Information Notice 2004-08, Reactor Coolant Pressure Boundary Leakage Attributable to Propagation of Cracking in Reactor Vessel Nozzle Welds: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/22/2004
| issue date = 04/22/2004
| title = Reactor Coolant Pressure Boundary Leakage Attributable to Propagation of Cracking in Reactor Vessel Nozzle Welds
| title = Reactor Coolant Pressure Boundary Leakage Attributable to Propagation of Cracking in Reactor Vessel Nozzle Welds
| author name = Beckner W D
| author name = Beckner W
| author affiliation = NRC/NRR/DIPM/IROB
| author affiliation = NRC/NRR/DIPM/IROB
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket =  
| docket =  
| license number =  
| license number =  
| contact person = Dozier J I, NRR/IROB 415-1014
| contact person = Dozier J, NRR/IROB 415-1014
| document report number = IN-04-008
| document report number = IN-04-008
| document type = NRC Information Notice
| document type = NRC Information Notice
| page count = 7
| page count = 7
}}
}}
{{#Wiki_filter:UNITED STATESNUCLEAR REGULATORY COMMISSIONOFFICE OF NUCLEAR REACTOR REGULATIONWASHINGTON, DC  20555-0001April 22, 2004NRC INFORMATION NOTICE 2004-08:REACTOR COOLANT PRESSURE BOUNDARYLEAKAGE ATTRIBUTABLE TO PROPAGATION
{{#Wiki_filter:UNITED STATES
 
===NUCLEAR REGULATORY COMMISSION===
OFFICE OF NUCLEAR REACTOR REGULATION
 
WASHINGTON, DC  20555-0001
 
===April 22, 2004===
NRC INFORMATION NOTICE 2004-08:
 
===REACTOR COOLANT PRESSURE BOUNDARY===
LEAKAGE ATTRIBUTABLE TO PROPAGATION


===OF CRACKING IN REACTOR VESSEL NOZZLE===
===OF CRACKING IN REACTOR VESSEL NOZZLE===
Line 20: Line 31:


==Addressees==
==Addressees==
:All holders of operating licensees for nuclear power boiling-water reactors (BWRs), exceptthose who have permanently ceased operations and have certified that fuel has been
:
All holders of operating licensees for nuclear power boiling-water reactors (BWRs), except
 
those who have permanently ceased operations and have certified that fuel has been


permanently removed from the reactor vessel.
permanently removed from the reactor vessel.


==Purpose==
==Purpose==
:The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice to alertaddressees to cracking identified in the nozzle-to-cap weld of control rod drive (CRD) return line
:
The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice to alert
 
addressees to cracking identified in the nozzle-to-cap weld of control rod drive (CRD) return line


penetration N10 at Pilgrim Nuclear Power Station (Pilgrim Station).  The NRC expects
penetration N10 at Pilgrim Nuclear Power Station (Pilgrim Station).  The NRC expects
Line 38: Line 55:


==Description of Circumstances==
==Description of Circumstances==
:During a planned outage on September 30, 2003, the licensee for Pilgrim Station beganperforming drywell inspections to identify and make necessary repairs to reduce drywell
:
During a planned outage on September 30, 2003, the licensee for Pilgrim Station began


leakage.  On October 1, 2003, the licensee's drywell inspections revealed leakage from the
performing drywell inspections to identify and make necessary repairs to reduce drywell
 
leakage.  On October 1, 2003, the licensees drywell inspections revealed leakage from the


nozzle-to-cap weld area of penetration N10.  The licensee concluded that the leakage was a
nozzle-to-cap weld area of penetration N10.  The licensee concluded that the leakage was a


contributor to the unidentified drywell leakage.The licensee used a Performance Demonstration Initiative (PDI) qualified manual ultrasonictesting (UT) technique to determine that the N10 nozzle-to-cap weld contained an unacceptable
contributor to the unidentified drywell leakage.
 
The licensee used a Performance Demonstration Initiative (PDI) qualified manual ultrasonic
 
testing (UT) technique to determine that the N10 nozzle-to-cap weld contained an unacceptable


flaw that was approximately 4.45cm (1.75 inches) long in the circumferential direction.
flaw that was approximately 4.45cm (1.75 inches) long in the circumferential direction.
Line 52: Line 76:
initiated at the inner diameter (ID) of the weld, in the area of previous weld repairs.  The
initiated at the inner diameter (ID) of the weld, in the area of previous weld repairs.  The


through-wall location appeared to be close to the centerline of the weld.Root Cause
through-wall location appeared to be close to the centerline of the weld.
 
Root Cause
 
The reactor pressure vessel (RPV) nozzle is made of SA-508, Class 2 low-alloy steel, while the


The reactor pressure vessel (RPV) nozzle is made of SA-508, Class 2 low-alloy steel, while theCRD return line cap is made of Alloy 600.  The subject weld is fabricated with Alloy 82/182 material, and the nozzle side of the weld is buttered with Alloy 182 material. Section 2.2.1.2 of the BWR Vessel and Internals Project report BWRVIP-49, "InstrumentPenetration Inspection and Flaw Evaluation Guidelines," states that there has been extensivelaboratory and field experience with stress corrosion cracking (SCC) of nickel based alloy, including wrought Alloy 600, Alloy 82 and Alloy 182 weld metal.  Both Alloy 600 and Alloy 182 are potentially susceptible to SCC under normal water chemistry conditions in the BWR
CRD return line cap is made of Alloy 600.  The subject weld is fabricated with Alloy 82/182 material, and the nozzle side of the weld is buttered with Alloy 182 material.
 
Section 2.2.1.2 of the BWR Vessel and Internals Project report BWRVIP-49, Instrument
 
Penetration Inspection and Flaw Evaluation Guidelines, states that there has been extensive
 
laboratory and field experience with stress corrosion cracking (SCC) of nickel based alloy, including wrought Alloy 600, Alloy 82 and Alloy 182 weld metal.  Both Alloy 600 and Alloy 182 are potentially susceptible to SCC under normal water chemistry conditions in the BWR


environment.  Alloy 600 is more resistant than Alloy 182 to crack initiation regardless of prior
environment.  Alloy 600 is more resistant than Alloy 182 to crack initiation regardless of prior
Line 70: Line 104:
degradation mechanisms refer to essentially the same phenomenon in the base metal and weld
degradation mechanisms refer to essentially the same phenomenon in the base metal and weld


metal. The licensee concluded that the root cause of the cracking in the nozzle-to-cap weld of CRDreturn line penetration N10 was IDSCC, given that the flaw was completely contained within theweld.  The licensee asserted that the IDSCC was induced by a combination of a crevice
metal.
 
The licensee concluded that the root cause of the cracking in the nozzle-to-cap weld of CRD
 
return line penetration N10 was IDSCC, given that the flaw was completely contained within the
 
weld.  The licensee asserted that the IDSCC was induced by a combination of a crevice
 
condition and weld repair stresses resulting from previous local weld repairs.
 
The licensee reviewed industry experience as part of its root cause evaluation.  General Electric


condition and weld repair stresses resulting from previous local weld repairs.The licensee reviewed industry experience as part of its root cause evaluation.  General Electric(GE) and utility personnel who comprised the root cause team for a 1997 event at Hope Creek
(GE) and utility personnel who comprised the root cause team for a 1997 event at Hope Creek


concluded that the through-wall leak in the core spray nozzle to safe-end weld was attributable
concluded that the through-wall leak in the core spray nozzle to safe-end weld was attributable
Line 80: Line 124:
rate was influenced by the presence of fabrication defects and weld repair stresses (i.e. the
rate was influenced by the presence of fabrication defects and weld repair stresses (i.e. the


leak was in the area of a previous local repair using Alloy 182).Corrective ActionThe Pilgrim Station licensee performed a weld overlay repair to stop the leakage.  Thelicensee's repair technique is an alternative to the requirements in Section XI, IWA-4000, of theBoiler and Pressure Vessel Code promulgated by the American Society of Mechanical
leak was in the area of a previous local repair using Alloy 182).
 
===Corrective Action===
The Pilgrim Station licensee performed a weld overlay repair to stop the leakage.  The
 
licensees repair technique is an alternative to the requirements in Section XI, IWA-4000, of the
 
Boiler and Pressure Vessel Code promulgated by the American Society of Mechanical
 
Engineers (ASME).  The repair was based on the use of Code Case N-504-2, Alternative
 
Rules for Repair of Class 1, 2, and 3 Austenitic Stainless Steel Piping (with modifications), and
 
Code Case N-638, Similar and Dissimilar Metal Welding Using Ambient Temperature Machine
 
GTAW Temper Bead Technique.  (See ADAMS Accession No. ML032870328.)
 
===Background===
:
The N10 nozzle is a 10-cm (4-inch) diameter RPV penetration that was previously used to


Engineers (ASME).  The repair was based on the use of Code Case N-504-2, "AlternativeRules for Repair of Class 1, 2, and 3 Austenitic Stainless Steel Piping" (with modifications), andCode Case N-638, Similar and Dissimilar Metal Welding Using Ambient Temperature MachineGTAW Temper Bead Technique."  (See ADAMS Accession No. ML032870328.)Background:The N10 nozzle is a 10-cm (4-inch) diameter RPV penetration that was previously used toreturn CRD system flow to the reactor vessel.  In 1977, the licensee modified the N10 nozzle to
return CRD system flow to the reactor vessel.  In 1977, the licensee modified the N10 nozzle to


prevent cracking attributable to the cyclic thermal stresses resulting from the return of cooler
prevent cracking attributable to the cyclic thermal stresses resulting from the return of cooler
Line 92: Line 155:
the CRD cooling water header.  The modification also included removing the safe end and
the CRD cooling water header.  The modification also included removing the safe end and


thermal sleeve from nozzle N10 and installing an Alloy 600 cap.  The final configuration of the nozzle was composed of an Alloy 82/182 nozzle-to-cap butt weld from the forged steel nozzle to the Alloy 600 cap.  Radiographic examination following the modification identified defects in
thermal sleeve from nozzle N10 and installing an Alloy 600 cap.  The final configuration of the nozzle was composed of an Alloy 82/182 nozzle-to-cap butt weld from the forged steel nozzle
 
to the Alloy 600 cap.  Radiographic examination following the modification identified defects in


the weld, which the licensee subsequently repaired.  The final testing of the modification was
the weld, which the licensee subsequently repaired.  The final testing of the modification was


performed in 1977 using NDE and hydrostatic testing.The NRC subsequently issued Generic Letter (GL) 88-01, "NRC Position on IGSCC in BWRAustenitic Stainless Steel Piping," to address the subject of IGSCC cracking in BWR piping. During that same time period, GE recommended that BWR owners inspect nozzle-to-safe-end
performed in 1977 using NDE and hydrostatic testing.
 
The NRC subsequently issued Generic Letter (GL) 88-01, NRC Position on IGSCC in BWR
 
Austenitic Stainless Steel Piping, to address the subject of IGSCC cracking in BWR piping.
 
During that same time period, GE recommended that BWR owners inspect nozzle-to-safe-end


welds containing Alloy 182 or a combination of Alloy 182 and Alloy 82 and, wherever practical, these inspections should be performed using automated UT scanning.  Past inspections of
welds containing Alloy 182 or a combination of Alloy 182 and Alloy 82 and, wherever practical, these inspections should be performed using automated UT scanning.  Past inspections of


dissimilar metal piping welds at Pilgrim Station were completed using the guidance in GL 88-01, which was superseded by guidance in BWRVIP-75, "Technical Basis for Revisions to GenericLetter 88-01 Inspection Schedules." (See ADAMS Accession Nos. ML003688842 andML021350645.)  In accordance with BWRVIP-75, the N10 nozzle-to-cap weld was classified as
dissimilar metal piping welds at Pilgrim Station were completed using the guidance in GL 88-01, which was superseded by guidance in BWRVIP-75, Technical Basis for Revisions to Generic
 
Letter 88-01 Inspection Schedules. (See ADAMS Accession Nos. ML003688842 and
 
ML021350645.)  In accordance with BWRVIP-75, the N10 nozzle-to-cap weld was classified as


a Category D weld, meaning that it is made of susceptible materials that have not been treated
a Category D weld, meaning that it is made of susceptible materials that have not been treated
Line 116: Line 191:
outage.  As part of that inspection, Inservice Inspection/ Nondestructive Examination personnel
outage.  As part of that inspection, Inservice Inspection/ Nondestructive Examination personnel


reviewed data sheets, but did not discover any recordable indications of SCC. Other related generic communications involving weld inspections and degradation in BWRsystems include the following NRC information notices (INs):IN 1990-30:"Ultrasonic Inspection Techniques for Dissimilar Metal Welds"IN 1992-50:"Cracking of Valves in the Condensate Return Lines of a BWR EmergencyCondenser System"IN 1998-44:"Ten-year Inservice Inspection (ISI) Program Update For Licensees That Intendto Implement Risk-Informed ISI of Piping"Discussion:The licensee's root cause for the cracking in nozzle N10 is consistent with the availableevidence and industry experience.  The weld metal is susceptible to IDSCC, and there is
reviewed data sheets, but did not discover any recordable indications of SCC.
 
Other related generic communications involving weld inspections and degradation in BWR
 
systems include the following NRC information notices (INs):
IN 1990-30:
Ultrasonic Inspection Techniques for Dissimilar Metal Welds
 
IN 1992-50:
Cracking of Valves in the Condensate Return Lines of a BWR Emergency
 
===Condenser System===
IN 1998-44:
Ten-year Inservice Inspection (ISI) Program Update For Licensees That Intend
 
to Implement Risk-Informed ISI of Piping
 
Discussion:
The licensees root cause for the cracking in nozzle N10 is consistent with the available
 
evidence and industry experience.  The weld metal is susceptible to IDSCC, and there is


minimal protection (i.e., no HWC) from SCC mechanisms because of the location of the nozzle
minimal protection (i.e., no HWC) from SCC mechanisms because of the location of the nozzle


cap and stagnant flow conditions. In conducting the Spring 1999 inspection, the licensee used manual ultrasonic inspectiontechniques with qualified inspectors.  The 2003 examinations were performed to the updated
cap and stagnant flow conditions.
 
In conducting the Spring 1999 inspection, the licensee used manual ultrasonic inspection
 
techniques with qualified inspectors.  The 2003 examinations were performed to the updated


requirements of Appendix VIII to Section XI of the ASME Code and the PDI program.
requirements of Appendix VIII to Section XI of the ASME Code and the PDI program.
Line 128: Line 227:
to detect flaws related to SCC mechanisms, including those that occur entirely within the weld
to detect flaws related to SCC mechanisms, including those that occur entirely within the weld


metal. With respect to future inspections of this weld, after the qualified ISI examination of the nozzleN10 weld, which is scheduled for the 2009 outage, the weld will be examined in accordance
metal. With respect to future inspections of this weld, after the qualified ISI examination of the nozzle
 
N10 weld, which is scheduled for the 2009 outage, the weld will be examined in accordance


with the schedule for Category E welds in BWRVIP-75.  BWRVIP-75 defines Category E welds
with the schedule for Category E welds in BWRVIP-75.  BWRVIP-75 defines Category E welds
Line 142: Line 243:
new cracking or crack growth.  The Category E welds are then examined at a rate of 25 percent
new cracking or crack growth.  The Category E welds are then examined at a rate of 25 percent


of the population every 10 years for normal water chemistry. The staff and the licensee discussed expanding the scope of the Fall 2003 inspection to includeall other Category D welds.  The licensee used the following factors to consider this expanded
of the population every 10 years for normal water chemistry.
 
The staff and the licensee discussed expanding the scope of the Fall 2003 inspection to include
 
all other Category D welds.  The licensee used the following factors to consider this expanded


scope based on the attributes of the cracked N10 weld:- weld at a reactor vessel nozzle- Category D weld
scope based on the attributes of the cracked N10 weld:
- weld at a reactor vessel nozzle
 
- Category D weld


- low HWC protection
- low HWC protection
Line 151: Line 259:
- significant weld repair during original installation
- significant weld repair during original installation


- ID grinding and/or radiographic defectsThe other Category D welds were, for example, protected by HWC, had improved inspections inthe past (i.e., automated UT, rather than manual UT), had no weld repairs, and had no
- ID grinding and/or radiographic defects
 
The other Category D welds were, for example, protected by HWC, had improved inspections in
 
the past (i.e., automated UT, rather than manual UT), had no weld repairs, and had no


radiographic defects.  Therefore, the licensee did not expand the scope of the inspection.The leakage from the penetration N10 nozzle-to-cap weld and other leak sources in the drywellwas less than the limit allowed by the plant's technical specifications (TS) for unidentifiedleakage and total leakage (combined unidentified and identified).  The staff found that the
radiographic defects.  Therefore, the licensee did not expand the scope of the inspection.
 
The leakage from the penetration N10 nozzle-to-cap weld and other leak sources in the drywell
 
was less than the limit allowed by the plants technical specifications (TS) for unidentified
 
leakage and total leakage (combined unidentified and identified).  The staff found that the


licensee had mitigating procedures, routine inspection activities, operable leakage detection
licensee had mitigating procedures, routine inspection activities, operable leakage detection
Line 163: Line 281:
basis, the staff determined, qualitatively, that the N10 pressure boundary leakage was of very
basis, the staff determined, qualitatively, that the N10 pressure boundary leakage was of very


low safety significance. Generic Implications:Based on the information currently available, such as other capped BWR CRD return lines andprior industry experience with IDSCC, the degradation that occurred at Pilgrim Station may be
low safety significance.
 
Generic Implications:
Based on the information currently available, such as other capped BWR CRD return lines and
 
prior industry experience with IDSCC, the degradation that occurred at Pilgrim Station may be


relevant to other BWR facilities.  The licensee for Pilgrim Station used guidance from
relevant to other BWR facilities.  The licensee for Pilgrim Station used guidance from


BWRVIP-75 to determine the appropriate inspection method and frequency for this weld. This information notice does not require any specific action or written response.  If you haveany questions about the information in this notice, please contact the technical contact identified
BWRVIP-75 to determine the appropriate inspection method and frequency for this weld. This information notice does not require any specific action or written response.  If you have


below or the appropriate project manager in the NRC's Office of Nuclear Reactor Regulation(NRR)./RA/William D. Beckner, Chief
any questions about the information in this notice, please contact the technical contact identified


===Reactors Operations Branch===
below or the appropriate project manager in the NRCs Office of Nuclear Reactor Regulation
Division of Inspection Program Management


===Office of Nuclear Reactor Regulation===
(NRR).
 
/RA/
 
===William D. Beckner, Chief===
Reactors Operations Branch
 
===Division of Inspection Program Management===
Office of Nuclear Reactor Regulation


===Technical Contact:===
===Technical Contact:===
Andrea D. Lee, NRRJerry Dozier, NRR(301) 415-2735(301) 415-1014 Email:  adw1@nrc.gov Email: jxd@nrc.govAttachment:  List of Recently Issued NRC Information Notices This information notice does not require any specific action or written response.  If you have


any questions about the information in this notice, please contact the technical contact identified
===Andrea D. Lee, NRR===
Jerry Dozier, NRR
 
(301) 415-2735
(301) 415-1014 Email:  adw1@nrc.gov
 
Email: jxd@nrc.gov
 
Attachment:  List of Recently Issued NRC Information Notices
 
ML041130396 OFFICE
 
OES:IROB:DIPM
 
Tech Editor
 
OCIO:IRSD:PSS
 
EMCB:DE
 
LPD4:DLPM
 
NAME
 
IJDozier JWF*
PKleene*
PAGarrity*
ADLee*
ABWang*
DATE
 
04/20/2004
03/01/2004
03/01/2004
03/03/2004
04/07/2004 OFFICE
 
BC:EMCB:DE
 
OES:IROB:DIPM
 
SC:OES:IROB:DIPM
 
C:IROB:DIPM
 
NAME
 
WHBateman*
CDPetrone*
CJackson
 
WDBeckner
 
DATE
 
04/15/2004
04/15/2004
04/22/2004
04/22/2004
    /      /
 
______________________________________________________________________________________
OL = Operating License
 
CP = Construction Permit
 
===Attachment LIST OF RECENTLY ISSUED===
NRC INFORMATION NOTICES
 
_____________________________________________________________________________________
Information
 
Date of


below or the appropriate project manager in the NRC's Office of Nuclear Reactor Regulation(NRR)./RA/William D. Beckner, Chief
Notice No.


===Reactors Operations Branch===
Subject
Division of Inspection Program Management


===Office of Nuclear Reactor Regulation===
Issuance


===Technical Contact:===
Issued to
Andrea D. Lee, NRRJerry Dozier, NRR(301) 415-2735(301) 415-1014 Email:  adw1@nrc.gov Email: jxd@nrc.govAttachment:  List of Recently Issued NRC Information NoticesDISTRIBUTION:ADAMS


IN FileDOCUMENT NAME: G:\OES\Staff Folders\Dozier\Dozier-Pilgrim CRD RTN Line Infinal.wpdADAMS ACCESSION NUMBER: ML041130396OFFICEOES:IROB:DIPMTech EditorOCIO:IRSD:PSSEMCB:DELPD4:DLPMNAMEIJDozier JWF*PKleene*PAGarrity*ADLee*ABWang*DATE04/20/200403/01/200403/01/200403/03/200404/07/2004OFFICEBC:EMCB:DEOES:IROB:DIPMSC:OES:IROB:DIPMC:IROB:DIPMNAMEWHBateman*CDPetrone*CJacksonWDBecknerDATE04/15/200404/15/200404/22/200404/22/2004    /      /OFFICIAL RECORD COPY
_____________________________________________________________________________________
2004-07


______________________________________________________________________________________OL = Operating License
===Plugging of Safety Injection===
Pump Lubrication Oil Coolers


CP = Construction PermitAttachment LIST OF RECENTLY ISSUEDNRC INFORMATION NOTICES_____________________________________________________________________________________InformationDate of
with Lakeweed


Notice No.        SubjectIssuanceIssued to_____________________________________________________________________________________2004-07Plugging of Safety InjectionPump Lubrication Oil Coolers
04/07/2004


with Lakeweed04/07/2004All holders of operating licensesor construction permits for
===All holders of operating licenses===
or construction permits for


nuclear power reactors, except
nuclear power reactors, except
Line 211: Line 413:
permanently removed from the
permanently removed from the


reactor vessel.2004-06Loss of Feedwater IsokineticSampling Probes at Dresden
reactor vessel.
 
2004-06
 
===Loss of Feedwater Isokinetic===
Sampling Probes at Dresden
 
===Units 2 and 3===
03/26/2004


Units 2 and 303/26/2004All holders of operating licenseesfor nuclear power reactors except
===All holders of operating licensees===
for nuclear power reactors except


those who have permanently
those who have permanently
Line 223: Line 434:
permanently removed from the
permanently removed from the


reactor vessel.2004-05Spent Fuel Pool Leakage toOnsite Groundwater03/03/2004All holders of operating licenseesfor nuclear power reactors (except
reactor vessel.
 
2004-05
 
===Spent Fuel Pool Leakage to===
Onsite Groundwater
 
03/03/2004
 
===All holders of operating licensees===
for nuclear power reactors (except


those who have permanently
those who have permanently
Line 239: Line 460:
of fuel storage licenses and
of fuel storage licenses and


construction permits.2004-04Fuel Damage During Cleaningat a Foreign Pressurized Water
construction permits.
 
2004-04
 
===Fuel Damage During Cleaning===
at a Foreign Pressurized Water
 
Reactor
 
02/24/2004


Reactor02/24/2004All holders of operating licensesfor light-water reactors, except
===All holders of operating licenses===
for light-water reactors, except


those who have permanently
those who have permanently
Line 251: Line 482:
permanently removed from the
permanently removed from the


reactor.Note:NRC generic communications may be received in electronic format shortly after they areissued by subscribing to the NRC listserver as follows:To subscribe send an e-mail to <listproc@nrc.gov >, no subject, and the followingcommand in the message portion:subscribe gc-nrr firstname lastname
reactor.
 
Note:
NRC generic communications may be received in electronic format shortly after they are


}}
issued by subscribing to the NRC listserver as follows:
To subscribe send an e-mail to <listproc@nrc.gov >, no subject, and the following
 
command in the message portion:
subscribe gc-nrr firstname lastname}}


{{Information notice-Nav}}
{{Information notice-Nav}}

Latest revision as of 03:26, 16 January 2025

Reactor Coolant Pressure Boundary Leakage Attributable to Propagation of Cracking in Reactor Vessel Nozzle Welds
ML041130396
Person / Time
Issue date: 04/22/2004
From: Beckner W
NRC/NRR/DIPM/IROB
To:
Dozier J, NRR/IROB 415-1014
References
IN-04-008
Download: ML041130396 (7)


UNITED STATES

NUCLEAR REGULATORY COMMISSION

OFFICE OF NUCLEAR REACTOR REGULATION

WASHINGTON, DC 20555-0001

April 22, 2004

NRC INFORMATION NOTICE 2004-08:

REACTOR COOLANT PRESSURE BOUNDARY

LEAKAGE ATTRIBUTABLE TO PROPAGATION

OF CRACKING IN REACTOR VESSEL NOZZLE

WELDS

Addressees

All holders of operating licensees for nuclear power boiling-water reactors (BWRs), except

those who have permanently ceased operations and have certified that fuel has been

permanently removed from the reactor vessel.

Purpose

The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice to alert

addressees to cracking identified in the nozzle-to-cap weld of control rod drive (CRD) return line

penetration N10 at Pilgrim Nuclear Power Station (Pilgrim Station). The NRC expects

recipients to review the information in this notice for applicability to their facilities and consider

actions, as appropriate, to avoid similar problems. However, suggestions contained in this

information notice do not constitute NRC requirements and, therefore, do not require any

specific action or written response.

Description of Circumstances

During a planned outage on September 30, 2003, the licensee for Pilgrim Station began

performing drywell inspections to identify and make necessary repairs to reduce drywell

leakage. On October 1, 2003, the licensees drywell inspections revealed leakage from the

nozzle-to-cap weld area of penetration N10. The licensee concluded that the leakage was a

contributor to the unidentified drywell leakage.

The licensee used a Performance Demonstration Initiative (PDI) qualified manual ultrasonic

testing (UT) technique to determine that the N10 nozzle-to-cap weld contained an unacceptable

flaw that was approximately 4.45cm (1.75 inches) long in the circumferential direction.

Observations by the nondestructive examination (NDE) inspector suggested that the flaw

initiated at the inner diameter (ID) of the weld, in the area of previous weld repairs. The

through-wall location appeared to be close to the centerline of the weld.

Root Cause

The reactor pressure vessel (RPV) nozzle is made of SA-508, Class 2 low-alloy steel, while the

CRD return line cap is made of Alloy 600. The subject weld is fabricated with Alloy 82/182 material, and the nozzle side of the weld is buttered with Alloy 182 material.

Section 2.2.1.2 of the BWR Vessel and Internals Project report BWRVIP-49, Instrument

Penetration Inspection and Flaw Evaluation Guidelines, states that there has been extensive

laboratory and field experience with stress corrosion cracking (SCC) of nickel based alloy, including wrought Alloy 600, Alloy 82 and Alloy 182 weld metal. Both Alloy 600 and Alloy 182 are potentially susceptible to SCC under normal water chemistry conditions in the BWR

environment. Alloy 600 is more resistant than Alloy 182 to crack initiation regardless of prior

fabrication history or metallurgical condition, particularly in the uncreviced condition. Consistent

with its higher chromium and lower carbon content, Alloy 82 weld metal is more resistant to

SCC than Alloy 182. Stress corrosion cracking in the base material is referred to as

intergranular SCC (IGSCC), while SCC in the weld material is referred to as interdendritic SCC

(IDSCC) because of the nature of the elongated grains (or dendrites) in the weld. Both

degradation mechanisms refer to essentially the same phenomenon in the base metal and weld

metal.

The licensee concluded that the root cause of the cracking in the nozzle-to-cap weld of CRD

return line penetration N10 was IDSCC, given that the flaw was completely contained within the

weld. The licensee asserted that the IDSCC was induced by a combination of a crevice

condition and weld repair stresses resulting from previous local weld repairs.

The licensee reviewed industry experience as part of its root cause evaluation. General Electric

(GE) and utility personnel who comprised the root cause team for a 1997 event at Hope Creek

concluded that the through-wall leak in the core spray nozzle to safe-end weld was attributable

to IDSCC in the Alloy 182 material. The root cause team also concluded that the crack growth

rate was influenced by the presence of fabrication defects and weld repair stresses (i.e. the

leak was in the area of a previous local repair using Alloy 182).

Corrective Action

The Pilgrim Station licensee performed a weld overlay repair to stop the leakage. The

licensees repair technique is an alternative to the requirements in Section XI, IWA-4000, of the

Boiler and Pressure Vessel Code promulgated by the American Society of Mechanical

Engineers (ASME). The repair was based on the use of Code Case N-504-2, Alternative

Rules for Repair of Class 1, 2, and 3 Austenitic Stainless Steel Piping (with modifications), and

Code Case N-638, Similar and Dissimilar Metal Welding Using Ambient Temperature Machine

GTAW Temper Bead Technique. (See ADAMS Accession No. ML032870328.)

Background

The N10 nozzle is a 10-cm (4-inch) diameter RPV penetration that was previously used to

return CRD system flow to the reactor vessel. In 1977, the licensee modified the N10 nozzle to

prevent cracking attributable to the cyclic thermal stresses resulting from the return of cooler

water to the reactor vessel from the CRD system. That modification consisted of cutting and

isolating the existing CRD system return line to nozzle N10 and rerouting the CRD return line to

the CRD cooling water header. The modification also included removing the safe end and

thermal sleeve from nozzle N10 and installing an Alloy 600 cap. The final configuration of the nozzle was composed of an Alloy 82/182 nozzle-to-cap butt weld from the forged steel nozzle

to the Alloy 600 cap. Radiographic examination following the modification identified defects in

the weld, which the licensee subsequently repaired. The final testing of the modification was

performed in 1977 using NDE and hydrostatic testing.

The NRC subsequently issued Generic Letter (GL) 88-01, NRC Position on IGSCC in BWR

Austenitic Stainless Steel Piping, to address the subject of IGSCC cracking in BWR piping.

During that same time period, GE recommended that BWR owners inspect nozzle-to-safe-end

welds containing Alloy 182 or a combination of Alloy 182 and Alloy 82 and, wherever practical, these inspections should be performed using automated UT scanning. Past inspections of

dissimilar metal piping welds at Pilgrim Station were completed using the guidance in GL 88-01, which was superseded by guidance in BWRVIP-75, Technical Basis for Revisions to Generic

Letter 88-01 Inspection Schedules. (See ADAMS Accession Nos. ML003688842 and

ML021350645.) In accordance with BWRVIP-75, the N10 nozzle-to-cap weld was classified as

a Category D weld, meaning that it is made of susceptible materials that have not been treated

with an IGSCC remedy and in which cracks have not been reported. The N10 nozzle is located

2.1m (84 inches) above the top of the active fuel and is not protected by hydrogen water

chemistry (HWC). (The purpose of HWC is to protect components from SCC.) Category D

welds have a 6-year inspection frequency. Prior to the Fall 2003 inspection, the licensee

performed its last inspection of the N10 nozzle-to-cap weld during the Spring 1999 refueling

outage. As part of that inspection, Inservice Inspection/ Nondestructive Examination personnel

reviewed data sheets, but did not discover any recordable indications of SCC.

Other related generic communications involving weld inspections and degradation in BWR

systems include the following NRC information notices (INs):

IN 1990-30:

Ultrasonic Inspection Techniques for Dissimilar Metal Welds

IN 1992-50:

Cracking of Valves in the Condensate Return Lines of a BWR Emergency

Condenser System

IN 1998-44:

Ten-year Inservice Inspection (ISI) Program Update For Licensees That Intend

to Implement Risk-Informed ISI of Piping

Discussion:

The licensees root cause for the cracking in nozzle N10 is consistent with the available

evidence and industry experience. The weld metal is susceptible to IDSCC, and there is

minimal protection (i.e., no HWC) from SCC mechanisms because of the location of the nozzle

cap and stagnant flow conditions.

In conducting the Spring 1999 inspection, the licensee used manual ultrasonic inspection

techniques with qualified inspectors. The 2003 examinations were performed to the updated

requirements of Appendix VIII to Section XI of the ASME Code and the PDI program.

Enhanced ultrasonic examinations using PDI-qualified inspectors have improved the capability

to detect flaws related to SCC mechanisms, including those that occur entirely within the weld

metal. With respect to future inspections of this weld, after the qualified ISI examination of the nozzle

N10 weld, which is scheduled for the 2009 outage, the weld will be examined in accordance

with the schedule for Category E welds in BWRVIP-75. BWRVIP-75 defines Category E welds

as those that have weld overlay repairs made with an IGSCC-resistant, nickel-based alloy (such

as Alloy 52) and have received one qualified ISI since the initial post-overlay examination. After

the initial examination, Category E welds with weld overlays are successively examined in

accordance with BWRVIP-75, and related NRC comments, in order to ensure that there is no

new cracking or crack growth. The Category E welds are then examined at a rate of 25 percent

of the population every 10 years for normal water chemistry.

The staff and the licensee discussed expanding the scope of the Fall 2003 inspection to include

all other Category D welds. The licensee used the following factors to consider this expanded

scope based on the attributes of the cracked N10 weld:

- weld at a reactor vessel nozzle

- Category D weld

- low HWC protection

- dissimilar metal weld (Alloy 82/182)

- significant weld repair during original installation

- ID grinding and/or radiographic defects

The other Category D welds were, for example, protected by HWC, had improved inspections in

the past (i.e., automated UT, rather than manual UT), had no weld repairs, and had no

radiographic defects. Therefore, the licensee did not expand the scope of the inspection.

The leakage from the penetration N10 nozzle-to-cap weld and other leak sources in the drywell

was less than the limit allowed by the plants technical specifications (TS) for unidentified

leakage and total leakage (combined unidentified and identified). The staff found that the

licensee had mitigating procedures, routine inspection activities, operable leakage detection

equipment and TS requirements designed to detect low levels of leakage from the reactor

coolant system (RCS) and minimize the potential that a flaw could remain undetected. On that

basis, the staff determined, qualitatively, that the N10 pressure boundary leakage was of very

low safety significance.

Generic Implications:

Based on the information currently available, such as other capped BWR CRD return lines and

prior industry experience with IDSCC, the degradation that occurred at Pilgrim Station may be

relevant to other BWR facilities. The licensee for Pilgrim Station used guidance from

BWRVIP-75 to determine the appropriate inspection method and frequency for this weld. This information notice does not require any specific action or written response. If you have

any questions about the information in this notice, please contact the technical contact identified

below or the appropriate project manager in the NRCs Office of Nuclear Reactor Regulation

(NRR).

/RA/

William D. Beckner, Chief

Reactors Operations Branch

Division of Inspection Program Management

Office of Nuclear Reactor Regulation

Technical Contact:

Andrea D. Lee, NRR

Jerry Dozier, NRR

(301) 415-2735

(301) 415-1014 Email: adw1@nrc.gov

Email: jxd@nrc.gov

Attachment: List of Recently Issued NRC Information Notices

ML041130396 OFFICE

OES:IROB:DIPM

Tech Editor

OCIO:IRSD:PSS

EMCB:DE

LPD4:DLPM

NAME

IJDozier JWF*

PKleene*

PAGarrity*

ADLee*

ABWang*

DATE

04/20/2004

03/01/2004

03/01/2004

03/03/2004

04/07/2004 OFFICE

BC:EMCB:DE

OES:IROB:DIPM

SC:OES:IROB:DIPM

C:IROB:DIPM

NAME

WHBateman*

CDPetrone*

CJackson

WDBeckner

DATE

04/15/2004

04/15/2004

04/22/2004

04/22/2004

/ /

______________________________________________________________________________________

OL = Operating License

CP = Construction Permit

Attachment LIST OF RECENTLY ISSUED

NRC INFORMATION NOTICES

_____________________________________________________________________________________

Information

Date of

Notice No.

Subject

Issuance

Issued to

_____________________________________________________________________________________

2004-07

Plugging of Safety Injection

Pump Lubrication Oil Coolers

with Lakeweed

04/07/2004

All holders of operating licenses

or construction permits for

nuclear power reactors, except

those who have permanently

ceased operations and have

certified that fuel has been

permanently removed from the

reactor vessel.

2004-06

Loss of Feedwater Isokinetic

Sampling Probes at Dresden

Units 2 and 3

03/26/2004

All holders of operating licensees

for nuclear power reactors except

those who have permanently

ceased operations and have

certified that fuel has been

permanently removed from the

reactor vessel.

2004-05

Spent Fuel Pool Leakage to

Onsite Groundwater

03/03/2004

All holders of operating licensees

for nuclear power reactors (except

those who have permanently

ceased operations and have

certified that fuel has been

permanently removed from the

reactor vessel) and for research

and test reactors, and all holders

of fuel storage licenses and

construction permits.

2004-04

Fuel Damage During Cleaning

at a Foreign Pressurized Water

Reactor

02/24/2004

All holders of operating licenses

for light-water reactors, except

those who have permanently

ceased operations and have

certified that fuel has been

permanently removed from the

reactor.

Note:

NRC generic communications may be received in electronic format shortly after they are

issued by subscribing to the NRC listserver as follows:

To subscribe send an e-mail to <listproc@nrc.gov >, no subject, and the following

command in the message portion:

subscribe gc-nrr firstname lastname