ML16251A090: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/06/2016
| issue date = 09/06/2016
| title = LTR-16-0358-1 Pilgrim: Region I Response to M. Barocas Regarding Safety Concerns at Pilgrim
| title = LTR-16-0358-1 Pilgrim: Region I Response to M. Barocas Regarding Safety Concerns at Pilgrim
| author name = Pfingsten J B
| author name = Pfingsten J
| author affiliation = NRC/RGN-I/DRP/PB5
| author affiliation = NRC/RGN-I/DRP/PB5
| addressee name = Barocas M
| addressee name = Barocas M
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD. KING OF PRUSSIA, PA 19406-2713   September 6, 2016 Mr. Moe Barocas 166 Herring River Rd Wellfleet, MA 02667
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406-2713 September 6, 2016 Mr. Moe Barocas 166 Herring River Rd Wellfleet, MA 02667  


==Dear Mr. Barocas,==
==Dear Mr. Barocas,==
This letter responds to your letter dated June 16, 2016, that requested the Pilgrim Nuclear Power Station be shutdown based on its recent poor operating performance. The NRC shares your concern regarding the safety impact of the degrading performance at Pilgrim. On September 1, 2015, the NRC issued a White finding and Notice of Violation to Pilgrim because Entergy had not adequately addressed a significant equipment problem that caused a failure of one of the plant's safety/relief valves in February 2013 and then caused in a similar failure in January 2015. This issue combined with a failure to adequately address the causes of multiple reactor shutdowns at Pilgrim in 2013 were indications of degrading performance that moved them into Column 4 (the "Repetitive Degraded Cornerstone" Column) of the NRC Action Matrix. The NRC believes that to this point Pilgrim continues to operate safely because the issues that moved them into Column 4 were of low to moderate safety significance; however, the increased oversight, inspection, and assessment directed by the assessment process for a plant in Column 4 now allows us to closely monitor for indications of unacceptable performance. If at any time it is determined that performance at Pilgrim has declined to an unacceptable level with respect to public safety, the NRC will not hesitate to take additional regulatory action up to and including the issuance of a shutdown order. More information regarding our additional oversight activities at Pilgrim is also available at the following website: http://www.nrc.gov/info-finder/reactors/pilg/special-oversight.html. We hope that this addresses your concerns regarding the NRC's actions in response to the recent degrading performance at Pilgrim. However, if you have any additional questions or concerns regarding these issues please feel free to contact us at 610-337-5030 or 610-337-5031.  
This letter responds to your {{letter dated|date=June 16, 2016|text=letter dated June 16, 2016}}, that requested the Pilgrim Nuclear Power Station be shutdown based on its recent poor operating performance. The NRC shares your concern regarding the safety impact of the degrading performance at Pilgrim. On September 1, 2015, the NRC issued a White finding and Notice of Violation to Pilgrim because Entergy had not adequately addressed a significant equipment problem that caused a failure of one of the plants safety/relief valves in February 2013 and then caused in a similar failure in January 2015. This issue combined with a failure to adequately address the causes of multiple reactor shutdowns at Pilgrim in 2013 were indications of degrading performance that moved them into Column 4 (the Repetitive Degraded Cornerstone Column) of the NRC Action Matrix.
The NRC believes that to this point Pilgrim continues to operate safely because the issues that moved them into Column 4 were of low to moderate safety significance; however, the increased oversight, inspection, and assessment directed by the assessment process for a plant in Column 4 now allows us to closely monitor for indications of unacceptable performance. If at any time it is determined that performance at Pilgrim has declined to an unacceptable level with respect to public safety, the NRC will not hesitate to take additional regulatory action up to and including the issuance of a shutdown order. More information regarding our additional oversight activities at Pilgrim is also available at the following website: http://www.nrc.gov/info-finder/reactors/pilg/special-oversight.html.
We hope that this addresses your concerns regarding the NRCs actions in response to the recent degrading performance at Pilgrim. However, if you have any additional questions or concerns regarding these issues please feel free to contact us at 610-337-5030 or 610-337-5031.
Sincerely,
/RA/
Jonathan B. Pfingsten, Project Engineer Reactor Projects Branch 5 Division of Reactor Projects


Sincerely,
ML16251A090 LTR-16-0358-1 SUNSI Review Non-Sensitive Sensitive
      /RA/
 
Jonathan B. Pfingsten, Project Engineer Reactor Projects Branch 5 Division of Reactor Projects   
Publicly Available


ML16251A090 LTR-16-0358-1  SUNSI Review  Non-Sensitive  Sensitive  Publicly Available Non-Publicly Available OFFICE RI/DRP     NAME JPfingsten     DATE 09/06/16}}
Non-Publicly Available OFFICE RI/DRP NAME JPfingsten DATE 09/06/16}}

Latest revision as of 20:28, 9 January 2025

LTR-16-0358-1 Pilgrim: Region I Response to M. Barocas Regarding Safety Concerns at Pilgrim
ML16251A090
Person / Time
Site: Pilgrim
Issue date: 09/06/2016
From: Jonathan Pfingsten
NRC/RGN-I/DRP/PB5
To: Barocas M
- No Known Affiliation
Shared Package
ML16193A466 List:
References
LTR-16-0358-1
Download: ML16251A090 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.

KING OF PRUSSIA, PA 19406-2713 September 6, 2016 Mr. Moe Barocas 166 Herring River Rd Wellfleet, MA 02667

Dear Mr. Barocas,

This letter responds to your letter dated June 16, 2016, that requested the Pilgrim Nuclear Power Station be shutdown based on its recent poor operating performance. The NRC shares your concern regarding the safety impact of the degrading performance at Pilgrim. On September 1, 2015, the NRC issued a White finding and Notice of Violation to Pilgrim because Entergy had not adequately addressed a significant equipment problem that caused a failure of one of the plants safety/relief valves in February 2013 and then caused in a similar failure in January 2015. This issue combined with a failure to adequately address the causes of multiple reactor shutdowns at Pilgrim in 2013 were indications of degrading performance that moved them into Column 4 (the Repetitive Degraded Cornerstone Column) of the NRC Action Matrix.

The NRC believes that to this point Pilgrim continues to operate safely because the issues that moved them into Column 4 were of low to moderate safety significance; however, the increased oversight, inspection, and assessment directed by the assessment process for a plant in Column 4 now allows us to closely monitor for indications of unacceptable performance. If at any time it is determined that performance at Pilgrim has declined to an unacceptable level with respect to public safety, the NRC will not hesitate to take additional regulatory action up to and including the issuance of a shutdown order. More information regarding our additional oversight activities at Pilgrim is also available at the following website: http://www.nrc.gov/info-finder/reactors/pilg/special-oversight.html.

We hope that this addresses your concerns regarding the NRCs actions in response to the recent degrading performance at Pilgrim. However, if you have any additional questions or concerns regarding these issues please feel free to contact us at 610-337-5030 or 610-337-5031.

Sincerely,

/RA/

Jonathan B. Pfingsten, Project Engineer Reactor Projects Branch 5 Division of Reactor Projects

ML16251A090 LTR-16-0358-1 SUNSI Review Non-Sensitive Sensitive

Publicly Available

Non-Publicly Available OFFICE RI/DRP NAME JPfingsten DATE 09/06/16