ML23247A009: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Form 2.1-1 Examination Preparation Checklist | {{#Wiki_filter:Facility 10/17/2022 Facility 10/21/2022 Exam Date Target Date Date Complete | ||
-240 2/19/2022 12/6/2021 | |||
-210 3/21/2022 12/6/2021 | |||
-210 3/21/2022 12/6/2021 | |||
-210 3/21/2022 N/A | |||
-210 3/21/2022 1/19/2022 | |||
-195 4/5/2022 12/6/2021 | |||
-150 5/20/2022 5/19/2022 | |||
-136 6/3/2022 6/2/2022 | |||
-100 7/9/2022 N/A | |||
-75 8/3/2022 7/21/2022 | |||
-60 8/18/2022 8/18/2022 | |||
-50 8/28/2022 8/12/2022 | |||
-50 8/28/2022 8/23/2022 Form 2.1-1 Examination Preparation Checklist OPERATING Exam COMPLT Date: | |||
: 6. Written examination outline developed by the NRC and sent to the facility licensee contact (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1 | |||
: 7. Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18). | |||
Ginna Facility 10/25/2022 Task Description OPERATING Exam START Date: | |||
: 1. Examination administration date confirmed (A.1-5). For NRC-prepared examinations, arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F). | |||
: 8. Operating test outlines reviewed by the NRC and feedback provided to the facility licensee (ES-2.3). | |||
: 9. NRC-prepared examinations approved by the NRC supervisor and forwarded for facility licensee review (ES-2.3). | |||
: 10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms; quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due. | |||
: 11. Preliminary waiver/excusal requests due (ES-2.2 E.1). | |||
: 2. NRC examiners and facility licensee contact assigned (B.1 and C.1-3). | |||
: 3. Facility licensee contact briefed on examination security and other requirements (D.4). As applicable, the facility licensee contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2). | |||
: 4. Reference material due for NRC-prepared examinations (F). | |||
: 5. Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5). | |||
WRITTEN Exam Developed By: | |||
WRITTEN Exam Date: | |||
OPERATING Exam Developed By: | |||
: 12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors authorization to proceed with the facility review granted (ES-2.3 D). | |||
: 13. Examination review results discussed between the NRC and the facility licensee (B.14). | |||
Page 1 of 2 | |||
Facility | Facility 10/17/2022 Facility 10/21/2022 Exam Date Target Date Date Complete | ||
-35 9/12/2022 8/29/2022 | |||
-30 9/17/2022 9/16/2022 | |||
-14 10/3/2022 10/3/2022 | |||
-7 10/10/2022 9/29/2022 | |||
-7 10/10/2022 9/28/2022 | |||
-7 10/10/2022 10/3/2022 | |||
-7 10/10/2022 10/7/2022 | |||
-7 10/10/2022 10/7/2022 | |||
: 20. Written examination administration guidelines reviewed with the facility licensee (D.14). | |||
: 21. Approved scenarios and job performance measures distributed to NRC examiners (D.12). | |||
* Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee. | * Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee. | ||
Form 2.1-1 Examination Preparation Checklist Ginna OPERATING Exam START Date: | |||
Page 2 of 2 | WRITTEN Exam Developed By: | ||
Facility OPERATING Exam Developed By: | |||
WRITTEN Exam Date: | |||
: 14. Examination preparatory week conducted by the NRC and the facility licensee (I). | |||
: 15. Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1). | |||
: 16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1 prepared (ES-2.2 C and E). | |||
: 17. Written examinations and operating tests approved by the NRC supervisor (C.9) | |||
: 18. Facility licensee management feedback on the examination requested by the NRC supervisor (C.10). | |||
: 19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent. | |||
10/25/2022 OPERATING Exam COMPLT Date: | |||
Task Description Page 2 of 2 | |||
Form 3.4-1 Events and Evolutions Checklist (Rev_091922) | Form 3.4-1 Events and Evolutions Checklist (Rev_091922) | ||
Facility: | |||
Facility: Ginna Date of Exam: 10/ | Ginna Date of Exam: | ||
10/2022 Operating Test No.: | |||
6 6 2 2 2 1 | N22-1 A | ||
P P | |||
L I | |||
C A | |||
N T | |||
E V | |||
E N | |||
6 1 2 2 1 | T T | ||
Y P | |||
E Scenarios N22-1-1 (Day 1) | |||
N22-1-2 (Day 2) | |||
2, 3, 2, 3, 2, 3, 12 4 4 2 | N22-1-3 (Day 3) | ||
T O | |||
T A | |||
L M | |||
I N | |||
I M | |||
U M(*) | |||
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S | |||
R O | |||
A T | |||
C B | |||
O P | |||
S R | |||
O A | |||
T C | |||
B O | |||
P S | |||
R O | |||
A T | |||
C B | |||
O P | |||
S R | |||
O A | |||
T C | |||
B O | |||
P R | |||
I U | |||
RX 0 | |||
1 1 | |||
0 NOR 1 | |||
1 2 | |||
1 1 | |||
1 SROU-1 I/C 2, 3, 4, 5, 7 | |||
2, 3, 5 | |||
8 4 | |||
4 2 | |||
MAJ 6 | |||
6 2 | |||
2 2 | |||
1 MC 0 | |||
1 1 | |||
0 TS 2, 3 2 | |||
0 2 | |||
2 RX 0 | |||
1 1 | |||
0 NOR 1 | |||
1 2 | |||
1 1 | |||
1 SROU-2 I/C 2, 3, 4, 5, 7 | |||
2, 3, 4, 5, 7, 8 11 4 | |||
4 2 | |||
MAJ 6 | |||
6 2 | |||
2 2 | |||
1 MC 0 | |||
1 1 | |||
0 TS 2, 3 2, 3 4 | |||
0 2 | |||
2 RX 0 | |||
1 1 | |||
0 NOR 1 | |||
1 1 | |||
1 1 | |||
SROU-3 I/C 2, 3, 4, 5, 7 | |||
5 4 | |||
4 2 | |||
MAJ 6 | |||
1 2 | |||
2 1 | |||
MC 0 | |||
1 1 | |||
0 TS 2, 3 2 | |||
0 2 | |||
2 RX 4 | |||
1 1 | |||
1 0 | |||
NOR 1 | |||
1 1 | |||
1 1 | |||
SROI-1 I/C 2, 3, 7 | |||
2, 3, 4, 5, 7, 8 2, 3, 4 | |||
12 4 | |||
4 2 | |||
MAJ 6 | |||
6 6 | |||
3 2 | |||
2 1 | |||
MC 2, 3, 7 | |||
2 4 | |||
1 1 | |||
0 TS 2, 3 2 | |||
0 2 | |||
2 RX 5 | |||
1 1 | |||
1 0 | |||
NOR 0 | |||
1 1 | |||
1 SROI-2 I/C 3, 4, 7, 8 1, 2, 3, 4, 5, 7 10 4 | |||
4 2 | |||
MAJ 6 | |||
6 2 | |||
2 2 | |||
1 MC 3, 4, 7 | |||
3 1 | |||
1 0 | |||
TS 1, 4 2 | |||
0 2 | |||
2 | |||
Form 3.4-1 Events and Evolutions Checklist (Rev_091922) | Form 3.4-1 Events and Evolutions Checklist (Rev_091922) | ||
Facility: | |||
Facility: Ginna Date of Exam: 10/2022 Operating Test No.: N22-1 A E Scenarios | Ginna Date of Exam: | ||
10/2022 Operating Test No.: | |||
N22-1 A | |||
2, 3, 2, 3, | P P | ||
TS 2, 3 2 0 2 2 | L I | ||
C A | |||
N T | |||
E V | |||
E N | |||
T T | |||
6 6 2 2 2 1 | Y P | ||
E Scenarios N22-1-1 (Day 1) | |||
N22-1-2 (Day 2) | |||
N22-1-3 (Day 3) | |||
6 6 2 2 2 1 | T O | ||
T A | |||
L M | |||
I N | |||
4, 5 2, 3, 1, 4, | I M | ||
U M(*) | |||
6 6 6 3 2 2 1 | CREW POSITION CREW POSITION CREW POSITION CREW POSITION S | ||
R O | |||
TS 0 0 2 2 | A T | ||
C B | |||
O P | |||
S R | |||
O A | |||
T C | |||
B O | |||
P S | |||
R O | |||
A T | |||
C B | |||
O P | |||
S R | |||
O A | |||
T C | |||
B O | |||
P R | |||
I U | |||
RX 4 | |||
1 1 | |||
1 0 | |||
NOR 1 | |||
1 1 | |||
1 1 | |||
SROI-3 I/C 2, 3, 7 | |||
2, 3, 4, 5, 7, 8 9 | |||
4 4 | |||
2 MAJ 6 | |||
6 2 | |||
2 2 | |||
1 MC 2, 3, 7 | |||
3 1 | |||
1 0 | |||
TS 2, 3 2 | |||
0 2 | |||
2 RX 4 | |||
1 1 | |||
1 0 | |||
NOR 1 | |||
1 1 | |||
1 1 | |||
RO-1 I/C 2, 3, 7 | |||
2, 3, 5 | |||
6 4 | |||
4 2 | |||
MAJ 6 | |||
6 2 | |||
2 2 | |||
1 MC 2, 3, 7 | |||
3 1 | |||
1 0 | |||
TS 0 | |||
0 2 | |||
2 RX 5 | |||
1 1 | |||
1 0 | |||
NOR 1 | |||
1 1 | |||
1 1 | |||
RO-2 I/C 4, 5 3, 4, 7, 8 6 | |||
4 4 | |||
2 MAJ 6 | |||
6 2 | |||
2 2 | |||
1 MC 5 | |||
3, 4, 7 | |||
4 1 | |||
1 0 | |||
TS 0 | |||
0 2 | |||
2 RX 5 | |||
1 1 | |||
1 0 | |||
NOR 1 | |||
1 1 | |||
1 1 | |||
RO-3 I/C 4, 5 3, 4, 7, 8 6 | |||
4 4 | |||
2 MAJ 6 | |||
6 2 | |||
2 2 | |||
1 MC 5 | |||
3, 4, 7 | |||
4 1 | |||
1 0 | |||
TS 0 | |||
0 2 | |||
2 RX 3 | |||
1 1 | |||
1 0 | |||
NOR 1 | |||
1 2 | |||
1 1 | |||
1 RO-4 I/C 4, 5 2, 3, 5 | |||
1, 4, 5, 7 9 | |||
4 4 | |||
2 MAJ 6 | |||
6 6 | |||
3 2 | |||
2 1 | |||
MC 5 | |||
1 1 | |||
1 0 | |||
TS 0 | |||
0 2 | |||
2 | |||
Form 3.4-1 Events and Evolutions Checklist (Rev_091922) | Form 3.4-1 Events and Evolutions Checklist (Rev_091922) | ||
Form 3.4-1 Instructions for the Events and Evolutions Checklist | Form 3.4-1 Instructions for the Events and Evolutions Checklist | ||
: 1. Mark the applicant license level for each simulator operating test number. | : 1. | ||
: 2. For the set of scenario columns, fill in the associated event number from Form 3.3-1, Scenario Outline, to show the specific event types being used for the applicant while in the assigned crew position for that scenario. | Mark the applicant license level for each simulator operating test number. | ||
: 2. | |||
For the set of scenario columns, fill in the associated event number from Form 3.3-1, Scenario Outline, to show the specific event types being used for the applicant while in the assigned crew position for that scenario. | |||
* Minimums are subject to the instructions in Section C.2, License Level Criteria. | * Minimums are subject to the instructions in Section C.2, License Level Criteria. | ||
KEY: RX = Reactivity Manipulation; NOR = Normal Evolution; I/C = Instrument/Component Failure; MAJ = Major Transient; Man. Ctrl = Manual Control of Automatic Function; TS = Technical Specification Evaluation; RO = Reactor Operator; SRO-I or I = Instant Senior Reactor Operator; SRO-U or U = Upgrade Senior Reactor Operator; SRO = Senior Reactor Operator; ATC = At the Controls; and BOP = Balance of Plan}} | KEY: RX = Reactivity Manipulation; NOR = Normal Evolution; I/C = Instrument/Component Failure; MAJ = Major Transient; Man. Ctrl = Manual Control of Automatic Function; TS = Technical Specification Evaluation; RO = Reactor Operator; SRO-I or I = Instant Senior Reactor Operator; SRO-U or U = Upgrade Senior Reactor Operator; SRO = Senior Reactor Operator; ATC = At the Controls; and BOP = Balance of Plan}} | ||
Latest revision as of 08:59, 25 November 2024
| ML23247A009 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 09/28/2022 |
| From: | Joseph Demarshall NRC/RGN-I/DORS/OB |
| To: | Constellation Energy Generation |
| References | |
| EPID L-2022-OLL-0008 | |
| Download: ML23247A009 (1) | |
Text
Facility 10/17/2022 Facility 10/21/2022 Exam Date Target Date Date Complete
-240 2/19/2022 12/6/2021
-210 3/21/2022 12/6/2021
-210 3/21/2022 12/6/2021
-210 3/21/2022 N/A
-210 3/21/2022 1/19/2022
-195 4/5/2022 12/6/2021
-150 5/20/2022 5/19/2022
-136 6/3/2022 6/2/2022
-100 7/9/2022 N/A
-75 8/3/2022 7/21/2022
-60 8/18/2022 8/18/2022
-50 8/28/2022 8/12/2022
-50 8/28/2022 8/23/2022 Form 2.1-1 Examination Preparation Checklist OPERATING Exam COMPLT Date:
- 6. Written examination outline developed by the NRC and sent to the facility licensee contact (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1
- 7. Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).
Ginna Facility 10/25/2022 Task Description OPERATING Exam START Date:
- 1. Examination administration date confirmed (A.1-5). For NRC-prepared examinations, arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).
- 8. Operating test outlines reviewed by the NRC and feedback provided to the facility licensee (ES-2.3).
- 9. NRC-prepared examinations approved by the NRC supervisor and forwarded for facility licensee review (ES-2.3).
- 10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms; quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.
- 11. Preliminary waiver/excusal requests due (ES-2.2 E.1).
- 2. NRC examiners and facility licensee contact assigned (B.1 and C.1-3).
- 3. Facility licensee contact briefed on examination security and other requirements (D.4). As applicable, the facility licensee contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).
- 4. Reference material due for NRC-prepared examinations (F).
- 5. Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5).
WRITTEN Exam Developed By:
WRITTEN Exam Date:
OPERATING Exam Developed By:
- 12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors authorization to proceed with the facility review granted (ES-2.3 D).
- 13. Examination review results discussed between the NRC and the facility licensee (B.14).
Page 1 of 2
Facility 10/17/2022 Facility 10/21/2022 Exam Date Target Date Date Complete
-35 9/12/2022 8/29/2022
-30 9/17/2022 9/16/2022
-14 10/3/2022 10/3/2022
-7 10/10/2022 9/29/2022
-7 10/10/2022 9/28/2022
-7 10/10/2022 10/3/2022
-7 10/10/2022 10/7/2022
-7 10/10/2022 10/7/2022
- 20. Written examination administration guidelines reviewed with the facility licensee (D.14).
- 21. Approved scenarios and job performance measures distributed to NRC examiners (D.12).
- Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.
Form 2.1-1 Examination Preparation Checklist Ginna OPERATING Exam START Date:
WRITTEN Exam Developed By:
Facility OPERATING Exam Developed By:
WRITTEN Exam Date:
- 14. Examination preparatory week conducted by the NRC and the facility licensee (I).
- 15. Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1).
- 16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1 prepared (ES-2.2 C and E).
- 17. Written examinations and operating tests approved by the NRC supervisor (C.9)
- 18. Facility licensee management feedback on the examination requested by the NRC supervisor (C.10).
- 19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.
10/25/2022 OPERATING Exam COMPLT Date:
Task Description Page 2 of 2
Form 3.4-1 Events and Evolutions Checklist (Rev_091922)
Facility:
Ginna Date of Exam:
10/2022 Operating Test No.:
N22-1 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios N22-1-1 (Day 1)
N22-1-2 (Day 2)
N22-1-3 (Day 3)
T O
T A
L M
I N
I M
U M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
RX 0
1 1
0 NOR 1
1 2
1 1
1 SROU-1 I/C 2, 3, 4, 5, 7
2, 3, 5
8 4
4 2
MAJ 6
6 2
2 2
1 MC 0
1 1
0 TS 2, 3 2
0 2
2 RX 0
1 1
0 NOR 1
1 2
1 1
1 SROU-2 I/C 2, 3, 4, 5, 7
2, 3, 4, 5, 7, 8 11 4
4 2
MAJ 6
6 2
2 2
1 MC 0
1 1
0 TS 2, 3 2, 3 4
0 2
2 RX 0
1 1
0 NOR 1
1 1
1 1
SROU-3 I/C 2, 3, 4, 5, 7
5 4
4 2
MAJ 6
1 2
2 1
MC 0
1 1
0 TS 2, 3 2
0 2
2 RX 4
1 1
1 0
NOR 1
1 1
1 1
SROI-1 I/C 2, 3, 7
2, 3, 4, 5, 7, 8 2, 3, 4
12 4
4 2
MAJ 6
6 6
3 2
2 1
MC 2, 3, 7
2 4
1 1
0 TS 2, 3 2
0 2
2 RX 5
1 1
1 0
NOR 0
1 1
1 SROI-2 I/C 3, 4, 7, 8 1, 2, 3, 4, 5, 7 10 4
4 2
MAJ 6
6 2
2 2
1 MC 3, 4, 7
3 1
1 0
TS 1, 4 2
0 2
2
Form 3.4-1 Events and Evolutions Checklist (Rev_091922)
Facility:
Ginna Date of Exam:
10/2022 Operating Test No.:
N22-1 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios N22-1-1 (Day 1)
N22-1-2 (Day 2)
N22-1-3 (Day 3)
T O
T A
L M
I N
I M
U M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
RX 4
1 1
1 0
NOR 1
1 1
1 1
SROI-3 I/C 2, 3, 7
2, 3, 4, 5, 7, 8 9
4 4
2 MAJ 6
6 2
2 2
1 MC 2, 3, 7
3 1
1 0
TS 2, 3 2
0 2
2 RX 4
1 1
1 0
NOR 1
1 1
1 1
RO-1 I/C 2, 3, 7
2, 3, 5
6 4
4 2
MAJ 6
6 2
2 2
1 MC 2, 3, 7
3 1
1 0
TS 0
0 2
2 RX 5
1 1
1 0
NOR 1
1 1
1 1
RO-2 I/C 4, 5 3, 4, 7, 8 6
4 4
2 MAJ 6
6 2
2 2
1 MC 5
3, 4, 7
4 1
1 0
TS 0
0 2
2 RX 5
1 1
1 0
NOR 1
1 1
1 1
RO-3 I/C 4, 5 3, 4, 7, 8 6
4 4
2 MAJ 6
6 2
2 2
1 MC 5
3, 4, 7
4 1
1 0
TS 0
0 2
2 RX 3
1 1
1 0
NOR 1
1 2
1 1
1 RO-4 I/C 4, 5 2, 3, 5
1, 4, 5, 7 9
4 4
2 MAJ 6
6 6
3 2
2 1
MC 5
1 1
1 0
TS 0
0 2
2
Form 3.4-1 Events and Evolutions Checklist (Rev_091922)
Form 3.4-1 Instructions for the Events and Evolutions Checklist
- 1.
Mark the applicant license level for each simulator operating test number.
- 2.
For the set of scenario columns, fill in the associated event number from Form 3.3-1, Scenario Outline, to show the specific event types being used for the applicant while in the assigned crew position for that scenario.
- Minimums are subject to the instructions in Section C.2, License Level Criteria.
KEY: RX = Reactivity Manipulation; NOR = Normal Evolution; I/C = Instrument/Component Failure; MAJ = Major Transient; Man. Ctrl = Manual Control of Automatic Function; TS = Technical Specification Evaluation; RO = Reactor Operator; SRO-I or I = Instant Senior Reactor Operator; SRO-U or U = Upgrade Senior Reactor Operator; SRO = Senior Reactor Operator; ATC = At the Controls; and BOP = Balance of Plan