

4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3

3 Complete 7111107A Heat Sink Performance Annually 1

1 Complete 7111107T Heat Sink Performance Triennial 3

2 Complete completed in previous year(s) 7111108G Inservice Inspection Activities - BWR Annually 1

1 Complete 7111111A Annual Review Annually 1

1 Complete 7111111B Licensed Operator Requalification Biennial 1

1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 8

8 Complete 7111112Q Maintenance Effectiveness Annually 8

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 14 14 Complete 7111115 Operability Determinations Annually 16 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 38 23 Complete 7111118 Plant Modifications Annually 4

3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 2

2 Complete 7111121 Component Design Bases Inspection Triennial 26 15 Complete completed in previous year(s) 7111121M CDBI (Teams)

Triennial 0

10 Complete 7111121N CDBI Programs Triennial 0

6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 20 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 6

1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1

1 Complete 7111406 Drill Evaluation Annually 3

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 18 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: River Bend (RBS) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1

1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 2

1 Complete 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1

1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 6

6 Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete 71153 Followup of Events and NOED Annually 9

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 19 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: South Texas Project (STP) 7111101 Adverse Weather Protection Annually 6

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2

2 Complete 7111105A Fire Protection - Annual Annually 1

1 Complete 7111105Q Fire Protection - Quarterly Annually 21 16 Complete 7111105T Fire Protection [Triennial]

Triennial 5

4 Complete completed in previous year(s) 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 4

3 Complete 7111107A Heat Sink Performance Annually 1

1 Complete 7111107T Heat Sink Performance Triennial 4

2 Complete 7111108P Inservice Inspection Activities - PWR Annually 2

1 Complete 7111111A Annual Review Annually 1

1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1

1 Complete 7111111Q Licensed Operator Requalification Annually 8

8 Complete 7111112Q Maintenance Effectiveness Annually 8

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 20 14 Complete 7111115 Operability Determinations Annually 20 19 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 43 23 Complete 7111118 Plant Modifications Annually 5

3 Complete 7111119 Post Maintenance Testing Annually 21 20 Complete 7111120 Refueling and Other Outage Activities Annually 4

2 Complete 7111121 Component Design Bases Inspection Triennial 0

15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams)

Triennial 0

10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0

6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 23 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 7

1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1

1 Complete 7111406 Drill Evaluation Annually 3

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 20 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: South Texas Project (STP) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete 71124.04 Occupational Dose Assessment Biennial 1

1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1

1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1

1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 24 24 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 6

6 Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 3

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 21 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Waterford (WAT) 7111101 Adverse Weather Protection Annually 5

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 14 12 Complete 7111104S Equipment Alignment Semiannually 2

2 Complete 7111105A Fire Protection - Annual Annually 1

1 Complete 7111105Q Fire Protection - Quarterly Annually 18 16 Complete 7111105T Fire Protection [Triennial]

Triennial 4

4 Complete 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3

3 Complete 7111107A Heat Sink Performance Annually 2

1 Complete 7111107T Heat Sink Performance Triennial 3

2 Complete completed in previous year(s) 7111108P Inservice Inspection Activities - PWR Annually 1

1 Complete completed in previous year(s) 7111111A Annual Review Annually 0

1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1

1 Complete 7111111Q Licensed Operator Requalification Annually 8

8 Complete 7111112Q Maintenance Effectiveness Annually 8

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 19 14 Complete 7111115 Operability Determinations Annually 18 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 37 23 Complete 7111118 Plant Modifications Annually 4

3 Complete 7111119 Post Maintenance Testing Annually 21 20 Complete 7111120 Refueling and Other Outage Activities Annually 1

2 Complete full sample not available 7111121 Component Design Bases Inspection Triennial 24 15 Complete completed in previous year(s) 7111121M CDBI (Teams)

Triennial 0

10 Complete 7111121N CDBI Programs Triennial 0

6 Complete 7111122 Surveillance Testing Annually 17 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 4

1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1

1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 22 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Waterford (WAT) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1

1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1

1 Complete 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1

1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 6

6 Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 6

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 23 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Wolf Creek (WC) 7111101 Adverse Weather Protection Annually 6

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 13 12 Complete 7111104S Equipment Alignment Semiannually 2

2 Complete 7111105A Fire Protection - Annual Annually 1

1 Complete 7111105Q Fire Protection - Quarterly Annually 20 16 Complete 7111105T Fire Protection [Triennial]

Triennial 8

4 Complete completed in previous year(s) 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 4

3 Complete 7111107A Heat Sink Performance Annually 2

1 Complete 7111107T Heat Sink Performance Triennial 0

2 Not Applicable completion not required during this inspection cycle 7111108P Inservice Inspection Activities - PWR Annually 1

1 Complete 7111111A Annual Review Annually 1

1 Complete 7111111B Licensed Operator Requalification Biennial 1

1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 8

8 Complete 7111112Q Maintenance Effectiveness Annually 8

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 19 14 Complete 7111115 Operability Determinations Annually 17 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 37 23 Complete 7111118 Plant Modifications Annually 4

3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 2

2 Complete 7111121 Component Design Bases Inspection Triennial 0

15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams)

Triennial 0

10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0

6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 18 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 4

1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1

1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 24 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Wolf Creek (WC) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete 71124.04 Occupational Dose Assessment Biennial 1

1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1

1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1

1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 8

6 Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 5

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 25 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Columbia Generating Station (WNP) 7111101 Adverse Weather Protection Annually 4

4 Complete 7111104 Equipment Alignment (Quarterly)

Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2

2 Complete 7111105A Fire Protection - Annual Annually 1

1 Complete 7111105Q Fire Protection - Quarterly Annually 16 16 Complete 7111105T Fire Protection [Triennial]

Triennial 7

4 Complete 7111105X Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 4

3 Complete 7111107A Heat Sink Performance Annually 1

1 Complete 7111107T Heat Sink Performance Triennial 0

2 Not Applicable completion not required during this inspection cycle 7111108G Inservice Inspection Activities - BWR Annually 1

1 Complete 7111111A Annual Review Annually 0

1 Complete opportunity to apply full procedure not available 7111111B Licensed Operator Requalification Biennial 1

1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 8

8 Complete 7111112Q Maintenance Effectiveness Annually 8

8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 15 14 Complete 7111115 Operability Determinations Annually 17 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 39 23 Complete completed in previous year(s) 7111118 Plant Modifications Annually 5

3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 1

2 Complete by reference iaw IMC 0306 7111121 Component Design Bases Inspection Triennial 0

15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams)

Triennial 0

10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0

6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 16 14 Complete 7111401 Exercise Evaluation Biennial 0

1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1

1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1

1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 5

1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1

1 Complete 7111406 Drill Evaluation Annually 3

3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1

1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page:

Page 26 of 26 02/25/2016 15:35:12 IR Report 8a Baseline Inspection Completion By Site Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Procedure Title Frequency Status Note Sample Completed Minimum Sample Region No: 4 Site: Columbia Generating Station (WNP) 71124.02 Occupational ALARA Biennial 2

1 Complete 71124.03 Airbore Radioactivity Biennial 1

1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1

1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1

1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1

1 Complete 71124.07 Rad. Environ. Monitoring Prog.

Biennial 1

1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1

1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3

3 Complete 71151 Performance Indicator Verfication Not Applicable 1

1 Complete 71152 PI&R Annually 6

6 Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete 71153 Followup of Events and NOED Annually 7

1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.