ML22291A034: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:U.S. Nuclear Regulatory Commission - Region II 245 Peachtree Center Ave. N.E.
{{#Wiki_filter:U.S. Nuclear Regulatory Commission - Region II 245 Peachtree Center Ave. N.E.
Atlanta, GA 30303-1200
Atlanta, GA 30303-1200 October 17, 2022 INSPECTION DOCUMENT REQUEST Licensee: Framatome Inc., Richland, WA Pre-Inspection Visit: NA Docket Number: 07001257 License Number: SNM-1227 Inspection Report Number: 2022-004 Enterprise Number: EPID: I-2022-004-0062 Inspection Dates: November 14 through 17, 2022 Inspection Procedure(s):
IP 88015 - Nuclear Criticality Safety, Issued 10/20/20 IP 88050 - Emergency Preparedness, Issued 12/17/20 Accompanying Personnel: None Identified Licensee Contacts:
Manager, EH&S and Licensing: Timothy Tate P: 509 375-8550 E: timothy.tate@framatome.com Manager, Licensing and Compliance: Calving Manning P: 509 375-8237 E. calvin.manning@framatome.com Inspector(s): Cynthia Taylor (Team Leader)
P: 404-997-4480 E: cynthia.taylor@nrc.gov Nick Peterka P: 404-997-4456 E: Nicholas.Peterka@nrc.gov


October 17, 2022
Inspection Document Request for NRC Inspection at Framatome Inc., Richland, WA The following is a request of documents the U.S. Nuclear Regulatory Commission (NRC) inspectors are interested in reviewing prior to the on-site inspection visit consistent with the guidance in NRC Inspection Manual Chapter 0620, Inspection Documents and Records. The documents provided in response to this request should contain enough information to facilitate the selection of specific inspection samples. Please provide the current version of these documents unless specified otherwise. If any of the information requested below does not apply to the facility, please specify in your response. The licensee is not required to provide documents that are already available in ADAMS. Electronic media is preferred for receiving the information, if readily available (preferably Microsoft Word format or searchable.pdf files).
 
INSPECTION DOCUMENT REQUEST
 
Licensee: Framatome Inc., Richland, WA
 
Pre-Inspection Visit: NA
 
Docket Number: 07001257 License Number: SNM-1227
 
Inspection Report Number: 202 2-004 Enterprise Number: EPID: I-2022-004- 0062
 
Inspection Dates: November 14 through 17, 2022
 
Inspection Procedure(s):
 
IP 88015 - Nuclear Criticality Safety, Issued 10/20/20 IP 88050 - Emergency Preparedness, Issued 12/17/20
 
Accompanying Personnel: None
 
Identified Licensee Contacts:
 
Manager, EH&S and Licensing: Timothy Tate P: 509 375-8550 E: timothy.tate@framatome.com
 
Manager, Licensing and Compliance: Calving Manning P: 509 375-8237 E. calvin.manning@framatome.com
 
Inspector(s): Cynthia Taylor (Team Leader) P: 404-997-4480 E: cynthia.taylor@nrc.gov
 
Nick Peterka P: 404-997-4456 E: Nicholas.Peterka@nrc.gov
 
Inspection Document Request for NRC Inspection at Framatome Inc., Richland, WA
 
The following is a request of documents the U.S. Nuclear Regulatory Commission (NRC) inspectors are interested in reviewing prior to the on-site inspection visit consistent with the guidance in NRC Inspection Manual Chapter 0620, Inspection Documents and Records. The documents provided in response to this request should contain enough information to facilitate the selection of specific inspection samples. Please provide the current version of these documents unless specified otherwise. If any of the information requested below does not apply to the facility, please specify in your response. The licensee is not required to provide documents that are already available in ADAMS. Electronic media is preferred for receiving the information, if readily available (preferably Microsoft Word format or searchable.pdf files).
The NRC can establish a secure cloud-based file storage service to facilitate document sharing as needed.
The NRC can establish a secure cloud-based file storage service to facilitate document sharing as needed.
If there are any questions or concerns regarding the information requested, please contact the NRC inspection team lead.
If there are any questions or concerns regarding the information requested, please contact the NRC inspection team lead.
INSPECTION PROCEDURE 88015 - NUCLEAR CRITICALITY SAFETY (PETERKA)
INSPECTION PROCEDURE 88015 - NUCLEAR CRITICALITY SAFETY (PETERKA)
Documentation Requested in Advance for In-Office Preparation
Documentation Requested in Advance for In-Office Preparation
: 1. List of new and/or revised NCSAs
: 1. List of new and/or revised NCSAs
: 2. NCSAs for System 150, 350, and 960
: 2. NCSAs for System 150, 350, and 960
: 3. List of NCS and CAAS related corrective action program entries since the last NCS inspection in May 2022.
: 3. List of NCS and CAAS related corrective action program entries since the last NCS inspection in May 2022.
Information Requested for On-Site Inspection
Information Requested for On-Site Inspection
: 1. The most recent audit of the NCS program (if any since the last NCS inspection in May 2022)
: 1. The most recent audit of the NCS program (if any since the last NCS inspection in May 2022)
Line 69: Line 37:
: 4. CAAS detector placement calculations, system description/drawings, and the most recent maintenance / logic testing records
: 4. CAAS detector placement calculations, system description/drawings, and the most recent maintenance / logic testing records
: 5. NCS inspection reports (a.k.a. weekly/monthly/quarterly walkdowns) since the last NCS inspection in May 2022
: 5. NCS inspection reports (a.k.a. weekly/monthly/quarterly walkdowns) since the last NCS inspection in May 2022
: 6. List of planned CAAS testing, NCS related IROFS testing, PMs, or calibrations scheduled for the inspection week. Also any other NCS related activities occurring during the inspection week
: 6. List of planned CAAS testing, NCS related IROFS testing, PMs, or calibrations scheduled for the inspection week. Also any other NCS related activities occurring during the inspection week Activities Requested for On-Site Inspection
 
Activities Requested for On-Site Inspection
: 1. Please schedule an accompaniment on a NCS walkdown if one is going to be performed
: 1. Please schedule an accompaniment on a NCS walkdown if one is going to be performed
: 2. Please schedule a walkdown of the MURS process and the DCP system with a focus on System 960
: 2. Please schedule a walkdown of the MURS process and the DCP system with a focus on System 960
: 3. Please schedule a walkdown of the site CAAS
: 3. Please schedule a walkdown of the site CAAS INSPECTION PROCEDURE 88050 - EMERGENCY PREPAREDNESS (TAYLOR)
 
Documentation Requested in Advance for In-Office Preparation  
INSPECTION PROCEDURE 88050 - EMERGENCY PREPAREDNESS (TAYLOR)
 
Documentation Requested in Advance for In-Office Preparation


Program
Program
: 1. Organizational charts
: 1.
Organizational charts
: a. Organizational chart with respect to individuals involved with Emergency Preparedness (EP). Please note any management personnel changes since the last inspection.
: a. Organizational chart with respect to individuals involved with Emergency Preparedness (EP). Please note any management personnel changes since the last inspection.
: b. If applicable, please provide the qualifications of any new management personnel in EP since the last inspection.
: b. If applicable, please provide the qualifications of any new management personnel in EP since the last inspection.
: 2. A list of any significant changes related to the EP program since the last EP inspectionto include changes to the following since the last inspection:
: 2.
A list of any significant changes related to the EP program since the last EP inspection to include changes to the following since the last inspection:
: a. Emergency Plan
: a. Emergency Plan
: b. responsibilities and authorities
: b. responsibilities and authorities
: c. staffing levels
: c. staffing levels
: d. key emergency personnel
: d. key emergency personnel
: 3. The most recent audits and assessments of the EP program since last inspection.
: 3.
 
The most recent audits and assessments of the EP program since last inspection.
Procedures
Procedures
: 4. Procedure(s) identifying the controls to ensure the emergency plan is maintained and up to date
: 4.
: 5. Any EP implementing procedures that were created or revised since the last EP inspection
Procedure(s) identifying the controls to ensure the emergency plan is maintained and up to date
: 6. List of current copies of implementing procedures along with the locations maintained in the appropriate field locations
: 5.
: 7. Procedures for inspection & inventory of EP equipment
Any EP implementing procedures that were created or revised since the last EP inspection
: 8. The procedure or process for evaluating plant changes and modifications for their potential impact on the emergency preparedness program
: 6.
: 9. Procedure that instructs personnel to evacuate to accountability/muster locations in the event of a criticality accident alarm system (CAAS) activation.
List of current copies of implementing procedures along with the locations maintained in the appropriate field locations
 
: 7.
Procedures for inspection & inventory of EP equipment
: 8.
The procedure or process for evaluating plant changes and modifications for their potential impact on the emergency preparedness program
: 9.
Procedure that instructs personnel to evacuate to accountability/muster locations in the event of a criticality accident alarm system (CAAS) activation.
Training
Training
: 10. Provide EP training that is offered to offsite responders, including fire, police, medical, and other emergency personnel. Please provide dates of the training.
: 10. Provide EP training that is offered to offsite responders, including fire, police, medical, and other emergency personnel. Please provide dates of the training.
: 11. Sample of records indicating staff completion of any required EP training
: 11. Sample of records indicating staff completion of any required EP training
: 12. EP training materials (e.g., slides, tests)
: 12. EP training materials (e.g., slides, tests)
: 13. EP personnel qualification/training records since last inspection
: 13. EP personnel qualification/training records since last inspection Offsite Support
 
: 14. The latest agreement(s) with Offsite Support Agencies Corrective Action/Event Review
Offsite Support
: 14. The latest agreement(s) with Offsite Support Agencies
 
Corrective Action/Event Review
: 15. EP-related Corrective Action Program entries, event reports, and issue screening documents since the last EP inspection
: 15. EP-related Corrective Action Program entries, event reports, and issue screening documents since the last EP inspection
: 16. List of events (operational events, include non-routine events and unusual occurrences) occurring that involved activation of the site emergency plan since the last inspection
: 16. List of events (operational events, include non-routine events and unusual occurrences) occurring that involved activation of the site emergency plan since the last inspection Plant Modifications/Hazardous Materials
 
Plant Modifications/Hazardous Materials
: 17. List of current pre-fire plans and required field locations
: 17. List of current pre-fire plans and required field locations
: 18. A list of, if any, plant modifications that were identified as affecting the sites emergency plan, since the last EP inspection
: 18. A list of, if any, plant modifications that were identified as affecting the sites emergency plan, since the last EP inspection Exercises, Drills, Equipment/Inventory
 
Exercises, Drills, Equipment/Inventory
: 19. Schedule of inspections or testing that will be occurring the week of November 14
: 19. Schedule of inspections or testing that will be occurring the week of November 14
: 20. Provide the licensees emergency call list and c ontact information for offsite support agencies
: 20. Provide the licensees emergency call list and contact information for offsite support agencies
: 21. List of all EP exercises and drills conducted since the last EP inspection
: 21. List of all EP exercises and drills conducted since the last EP inspection
: 22. If applicable, please identify IROFS and provide results of EP management measures documentation since the last inspection.
: 22. If applicable, please identify IROFS and provide results of EP management measures documentation since the last inspection.
Activities Requested for On-Site Inspection
Activities Requested for On-Site Inspection
: 1. Please schedule an accompaniment for walkdown of emergency equipment/inventory
: 1.
: 2. Interview of Emergency Preparedness Manager and staff
Please schedule an accompaniment for walkdown of emergency equipment/inventory
: 3. Please schedule a walkdown of evacuation areas ( Please provide current map of EP evacuation areas).
: 2.
 
Interview of Emergency Preparedness Manager and staff
PAPERWORK REDUCTION ACT STATEMENT
: 3.
 
Please schedule a walkdown of evacuation areas ( Please provide current map of EP evacuation areas).
This letter contains mandatory information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) approved these information collections (approval number 3150- 0009). The burden to the public for these information collections is estimated to average 1 hour per response. Send comments regarding this information collection to the FOIA, Library and Information Collection Branch, Office of the Chief Information Officer, Mail Stop: T6-A10M, U.S. Nuclear Regulatory Commission, Washington, DC 20555- 0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150- 0009) Office of Management and Budget, Washington, DC 20503.
PAPERWORK REDUCTION ACT STATEMENT This letter contains mandatory information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) approved these information collections (approval number 3150-0009). The burden to the public for these information collections is estimated to average 1 hour per response. Send comments regarding this information collection to the FOIA, Library and Information Collection Branch, Office of the Chief Information Officer, Mail Stop: T6-A10M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0009) Office of Management and Budget, Washington, DC 20503.
 
Public Protection Notification The NRC may not conduct nor sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.}}
Public Protection Notification The NRC may not conduct nor sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.}}

Latest revision as of 15:20, 27 November 2024

Framatome Inspection Request (2022 Nuclear Criticality and Emergency Preparedness)
ML22291A034
Person / Time
Site: Framatome ANP Richland
Issue date: 10/17/2022
From:
NRC/RGN-II/DFFI
To:
References
EPID I-2022-004-0062 IR 2022004
Download: ML22291A034 (4)


Text

U.S. Nuclear Regulatory Commission - Region II 245 Peachtree Center Ave. N.E.

Atlanta, GA 30303-1200 October 17, 2022 INSPECTION DOCUMENT REQUEST Licensee: Framatome Inc., Richland, WA Pre-Inspection Visit: NA Docket Number: 07001257 License Number: SNM-1227 Inspection Report Number: 2022-004 Enterprise Number: EPID: I-2022-004-0062 Inspection Dates: November 14 through 17, 2022 Inspection Procedure(s):

IP 88015 - Nuclear Criticality Safety, Issued 10/20/20 IP 88050 - Emergency Preparedness, Issued 12/17/20 Accompanying Personnel: None Identified Licensee Contacts:

Manager, EH&S and Licensing: Timothy Tate P: 509 375-8550 E: timothy.tate@framatome.com Manager, Licensing and Compliance: Calving Manning P: 509 375-8237 E. calvin.manning@framatome.com Inspector(s): Cynthia Taylor (Team Leader)

P: 404-997-4480 E: cynthia.taylor@nrc.gov Nick Peterka P: 404-997-4456 E: Nicholas.Peterka@nrc.gov

Inspection Document Request for NRC Inspection at Framatome Inc., Richland, WA The following is a request of documents the U.S. Nuclear Regulatory Commission (NRC) inspectors are interested in reviewing prior to the on-site inspection visit consistent with the guidance in NRC Inspection Manual Chapter 0620, Inspection Documents and Records. The documents provided in response to this request should contain enough information to facilitate the selection of specific inspection samples. Please provide the current version of these documents unless specified otherwise. If any of the information requested below does not apply to the facility, please specify in your response. The licensee is not required to provide documents that are already available in ADAMS. Electronic media is preferred for receiving the information, if readily available (preferably Microsoft Word format or searchable.pdf files).

The NRC can establish a secure cloud-based file storage service to facilitate document sharing as needed.

If there are any questions or concerns regarding the information requested, please contact the NRC inspection team lead.

INSPECTION PROCEDURE 88015 - NUCLEAR CRITICALITY SAFETY (PETERKA)

Documentation Requested in Advance for In-Office Preparation

1. List of new and/or revised NCSAs
2. NCSAs for System 150, 350, and 960
3. List of NCS and CAAS related corrective action program entries since the last NCS inspection in May 2022.

Information Requested for On-Site Inspection

1. The most recent audit of the NCS program (if any since the last NCS inspection in May 2022)
2. Any new or revised NCS procedures since the last NCS inspection
3. Qualification records for in-training or recently qualified NCS engineers
4. CAAS detector placement calculations, system description/drawings, and the most recent maintenance / logic testing records
5. NCS inspection reports (a.k.a. weekly/monthly/quarterly walkdowns) since the last NCS inspection in May 2022
6. List of planned CAAS testing, NCS related IROFS testing, PMs, or calibrations scheduled for the inspection week. Also any other NCS related activities occurring during the inspection week Activities Requested for On-Site Inspection
1. Please schedule an accompaniment on a NCS walkdown if one is going to be performed
2. Please schedule a walkdown of the MURS process and the DCP system with a focus on System 960
3. Please schedule a walkdown of the site CAAS INSPECTION PROCEDURE 88050 - EMERGENCY PREPAREDNESS (TAYLOR)

Documentation Requested in Advance for In-Office Preparation

Program

1.

Organizational charts

a. Organizational chart with respect to individuals involved with Emergency Preparedness (EP). Please note any management personnel changes since the last inspection.
b. If applicable, please provide the qualifications of any new management personnel in EP since the last inspection.
2.

A list of any significant changes related to the EP program since the last EP inspection to include changes to the following since the last inspection:

a. Emergency Plan
b. responsibilities and authorities
c. staffing levels
d. key emergency personnel
3.

The most recent audits and assessments of the EP program since last inspection.

Procedures

4.

Procedure(s) identifying the controls to ensure the emergency plan is maintained and up to date

5.

Any EP implementing procedures that were created or revised since the last EP inspection

6.

List of current copies of implementing procedures along with the locations maintained in the appropriate field locations

7.

Procedures for inspection & inventory of EP equipment

8.

The procedure or process for evaluating plant changes and modifications for their potential impact on the emergency preparedness program

9.

Procedure that instructs personnel to evacuate to accountability/muster locations in the event of a criticality accident alarm system (CAAS) activation.

Training

10. Provide EP training that is offered to offsite responders, including fire, police, medical, and other emergency personnel. Please provide dates of the training.
11. Sample of records indicating staff completion of any required EP training
12. EP training materials (e.g., slides, tests)
13. EP personnel qualification/training records since last inspection Offsite Support
14. The latest agreement(s) with Offsite Support Agencies Corrective Action/Event Review
15. EP-related Corrective Action Program entries, event reports, and issue screening documents since the last EP inspection
16. List of events (operational events, include non-routine events and unusual occurrences) occurring that involved activation of the site emergency plan since the last inspection Plant Modifications/Hazardous Materials
17. List of current pre-fire plans and required field locations
18. A list of, if any, plant modifications that were identified as affecting the sites emergency plan, since the last EP inspection Exercises, Drills, Equipment/Inventory
19. Schedule of inspections or testing that will be occurring the week of November 14
20. Provide the licensees emergency call list and contact information for offsite support agencies
21. List of all EP exercises and drills conducted since the last EP inspection
22. If applicable, please identify IROFS and provide results of EP management measures documentation since the last inspection.

Activities Requested for On-Site Inspection

1.

Please schedule an accompaniment for walkdown of emergency equipment/inventory

2.

Interview of Emergency Preparedness Manager and staff

3.

Please schedule a walkdown of evacuation areas ( Please provide current map of EP evacuation areas).

PAPERWORK REDUCTION ACT STATEMENT This letter contains mandatory information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) approved these information collections (approval number 3150-0009). The burden to the public for these information collections is estimated to average 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per response. Send comments regarding this information collection to the FOIA, Library and Information Collection Branch, Office of the Chief Information Officer, Mail Stop: T6-A10M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0009) Office of Management and Budget, Washington, DC 20503.

Public Protection Notification The NRC may not conduct nor sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.