| number = ML18078A788
| number = ML18078A788
| issue date = 03/19/2018
| issue date = 03/19/2018
| title = Callaway Plant, Unit 1 - Owner'S Activity Reports (OAR-1 Forms) for Cycle/Refuel 22
| title = Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 22
| author name = Wink R C
| author name = Wink R
| author affiliation = Ameren Missouri, Union Electric Co
| author affiliation = Ameren Missouri, Union Electric Co
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:  
{{#Wiki_filter:Ameren MISSOURI (allaav Plant March 19. 2018 ULNRC-0641 9 U.S. Nuclear Regulatory Commission AUn: Document Control Desk Washington. DC 20555-0001 10 CFR 50.55a Ladies and Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
RENEWED FACILITY OPERATING LICENSE NPF-30 OWNERS ACTIVITY REPORTS (OAR-I FORMS) FOR CYCLE/REFUEL 22 Please lind enclosed the O\\\\ners Activity Reports (OARI Forms) Fot Cc1e 22 and Refuel 22 activities at Callaway Plant. The reports are submitted pursuant to the provisions of the applicable revisions of ASME Boiler and Pressure Vessel Code Case N-532. Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summar Report Preparation and Submission.
The OAR-I forms enclosed are associated with the Following Cycle 22 and ReFuel 22 activities at Callawav Plant:
1.
Inservice Inspection (1St) and Repait/Replacement activities for the first period of the Fourth ISI Program interval, and 2.
Containment Inservice Inspection pursuant to ASME Section XL. subsection IWE For the third period of the second I WE Program interval.
Each enclosed OAR-I form includes a listing of items with identified flaws or relevant conditions that required evaluation for continued service (Table I) and an abstract of repair/replacement activities required for continued service (Table 2).
In accordance with Revision 0 of the fourth Interval ISI Program Plan, the OAR-i form for the ISI and Repair/Replacement activities is submitted in accordance with Code Case N-532-5. Similarly, in accordance with Revision 3 of the IWE Program Plan, the OAR-I form for the Containment Inservice inspection activities is submitted in accordance with Code Case N-532-4.
P.O. Box 620 Fulton, MO 65251 AmerenMissourLcom
: t. I N RCO-J 9 i\\JaicIi 9.2018 Pae 2 of 4 Iii is Ietti.r does noI contain new comnu iinents.
I I ti re are any qtiesnons, please contact Jim Kovar at (311)225-1478.
Sincerely. Q7/!
Roger C. Wink Nlanagei, RegiiIatoi.\\fiairs
.II K


}}
==Enclosure:==
UA R I forms (2)
 
ULNRC-064 19 March 192018 Paae 3 of 4 cc:
Mr. Kriss M. Kennedy Regional Administrator U. S. Nucleat Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington. TX 76011-4511 Senior Resident Inspector Callawav Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. L. John Kios Project Manager, Callawav Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 081-14 Washington, DC 20555-0001
 
U LN RC-064 19 March 19,201$
Page 4 of 4 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 6100 Western Place, Suite 1050 Fort Worth. IX 76107 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Other Situations tILNRC Distribution:
F. M. Diya I. F. Herrmann S. P. Banker B. L. Cox R. C. Wink T. B. Etwood A. A. Alley Corporate Communications NSRB Secretary STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)
Missouri Public Service Commission
 
CALLAWAY NUCLEAR PLANT FORM OAR-I OWNERS ACTIVITY REPORT Report Ncmtbet 22 Plant Catlaway Energy Center, P.C. Box 620. Fulton, MO 85251 Unit No.
1 Commercial service date 12)1911984 Refueling outage no.
22 C ipIcude Current Inspection Interval let, 2nd, 3rd, 4Th. oThei Current inspection period 1st t1i 2nd. 3rd)
Edition and Addenda of Section Xi appiicabte to the Inspection plans 2007 Edition with 2008 Addenda Date and revision of inspection plans 111912016, Rev. 0 Edition and Addenda of Section Xl applicable to repalrfrepfacement activities, if different than the inspection plans Same ac Inspection plan Code Cases used N-532-5, N-661-2 Qf ap$c,SFe)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made In this report ate correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and Cc) the repair/replacement activities and evaluations supporting the completion of 22
 
(rerung euIqa number) conform to the requirements of Section Xi.
Signed Date LIiL
 
CERTIPICAT O INSRVlCC INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by the Hartford Steam Boiler Inspection and Insurance Company of Hartford, CT have inspected the items described in this Owners Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report In accordance with the requirements of Section Xl.
By sigtiing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair!
replacement activities and evaluation described In this report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Inury or property damage or a loss of any kind arising from or connected with this Inspection.
Commissions I33 I MO12 Inapedorn Sgnaure NIiiml& nsrd. Sta. Pronce. and don.rda Date 3-ic-ZOC Page 1 of3
 
CALLAWAY NUCLEAR PLANT TABLE 1 iTEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category Item Description Evaluation Description and Item Number NONE Page 2 of 3
 
LU0 Lii C,,
LU Dz 00 0
U Ui C
U C,,
cjW WI
<I I-0 F
LU LU0
-J0 U
C
 
CALLAWAY NUCLEAR PLANT FORM OAR-I OWNERS ACTIVITY REPORT Report Number 22 Plant Callaway Energy center, P.O. Box 620, Fulton, MO 65251 Unit No.
1 Commercial service date 12/19/1984 Refueling outage no.
22
{f appicabie)
Current inspection intervaT 2rd (IWE Program) (IWE Program)
(1i, 2nd, 3rd, 4ih, other)
Current inspection period 3 (IWE Program) lisi, 2nd, 3rd)
Edition and Addenda of Section Xl applicable to the inspection plans 2001 Edition with 2003 Addenda {IWE Program)
Date and revision of inspection plans lINE Program: 12/08/2009, Rev. 3 Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans Same as Inspection plan Code Cases used N-532-4, (if applicable)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made In this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (C) the repair/replacement activities and evaluations supporting the completion of 22 (reianiing ovtao nunberl conform to the rements of Section Xl.
Signed f?oic 7a3 Date O) Oo. o7 Owner or Owners Designee, Ti:e CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by tk6 14+4&1j Xadr c..,A Tw,r&#xf3;f r#rcA Ct have inspected the items described in this Owners Activity Report, and slate that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair?
replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Ili Commission tLfl33 vl i&#xe7; p&#xe7;j inpe:inrs Sairn Nabonai Board. Stale. Prodnce, and Endorsements Date 3.I2-I%
Page 1 of2
 
Iz
-J0 w
-Jci D
0 LU C
LU H
5 Cc)
I0 UJ 0I-m<o
<>11::
U0 LUQZ (Thi U)ZD ULU I
(I)
U H-LU0 LU U) 0 LU Iz00 0
LL 0
LU DC LU U)
LU,
<H F
U LU0 0
LU 0
LU U0 I0 H-U) 0 0
0 U) a)0 cz0 Cu LU 0
0 0
U) a)
Ea) 0 a)
CuE C) cu -
c U
cu 0
C-a) a)
0}}

Latest revision as of 06:19, 6 January 2025

Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 22
ML18078A788
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/19/2018
From: Wink R
Ameren Missouri, Union Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC-0641 9
Download: ML18078A788 (9)


Text

Ameren MISSOURI (allaav Plant March 19. 2018 ULNRC-0641 9 U.S. Nuclear Regulatory Commission AUn: Document Control Desk Washington. DC 20555-0001 10 CFR 50.55a Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

RENEWED FACILITY OPERATING LICENSE NPF-30 OWNERS ACTIVITY REPORTS (OAR-I FORMS) FOR CYCLE/REFUEL 22 Please lind enclosed the O\\\\ners Activity Reports (OARI Forms) Fot Cc1e 22 and Refuel 22 activities at Callaway Plant. The reports are submitted pursuant to the provisions of the applicable revisions of ASME Boiler and Pressure Vessel Code Case N-532. Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summar Report Preparation and Submission.

The OAR-I forms enclosed are associated with the Following Cycle 22 and ReFuel 22 activities at Callawav Plant:

1.

Inservice Inspection (1St) and Repait/Replacement activities for the first period of the Fourth ISI Program interval, and 2.

Containment Inservice Inspection pursuant to ASME Section XL. subsection IWE For the third period of the second I WE Program interval.

Each enclosed OAR-I form includes a listing of items with identified flaws or relevant conditions that required evaluation for continued service (Table I) and an abstract of repair/replacement activities required for continued service (Table 2).

In accordance with Revision 0 of the fourth Interval ISI Program Plan, the OAR-i form for the ISI and Repair/Replacement activities is submitted in accordance with Code Case N-532-5. Similarly, in accordance with Revision 3 of the IWE Program Plan, the OAR-I form for the Containment Inservice inspection activities is submitted in accordance with Code Case N-532-4.

P.O. Box 620 Fulton, MO 65251 AmerenMissourLcom

t. I N RCO-J 9 i\\JaicIi 9.2018 Pae 2 of 4 Iii is Ietti.r does noI contain new comnu iinents.

I I ti re are any qtiesnons, please contact Jim Kovar at (311)225-1478.

Sincerely. Q7/!

Roger C. Wink Nlanagei, RegiiIatoi.\\fiairs

.II K

Enclosure:

UA R I forms (2)

ULNRC-064 19 March 192018 Paae 3 of 4 cc:

Mr. Kriss M. Kennedy Regional Administrator U. S. Nucleat Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington. TX 76011-4511 Senior Resident Inspector Callawav Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. L. John Kios Project Manager, Callawav Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 081-14 Washington, DC 20555-0001

U LN RC-064 19 March 19,201$

Page 4 of 4 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 6100 Western Place, Suite 1050 Fort Worth. IX 76107 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Other Situations tILNRC Distribution:

F. M. Diya I. F. Herrmann S. P. Banker B. L. Cox R. C. Wink T. B. Etwood A. A. Alley Corporate Communications NSRB Secretary STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)

Missouri Public Service Commission

CALLAWAY NUCLEAR PLANT FORM OAR-I OWNERS ACTIVITY REPORT Report Ncmtbet 22 Plant Catlaway Energy Center, P.C. Box 620. Fulton, MO 85251 Unit No.

1 Commercial service date 12)1911984 Refueling outage no.

22 C ipIcude Current Inspection Interval let, 2nd, 3rd, 4Th. oThei Current inspection period 1st t1i 2nd. 3rd)

Edition and Addenda of Section Xi appiicabte to the Inspection plans 2007 Edition with 2008 Addenda Date and revision of inspection plans 111912016, Rev. 0 Edition and Addenda of Section Xl applicable to repalrfrepfacement activities, if different than the inspection plans Same ac Inspection plan Code Cases used N-532-5, N-661-2 Qf ap$c,SFe)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made In this report ate correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and Cc) the repair/replacement activities and evaluations supporting the completion of 22

(rerung euIqa number) conform to the requirements of Section Xi.

Signed Date LIiL

CERTIPICAT O INSRVlCC INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by the Hartford Steam Boiler Inspection and Insurance Company of Hartford, CT have inspected the items described in this Owners Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report In accordance with the requirements of Section Xl.

By sigtiing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair!

replacement activities and evaluation described In this report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Inury or property damage or a loss of any kind arising from or connected with this Inspection.

Commissions I33 I MO12 Inapedorn Sgnaure NIiiml& nsrd. Sta. Pronce. and don.rda Date 3-ic-ZOC Page 1 of3

CALLAWAY NUCLEAR PLANT TABLE 1 iTEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category Item Description Evaluation Description and Item Number NONE Page 2 of 3

LU0 Lii C,,

LU Dz 00 0

U Ui C

U C,,

cjW WI

<I I-0 F

LU LU0

-J0 U

C

CALLAWAY NUCLEAR PLANT FORM OAR-I OWNERS ACTIVITY REPORT Report Number 22 Plant Callaway Energy center, P.O. Box 620, Fulton, MO 65251 Unit No.

1 Commercial service date 12/19/1984 Refueling outage no.

22

{f appicabie)

Current inspection intervaT 2rd (IWE Program) (IWE Program)

(1i, 2nd, 3rd, 4ih, other)

Current inspection period 3 (IWE Program) lisi, 2nd, 3rd)

Edition and Addenda of Section Xl applicable to the inspection plans 2001 Edition with 2003 Addenda {IWE Program)

Date and revision of inspection plans lINE Program: 12/08/2009, Rev. 3 Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans Same as Inspection plan Code Cases used N-532-4, (if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made In this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (C) the repair/replacement activities and evaluations supporting the completion of 22 (reianiing ovtao nunberl conform to the rements of Section Xl.

Signed f?oic 7a3 Date O) Oo. o7 Owner or Owners Designee, Ti:e CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by tk6 14+4&1j Xadr c..,A Tw,róf r#rcA Ct have inspected the items described in this Owners Activity Report, and slate that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair?

replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Ili Commission tLfl33 vl iç pçj inpe:inrs Sairn Nabonai Board. Stale. Prodnce, and Endorsements Date 3.I2-I%

Page 1 of2

Iz

-J0 w

-Jci D

0 LU C

LU H

5 Cc)

I0 UJ 0I-m<o

<>11::

U0 LUQZ (Thi U)ZD ULU I

(I)

U H-LU0 LU U) 0 LU Iz00 0

LL 0

LU DC LU U)

LU,

<H F

U LU0 0

LU 0

LU U0 I0 H-U) 0 0

0 U) a)0 cz0 Cu LU 0

0 0

U) a)

Ea) 0 a)

CuE C) cu -

c U

cu 0

C-a) a)

0