ML16116A080: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/23/2016
| issue date = 03/23/2016
| title = 2016 Byron Nuclear Station Initial License Examination Form ES-301-2 RO Rev 1
| title = 2016 Byron Nuclear Station Initial License Examination Form ES-301-2 RO Rev 1
| author name = Bielby M E
| author name = Bielby M
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2   Facility: Byron NRC 2016 Date of Examination: 3/14/2016 Exam Level: RO SRO-I SRO-U Operating Test No.: Byron 2016301 Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code* Safety Function a. Realign RCCA 003AA1.02 Ability to operate and/or monitor the following as they apply to the Dropped Control; Rod: Controls and componenets necessary to recover rod. 3.6/3.4 Bank S, D 1 b. Switch to Hot Leg Recirculation 011EA1.11 Ability to operate and monitor the following as they apply to a Large Break LOCA: Long-term cooling of core. 4.2/4.2 Bank - 2013 NRC S, P, D, EN, L, A 2 c. SI pump ASME startup (with cavitation indication) 006A2.04 Ability to (a) predict the impacts of the following malfunctions or operations on the Emergency Core Cooling System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Improper discharge pressure. 3.4/3.8 Bank S, D, EN, A 3 d. Respond to RCP seal malfunction 015AA1.22 Ability to operate and/or monitor the following as they apply to the Reactor Coolant Pump Malfunctions: RCP seal failure/malfunction. 4.0/4.2 Bank S, D 4P e. Respond to 1A SX Pump Trip (Standby Pump Trips) 076A4.01 Ability to manually operate and/or monitor in the control room: SWS pumps. 2.9/2.9 Bank S, D, A 4S f. Align the SX towers for LOCA conditions (Require RCFC shutdown) 022A4.01 Ability to manually operate and/or monitor in the control room: CCS fans. 3.6/3.6 Bank S, D, EN, L, A 5
{{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Byron NRC 2016 Date of Examination: 3/14/2016 Exam Level: RO SRO-I SRO-U Operating Test No.: Byron 2016301 Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code*
: g. Supply Non-ESF Bus from ESF Bus (Post-LOCA) 062A4.01 Ability to manually operate and/or monitor in the control room: All breakers (including available switchyard). 3.3/3.1 NEW S, N, EN, L 6 h. CW Pump trip with discharge valve failure to auto close 075A2.02 Ability to (a) predict the impacts of the following malfunctions or operations on the Circulating Water System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of circulating water pumps. 2.5/2.7 NEW S, N 8 In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i. Trip Reactor outside the MCR (Open MCC breakers) 029EA1.12 Ability to operate and monitor the following as they apply to an ATWS: M/G set power supply and reactor trip breakers. 4.1/4.0 Modified from 2013 NRC M, E, A 1 j. Transfer instrument bus to CVT supply 057AA1.01 Ability to operate and monitor the following as they apply to the Loss of Vital AC Instrument Bus: Manual inverter swapping. 3.7/3.7 Bank D, E 6 k. Manual makeup to CC surge tank from backup SX system 008K4.02 Knowledge of CCWS design feature(s) and/or interlocks which provide for the following: Operation of the surge tank, including the associated valves and controls. 2.9/2.7 NEW R, E, N 8
Safety Function
* All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
: a. Realign RCCA 003AA1.02 Ability to operate and/or monitor the following as they apply to the Dropped Control; Rod: Controls and componenets necessary to recover rod. 3.6/3.4 Bank S, D 1
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A) (P)revious 2 exams (R)CA (S)imulator 5 4-6 / 4-6 / 2-3 7 4 3 4 1 1 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2   Facility: Byron NRC 2016 Date of Examination:  3/14/2016 Exam Level:  RO  SRO-I  SRO-U  Operating Test No.: Byron 2016301 Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code* Safety Function a. Realign RCCA 003AA1.02 Ability to operate and/or monitor the following as they apply to the Dropped Control; Rod: Controls and componenets necessary to recover rod. 3.6/3.4 Bank S, D 1 b. Switch to Hot Leg Recirculation 011EA1.11 Ability to operate and monitor the following as they apply to a Large Break LOCA: Long-term cooling of core. 4.2/4.2 Bank - 2013 NRC S, P, D, EN, L, A 2 c. SI pump ASME startup (with cavitation indication) 006A2.04 Ability to (a) predict the impacts of the following malfunctions or operations on the Emergency Core Cooling System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Improper discharge pressure. 3.4/3.8 Bank S, D, EN, A 3 d. Respond to RCP seal malfunction 015AA1.22 Ability to operate and/or monitor the following as they apply to the Reactor Coolant Pump Malfunctions: RCP seal failure/malfunction. 4.0/4.2 Bank S, D 4P e. Respond to 1A SX Pump Trip (Standby Pump Trips) 076A4.01 Ability to manually operate and/or monitor in the control room: SWS pumps. 2.9/2.9 Bank S, D, A 4S f. Align the SX towers for LOCA conditions (Require RCFC shutdown) 022A4.01 Ability to manually operate and/or monitor in the control room: CCS fans. 3.6/3.Bank S, D, EN, L, A
: b. Switch to Hot Leg Recirculation 011EA1.11 Ability to operate and monitor the following as they apply to a Large Break LOCA: Long-term cooling of core. 4.2/4.2 Bank - 2013 NRC S, P, D, EN, L, A 2
: g. Supply Non-ESF Bus from ESF Bus (Post-LOCA) 062A4.01 Ability to manually operate and/or monitor in the control room: All breakers (including available switchyard). 3.3/3.1 NEW S, N, EN, L 6 h. CW Pump trip with discharge valve failure to auto close 075A2.02 Ability to (a) predict the impacts of the following malfunctions or operations on the Circulating Water System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of circulating water pumps. 2.5/2.7 NEW S, N 8 In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i. Trip Reactor outside the MCR (Open MCC breakers) 029EA1.12 Ability to operate and monitor the following as they apply to an ATWS: M/G set power supply and reactor trip breakers. 4.1/4.0 Modified from 2013 NRC M, E, A 1 j. Transfer instrument bus to CVT supply 057AA1.01 Ability to operate and monitor the following as they apply to the Loss of Vital AC Instrument Bus: Manual inverter swapping. 3.7/3.7 Bank D, E 6 k. Manual makeup to CC surge tank from backup SX system 008K4.02 Knowledge of CCWS design feature(s) and/or interlocks which provide for the following: Operation of the surge tank, including the associated valves and controls. 2.9/2.7 NEW R, E, N 8
: c. SI pump ASME startup (with cavitation indication) 006A2.04 Ability to (a) predict the impacts of the following malfunctions or operations on the Emergency Core Cooling System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Improper discharge pressure. 3.4/3.8 Bank S, D, EN, A 3
* All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
: d. Respond to RCP seal malfunction 015AA1.22 Ability to operate and/or monitor the following as they apply to the Reactor Coolant Pump Malfunctions: RCP seal failure/malfunction. 4.0/4.2 Bank S, D 4P
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A) (P)revious 2 exams (R)CA  (S)imulator 5 4-6 / 4-6 / 2-3 7  3  4  3  4  1  1}}
: e. Respond to 1A SX Pump Trip (Standby Pump Trips) 076A4.01 Ability to manually operate and/or monitor in the control room: SWS pumps. 2.9/2.9 Bank S, D, A 4S
: f. Align the SX towers for LOCA conditions (Require RCFC shutdown) 022A4.01 Ability to manually operate and/or monitor in the control room: CCS fans. 3.6/3.6 Bank S, D, EN, L, A 5
: g. Supply Non-ESF Bus from ESF Bus (Post-LOCA) 062A4.01 Ability to manually operate and/or monitor in the control room: All breakers (including available switchyard). 3.3/3.1 NEW S, N, EN, L 6
: h. CW Pump trip with discharge valve failure to auto close 075A2.02 Ability to (a) predict the impacts of the following malfunctions or operations on the Circulating Water System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of circulating water pumps. 2.5/2.7 NEW S, N 8
In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: i. Trip Reactor outside the MCR (Open MCC breakers) 029EA1.12 Ability to operate and monitor the following as they apply to an ATWS: M/G set power supply and reactor trip breakers. 4.1/4.0 Modified from 2013 NRC M, E, A 1
: j. Transfer instrument bus to CVT supply 057AA1.01 Ability to operate and monitor the following as they apply to the Loss of Vital AC Instrument Bus: Manual inverter swapping.
3.7/3.7 Bank D, E 6
: k. Manual makeup to CC surge tank from backup SX system 008K4.02 Knowledge of CCWS design feature(s) and/or interlocks which provide for the following: Operation of the surge tank, including the associated valves and controls. 2.9/2.7 NEW R, E, N 8
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 5
4-6 / 4-6 / 2-3 7
9 / 8 / 4 3
1 / 1 / 1 4
1 / 1 / 1 (control room system) 3 1 / 1 / 1 4
2 / 2 / 1 1
3 / 3 / 2 (randomly selected) 1 1 / 1 / 1
 
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Byron NRC 2016 Date of Examination: 3/14/2016 Exam Level: RO SRO-I SRO-U Operating Test No.: Byron 2016301 Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code*
Safety Function
: a. Realign RCCA 003AA1.02 Ability to operate and/or monitor the following as they apply to the Dropped Control; Rod: Controls and componenets necessary to recover rod. 3.6/3.4 Bank S, D 1
: b. Switch to Hot Leg Recirculation 011EA1.11 Ability to operate and monitor the following as they apply to a Large Break LOCA: Long-term cooling of core. 4.2/4.2 Bank - 2013 NRC S, P, D, EN, L, A 2
: c. SI pump ASME startup (with cavitation indication) 006A2.04 Ability to (a) predict the impacts of the following malfunctions or operations on the Emergency Core Cooling System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Improper discharge pressure. 3.4/3.8 Bank S, D, EN, A 3
: d. Respond to RCP seal malfunction 015AA1.22 Ability to operate and/or monitor the following as they apply to the Reactor Coolant Pump Malfunctions: RCP seal failure/malfunction. 4.0/4.2 Bank S, D 4P
: e. Respond to 1A SX Pump Trip (Standby Pump Trips) 076A4.01 Ability to manually operate and/or monitor in the control room: SWS pumps. 2.9/2.9 Bank S, D, A 4S
: f. Align the SX towers for LOCA conditions (Require RCFC shutdown) 022A4.01 Ability to manually operate and/or monitor in the control room: CCS fans. 3.6/3.6 Bank S, D, EN, L, A 5
: g. Supply Non-ESF Bus from ESF Bus (Post-LOCA) 062A4.01 Ability to manually operate and/or monitor in the control room: All breakers (including available switchyard). 3.3/3.1 NEW S, N, EN, L 6
: h. CW Pump trip with discharge valve failure to auto close 075A2.02 Ability to (a) predict the impacts of the following malfunctions or operations on the Circulating Water System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of circulating water pumps. 2.5/2.7 NEW S, N 8
In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: i. Trip Reactor outside the MCR (Open MCC breakers) 029EA1.12 Ability to operate and monitor the following as they apply to an ATWS: M/G set power supply and reactor trip breakers. 4.1/4.0 Modified from 2013 NRC M, E, A 1
: j. Transfer instrument bus to CVT supply 057AA1.01 Ability to operate and monitor the following as they apply to the Loss of Vital AC Instrument Bus: Manual inverter swapping.
3.7/3.7 Bank D, E 6
: k. Manual makeup to CC surge tank from backup SX system 008K4.02 Knowledge of CCWS design feature(s) and/or interlocks which provide for the following: Operation of the surge tank, including the associated valves and controls. 2.9/2.7 NEW R, E, N 8
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 5
4-6 / 4-6 / 2-3 7
9 / 8 / 4 3
1 / 1 / 1 4
1 / 1 / 1 (control room system) 3 1 / 1 / 1 4
2 / 2 / 1 1
3 / 3 / 2 (randomly selected) 1 1 / 1 / 1}}

Latest revision as of 00:53, 10 January 2025

2016 Byron Nuclear Station Initial License Examination Form ES-301-2 RO Rev 1
ML16116A080
Person / Time
Site: Byron  Constellation icon.png
Issue date: 03/23/2016
From: Bielby M
Operations Branch III
To:
Exelon Generation Co
References
Download: ML16116A080 (2)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Byron NRC 2016 Date of Examination: 3/14/2016 Exam Level: RO SRO-I SRO-U Operating Test No.: Byron 2016301 Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code*

Safety Function

a. Realign RCCA 003AA1.02 Ability to operate and/or monitor the following as they apply to the Dropped Control; Rod: Controls and componenets necessary to recover rod. 3.6/3.4 Bank S, D 1
b. Switch to Hot Leg Recirculation 011EA1.11 Ability to operate and monitor the following as they apply to a Large Break LOCA: Long-term cooling of core. 4.2/4.2 Bank - 2013 NRC S, P, D, EN, L, A 2
c. SI pump ASME startup (with cavitation indication) 006A2.04 Ability to (a) predict the impacts of the following malfunctions or operations on the Emergency Core Cooling System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Improper discharge pressure. 3.4/3.8 Bank S, D, EN, A 3
d. Respond to RCP seal malfunction 015AA1.22 Ability to operate and/or monitor the following as they apply to the Reactor Coolant Pump Malfunctions: RCP seal failure/malfunction. 4.0/4.2 Bank S, D 4P
e. Respond to 1A SX Pump Trip (Standby Pump Trips) 076A4.01 Ability to manually operate and/or monitor in the control room: SWS pumps. 2.9/2.9 Bank S, D, A 4S
f. Align the SX towers for LOCA conditions (Require RCFC shutdown) 022A4.01 Ability to manually operate and/or monitor in the control room: CCS fans. 3.6/3.6 Bank S, D, EN, L, A 5
g. Supply Non-ESF Bus from ESF Bus (Post-LOCA) 062A4.01 Ability to manually operate and/or monitor in the control room: All breakers (including available switchyard). 3.3/3.1 NEW S, N, EN, L 6
h. CW Pump trip with discharge valve failure to auto close 075A2.02 Ability to (a) predict the impacts of the following malfunctions or operations on the Circulating Water System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of circulating water pumps. 2.5/2.7 NEW S, N 8

In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. Trip Reactor outside the MCR (Open MCC breakers) 029EA1.12 Ability to operate and monitor the following as they apply to an ATWS: M/G set power supply and reactor trip breakers. 4.1/4.0 Modified from 2013 NRC M, E, A 1
j. Transfer instrument bus to CVT supply 057AA1.01 Ability to operate and monitor the following as they apply to the Loss of Vital AC Instrument Bus: Manual inverter swapping.

3.7/3.7 Bank D, E 6

k. Manual makeup to CC surge tank from backup SX system 008K4.02 Knowledge of CCWS design feature(s) and/or interlocks which provide for the following: Operation of the surge tank, including the associated valves and controls. 2.9/2.7 NEW R, E, N 8

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 5

4-6 / 4-6 / 2-3 7

9 / 8 / 4 3

1 / 1 / 1 4

1 / 1 / 1 (control room system) 3 1 / 1 / 1 4

2 / 2 / 1 1

3 / 3 / 2 (randomly selected) 1 1 / 1 / 1

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Byron NRC 2016 Date of Examination: 3/14/2016 Exam Level: RO SRO-I SRO-U Operating Test No.: Byron 2016301 Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code*

Safety Function

a. Realign RCCA 003AA1.02 Ability to operate and/or monitor the following as they apply to the Dropped Control; Rod: Controls and componenets necessary to recover rod. 3.6/3.4 Bank S, D 1
b. Switch to Hot Leg Recirculation 011EA1.11 Ability to operate and monitor the following as they apply to a Large Break LOCA: Long-term cooling of core. 4.2/4.2 Bank - 2013 NRC S, P, D, EN, L, A 2
c. SI pump ASME startup (with cavitation indication) 006A2.04 Ability to (a) predict the impacts of the following malfunctions or operations on the Emergency Core Cooling System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Improper discharge pressure. 3.4/3.8 Bank S, D, EN, A 3
d. Respond to RCP seal malfunction 015AA1.22 Ability to operate and/or monitor the following as they apply to the Reactor Coolant Pump Malfunctions: RCP seal failure/malfunction. 4.0/4.2 Bank S, D 4P
e. Respond to 1A SX Pump Trip (Standby Pump Trips) 076A4.01 Ability to manually operate and/or monitor in the control room: SWS pumps. 2.9/2.9 Bank S, D, A 4S
f. Align the SX towers for LOCA conditions (Require RCFC shutdown) 022A4.01 Ability to manually operate and/or monitor in the control room: CCS fans. 3.6/3.6 Bank S, D, EN, L, A 5
g. Supply Non-ESF Bus from ESF Bus (Post-LOCA) 062A4.01 Ability to manually operate and/or monitor in the control room: All breakers (including available switchyard). 3.3/3.1 NEW S, N, EN, L 6
h. CW Pump trip with discharge valve failure to auto close 075A2.02 Ability to (a) predict the impacts of the following malfunctions or operations on the Circulating Water System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of circulating water pumps. 2.5/2.7 NEW S, N 8

In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. Trip Reactor outside the MCR (Open MCC breakers) 029EA1.12 Ability to operate and monitor the following as they apply to an ATWS: M/G set power supply and reactor trip breakers. 4.1/4.0 Modified from 2013 NRC M, E, A 1
j. Transfer instrument bus to CVT supply 057AA1.01 Ability to operate and monitor the following as they apply to the Loss of Vital AC Instrument Bus: Manual inverter swapping.

3.7/3.7 Bank D, E 6

k. Manual makeup to CC surge tank from backup SX system 008K4.02 Knowledge of CCWS design feature(s) and/or interlocks which provide for the following: Operation of the surge tank, including the associated valves and controls. 2.9/2.7 NEW R, E, N 8

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 5

4-6 / 4-6 / 2-3 7

9 / 8 / 4 3

1 / 1 / 1 4

1 / 1 / 1 (control room system) 3 1 / 1 / 1 4

2 / 2 / 1 1

3 / 3 / 2 (randomly selected) 1 1 / 1 / 1