ML110871539: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML110871539
| number = ML110871539
| issue date = 03/15/2011
| issue date = 03/15/2011
| title = Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report (Fsar), Amendment 103. Section/Page 2.4-166 Hydrologic Engineering Through 2.4-247
| title = Unit 2 - Final Safety Analysis Report (Fsar), Amendment 103. Section/Page 2.4-166 Hydrologic Engineering Through 2.4-247
| author name =  
| author name =  
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
Line 13: Line 13:
| page count = 82
| page count = 82
}}
}}
=Text=
{{#Wiki_filter:HYDROLOGIC ENGINEERING 2.4-166 WATTS BAR WBNP-103 Figure 2.4-30 thru Figure 2.4-40 Are Not Used
2.4-167 HYDROLOGIC ENGINEERING WATTS BAR WBNP-103 THIS PAGE INTENTIONALLY BLANK
HYDROLOGIC ENGINEERING 2.4-168 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-40a Main Plant Site Grading And Drainage System For Flood Studies Sheet 1
HYDROLOGIC ENGINEERING 2.4-169 WATTS BAR WBNP-103 Figure 2.4-40a Deleted by Amendment 101
HYDROLOGIC ENGINEERING 2.4-170 WATTS BAR WBNP-103 Figure 2.4-40a Deleted by Amendment 101
HYDROLOGIC ENGINEERING 2.4-171 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-40b Main Plant General Plan
HYDROLOGIC ENGINEERING 2.4-172 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-40c Yard Site Grading and Drainage System For Flood Studies
HYDROLOGIC ENGINEERING 2.4-173 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-40d-1 Main Plant Plant Perimeter Roads Plan and Profile Sheet 1
HYDROLOGIC ENGINEERING 2.4-174 WATTS BAR WBNP-103 Figure 2.4-40d Main Plant Plant Perimeter Roads Plan and Profile - Sheet 2
HYDROLOGIC ENGINEERING 2.4-175 WATTS BAR WBNP-103 Figure 2.4-40d Main Plant Plant Perimeter Roads Plan and Profile - Sheet 3
HYDROLOGIC ENGINEERING 2.4-176 WATTS BAR WBNP-103 Figure 2.4-40e Access Highway TVA DWG 1001H202 R4 - Sheet 1
HYDROLOGIC ENGINEERING 2.4-177 WATTS BAR WBNP-103 Figure 2.4-40e Access Highway TVA DWG. 1001H201 R4 - Sheet 2
HYDROLOGIC ENGINEERING 2.4-178 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-40f Main Plant Main Plant Tracks Plan - Sheet 1
HYDROLOGIC ENGINEERING 2.4-179 WATTS BAR WBNP-103 Figure 2.4-40f Main Plant Main Plant Tracks Sections & Profiles - Sheet 2
HYDROLOGIC ENGINEERING 2.4-180 WATTS BAR WBNP-103 Figure 2.4-40f Main Plant Main Plant Tracks Sections & Profiles - Sheet 3
HYDROLOGIC ENGINEERING 2.4-181 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-40g Yard, Grading Drainage and Surfacing Transformer & Switchyard - Sheet 1
HYDROLOGIC ENGINEERING 2.4-182 WATTS BAR WBNP-103 Figure 2.4-40g Yard, Grading Drainage and Surfacing Transformer & Switchyard - Sheet 2
HYDROLOGIC ENGINEERING 2.4-183 WATTS BAR WBNP-103 Figure 2.4-40g Yard, Grading Drainage and Surfacing Transformer & Switchyard - Sheet 3
HYDROLOGIC ENGINEERING 2.4-184 WATTS BAR WBNP-103 Figure 2.4-40h Probable Maximum Precipation Point Rainfall
HYDROLOGIC ENGINEERING 2.4-185 WATTS BAR WBNP-103 Figure 2.4-40i Deleted by Amendment 83
HYDROLOGIC ENGINEERING 2.4-186 WATTS BAR WBNP-103 Figure 2.4-40j Deleted by Amendment 83
HYDROLOGIC ENGINEERING 2.4-187 WATTS BAR WBNP-103 Figure 2.4-40k Deleted by Amendment 83
HYDROLOGIC ENGINEERING 2.4-188 WATTS BAR WBNP-103 Figure 2.4-40L Deleted by Amendment 83
HYDROLOGIC ENGINEERING 2.4-189 WATTS BAR WBNP-103 THIS PAGE INTENTIONALLY BLANK
HYDROLOGIC ENGINEERING 2.4-190 WATTS BAR WBNP-103 Figure 2.4-41 thru Figure 2.4-60 Are Not Used
2.4-191 HYDROLOGIC ENGINEERING WATTS BAR WBNP-103 THIS PAGE INTENTIONALLY BLANK
HYDROLOGIC ENGINEERING 2.4-192 WATTS BAR WBNP-103 Figure 2.4-61 Watts Bar Probable Maximum Flood Water Levels Before and After Embankment Failure
2.4-193 HYDROLOGIC ENGINEERING WATTS BAR WBNP-103 Figure 2.4-62 Relative Bore Height (After J. J. Stroker, REF. 31)
HYDROLOGIC ENGINEERING 2.4-194 WATTS BAR WBNP-103 Figure 2.4-63 Assumed Limits of Embankment Failure Wave Expansion
2.4-195 HYDROLOGIC ENGINEERING WATTS BAR WBNP-103 Figure 2.4-64 Watts Bar Nuclear Plant Probable Maximum Flood Elevation
HYDROLOGIC ENGINEERING 2.4-196 WATTS BAR WBNP-103 Figure 2.4-65 thru Figure 2.4-67 Are Not Used
2.4-197 HYDROLOGIC ENGINEERING WATTS BAR WBNP-103 THIS PAGE INTENTIONALLY BLANK
2.4-198 HYDROLOGIC ENGINEERING WATTS BAR WBNP-103
????
Figure 2.4-68 Powerhouse & Spillway Results of Analysis For Operating Basis Earthquake - Watts Bar Dam
HYDROLOGIC ENGINEERING 2.4-199 WATTS BAR WBNP-103 Figure 2.4-69 Deleted by Amendment 103
2.4-200 HYDROLOGIC ENGINEERING WATTS BAR WBNP-103 Figure 2.4-70 Deleted by Amendment 83
HYDROLOGIC ENGINEERING 2.4-201 WATTS BAR WBNP-103 Figure 2.4-71 Powerhouse & Spillway Results of Analysis For Operating Basis Earthquake - Fort Loudoun Dam
2.4-202 HYDROLOGIC ENGINEERING WATTS BAR WBNP-103 Figure 2.4-72 Embankment Results Of Analysis For Operating Basis Earthquake - Fort Loudoun Dam
HYDROLOGIC ENGINEERING 2.4-203 WATTS BAR WBNP-103 Figure 2.4-73 Deleted by Amendment 103
2.4-204 HYDROLOGIC ENGINEERING WATTS BAR WBNP-103 Figure 2.4-74 Deleted by Amendment 103
HYDROLOGIC ENGINEERING 2.4-205 WATTS BAR WBNP-103 Figure 2.4-75 Deleted by Amendment 103
HYDROLOGIC ENGINEERING 2.4-206 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-76 Analysis For OBE & 1/2 PMF Assumed Condition of Dam After Failure Norris Dam
HYDROLOGIC ENGINEERING 2.4-207 WATTS BAR WBNP-103 Figure 2.4-77 Spillway & Nonoverflow Results of Analysis For Operating Basis Earthquake -Cherokee Dam
HYDROLOGIC ENGINEERING 2.4-208 WATTS BAR WBNP-103 Figure 2.4-78 Embankment Results of Analysis For Operating Basis Earthquake - Cherokee Dam
HYDROLOGIC ENGINEERING 2.4-209 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-79 Assumed Condition of Dam After Failure PBE And 1/2 Probable Max Flood - Cherokee Dam
HYDROLOGIC ENGINEERING 2.4-210 WATTS BAR WBNP-103 Figure 2.4-80 Spillway & Nonoverflow Results of Analysis For Operating Basis Earthquake - Douglas Dam
HYDROLOGIC ENGINEERING 2.4-211 WATTS BAR WBNP-103 Figure 2.4-81 Saddle Dam No. 1 Results of Analysis For Operating Basis Earthquake - Douglas Dam
HYDROLOGIC ENGINEERING 2.4-212 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-82 Douglas Dam Assumed Condition of Dam After Failure aBE And 1/2 Probable Maximum Flood - Douglas Project
HYDROLOGIC ENGINEERING 2.4-213 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-83 Fontana Dam Assumed Condition of Dam after Failure OBE And 1/2 Probable Maximum Flood
HYDROLOGIC ENGINEERING 2.4-214 WATTS BAR WBNP-103 Figure 2.4-84 Deleted by Amendment 63
HYDROLOGIC ENGINEERING 2.4-215 WATTS BAR WBNP-103 Figure 2.4-85 Deleted by Amendment 63
HYDROLOGIC ENGINEERING 2.4-216 WATTS BAR WBNP-103 Figure 2.4-86 Spillway Results of Analysis For SSE Earthquake Fort Loudoun Dam
HYDROLOGIC ENGINEERING 2.4-217 WATTS BAR WBNP-103 Figure 2.4-87 Embankment Results of Analysis For SSE Earthquake Fort Loudoun Dam
HYDROLOGIC ENGINEERING 2.4-218 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-88 Fort Loudoun Dam Assumed Condition of Dam After Failure SSE Combined With a 25 Year Flood - Fort Loudoun Dam
HYDROLOGIC ENGINEERING 2.4-219 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-89 Tellico Dam Assumed Condition of Dam After Failure SSE Combined With a 25 Year Flood Tellico Project
HYDROLOGIC ENGINEERING 2.4-220 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-90 Norris Dam SSE + 25 Year Flood Judged Condition of Dam After Failure - Norris Dam
HYDROLOGIC ENGINEERING 2.4-221 WATTS BAR WBNP-103 Figure 2.4-91 SSE With Epicenter In North Knoxville Vicinity
HYDROLOGIC ENGINEERING 2.4-222 WATTS BAR WBNP-103 Figure 2.4-92 Deleted by Amendment 103
HYDROLOGIC ENGINEERING 2.4-223 WATTS BAR WBNP-103 Figure 2.4-93 SSE With Epicenter In West Knoxville Vicinity
HYDROLOGIC ENGINEERING 2.4-224 WATTS BAR WBNP-103 Figure 2.4-94 Location of SSE For Simultaneous Failure of The Douglas and Fontana Dams
HYDROLOGIC ENGINEERING 2.4-225 WATTS BAR WBNP-103 Figure 2.4-95 Deleted by Amendment 103
HYDROLOGIC ENGINEERING 2.4-226 WATTS BAR WBNP-103 Figure 2.4-96 Deleted by Amendment 103
HYDROLOGIC ENGINEERING 2.4-227 WATTS BAR WBNP-103 Figure 2.4-97 Deleted by Amendment 103
HYDROLOGIC ENGINEERING 2.4-228 WATTS BAR WBNP-103 Figure 2.4-98 Not Used
HYDROLOGIC ENGINEERING 2.4-229 WATTS BAR WBNP-103 Figure 2.4-99 Grading Plan Intake Channel
HYDROLOGIC ENGINEERING 2.4-230 WATTS BAR WBNP-103 Figure 2.4-100 Deleted by Amendment 83
HYDROLOGIC ENGINEERING 2.4-231 WATTS BAR WBNP-103 Figure 2.4-101 Deleted by Amendment 33
HYDROLOGIC ENGINEERING 2.4-232 WATTS BAR WBNP-103 Figure 2.4-102 Wells And Spring Inventory Within 2-Mile Radius of Watts Bar Nuclear Plant Site
HYDROLOGIC ENGINEERING 2.4-233 WATTS BAR WBNP-103 Figure 2.4-103 Water-Level Fluctuations In Observation Wells at The Watts Bar Site
HYDROLOGIC ENGINEERING 2.4-234 WATTS BAR WBNP-103 Figure 2.4-104 Locations of Ground - Water Observation Wells
HYDROLOGIC ENGINEERING 2.4-235 WATTS BAR WBNP-103 Figure 2.4-105 Generalized Water-Table Contour Map January 1972
HYDROLOGIC ENGINEERING 2.4-236 WATTS BAR WBNP-103 Figure 2.4-106 Mechanical - Flow Diagram Fuel Pool Cooling and Cleaning System
HYDROLOGIC ENGINEERING 2.4-237 WATTS BAR WBNP-103 Figure 2.4-107 Powerhouse Units 1 & 2 Flow Diagram - Residual Heat Removal System
HYDROLOGIC ENGINEERING 2.4-238 WATTS BAR WBNP-103 Figure 2.4-108 Schematic Flow Diagram Flood Protection Provisions Open Reactor Cooling (Unit 1 Shown, Unit 2 Similar)
HYDROLOGIC ENGINEERING 2.4-239 WATTS BAR WBNP-103 Figure 2.4-109 Schematic Flow Diagram Flood Protection Provisions Natural Convection Cooling (Unit 1 Shown, Unit 2 Similar)
HYDROLOGIC ENGINEERING 2.4-240 WATTS BAR WBNP-103 Figure 2.4-110 (Sheet 1) Watts Bar Nuclear Plant Rainfall Flood Warning Time Basis For Safe Shutdown For Plant Flooding - Winter Events
HYDROLOGIC ENGINEERING 2.4-241 WATTS BAR WBNP-103 Figure 2.4-110 (Sheet 2) Watts Bar Nuclear Plant Rainfall Flood Warning Time Basis For Safe Shutdown For Plant Flooding - Summer Events
2.4-242 HYDROLOGIC ENGINEERING WATTS BAR WBNP-103 Figure 2.4-111 Deleted by Amendment 103
HYDROLOGIC ENGINEERING 2.4-243 WATTS BAR WBNP-103 Figure 2.4-112 OBE with Epicenter Within Area Shown
HYDROLOGIC ENGINEERING 2.4-244 WATTS BAR WBNP-103 Figure 2.4-113 SSE Failure of Norris, Cherokee, Douglas, and Tellico Dams with 25-Year Flood Failure Wave at Watts Bar Nuclear Plant
2.4-245 HYDROLOGIC ENGINEERING WATTS BAR WBNP-103 Figure 2.4-114 SSE Failure of Norris, Cherokee, Douglas, and Tellico Dams with 25-Year Flood Failure Wave at Watts Bar Nuclear Plant
HYDROLOGIC ENGINEERING 2.4-246 WATTS BAR WBNP-103 Figure 2.4-115 OBE Failure of Norris and Tellico Dams with 1/2 PMF Event Failure Wave at Watts Bar Nuclear Plant
HYDROLOGIC ENGINEERING 2.4-247 WATTS BAR WBNP-103 Figure 2.4-116 OBE Failure of Cherokee, Douglas and Tellico Dams with 1/2 PMF Event Failure Wave at Watts Bar Nuclear Plant}}

Latest revision as of 07:30, 13 January 2025

Unit 2 - Final Safety Analysis Report (Fsar), Amendment 103. Section/Page 2.4-166 Hydrologic Engineering Through 2.4-247
ML110871539
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 03/15/2011
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
References
Download: ML110871539 (82)


Text

HYDROLOGIC ENGINEERING 2.4-166 WATTS BAR WBNP-103 Figure 2.4-30 thru Figure 2.4-40 Are Not Used

2.4-167 HYDROLOGIC ENGINEERING WATTS BAR WBNP-103 THIS PAGE INTENTIONALLY BLANK

HYDROLOGIC ENGINEERING 2.4-168 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-40a Main Plant Site Grading And Drainage System For Flood Studies Sheet 1

HYDROLOGIC ENGINEERING 2.4-169 WATTS BAR WBNP-103 Figure 2.4-40a Deleted by Amendment 101

HYDROLOGIC ENGINEERING 2.4-170 WATTS BAR WBNP-103 Figure 2.4-40a Deleted by Amendment 101

HYDROLOGIC ENGINEERING 2.4-171 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-40b Main Plant General Plan

HYDROLOGIC ENGINEERING 2.4-172 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-40c Yard Site Grading and Drainage System For Flood Studies

HYDROLOGIC ENGINEERING 2.4-173 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-40d-1 Main Plant Plant Perimeter Roads Plan and Profile Sheet 1

HYDROLOGIC ENGINEERING 2.4-174 WATTS BAR WBNP-103 Figure 2.4-40d Main Plant Plant Perimeter Roads Plan and Profile - Sheet 2

HYDROLOGIC ENGINEERING 2.4-175 WATTS BAR WBNP-103 Figure 2.4-40d Main Plant Plant Perimeter Roads Plan and Profile - Sheet 3

HYDROLOGIC ENGINEERING 2.4-176 WATTS BAR WBNP-103 Figure 2.4-40e Access Highway TVA DWG 1001H202 R4 - Sheet 1

HYDROLOGIC ENGINEERING 2.4-177 WATTS BAR WBNP-103 Figure 2.4-40e Access Highway TVA DWG. 1001H201 R4 - Sheet 2

HYDROLOGIC ENGINEERING 2.4-178 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-40f Main Plant Main Plant Tracks Plan - Sheet 1

HYDROLOGIC ENGINEERING 2.4-179 WATTS BAR WBNP-103 Figure 2.4-40f Main Plant Main Plant Tracks Sections & Profiles - Sheet 2

HYDROLOGIC ENGINEERING 2.4-180 WATTS BAR WBNP-103 Figure 2.4-40f Main Plant Main Plant Tracks Sections & Profiles - Sheet 3

HYDROLOGIC ENGINEERING 2.4-181 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-40g Yard, Grading Drainage and Surfacing Transformer & Switchyard - Sheet 1

HYDROLOGIC ENGINEERING 2.4-182 WATTS BAR WBNP-103 Figure 2.4-40g Yard, Grading Drainage and Surfacing Transformer & Switchyard - Sheet 2

HYDROLOGIC ENGINEERING 2.4-183 WATTS BAR WBNP-103 Figure 2.4-40g Yard, Grading Drainage and Surfacing Transformer & Switchyard - Sheet 3

HYDROLOGIC ENGINEERING 2.4-184 WATTS BAR WBNP-103 Figure 2.4-40h Probable Maximum Precipation Point Rainfall

HYDROLOGIC ENGINEERING 2.4-185 WATTS BAR WBNP-103 Figure 2.4-40i Deleted by Amendment 83

HYDROLOGIC ENGINEERING 2.4-186 WATTS BAR WBNP-103 Figure 2.4-40j Deleted by Amendment 83

HYDROLOGIC ENGINEERING 2.4-187 WATTS BAR WBNP-103 Figure 2.4-40k Deleted by Amendment 83

HYDROLOGIC ENGINEERING 2.4-188 WATTS BAR WBNP-103 Figure 2.4-40L Deleted by Amendment 83

HYDROLOGIC ENGINEERING 2.4-189 WATTS BAR WBNP-103 THIS PAGE INTENTIONALLY BLANK

HYDROLOGIC ENGINEERING 2.4-190 WATTS BAR WBNP-103 Figure 2.4-41 thru Figure 2.4-60 Are Not Used

2.4-191 HYDROLOGIC ENGINEERING WATTS BAR WBNP-103 THIS PAGE INTENTIONALLY BLANK

HYDROLOGIC ENGINEERING 2.4-192 WATTS BAR WBNP-103 Figure 2.4-61 Watts Bar Probable Maximum Flood Water Levels Before and After Embankment Failure

2.4-193 HYDROLOGIC ENGINEERING WATTS BAR WBNP-103 Figure 2.4-62 Relative Bore Height (After J. J. Stroker, REF. 31)

HYDROLOGIC ENGINEERING 2.4-194 WATTS BAR WBNP-103 Figure 2.4-63 Assumed Limits of Embankment Failure Wave Expansion

2.4-195 HYDROLOGIC ENGINEERING WATTS BAR WBNP-103 Figure 2.4-64 Watts Bar Nuclear Plant Probable Maximum Flood Elevation

HYDROLOGIC ENGINEERING 2.4-196 WATTS BAR WBNP-103 Figure 2.4-65 thru Figure 2.4-67 Are Not Used

2.4-197 HYDROLOGIC ENGINEERING WATTS BAR WBNP-103 THIS PAGE INTENTIONALLY BLANK

2.4-198 HYDROLOGIC ENGINEERING WATTS BAR WBNP-103

????

Figure 2.4-68 Powerhouse & Spillway Results of Analysis For Operating Basis Earthquake - Watts Bar Dam

HYDROLOGIC ENGINEERING 2.4-199 WATTS BAR WBNP-103 Figure 2.4-69 Deleted by Amendment 103

2.4-200 HYDROLOGIC ENGINEERING WATTS BAR WBNP-103 Figure 2.4-70 Deleted by Amendment 83

HYDROLOGIC ENGINEERING 2.4-201 WATTS BAR WBNP-103 Figure 2.4-71 Powerhouse & Spillway Results of Analysis For Operating Basis Earthquake - Fort Loudoun Dam

2.4-202 HYDROLOGIC ENGINEERING WATTS BAR WBNP-103 Figure 2.4-72 Embankment Results Of Analysis For Operating Basis Earthquake - Fort Loudoun Dam

HYDROLOGIC ENGINEERING 2.4-203 WATTS BAR WBNP-103 Figure 2.4-73 Deleted by Amendment 103

2.4-204 HYDROLOGIC ENGINEERING WATTS BAR WBNP-103 Figure 2.4-74 Deleted by Amendment 103

HYDROLOGIC ENGINEERING 2.4-205 WATTS BAR WBNP-103 Figure 2.4-75 Deleted by Amendment 103

HYDROLOGIC ENGINEERING 2.4-206 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-76 Analysis For OBE & 1/2 PMF Assumed Condition of Dam After Failure Norris Dam

HYDROLOGIC ENGINEERING 2.4-207 WATTS BAR WBNP-103 Figure 2.4-77 Spillway & Nonoverflow Results of Analysis For Operating Basis Earthquake -Cherokee Dam

HYDROLOGIC ENGINEERING 2.4-208 WATTS BAR WBNP-103 Figure 2.4-78 Embankment Results of Analysis For Operating Basis Earthquake - Cherokee Dam

HYDROLOGIC ENGINEERING 2.4-209 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-79 Assumed Condition of Dam After Failure PBE And 1/2 Probable Max Flood - Cherokee Dam

HYDROLOGIC ENGINEERING 2.4-210 WATTS BAR WBNP-103 Figure 2.4-80 Spillway & Nonoverflow Results of Analysis For Operating Basis Earthquake - Douglas Dam

HYDROLOGIC ENGINEERING 2.4-211 WATTS BAR WBNP-103 Figure 2.4-81 Saddle Dam No. 1 Results of Analysis For Operating Basis Earthquake - Douglas Dam

HYDROLOGIC ENGINEERING 2.4-212 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-82 Douglas Dam Assumed Condition of Dam After Failure aBE And 1/2 Probable Maximum Flood - Douglas Project

HYDROLOGIC ENGINEERING 2.4-213 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-83 Fontana Dam Assumed Condition of Dam after Failure OBE And 1/2 Probable Maximum Flood

HYDROLOGIC ENGINEERING 2.4-214 WATTS BAR WBNP-103 Figure 2.4-84 Deleted by Amendment 63

HYDROLOGIC ENGINEERING 2.4-215 WATTS BAR WBNP-103 Figure 2.4-85 Deleted by Amendment 63

HYDROLOGIC ENGINEERING 2.4-216 WATTS BAR WBNP-103 Figure 2.4-86 Spillway Results of Analysis For SSE Earthquake Fort Loudoun Dam

HYDROLOGIC ENGINEERING 2.4-217 WATTS BAR WBNP-103 Figure 2.4-87 Embankment Results of Analysis For SSE Earthquake Fort Loudoun Dam

HYDROLOGIC ENGINEERING 2.4-218 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-88 Fort Loudoun Dam Assumed Condition of Dam After Failure SSE Combined With a 25 Year Flood - Fort Loudoun Dam

HYDROLOGIC ENGINEERING 2.4-219 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-89 Tellico Dam Assumed Condition of Dam After Failure SSE Combined With a 25 Year Flood Tellico Project

HYDROLOGIC ENGINEERING 2.4-220 WATTS BAR WBNP-103 Security-Related Information - Withheld Under 10CFR2.390 Figure 2.4-90 Norris Dam SSE + 25 Year Flood Judged Condition of Dam After Failure - Norris Dam

HYDROLOGIC ENGINEERING 2.4-221 WATTS BAR WBNP-103 Figure 2.4-91 SSE With Epicenter In North Knoxville Vicinity

HYDROLOGIC ENGINEERING 2.4-222 WATTS BAR WBNP-103 Figure 2.4-92 Deleted by Amendment 103

HYDROLOGIC ENGINEERING 2.4-223 WATTS BAR WBNP-103 Figure 2.4-93 SSE With Epicenter In West Knoxville Vicinity

HYDROLOGIC ENGINEERING 2.4-224 WATTS BAR WBNP-103 Figure 2.4-94 Location of SSE For Simultaneous Failure of The Douglas and Fontana Dams

HYDROLOGIC ENGINEERING 2.4-225 WATTS BAR WBNP-103 Figure 2.4-95 Deleted by Amendment 103

HYDROLOGIC ENGINEERING 2.4-226 WATTS BAR WBNP-103 Figure 2.4-96 Deleted by Amendment 103

HYDROLOGIC ENGINEERING 2.4-227 WATTS BAR WBNP-103 Figure 2.4-97 Deleted by Amendment 103

HYDROLOGIC ENGINEERING 2.4-228 WATTS BAR WBNP-103 Figure 2.4-98 Not Used

HYDROLOGIC ENGINEERING 2.4-229 WATTS BAR WBNP-103 Figure 2.4-99 Grading Plan Intake Channel

HYDROLOGIC ENGINEERING 2.4-230 WATTS BAR WBNP-103 Figure 2.4-100 Deleted by Amendment 83

HYDROLOGIC ENGINEERING 2.4-231 WATTS BAR WBNP-103 Figure 2.4-101 Deleted by Amendment 33

HYDROLOGIC ENGINEERING 2.4-232 WATTS BAR WBNP-103 Figure 2.4-102 Wells And Spring Inventory Within 2-Mile Radius of Watts Bar Nuclear Plant Site

HYDROLOGIC ENGINEERING 2.4-233 WATTS BAR WBNP-103 Figure 2.4-103 Water-Level Fluctuations In Observation Wells at The Watts Bar Site

HYDROLOGIC ENGINEERING 2.4-234 WATTS BAR WBNP-103 Figure 2.4-104 Locations of Ground - Water Observation Wells

HYDROLOGIC ENGINEERING 2.4-235 WATTS BAR WBNP-103 Figure 2.4-105 Generalized Water-Table Contour Map January 1972

HYDROLOGIC ENGINEERING 2.4-236 WATTS BAR WBNP-103 Figure 2.4-106 Mechanical - Flow Diagram Fuel Pool Cooling and Cleaning System

HYDROLOGIC ENGINEERING 2.4-237 WATTS BAR WBNP-103 Figure 2.4-107 Powerhouse Units 1 & 2 Flow Diagram - Residual Heat Removal System

HYDROLOGIC ENGINEERING 2.4-238 WATTS BAR WBNP-103 Figure 2.4-108 Schematic Flow Diagram Flood Protection Provisions Open Reactor Cooling (Unit 1 Shown, Unit 2 Similar)

HYDROLOGIC ENGINEERING 2.4-239 WATTS BAR WBNP-103 Figure 2.4-109 Schematic Flow Diagram Flood Protection Provisions Natural Convection Cooling (Unit 1 Shown, Unit 2 Similar)

HYDROLOGIC ENGINEERING 2.4-240 WATTS BAR WBNP-103 Figure 2.4-110 (Sheet 1) Watts Bar Nuclear Plant Rainfall Flood Warning Time Basis For Safe Shutdown For Plant Flooding - Winter Events

HYDROLOGIC ENGINEERING 2.4-241 WATTS BAR WBNP-103 Figure 2.4-110 (Sheet 2) Watts Bar Nuclear Plant Rainfall Flood Warning Time Basis For Safe Shutdown For Plant Flooding - Summer Events

2.4-242 HYDROLOGIC ENGINEERING WATTS BAR WBNP-103 Figure 2.4-111 Deleted by Amendment 103

HYDROLOGIC ENGINEERING 2.4-243 WATTS BAR WBNP-103 Figure 2.4-112 OBE with Epicenter Within Area Shown

HYDROLOGIC ENGINEERING 2.4-244 WATTS BAR WBNP-103 Figure 2.4-113 SSE Failure of Norris, Cherokee, Douglas, and Tellico Dams with 25-Year Flood Failure Wave at Watts Bar Nuclear Plant

2.4-245 HYDROLOGIC ENGINEERING WATTS BAR WBNP-103 Figure 2.4-114 SSE Failure of Norris, Cherokee, Douglas, and Tellico Dams with 25-Year Flood Failure Wave at Watts Bar Nuclear Plant

HYDROLOGIC ENGINEERING 2.4-246 WATTS BAR WBNP-103 Figure 2.4-115 OBE Failure of Norris and Tellico Dams with 1/2 PMF Event Failure Wave at Watts Bar Nuclear Plant

HYDROLOGIC ENGINEERING 2.4-247 WATTS BAR WBNP-103 Figure 2.4-116 OBE Failure of Cherokee, Douglas and Tellico Dams with 1/2 PMF Event Failure Wave at Watts Bar Nuclear Plant