ML23251A017: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Re: FOIA-2023-000163, Interim #1 Below is a report of publicly available responsive records. You can search for these records by their accession number (ML#) in the Advanced Search of ADAMS at https://adams.nrc.gov/wba/. If you need assistance with searching and downloading these records, please contact the NRC's Public Document Room at 301-415-4737 from 8 am to 4 pm (EST) or at pdr.resource@nrc.gov. | {{#Wiki_filter:1 Re: FOIA-2023-000163, Interim #1 Below is a report of publicly available responsive records. You can search for these records by their accession number (ML#) in the Advanced Search of ADAMS at https://adams.nrc.gov/wba/. If you need assistance with searching and downloading these records, please contact the NRC's Public Document Room at 301-415-4737 from 8 am to 4 pm (EST) or at pdr.resource@nrc.gov. | ||
Accession Number: | |||
Accession Number: ML17054A529 | ML17054A529 Document Date: | ||
Tue Jan 31 06:00:00 EST 1984 Document | |||
Document Date: Tue Jan 31 06:00:00 EST 1984 | |||
Document | |||
==Title:== | ==Title:== | ||
"Evaluation of Angled Screen Fish Diversion Sys at Oswego Steam Station Unit 6." | "Evaluation of Angled Screen Fish Diversion Sys at Oswego Steam Station Unit 6." | ||
Author Affiliation: | |||
Author Affiliation: LAWLER, MATUSKY & SKELLY ENGINEERS | LAWLER, MATUSKY & SKELLY ENGINEERS Accession Number: | ||
ML17054B236 Document Date: | |||
Accession Number: ML17054B236 | Fri Nov 30 06:00:00 EST 1984 Document | ||
Document Date: Fri Nov 30 06:00:00 EST 1984 | |||
Document | |||
==Title:== | ==Title:== | ||
Advises that rept on vertical floor flexibility will be provided by 850101. | Advises that rept on vertical floor flexibility will be provided by 850101. | ||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | Author Affiliation: | ||
NIAGARA MOHAWK POWER CORP. | |||
Accession Number: ML17054B402 Document Date: Tue Feb 12 06:00:00 EST 1985 | Accession Number: | ||
ML17054B402 Document Date: | |||
Document | Tue Feb 12 06:00:00 EST 1985 Document | ||
==Title:== | ==Title:== | ||
Responds to 850122 ltr,stating commitments re alternate damping values | Responds to 850122 ltr,stating commitments re alternate damping values | ||
& verification of increased piping displacements.Commitments will be incorporated into FSAR Amend 18. | & verification of increased piping displacements.Commitments will be incorporated into FSAR Amend 18. | ||
Author Affiliation: | |||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | NIAGARA MOHAWK POWER CORP. | ||
Accession Number: | |||
Accession Number: ML17055A777 | ML17055A777 Document Date: | ||
Sat Nov 30 06:00:00 EST 1985 Document | |||
Document Date: Sat Nov 30 06:00:00 EST 1985 | |||
Document | |||
==Title:== | ==Title:== | ||
Updated environ qualification document. | Updated environ qualification document. | ||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | Author Affiliation: | ||
NIAGARA MOHAWK POWER CORP. | |||
Accession Number: ML17055B175 Document Date: Fri Jan 10 06:00:00 EST 1986 | Accession Number: | ||
ML17055B175 Document Date: | |||
Document | Fri Jan 10 06:00:00 EST 1986 Document | ||
==Title:== | ==Title:== | ||
Preoperational Security Program Review Insp Rept 50-410/85-38 on 851028-1101.No violation noted.Major areas inspected:security plan & implementing procedures.Portions withheld (ref 10CFR2.790(a) & 9.5.(a)(4)). | Preoperational Security Program Review Insp Rept 50-410/85-38 on 851028-1101.No violation noted.Major areas inspected:security plan & implementing procedures.Portions withheld (ref 10CFR2.790(a) & 9.5.(a)(4)). | ||
Author Affiliation: | |||
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | |||
Accession Number: | |||
ML17055B517 Document Date: | |||
Mon Mar 10 06:00:00 EST 1986 | |||
2 Document | |||
==Title:== | ==Title:== | ||
Rev 4 to Administrative Procedure AP-2.0, "Production & Control of Procedures." | Rev 4 to Administrative Procedure AP-2.0, "Production & Control of Procedures." | ||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | Author Affiliation: | ||
NIAGARA MOHAWK POWER CORP. | |||
Accession Number: ML17055B764 | Accession Number: | ||
ML17055B764 Document Date: | |||
Document Date: Thu May 08 06:00:00 EDT 1986 | Thu May 08 06:00:00 EDT 1986 Document | ||
Document | |||
==Title:== | ==Title:== | ||
"Human Factors Engineering,DCRDR Supplemental Technical Evaluation Rept,Nine Mile Point Unit 2." | "Human Factors Engineering,DCRDR Supplemental Technical Evaluation Rept,Nine Mile Point Unit 2." | ||
Author Affiliation: LAWRENCE LIVERMORE NATIONAL LABORATORY | Author Affiliation: | ||
LAWRENCE LIVERMORE NATIONAL LABORATORY Accession Number: | |||
Accession Number: ML17055B997 | ML17055B997 Document Date: | ||
Mon Jun 09 06:00:00 EDT 1986 Document | |||
Document Date: Mon Jun 09 06:00:00 EDT 1986 | |||
Document | |||
==Title:== | ==Title:== | ||
Forwards marked-up revised supplemental rept to DCRDR final summary rept,including checklist survey,response to NRC SER & study results since Sept 1985 final rept.Rept also addresses items in Haughey 860122 ltr & 860520 meeting. | Forwards marked-up revised supplemental rept to DCRDR final summary rept,including checklist survey,response to NRC SER & study results since Sept 1985 final rept.Rept also addresses items in Haughey 860122 ltr & 860520 meeting. | ||
Author Affiliation: | |||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | NIAGARA MOHAWK POWER CORP. | ||
Accession Number: | |||
Accession Number: ML17055C057 | ML17055C057 Document Date: | ||
Thu Jul 10 06:00:00 EDT 1986 Document | |||
Document Date: Thu Jul 10 06:00:00 EDT 1986 | |||
Document | |||
==Title:== | ==Title:== | ||
Insp Rept 50-410/86-28 on 860527-0613.No violation noted. Major areas inspected:const deficiencies,bulletins & outstanding items re safety -related mechanical,electrical | Insp Rept 50-410/86-28 on 860527-0613.No violation noted. Major areas inspected:const deficiencies,bulletins & outstanding items re safety-related mechanical,electrical | ||
& instrumentation distribution & equipment. | & instrumentation distribution & equipment. | ||
Author Affiliation: NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | Author Affiliation: | ||
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | |||
Accession Number: ML17055C117 Document Date: Thu Jul 31 06:00:00 EDT 1986 | Accession Number: | ||
ML17055C117 Document Date: | |||
Document | Thu Jul 31 06:00:00 EDT 1986 Document | ||
==Title:== | ==Title:== | ||
SAFETY EVALUATION REPORT RELATED TO THE OPERATION OF NINE MILE POINT NUCLEAR STATION,UNIT NO. 2.Docket No. 50-410. (Niagara Mohawk Power Corporation) | SAFETY EVALUATION REPORT RELATED TO THE OPERATION OF NINE MILE POINT NUCLEAR STATION,UNIT NO. 2.Docket No. 50-410. (Niagara Mohawk Power Corporation) | ||
Author Affiliation: | |||
Author Affiliation: NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | ||
Accession Number: | |||
Accession Number: ML17055D117 | ML17055D117 Document Date: | ||
Tue Aug 04 06:00:00 EDT 1987 Document | |||
Document Date: Tue Aug 04 06:00:00 EDT 1987 | |||
Document | |||
==Title:== | ==Title:== | ||
Operational Readiness Team Insp Rept 50-410/87-16 on 870601-12.Violation noted.Major areas inspected:testing,training & maint & assessed licensee readiness for full power operations.Unresolved item identified. | Operational Readiness Team Insp Rept 50-410/87-16 on 870601-12.Violation noted.Major areas inspected:testing,training & maint & assessed licensee readiness for full power operations.Unresolved item identified. | ||
Author Affiliation: | |||
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | |||
3 Accession Number: | |||
ML17055D694 Document Date: | |||
Thu Mar 10 06:00:00 EST 1988 Document | |||
Document | |||
==Title:== | ==Title:== | ||
Exam Rept 50-410/87-43OL on 871216 & 880126-28.Exam results: all senior reactor operators & reactor operators passed written exams,three senior reactor operators & three reactor operators passed operating exams.One senior operator failed. | Exam Rept 50-410/87-43OL on 871216 & 880126-28.Exam results: all senior reactor operators & reactor operators passed written exams,three senior reactor operators & three reactor operators passed operating exams.One senior operator failed. | ||
Author Affiliation: | |||
Author Affiliation: NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | ||
Accession Number: | |||
Accession Number: ML17055D843 | ML17055D843 Document Date: | ||
Wed May 04 06:00:00 EDT 1988 Document | |||
Document Date: Wed May 04 06:00:00 EDT 1988 | |||
Document | |||
==Title:== | ==Title:== | ||
LER 88-020-00:on 880407,ESF actuated on spurious radiation signal due to electrical noise.Caused by contractor "chattering" due to increased valve 2HCS*MOV25B torque requirement.Torque switch of valve adjusted.W/880504 ltr. | LER 88-020-00:on 880407,ESF actuated on spurious radiation signal due to electrical noise.Caused by contractor "chattering" due to increased valve 2HCS*MOV25B torque requirement.Torque switch of valve adjusted.W/880504 ltr. | ||
Author Affiliation: | |||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | NIAGARA MOHAWK POWER CORP. | ||
Accession Number: | |||
Accession Number: ML17055E127 | ML17055E127 Document Date: | ||
Mon Aug 22 06:00:00 EDT 1988 Document | |||
Document Date: Mon Aug 22 06:00:00 EDT 1988 Document | |||
==Title:== | ==Title:== | ||
LER 88-035-00:on 880721,automatic initiation of control bldg special filter train occurred.Caused by electrical noise due to operation of RCIC trip & throttle valve.Filter train returned to standby & work request issued.W/880822 ltr. | LER 88-035-00:on 880721,automatic initiation of control bldg special filter train occurred.Caused by electrical noise due to operation of RCIC trip & throttle valve.Filter train returned to standby & work request issued.W/880822 ltr. | ||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | Author Affiliation: | ||
NIAGARA MOHAWK POWER CORP. | |||
Accession Number: ML17055E359 Document Date: Wed Nov 23 06:00:00 EST 1988 | Accession Number: | ||
ML17055E359 Document Date: | |||
Document | Wed Nov 23 06:00:00 EST 1988 Document | ||
==Title:== | ==Title:== | ||
LER 88-059-00:on 881025,ESF actuation occurred.Caused by accidental contact of heat sink plates of power source w/flex conduit.Lessons learned transmittal issued to appropriate depts & warning will be emplaced.W/881123 ltr. | LER 88-059-00:on 881025,ESF actuation occurred.Caused by accidental contact of heat sink plates of power source w/flex conduit.Lessons learned transmittal issued to appropriate depts & warning will be emplaced.W/881123 ltr. | ||
Author Affiliation: | |||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | NIAGARA MOHAWK POWER CORP. | ||
Accession Number: | |||
Accession Number: ML17055E366 | ML17055E366 Document Date: | ||
Tue Nov 29 06:00:00 EST 1988 Document | |||
Document Date: Tue Nov 29 06:00:00 EST 1988 Document | |||
==Title:== | ==Title:== | ||
LER 88-061-00:on 881030,facility experienced ESF actuation while reactor mode switch in shutdown.Caused by equipment malfunction.Work stopped on gas treatment sys & verification that no actual high radiation signals noted.W/881129 ltr. | LER 88-061-00:on 881030,facility experienced ESF actuation while reactor mode switch in shutdown.Caused by equipment malfunction.Work stopped on gas treatment sys & verification that no actual high radiation signals noted.W/881129 ltr. | ||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | Author Affiliation: | ||
NIAGARA MOHAWK POWER CORP. | |||
Accession Number: | |||
ML17055E520 Document Date: | |||
Thu Feb 09 06:00:00 EST 1989 | |||
4 Document | |||
==Title:== | ==Title:== | ||
LER 87-078-01:on 871220,secondary containment isolation & standby gas treatment initiation occurred.Caused by design deficiencies.Isolations reset,safety sys secured & normal ventilation sys restored.W/890209 ltr. | LER 87-078-01:on 871220,secondary containment isolation & standby gas treatment initiation occurred.Caused by design deficiencies.Isolations reset,safety sys secured & normal ventilation sys restored.W/890209 ltr. | ||
Author Affiliation: | |||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | NIAGARA MOHAWK POWER CORP. | ||
Accession Number: | |||
Accession Number: ML17056A038 | ML17056A038 Document Date: | ||
Thu Jun 01 06:00:00 EDT 1989 Document | |||
Document Date: Thu Jun 01 06:00:00 EDT 1989 | |||
Document | |||
==Title:== | ==Title:== | ||
Insp Repts 50-220/89-05 & 50-410/89-05 on 890404-0512. Violations noted.Major areas inspected:licensee actions on previous insp findings,plant tours,safety sys walkdown,NRC bulletin & notice reviews & LER reviews. | Insp Repts 50-220/89-05 & 50-410/89-05 on 890404-0512. Violations noted.Major areas inspected:licensee actions on previous insp findings,plant tours,safety sys walkdown,NRC bulletin & notice reviews & LER reviews. | ||
Author Affiliation: NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | Author Affiliation: | ||
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | |||
Accession Number: ML17056A390 Document Date: Wed Oct 25 06:00:00 EDT 1989 | Accession Number: | ||
ML17056A390 Document Date: | |||
Document | Wed Oct 25 06:00:00 EDT 1989 Document | ||
==Title:== | ==Title:== | ||
LER 89-026-00:on 890926,unit experienced two ESF actuations of secondary containment isolation & standby gas treatment sys initiation.Caused by spurious signal due to electrical noise resulting from welding.Welding suspended.W/891025 ltr. | LER 89-026-00:on 890926,unit experienced two ESF actuations of secondary containment isolation & standby gas treatment sys initiation.Caused by spurious signal due to electrical noise resulting from welding.Welding suspended.W/891025 ltr. | ||
Author Affiliation: | |||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | NIAGARA MOHAWK POWER CORP. | ||
Accession Number: | |||
Accession Number: ML17056A396 | ML17056A396 Document Date: | ||
Wed Nov 01 06:00:00 EST 1989 Document | |||
Document Date: Wed Nov 01 06:00:00 EST 1989 Document | |||
==Title:== | ==Title:== | ||
Forwards request for addl info on crane travel,per 890726 spent fuel storage pool amend application. | Forwards request for addl info on crane travel,per 890726 spent fuel storage pool amend application. | ||
Author Affiliation: | |||
Author Affiliation: NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | ||
Accession Number: | |||
Accession Number: ML17056A463 Document Date: Tue Nov 28 06:00:00 EST 1989 | ML17056A463 Document Date: | ||
Tue Nov 28 06:00:00 EST 1989 Document | |||
Document | |||
==Title:== | ==Title:== | ||
Ack receipt of 891031 response to 60-day reporting requirements of Generic Ltr 88-20 re individual plant exams. Util plan will be reviewed to determine impact on licensee & NRC resources. | Ack receipt of 891031 response to 60-day reporting requirements of Generic Ltr 88-20 re individual plant exams. Util plan will be reviewed to determine impact on licensee & NRC resources. | ||
Author Affiliation: | |||
Author Affiliation: NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | ||
Accession Number: | |||
Accession Number: ML17056A536 | ML17056A536 Document Date: | ||
Tue Jan 02 06:00:00 EST 1990 Document | |||
Document Date: Tue Jan 02 06:00:00 EST 1990 | |||
Document | |||
==Title:== | ==Title:== | ||
LER 89-040-00:on 891201,automatic reactor scram occurred due to APRM high neutron flux signals,causing turbine trip on reverse power by anti -motoring device.Caused by sudden zero voltage input.Work request issued.W/900102 ltr | LER 89-040-00:on 891201,automatic reactor scram occurred due to APRM high neutron flux signals,causing turbine trip on reverse power by anti-motoring device.Caused by sudden zero voltage input.Work request issued.W/900102 ltr. | ||
Accession Number: ML17056A570 | 5 Author Affiliation: | ||
NIAGARA MOHAWK POWER CORP. | |||
Document Date: Sun Dec 31 06:00:00 EST 1989 | Accession Number: | ||
ML17056A570 Document Date: | |||
Document | Sun Dec 31 06:00:00 EST 1989 Document | ||
==Title:== | ==Title:== | ||
Monthly operating rept for Dec 1989 for Nine Mile Point Unit 2. | Monthly operating rept for Dec 1989 for Nine Mile Point Unit 2. | ||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | Author Affiliation: | ||
NIAGARA MOHAWK POWER CORP. | |||
Accession Number: ML17056A647 Document Date: Sun Dec 31 06:00:00 EST 1989 | Accession Number: | ||
ML17056A647 Document Date: | |||
Document | Sun Dec 31 06:00:00 EST 1989 Document | ||
==Title:== | ==Title:== | ||
"Annual Tabulation of Occupational Exposure Rept & 10CFR20.407(a)(2) | "Annual Tabulation of Occupational Exposure Rept & 10CFR20.407(a)(2) | ||
Rept for 1989." W/900227 ltr. | Rept for 1989." W/900227 ltr. | ||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | Author Affiliation: | ||
NIAGARA MOHAWK POWER CORP. | |||
Accession Number: ML17056A797 Document Date: Sun Dec 31 06:00:00 EST 1989 | Accession Number: | ||
ML17056A797 Document Date: | |||
Document | Sun Dec 31 06:00:00 EST 1989 Document | ||
==Title:== | ==Title:== | ||
"New York State Electric & Gas Corp 1989 Annual Rept." | "New York State Electric & Gas Corp 1989 Annual Rept." | ||
Author Affiliation: | |||
Author Affiliation: NEW YORK STATE ELECTRIC & GAS CORP. | NEW YORK STATE ELECTRIC & GAS CORP. | ||
Accession Number: | |||
Accession Number: ML17056B042 | ML17056B042 Document Date: | ||
Mon Oct 08 06:00:00 EDT 1990 Document | |||
Document Date: Mon Oct 08 06:00:00 EDT 1990 Document | |||
==Title:== | ==Title:== | ||
LER 90-001-01:on 900103,unit experienced actuation of ESF. Caused by electrical interference associated w/cycling of control bldg chiller breaker.Chiller repaired & plant change initiated.W/901008 ltr. | LER 90-001-01:on 900103,unit experienced actuation of ESF. Caused by electrical interference associated w/cycling of control bldg chiller breaker.Chiller repaired & plant change initiated.W/901008 ltr. | ||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | Author Affiliation: | ||
NIAGARA MOHAWK POWER CORP. | |||
Accession Number: ML17056B236 Document Date: Thu Jan 10 06:00:00 EST 1991 | Accession Number: | ||
ML17056B236 Document Date: | |||
Document | Thu Jan 10 06:00:00 EST 1991 Document | ||
==Title:== | ==Title:== | ||
LER 90-024-00:on 901212,Unit 2 experienced actuation of ESF. Caused by exterior electrical noises being induced into plant grounding grid.Verifies that no high radiation condition existed.W/910110 ltr. | LER 90-024-00:on 901212,Unit 2 experienced actuation of ESF. Caused by exterior electrical noises being induced into plant grounding grid.Verifies that no high radiation condition existed.W/910110 ltr. | ||
Author Affiliation: | |||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | NIAGARA MOHAWK POWER CORP. | ||
Accession Number: | |||
Accession Number: ML17056B281 | ML17056B281 Document Date: | ||
Mon Feb 04 06:00:00 EST 1991 Document | |||
Document Date: Mon Feb 04 06:00:00 EST 1991 | |||
Document | |||
==Title:== | ==Title:== | ||
Special rept:on 910118,while mode selector switch in refuel position,main stack & reactor bldg gaseous effluent monitoring sys instrumentation declared inoperable.Caused by component failures due to lightning strike to main stack. | Special rept:on 910118,while mode selector switch in refuel position,main stack & reactor bldg gaseous effluent monitoring sys instrumentation declared inoperable.Caused by component failures due to lightning strike to main stack. | ||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | Author Affiliation: | ||
NIAGARA MOHAWK POWER CORP. | |||
Document | 6 Accession Number: | ||
ML17056B338 Document Date: | |||
Fri Feb 15 06:00:00 EST 1991 Document | |||
==Title:== | ==Title:== | ||
LER 91-001-00:on 910118,primary containment vent & purge isolation signal from standby gas treatment sys radiation microprocessor occurred.Caused by lightning strike on main stack tower.Tower design specs modified.W/910215 ltr. | LER 91-001-00:on 910118,primary containment vent & purge isolation signal from standby gas treatment sys radiation microprocessor occurred.Caused by lightning strike on main stack tower.Tower design specs modified.W/910215 ltr. | ||
Author Affiliation: | |||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | NIAGARA MOHAWK POWER CORP. | ||
Accession Number: | |||
Accession Number: ML17056B350 | ML17056B350 Document Date: | ||
Mon Dec 31 06:00:00 EST 1990 Document | |||
Document Date: Mon Dec 31 06:00:00 EST 1990 | |||
Document | |||
==Title:== | ==Title:== | ||
"Nine Mile Point Unit 2,Semiannual Radioactive Effluent Release Rept,Jul-Dec 1990." | "Nine Mile Point Unit 2,Semiannual Radioactive Effluent Release Rept,Jul-Dec 1990." | ||
Author Affiliation: | |||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | NIAGARA MOHAWK POWER CORP. | ||
Accession Number: | |||
Accession Number: ML17056B435 | ML17056B435 Document Date: | ||
Tue Oct 08 06:00:00 EDT 1991 Document | |||
Document Date: Tue Oct 08 06:00:00 EDT 1991 | |||
Document | |||
==Title:== | ==Title:== | ||
Insp repts 50-220/91-17 & 50-410/91-17 on 910728-0907. Violations noted.Major areas inspected:operations, radiological controls,maint,surveillance,security, engineering & technical support & safety assessment. | Insp repts 50-220/91-17 & 50-410/91-17 on 910728-0907. Violations noted.Major areas inspected:operations, radiological controls,maint,surveillance,security, engineering & technical support & safety assessment. | ||
Author Affiliation: | |||
Author Affiliation: NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | ||
Accession Number: | |||
Accession Number: ML17056B530 | ML17056B530 Document Date: | ||
Mon Nov 25 06:00:00 EST 1991 Document | |||
Document Date: Mon Nov 25 06:00:00 EST 1991 Document | |||
==Title:== | ==Title:== | ||
"Emergency Preparedness Drills/Exercises." | "Emergency Preparedness Drills/Exercises." | ||
Author Affiliation: | |||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | NIAGARA MOHAWK POWER CORP. | ||
Accession Number: | |||
Accession Number: ML17056B680 | ML17056B680 Document Date: | ||
Thu Feb 20 06:00:00 EST 1992 Document | |||
Document Date: Thu Feb 20 06:00:00 EST 1992 | |||
Document | |||
==Title:== | ==Title:== | ||
Insp Repts 50-220/91-29 & 50-410/91-29 on 911222-920125. Major areas inspected:plant operations,radiological controls,maint,surveillance,security & safety assessment/ quality verfication. | Insp Repts 50-220/91-29 & 50-410/91-29 on 911222-920125. Major areas inspected:plant operations,radiological controls,maint,surveillance,security & safety assessment/ quality verfication. | ||
Author Affiliation: | |||
Author Affiliation: NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | ||
Accession Number: | |||
Accession Number: ML17058A791 | ML17058A791 Document Date: | ||
Mon Jun 03 06:00:00 EDT 1991 Document | |||
Document Date: Mon Jun 03 06:00:00 EDT 1991 Document | |||
==Title:== | ==Title:== | ||
LER 91-009-00:on 910503,ESF actuation & secondary containment isolation occurred,causing reactor bldg recirculation unit cooler to start.Caused by spurious high radiation signal.Work request initiated.W/910603 ltr. | LER 91-009-00:on 910503,ESF actuation & secondary containment isolation occurred,causing reactor bldg recirculation unit cooler to start.Caused by spurious high radiation signal.Work request initiated.W/910603 ltr. | ||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | Author Affiliation: | ||
NIAGARA MOHAWK POWER CORP. | |||
7 Accession Number: | |||
ML17058A841 Document Date: | |||
Document | Fri Jun 28 06:00:00 EDT 1991 Document | ||
==Title:== | ==Title:== | ||
LER 88-059-01:on 881025,ESF actuated,resulting in isolation of Div 1 RHR shutdown cooling subsystem.Caused by accidently contacting heat sink plates of power source unit w/flexible conduit.Warning labels installed.W/910625 ltr. | LER 88-059-01:on 881025,ESF actuated,resulting in isolation of Div 1 RHR shutdown cooling subsystem.Caused by accidently contacting heat sink plates of power source unit w/flexible conduit.Warning labels installed.W/910625 ltr. | ||
Author Affiliation: | |||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | NIAGARA MOHAWK POWER CORP. | ||
Accession Number: | |||
Accession Number: ML17058A874 | ML17058A874 Document Date: | ||
Thu Aug 01 06:00:00 EDT 1991 Document | |||
Document Date: Thu Aug 01 06:00:00 EDT 1991 | |||
Document | |||
==Title:== | ==Title:== | ||
LER 91-009-01:on 910503,ESF actuation occurred due to spurious high radiation level signal.Caused by inadequate welder training program content.Procedure change evaluation initiated.W/910801 ltr. | LER 91-009-01:on 910503,ESF actuation occurred due to spurious high radiation level signal.Caused by inadequate welder training program content.Procedure change evaluation initiated.W/910801 ltr. | ||
Author Affiliation: | |||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | NIAGARA MOHAWK POWER CORP. | ||
Accession Number: | |||
Accession Number: ML17058B081 | ML17058B081 Document Date: | ||
Wed Aug 01 06:00:00 EDT 1990 Document | |||
Document Date: Wed Aug 01 06:00:00 EDT 1990 Document | |||
==Title:== | ==Title:== | ||
Computer printout entitled, "Human Engineering Discrepancies." | Computer printout entitled, "Human Engineering Discrepancies." | ||
Supporting documentation encl. | Supporting documentation encl. | ||
Author Affiliation: | |||
Author Affiliation: ADVANCED RESOURCE DEVELOPMENT CORP. | ADVANCED RESOURCE DEVELOPMENT CORP. | ||
Accession Number: | |||
Accession Number: ML17058B398 | ML17058B398 Document Date: | ||
Thu Dec 20 06:00:00 EST 1990 Document | |||
Document Date: Thu Dec 20 06:00:00 EST 1990 Document | |||
==Title:== | ==Title:== | ||
Rev 6 to 02-REQ-001-262-2-01, "Plant AC Electrical Distribution Sys." | Rev 6 to 02-REQ-001-262-2-01, "Plant AC Electrical Distribution Sys." | ||
Author Affiliation: | |||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | NIAGARA MOHAWK POWER CORP. | ||
Accession Number: | |||
Accession Number: ML17058B426 | ML17058B426 Document Date: | ||
Thu Sep 12 06:00:00 EDT 1991 Document | |||
Document Date: Thu Sep 12 06:00:00 EDT 1991 | |||
Document | |||
==Title:== | ==Title:== | ||
Forwards drawings requested from DJ Hess.Exide executive summary encl.W/o encl. | Forwards drawings requested from DJ Hess.Exide executive summary encl.W/o encl. | ||
Author Affiliation: | |||
Author Affiliation: EXIDE CORP. | EXIDE CORP. | ||
Accession Number: | |||
Accession Number: ML17058B483 | ML17058B483 Document Date: | ||
Sun Aug 18 06:00:00 EDT 1991 Document | |||
Document Date: Sun Aug 18 06:00:00 EDT 1991 | |||
Document | |||
==Title:== | ==Title:== | ||
Transcript of 910818 NMP Nuclear Power Plant info exchange meeting in Scriba,NY.Pp 1-164. | Transcript of 910818 NMP Nuclear Power Plant info exchange meeting in Scriba,NY.Pp 1-164. | ||
Author Affiliation: | |||
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD) | |||
8 Accession Number: | |||
ML17058B611 Document Date: | |||
Tue Sep 03 06:00:00 EDT 1991 Document | |||
Document | |||
==Title:== | ==Title:== | ||
Transcript of info meeting on 910903 in Bethesda,MD.Pp 1-175. | Transcript of info meeting on 910903 in Bethesda,MD.Pp 1-175. | ||
Author Affiliation: | |||
Author Affiliation: NRC - INCIDENT INVESTIGATION TEAM | NRC - INCIDENT INVESTIGATION TEAM Accession Number: | ||
ML17058B639 Document Date: | |||
Accession Number: ML17058B639 | Sat Sep 07 06:00:00 EDT 1991 Document | ||
Document Date: Sat Sep 07 06:00:00 EDT 1991 Document | |||
==Title:== | ==Title:== | ||
Transcript of info exchange meeting on 910907 in Bethesda, MD.Pp 1-101. | Transcript of info exchange meeting on 910907 in Bethesda, MD.Pp 1-101. | ||
Author Affiliation: | |||
Author Affiliation: NRC - INCIDENT INVESTIGATION TEAM | NRC - INCIDENT INVESTIGATION TEAM Accession Number: | ||
ML17058B722 Document Date: | |||
Accession Number: ML17058B722 | Fri Aug 31 06:00:00 EDT 1990 Document | ||
Document Date: Fri Aug 31 06:00:00 EDT 1990 Document | |||
==Title:== | ==Title:== | ||
Rev 2 to, "24 Volt DC Distribution." | Rev 2 to, "24 Volt DC Distribution." | ||
Author Affiliation: | |||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | NIAGARA MOHAWK POWER CORP. | ||
Accession Number: | |||
Accession Number: ML17058B734 Document Date: Fri Jan 12 06:00:00 EST 1990 | ML17058B734 Document Date: | ||
Fri Jan 12 06:00:00 EST 1990 Document | |||
Document | |||
==Title:== | ==Title:== | ||
Rev 3 to operating procedure N2-OP-97, "Reactor Protection Sys." | Rev 3 to operating procedure N2-OP-97, "Reactor Protection Sys." | ||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | Author Affiliation: | ||
NIAGARA MOHAWK POWER CORP. | |||
Accession Number: ML17058B736 Document Date: Mon Aug 18 06:00:00 EDT 1986 | Accession Number: | ||
ML17058B736 Document Date: | |||
Document | Mon Aug 18 06:00:00 EDT 1986 Document | ||
==Title:== | ==Title:== | ||
Rev 2 to operating procedure N2-OP-96, "Reactor Manual Control & Rod Position Indication Sys." | Rev 2 to operating procedure N2-OP-96, "Reactor Manual Control & Rod Position Indication Sys." | ||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | Author Affiliation: | ||
NIAGARA MOHAWK POWER CORP. | |||
Accession Number: ML17059A091 Document Date: Thu Oct 28 06:00:00 EDT 1993 | Accession Number: | ||
ML17059A091 Document Date: | |||
Document | Thu Oct 28 06:00:00 EDT 1993 Document | ||
==Title:== | ==Title:== | ||
LER 93-001-01:on 930105,ESF actuation occurred due to equipment failure.Root cause of event was radio frequency interference.Util eliminated use of radios in switchgear rooms & evaluated use of delay circuits.W/931028 ltr. | LER 93-001-01:on 930105,ESF actuation occurred due to equipment failure.Root cause of event was radio frequency interference.Util eliminated use of radios in switchgear rooms & evaluated use of delay circuits.W/931028 ltr. | ||
Author Affiliation: | |||
NIAGARA MOHAWK POWER CORP. | |||
Accession Number: | |||
ML18037A034 Document Date: | |||
Thu Sep 13 06:00:00 EDT 1984 | |||
9 Document | |||
==Title:== | ==Title:== | ||
Forwards responses to SER Open Items 421.3,4,10,13,15,18,20, 23,25,27,28,34,36,37,42,43,44 & 47,to aid in NRC review of application for license.Info will be included in next FSAR amend. | Forwards responses to SER Open Items 421.3,4,10,13,15,18,20, 23,25,27,28,34,36,37,42,43,44 & 47,to aid in NRC review of application for license.Info will be included in next FSAR amend. | ||
Author Affiliation: | |||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | NIAGARA MOHAWK POWER CORP. | ||
Accession Number: | |||
Accession Number: ML18037A121 | ML18037A121 Document Date: | ||
Fri Feb 08 06:00:00 EST 1985 Document | |||
Document Date: Fri Feb 08 06:00:00 EST 1985 | |||
Document | |||
==Title:== | ==Title:== | ||
Suppl 8 to environ rept - OL stage. | Suppl 8 to environ rept - OL stage. | ||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | Author Affiliation: | ||
NIAGARA MOHAWK POWER CORP. | |||
Accession Number: ML18038A091 | Accession Number: | ||
ML18038A091 Document Date: | |||
Document Date: Wed Nov 20 06:00:00 EST 1985 | Wed Nov 20 06:00:00 EST 1985 Document | ||
Document | |||
==Title:== | ==Title:== | ||
Forwards proof & review Tech Specs per 851118 discussion. Review should identify areas inconsistent w/FSAR or as -built plant. | Forwards proof & review Tech Specs per 851118 discussion. Review should identify areas inconsistent w/FSAR or as-built plant. | ||
Author Affiliation: NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | Author Affiliation: | ||
NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | |||
Accession Number: ML18038A109 | Accession Number: | ||
ML18038A109 Document Date: | |||
Document Date: Mon Dec 30 06:00:00 EST 1985 | Mon Dec 30 06:00:00 EST 1985 Document | ||
Document | |||
==Title:== | ==Title:== | ||
Forwards marked-up proof & review Tech Specs,reflecting comments based on review against current plant design.SAR & Tech Spec verification program continuing.Changes will be incorporated during branch review process. | Forwards marked-up proof & review Tech Specs,reflecting comments based on review against current plant design.SAR & Tech Spec verification program continuing.Changes will be incorporated during branch review process. | ||
Author Affiliation: | |||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | NIAGARA MOHAWK POWER CORP. | ||
Accession Number: | |||
Accession Number: ML18038A372 | ML18038A372 Document Date: | ||
Tue Sep 10 06:00:00 EDT 1991 Document | |||
Document Date: Tue Sep 10 06:00:00 EDT 1991 | |||
Document | |||
==Title:== | ==Title:== | ||
Forwards Rev 1 to "Root Cause Rept for Exide Uninterruptible Power Supplies (UPS) 1A,B,C,D & G Trip Event of 910813" & responses to root cause | Forwards Rev 1 to "Root Cause Rept for Exide Uninterruptible Power Supplies (UPS) 1A,B,C,D & G Trip Event of 910813" & responses to root cause analysis,short term corrective plan,load lists & procedures & training. | ||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | Author Affiliation: | ||
NIAGARA MOHAWK POWER CORP. | |||
Accession Number: ML18038A374 Document Date: Mon Sep 09 06:00:00 EDT 1991 | Accession Number: | ||
ML18038A374 Document Date: | |||
Document | Mon Sep 09 06:00:00 EDT 1991 Document | ||
==Title:== | ==Title:== | ||
Rev 1 to "Root Cause Rept for Exide UPS 1A,B,C,D & G Trip Event of 910813." Electrical fault on B phase main step-up transformer occurred due to improper design.Logic power supply for subj UPS units to be modified. | Rev 1 to "Root Cause Rept for Exide UPS 1A,B,C,D & G Trip Event of 910813." Electrical fault on B phase main step-up transformer occurred due to improper design.Logic power supply for subj UPS units to be modified. | ||
Author Affiliation: | |||
NIAGARA MOHAWK POWER CORP. | |||
Accession Number: | |||
ML18038A375 Document Date: | |||
Thu Sep 05 06:00:00 EDT 1991 | |||
10 Document | |||
==Title:== | ==Title:== | ||
"Niagara Mohawk Nine Mile Point Unit 2 Event of 910813." | "Niagara Mohawk Nine Mile Point Unit 2 Event of 910813." | ||
Author Affiliation: GENERAL ELECTRIC CO. | Author Affiliation: | ||
Document Report Number: NUREG-1455 | GENERAL ELECTRIC CO. | ||
Document Report Number: NUREG-1455 Accession Number: | |||
Accession Number: ML18038A389 | ML18038A389 Document Date: | ||
Wed Feb 17 06:00:00 EST 1988 Document | |||
Document Date: Wed Feb 17 06:00:00 EST 1988 Document | |||
==Title:== | ==Title:== | ||
LER 88-001-00:on 880120,reactor scram occurred due to actual low water level condition.Caused by design & personnel errors.Operator disciplined & mod addressed inadvertent feedwater control valve lockup.W/880217 ltr. | LER 88-001-00:on 880120,reactor scram occurred due to actual low water level condition.Caused by design & personnel errors.Operator disciplined & mod addressed inadvertent feedwater control valve lockup.W/880217 ltr. | ||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | Author Affiliation: | ||
NIAGARA MOHAWK POWER CORP. | |||
Accession Number: ML18038A470 Document Date: Mon May 15 06:00:00 EDT 1989 | Accession Number: | ||
ML18038A470 Document Date: | |||
Document | Mon May 15 06:00:00 EDT 1989 Document | ||
==Title:== | ==Title:== | ||
LER 89-014-00:on 890413,unit reactor experienced reactor scram which was result of turbine trip due to actuation of generator protection circuitry.Turbine trip caused by disconnected wire.Wire relanded.W/890515 ltr. | LER 89-014-00:on 890413,unit reactor experienced reactor scram which was result of turbine trip due to actuation of generator protection circuitry.Turbine trip caused by disconnected wire.Wire relanded.W/890515 ltr. | ||
Author Affiliation: | |||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | NIAGARA MOHAWK POWER CORP. | ||
Accession Number: | |||
Accession Number: ML18038A499 | ML18038A499 Document Date: | ||
Mon Dec 30 06:00:00 EST 1991 Document | |||
Document Date: Mon Dec 30 06:00:00 EST 1991 | |||
Document | |||
==Title:== | ==Title:== | ||
Forwards Rev 24 to site emergency plan & Rev 15 to EPIP S-EPP-2, "Fire Fighting," Rev 13 to Emergency Preparedness Procedure S -EPP-5, "Station Evacuation" | Forwards Rev 24 to site emergency plan & Rev 15 to EPIP S-EPP-2, "Fire Fighting," Rev 13 to Emergency Preparedness Procedure S-EPP-5, "Station Evacuation" | ||
& Rev 8 to EPIP S-EPP-19, "Site Evacuation Procedure." | & Rev 8 to EPIP S-EPP-19, "Site Evacuation Procedure." | ||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | Author Affiliation: | ||
NIAGARA MOHAWK POWER CORP. | |||
Accession Number: ML18041A031 Document Date: Tue Dec 13 06:00:00 EST 1994 | Accession Number: | ||
ML18041A031 Document Date: | |||
Document | Tue Dec 13 06:00:00 EST 1994 Document | ||
==Title:== | ==Title:== | ||
Forwards emergency plan maintenance procedure EPMP -EPP-08, Rev 02, "Maintenance,Testing & Operation of Oswego County Prompt Notification Sys." | Forwards emergency plan maintenance procedure EPMP-EPP-08, Rev 02, "Maintenance,Testing & Operation of Oswego County Prompt Notification Sys." | ||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | Author Affiliation: | ||
NIAGARA MOHAWK POWER CORP. | |||
Accession | Accession Number: | ||
Document Date: Mon Dec 31 06:00:00 EST 1984 Document | ML18041A286 Document Date: Mon Dec 31 06:00:00 EST 1984 Document | ||
==Title:== | ==Title:== | ||
"Exide Electronics Model 1105." Supporting documentation & five oversize drawings encl. | "Exide Electronics Model 1105." Supporting documentation & five oversize drawings encl. | ||
Author Affiliation: STONE & WEBSTER ENGINEERING CORP. | Author Affiliation: STONE & WEBSTER ENGINEERING CORP. | ||
Accession Number: | |||
ML20044C678 | |||
11 Document Date: | |||
Sat Sep 07 06:00:00 EDT 1991 Document | |||
Document Date: Sat Sep 07 06:00:00 EDT 1991 Document | |||
==Title:== | ==Title:== | ||
"Main Transformer Rept for Event of 910813." | "Main Transformer Rept for Event of 910813." | ||
Author Affiliation: | |||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | NIAGARA MOHAWK POWER CORP. | ||
Accession Number: | |||
Accession Number: ML20044H209 Document Date: Mon May 24 06:00:00 EDT 1993 | ML20044H209 Document Date: | ||
Mon May 24 06:00:00 EDT 1993 Document | |||
Document | |||
==Title:== | ==Title:== | ||
Insp repts 50-220/93-06 & 50-410/93-06 on 930411-0508.Major areas inspected:plant operations,radiological controls, maint,surveillance,emergency planning,security | Insp repts 50-220/93-06 & 50-410/93-06 on 930411-0508.Major areas inspected:plant operations,radiological controls, maint,surveillance,emergency planning,security | ||
& safety assessment/quality verification activities. | & safety assessment/quality verification activities. | ||
Author Affiliation: | |||
Author Affiliation: NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | ||
Accession Number: | |||
Accession Number: ML20056C166 | ML20056C166 Document Date: | ||
Fri Mar 12 06:00:00 EST 1993 Document | |||
Document Date: Fri Mar 12 06:00:00 EST 1993 Document | |||
==Title:== | ==Title:== | ||
Insp repts 50-220/93-01 & 50-410/93-01 on 930124-0227. Violations noted.Major areas inspected:plant operations, radiological controls,maintenance,surveillance,security & safety assessment/quality verification activities. | Insp repts 50-220/93-01 & 50-410/93-01 on 930124-0227. Violations noted.Major areas inspected:plant operations, radiological controls,maintenance,surveillance,security & safety assessment/quality verification activities. | ||
Author Affiliation: NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | Author Affiliation: | ||
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | |||
Accession Number: ML20062M238 | Accession Number: | ||
ML20062M238 Document Date: | |||
Document Date: Tue Dec 28 06:00:00 EST 1993 Document | Tue Dec 28 06:00:00 EST 1993 Document | ||
==Title:== | ==Title:== | ||
Provides results of Nine Mile Point Unit 2 plant specific technical assessment for instruments assumed to operate in USAR Chapters 6 & 15 & for which Instrument Setpoint Methodology Group calculations developed,per TR NEDC -31336. | Provides results of Nine Mile Point Unit 2 plant specific technical assessment for instruments assumed to operate in USAR Chapters 6 & 15 & for which Instrument Setpoint Methodology Group calculations developed,per TR NEDC-31336. | ||
Author Affiliation: | |||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | NIAGARA MOHAWK POWER CORP. | ||
Accession Number: | |||
Accession Number: ML20066G358 | ML20066G358 Document Date: | ||
Tue Jun 11 06:00:00 EDT 1985 Document | |||
Document Date: Tue Jun 11 06:00:00 EDT 1985 | |||
Document | |||
==Title:== | ==Title:== | ||
Forwards proposed implementing license condition & listing of revs to SER statement for plant re physical security plan. | Forwards proposed implementing license condition & listing of revs to SER statement for plant re physical security plan. | ||
Author Affiliation: | |||
Author Affiliation: NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) | NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) | ||
Accession Number: | |||
Accession Number: ML20070D160 | ML20070D160 Document Date: | ||
Fri Jun 24 06:00:00 EDT 1994 Document | |||
Document Date: Fri Jun 24 06:00:00 EDT 1994 Document | |||
==Title:== | ==Title:== | ||
Insp repts 50-220/94-07 & 50-410/94-07 on 940417-0528. Violations noted.Major areas inspected:plant operations, maint,engineering,plant support & safety assessment/quality verification. | Insp repts 50-220/94-07 & 50-410/94-07 on 940417-0528. Violations noted.Major areas inspected:plant operations, maint,engineering,plant support & safety assessment/quality verification. | ||
Author Affiliation: NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | Author Affiliation: | ||
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | |||
Document | 12 Accession Number: | ||
ML20073C571 Document Date: | |||
Thu Sep 08 06:00:00 EDT 1994 Document | |||
==Title:== | ==Title:== | ||
Insp repts 50-220/94-13 & 50-410/94-15 on 940710-0820.No violations noted.Major areas inspected:plant operations, maint,engineering & plant support. | Insp repts 50-220/94-13 & 50-410/94-15 on 940710-0820.No violations noted.Major areas inspected:plant operations, maint,engineering & plant support. | ||
Author Affiliation: NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | Author Affiliation: | ||
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | |||
Accession Number: ML20080H840 Document Date: Thu Jan 26 06:00:00 EST 1984 | Accession Number: | ||
ML20080H840 Document Date: | |||
Document | Thu Jan 26 06:00:00 EST 1984 Document | ||
==Title:== | ==Title:== | ||
IE Const Appraisal Insp Rept 50-410/83-18 on 831107-19 & 28-1209.Major areas inspected:detailed exam of selected hardware subsequent to QC insps,selective exam of procedures & representative records & observation of in process work. | IE Const Appraisal Insp Rept 50-410/83-18 on 831107-19 & 28-1209.Major areas inspected:detailed exam of selected hardware subsequent to QC insps,selective exam of procedures & representative records & observation of in process work. | ||
Author Affiliation: | |||
Author Affiliation: NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) | ||
Accession Number: | |||
Accession Number: ML20087N144 | ML20087N144 Document Date: | ||
Sat Mar 31 06:00:00 EST 1984 Document | |||
Document Date: Sat Mar 31 06:00:00 EST 1984 Document | |||
==Title:== | ==Title:== | ||
Suppl 6 to environ rept - OL stage. | Suppl 6 to environ rept - OL stage. | ||
Author Affiliation: | |||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | NIAGARA MOHAWK POWER CORP. | ||
Accession Number: | |||
Accession Number: ML20091J357 | ML20091J357 Document Date: | ||
Mon Jan 06 06:00:00 EST 1992 Document | |||
Document Date: Mon Jan 06 06:00:00 EST 1992 | |||
Document | |||
==Title:== | ==Title:== | ||
Identifies & assigns responsibility for generic & plant-specific actions resulting from investigations of 910813 incident at Unit 2 (NUREG-1455).Staff actions resulting from subj incident encl. | Identifies & assigns responsibility for generic & plant-specific actions resulting from investigations of 910813 incident at Unit 2 (NUREG-1455).Staff actions resulting from subj incident encl. | ||
Author Affiliation: | |||
Author Affiliation: NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) | NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) | ||
Accession Number: | |||
Accession Number: ML20204C399 Document Date: Wed Mar 18 06:00:00 EST 1987 | ML20204C399 Document Date: | ||
Wed Mar 18 06:00:00 EST 1987 Document | |||
Document | |||
==Title:== | ==Title:== | ||
LER 86- | LER 86-011-01:on 861127 & 1208,automatic initiation of standby gas treatment sys Divs I & II occurred.Caused by spurious reactor bldg exhaust ventilation duct high radiation signals.Accumulator added to lines.W/870318 ltr. | ||
Author Affiliation: | |||
Author Affiliation: NIAGARA MOHAWK POWER CORP. | NIAGARA MOHAWK POWER CORP. | ||
Accession Number: | |||
Accession Number: ML031060589 | ML031060589 Document Date: | ||
Thu Mar 17 00:00:00 EST 1994 Document | |||
Document Date: Thu Mar 17 00:00:00 EST 1994 | |||
Document | |||
==Title:== | ==Title:== | ||
NRC Information Notice 1994-020: Common-Cause Failures Due to Inadequate Design Control and | NRC Information Notice 1994-020: Common-Cause Failures Due to Inadequate Design Control and Dedication. | ||
Document | 13 Author Affiliation: | ||
NRC/NRR Accession Number: | |||
ML031070324 Document Date: | |||
Fri Sep 17 00:00:00 EDT 1993 Document | |||
==Title:== | ==Title:== | ||
NRC Information Notice 1993-075: Spurious Tripping of Low -Voltage Power Circuit Breakers with GE RMS-9 Digital Trip Units. | NRC Information Notice 1993-075: Spurious Tripping of Low-Voltage Power Circuit Breakers with GE RMS-9 Digital Trip Units. | ||
Author Affiliation: | |||
Author Affiliation: NRC/NRR | NRC/NRR Accession Number: | ||
ML031130479 Document Date: | |||
Accession Number: ML031130479 | Fri Dec 04 00:00:00 EST 1987 Document | ||
Document Date: Fri Dec 04 00:00:00 EST 1987 | |||
Document | |||
==Title:== | ==Title:== | ||
NRC Information Notice 1987-060: Depressurization of Reactor Coolant Systems in Pressurized-Water Reactors. | NRC Information Notice 1987-060: Depressurization of Reactor Coolant Systems in Pressurized-Water Reactors. | ||
Author Affiliation: | |||
Author Affiliation: NRC/NRR | NRC/NRR Accession Number: | ||
ML031190235 Document Date: | |||
Accession Number: ML031190235 | Tue Sep 24 00:00:00 EDT 1991 Document | ||
Document Date: Tue Sep 24 00:00:00 EDT 1991 | |||
Document | |||
==Title:== | ==Title:== | ||
NRC Information Notice 1991-060: False Alarms of Alarm Ratemeters Because of Radiofrequency Interference. | NRC Information Notice 1991-060: False Alarms of Alarm Ratemeters Because of Radiofrequency Interference. | ||
Author Affiliation: | |||
Author Affiliation: NRC/NMSS/IMNS | NRC/NMSS/IMNS Accession Number: | ||
ML031190579 Document Date: | |||
Accession Number: ML031190579 | Tue Mar 05 00:00:00 EST 1991 Document | ||
Document Date: Tue Mar 05 00:00:00 EST 1991 | |||
Document | |||
==Title:== | ==Title:== | ||
NRC Information Notice 1991-014: Recent Safety-Related Incidents at Large Irradiators. | NRC Information Notice 1991-014: Recent Safety-Related Incidents at Large Irradiators. | ||
Author Affiliation: | |||
Author Affiliation: NRC/NRR | NRC/NRR Accession Number: | ||
ML031190682 Document Date: | |||
Accession Number: ML031190682 | Mon Feb 04 00:00:00 EST 1991 Document | ||
Document Date: Mon Feb 04 00:00:00 EST 1991 | |||
Document | |||
==Title:== | ==Title:== | ||
NRC Information Notice 1991-007: Maintenance Deficiency Associated with General Electric Horizontal Custom 8000 Induction Motors. | NRC Information Notice 1991-007: Maintenance Deficiency Associated with General Electric Horizontal Custom 8000 Induction Motors. | ||
Author Affiliation: | |||
Author Affiliation: NRC/NRR | NRC/NRR Accession Number: | ||
ML031220597 Document Date: | |||
Accession Number: ML031220597 | Mon Mar 10 00:00:00 EST 1986 Document | ||
Document Date: Mon Mar 10 00:00:00 EST 1986 | |||
Document | |||
==Title:== | ==Title:== | ||
NRC Information Notice 1986-015: Loss of Offsite Power Caused by Problems in Fiber Optics Systems. | NRC Information Notice 1986-015: Loss of Offsite Power Caused by Problems in Fiber Optics Systems. | ||
Author Affiliation: | |||
NRC/IE | |||
14 Accession Number: | |||
ML031250230 Document Date: | |||
Tue Dec 02 00:00:00 EST 1986 Document | |||
Accession Number: ML031250230 Document Date: Tue Dec 02 00:00:00 EST 1986 | |||
Document | |||
==Title:== | ==Title:== | ||
NRC Information Notice 1986-098: Offsite Medical Services. | NRC Information Notice 1986-098: Offsite Medical Services. | ||
Author Affiliation: | |||
Author Affiliation: NRC/IE | NRC/IE Accession Number: | ||
ML082670424 Document Date: | |||
Accession Number: ML082670424 | Wed Feb 15 06:00:00 EST 1984 Document | ||
Document Date: Wed Feb 15 06:00:00 EST 1984 Document | |||
==Title:== | ==Title:== | ||
IE Info Notice 83-63,Suppl 1, "Potential Failures of Westinghouse Type SA-1 Differential Relays." Svc | IE Info Notice 83-63,Suppl 1, "Potential Failures of Westinghouse Type SA-1 Differential Relays." Svc list encl. | ||
Author Affiliation: | |||
Author Affiliation: NRC/IE | NRC/IE}} | ||
Latest revision as of 08:56, 25 November 2024
| ML23251A017 | |
| Person / Time | |
|---|---|
| Issue date: | 08/31/2023 |
| From: | NRC/OCIO |
| To: | - No Known Affiliation |
| Shared Package | |
| ML23251A034 | List: |
| References | |
| FOIA-2023-000163 | |
| Download: ML23251A017 (1) | |
Text
1 Re: FOIA-2023-000163, Interim #1 Below is a report of publicly available responsive records. You can search for these records by their accession number (ML#) in the Advanced Search of ADAMS at https://adams.nrc.gov/wba/. If you need assistance with searching and downloading these records, please contact the NRC's Public Document Room at 301-415-4737 from 8 am to 4 pm (EST) or at pdr.resource@nrc.gov.
Accession Number:
ML17054A529 Document Date:
Tue Jan 31 06:00:00 EST 1984 Document
Title:
"Evaluation of Angled Screen Fish Diversion Sys at Oswego Steam Station Unit 6."
Author Affiliation:
LAWLER, MATUSKY & SKELLY ENGINEERS Accession Number:
ML17054B236 Document Date:
Fri Nov 30 06:00:00 EST 1984 Document
Title:
Advises that rept on vertical floor flexibility will be provided by 850101.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17054B402 Document Date:
Tue Feb 12 06:00:00 EST 1985 Document
Title:
Responds to 850122 ltr,stating commitments re alternate damping values
& verification of increased piping displacements.Commitments will be incorporated into FSAR Amend 18.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17055A777 Document Date:
Sat Nov 30 06:00:00 EST 1985 Document
Title:
Updated environ qualification document.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17055B175 Document Date:
Fri Jan 10 06:00:00 EST 1986 Document
Title:
Preoperational Security Program Review Insp Rept 50-410/85-38 on 851028-1101.No violation noted.Major areas inspected:security plan & implementing procedures.Portions withheld (ref 10CFR2.790(a) & 9.5.(a)(4)).
Author Affiliation:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Accession Number:
ML17055B517 Document Date:
Mon Mar 10 06:00:00 EST 1986
2 Document
Title:
Rev 4 to Administrative Procedure AP-2.0, "Production & Control of Procedures."
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17055B764 Document Date:
Thu May 08 06:00:00 EDT 1986 Document
Title:
"Human Factors Engineering,DCRDR Supplemental Technical Evaluation Rept,Nine Mile Point Unit 2."
Author Affiliation:
LAWRENCE LIVERMORE NATIONAL LABORATORY Accession Number:
ML17055B997 Document Date:
Mon Jun 09 06:00:00 EDT 1986 Document
Title:
Forwards marked-up revised supplemental rept to DCRDR final summary rept,including checklist survey,response to NRC SER & study results since Sept 1985 final rept.Rept also addresses items in Haughey 860122 ltr & 860520 meeting.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17055C057 Document Date:
Thu Jul 10 06:00:00 EDT 1986 Document
Title:
Insp Rept 50-410/86-28 on 860527-0613.No violation noted. Major areas inspected:const deficiencies,bulletins & outstanding items re safety-related mechanical,electrical
& instrumentation distribution & equipment.
Author Affiliation:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Accession Number:
ML17055C117 Document Date:
Thu Jul 31 06:00:00 EDT 1986 Document
Title:
SAFETY EVALUATION REPORT RELATED TO THE OPERATION OF NINE MILE POINT NUCLEAR STATION,UNIT NO. 2.Docket No. 50-410. (Niagara Mohawk Power Corporation)
Author Affiliation:
NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
Accession Number:
ML17055D117 Document Date:
Tue Aug 04 06:00:00 EDT 1987 Document
Title:
Operational Readiness Team Insp Rept 50-410/87-16 on 870601-12.Violation noted.Major areas inspected:testing,training & maint & assessed licensee readiness for full power operations.Unresolved item identified.
Author Affiliation:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
3 Accession Number:
ML17055D694 Document Date:
Thu Mar 10 06:00:00 EST 1988 Document
Title:
Exam Rept 50-410/87-43OL on 871216 & 880126-28.Exam results: all senior reactor operators & reactor operators passed written exams,three senior reactor operators & three reactor operators passed operating exams.One senior operator failed.
Author Affiliation:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Accession Number:
ML17055D843 Document Date:
Wed May 04 06:00:00 EDT 1988 Document
Title:
LER 88-020-00:on 880407,ESF actuated on spurious radiation signal due to electrical noise.Caused by contractor "chattering" due to increased valve 2HCS*MOV25B torque requirement.Torque switch of valve adjusted.W/880504 ltr.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17055E127 Document Date:
Mon Aug 22 06:00:00 EDT 1988 Document
Title:
LER 88-035-00:on 880721,automatic initiation of control bldg special filter train occurred.Caused by electrical noise due to operation of RCIC trip & throttle valve.Filter train returned to standby & work request issued.W/880822 ltr.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17055E359 Document Date:
Wed Nov 23 06:00:00 EST 1988 Document
Title:
LER 88-059-00:on 881025,ESF actuation occurred.Caused by accidental contact of heat sink plates of power source w/flex conduit.Lessons learned transmittal issued to appropriate depts & warning will be emplaced.W/881123 ltr.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17055E366 Document Date:
Tue Nov 29 06:00:00 EST 1988 Document
Title:
LER 88-061-00:on 881030,facility experienced ESF actuation while reactor mode switch in shutdown.Caused by equipment malfunction.Work stopped on gas treatment sys & verification that no actual high radiation signals noted.W/881129 ltr.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17055E520 Document Date:
Thu Feb 09 06:00:00 EST 1989
4 Document
Title:
LER 87-078-01:on 871220,secondary containment isolation & standby gas treatment initiation occurred.Caused by design deficiencies.Isolations reset,safety sys secured & normal ventilation sys restored.W/890209 ltr.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17056A038 Document Date:
Thu Jun 01 06:00:00 EDT 1989 Document
Title:
Insp Repts 50-220/89-05 & 50-410/89-05 on 890404-0512. Violations noted.Major areas inspected:licensee actions on previous insp findings,plant tours,safety sys walkdown,NRC bulletin & notice reviews & LER reviews.
Author Affiliation:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Accession Number:
ML17056A390 Document Date:
Wed Oct 25 06:00:00 EDT 1989 Document
Title:
LER 89-026-00:on 890926,unit experienced two ESF actuations of secondary containment isolation & standby gas treatment sys initiation.Caused by spurious signal due to electrical noise resulting from welding.Welding suspended.W/891025 ltr.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17056A396 Document Date:
Wed Nov 01 06:00:00 EST 1989 Document
Title:
Forwards request for addl info on crane travel,per 890726 spent fuel storage pool amend application.
Author Affiliation:
NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
Accession Number:
ML17056A463 Document Date:
Tue Nov 28 06:00:00 EST 1989 Document
Title:
Ack receipt of 891031 response to 60-day reporting requirements of Generic Ltr 88-20 re individual plant exams. Util plan will be reviewed to determine impact on licensee & NRC resources.
Author Affiliation:
NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
Accession Number:
ML17056A536 Document Date:
Tue Jan 02 06:00:00 EST 1990 Document
Title:
LER 89-040-00:on 891201,automatic reactor scram occurred due to APRM high neutron flux signals,causing turbine trip on reverse power by anti-motoring device.Caused by sudden zero voltage input.Work request issued.W/900102 ltr.
5 Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17056A570 Document Date:
Sun Dec 31 06:00:00 EST 1989 Document
Title:
Monthly operating rept for Dec 1989 for Nine Mile Point Unit 2.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17056A647 Document Date:
Sun Dec 31 06:00:00 EST 1989 Document
Title:
"Annual Tabulation of Occupational Exposure Rept & 10CFR20.407(a)(2)
Rept for 1989." W/900227 ltr.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17056A797 Document Date:
Sun Dec 31 06:00:00 EST 1989 Document
Title:
"New York State Electric & Gas Corp 1989 Annual Rept."
Author Affiliation:
NEW YORK STATE ELECTRIC & GAS CORP.
Accession Number:
ML17056B042 Document Date:
Mon Oct 08 06:00:00 EDT 1990 Document
Title:
LER 90-001-01:on 900103,unit experienced actuation of ESF. Caused by electrical interference associated w/cycling of control bldg chiller breaker.Chiller repaired & plant change initiated.W/901008 ltr.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17056B236 Document Date:
Thu Jan 10 06:00:00 EST 1991 Document
Title:
LER 90-024-00:on 901212,Unit 2 experienced actuation of ESF. Caused by exterior electrical noises being induced into plant grounding grid.Verifies that no high radiation condition existed.W/910110 ltr.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17056B281 Document Date:
Mon Feb 04 06:00:00 EST 1991 Document
Title:
Special rept:on 910118,while mode selector switch in refuel position,main stack & reactor bldg gaseous effluent monitoring sys instrumentation declared inoperable.Caused by component failures due to lightning strike to main stack.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
6 Accession Number:
ML17056B338 Document Date:
Fri Feb 15 06:00:00 EST 1991 Document
Title:
LER 91-001-00:on 910118,primary containment vent & purge isolation signal from standby gas treatment sys radiation microprocessor occurred.Caused by lightning strike on main stack tower.Tower design specs modified.W/910215 ltr.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17056B350 Document Date:
Mon Dec 31 06:00:00 EST 1990 Document
Title:
"Nine Mile Point Unit 2,Semiannual Radioactive Effluent Release Rept,Jul-Dec 1990."
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17056B435 Document Date:
Tue Oct 08 06:00:00 EDT 1991 Document
Title:
Insp repts 50-220/91-17 & 50-410/91-17 on 910728-0907. Violations noted.Major areas inspected:operations, radiological controls,maint,surveillance,security, engineering & technical support & safety assessment.
Author Affiliation:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Accession Number:
ML17056B530 Document Date:
Mon Nov 25 06:00:00 EST 1991 Document
Title:
"Emergency Preparedness Drills/Exercises."
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17056B680 Document Date:
Thu Feb 20 06:00:00 EST 1992 Document
Title:
Insp Repts 50-220/91-29 & 50-410/91-29 on 911222-920125. Major areas inspected:plant operations,radiological controls,maint,surveillance,security & safety assessment/ quality verfication.
Author Affiliation:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Accession Number:
ML17058A791 Document Date:
Mon Jun 03 06:00:00 EDT 1991 Document
Title:
LER 91-009-00:on 910503,ESF actuation & secondary containment isolation occurred,causing reactor bldg recirculation unit cooler to start.Caused by spurious high radiation signal.Work request initiated.W/910603 ltr.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
7 Accession Number:
ML17058A841 Document Date:
Fri Jun 28 06:00:00 EDT 1991 Document
Title:
LER 88-059-01:on 881025,ESF actuated,resulting in isolation of Div 1 RHR shutdown cooling subsystem.Caused by accidently contacting heat sink plates of power source unit w/flexible conduit.Warning labels installed.W/910625 ltr.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17058A874 Document Date:
Thu Aug 01 06:00:00 EDT 1991 Document
Title:
LER 91-009-01:on 910503,ESF actuation occurred due to spurious high radiation level signal.Caused by inadequate welder training program content.Procedure change evaluation initiated.W/910801 ltr.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17058B081 Document Date:
Wed Aug 01 06:00:00 EDT 1990 Document
Title:
Computer printout entitled, "Human Engineering Discrepancies."
Supporting documentation encl.
Author Affiliation:
ADVANCED RESOURCE DEVELOPMENT CORP.
Accession Number:
ML17058B398 Document Date:
Thu Dec 20 06:00:00 EST 1990 Document
Title:
Rev 6 to 02-REQ-001-262-2-01, "Plant AC Electrical Distribution Sys."
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17058B426 Document Date:
Thu Sep 12 06:00:00 EDT 1991 Document
Title:
Forwards drawings requested from DJ Hess.Exide executive summary encl.W/o encl.
Author Affiliation:
EXIDE CORP.
Accession Number:
ML17058B483 Document Date:
Sun Aug 18 06:00:00 EDT 1991 Document
Title:
Transcript of 910818 NMP Nuclear Power Plant info exchange meeting in Scriba,NY.Pp 1-164.
Author Affiliation:
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
8 Accession Number:
ML17058B611 Document Date:
Tue Sep 03 06:00:00 EDT 1991 Document
Title:
Transcript of info meeting on 910903 in Bethesda,MD.Pp 1-175.
Author Affiliation:
NRC - INCIDENT INVESTIGATION TEAM Accession Number:
ML17058B639 Document Date:
Sat Sep 07 06:00:00 EDT 1991 Document
Title:
Transcript of info exchange meeting on 910907 in Bethesda, MD.Pp 1-101.
Author Affiliation:
NRC - INCIDENT INVESTIGATION TEAM Accession Number:
ML17058B722 Document Date:
Fri Aug 31 06:00:00 EDT 1990 Document
Title:
Rev 2 to, "24 Volt DC Distribution."
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17058B734 Document Date:
Fri Jan 12 06:00:00 EST 1990 Document
Title:
Rev 3 to operating procedure N2-OP-97, "Reactor Protection Sys."
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17058B736 Document Date:
Mon Aug 18 06:00:00 EDT 1986 Document
Title:
Rev 2 to operating procedure N2-OP-96, "Reactor Manual Control & Rod Position Indication Sys."
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML17059A091 Document Date:
Thu Oct 28 06:00:00 EDT 1993 Document
Title:
LER 93-001-01:on 930105,ESF actuation occurred due to equipment failure.Root cause of event was radio frequency interference.Util eliminated use of radios in switchgear rooms & evaluated use of delay circuits.W/931028 ltr.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML18037A034 Document Date:
Thu Sep 13 06:00:00 EDT 1984
9 Document
Title:
Forwards responses to SER Open Items 421.3,4,10,13,15,18,20, 23,25,27,28,34,36,37,42,43,44 & 47,to aid in NRC review of application for license.Info will be included in next FSAR amend.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML18037A121 Document Date:
Fri Feb 08 06:00:00 EST 1985 Document
Title:
Suppl 8 to environ rept - OL stage.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML18038A091 Document Date:
Wed Nov 20 06:00:00 EST 1985 Document
Title:
Forwards proof & review Tech Specs per 851118 discussion. Review should identify areas inconsistent w/FSAR or as-built plant.
Author Affiliation:
NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
Accession Number:
ML18038A109 Document Date:
Mon Dec 30 06:00:00 EST 1985 Document
Title:
Forwards marked-up proof & review Tech Specs,reflecting comments based on review against current plant design.SAR & Tech Spec verification program continuing.Changes will be incorporated during branch review process.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML18038A372 Document Date:
Tue Sep 10 06:00:00 EDT 1991 Document
Title:
Forwards Rev 1 to "Root Cause Rept for Exide Uninterruptible Power Supplies (UPS) 1A,B,C,D & G Trip Event of 910813" & responses to root cause analysis,short term corrective plan,load lists & procedures & training.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML18038A374 Document Date:
Mon Sep 09 06:00:00 EDT 1991 Document
Title:
Rev 1 to "Root Cause Rept for Exide UPS 1A,B,C,D & G Trip Event of 910813." Electrical fault on B phase main step-up transformer occurred due to improper design.Logic power supply for subj UPS units to be modified.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML18038A375 Document Date:
Thu Sep 05 06:00:00 EDT 1991
10 Document
Title:
"Niagara Mohawk Nine Mile Point Unit 2 Event of 910813."
Author Affiliation:
GENERAL ELECTRIC CO.
Document Report Number: NUREG-1455 Accession Number:
ML18038A389 Document Date:
Wed Feb 17 06:00:00 EST 1988 Document
Title:
LER 88-001-00:on 880120,reactor scram occurred due to actual low water level condition.Caused by design & personnel errors.Operator disciplined & mod addressed inadvertent feedwater control valve lockup.W/880217 ltr.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML18038A470 Document Date:
Mon May 15 06:00:00 EDT 1989 Document
Title:
LER 89-014-00:on 890413,unit reactor experienced reactor scram which was result of turbine trip due to actuation of generator protection circuitry.Turbine trip caused by disconnected wire.Wire relanded.W/890515 ltr.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML18038A499 Document Date:
Mon Dec 30 06:00:00 EST 1991 Document
Title:
Forwards Rev 24 to site emergency plan & Rev 15 to EPIP S-EPP-2, "Fire Fighting," Rev 13 to Emergency Preparedness Procedure S-EPP-5, "Station Evacuation"
& Rev 8 to EPIP S-EPP-19, "Site Evacuation Procedure."
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML18041A031 Document Date:
Tue Dec 13 06:00:00 EST 1994 Document
Title:
Forwards emergency plan maintenance procedure EPMP-EPP-08, Rev 02, "Maintenance,Testing & Operation of Oswego County Prompt Notification Sys."
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML18041A286 Document Date: Mon Dec 31 06:00:00 EST 1984 Document
Title:
"Exide Electronics Model 1105." Supporting documentation & five oversize drawings encl.
Author Affiliation: STONE & WEBSTER ENGINEERING CORP.
Accession Number:
11 Document Date:
Sat Sep 07 06:00:00 EDT 1991 Document
Title:
"Main Transformer Rept for Event of 910813."
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML20044H209 Document Date:
Mon May 24 06:00:00 EDT 1993 Document
Title:
Insp repts 50-220/93-06 & 50-410/93-06 on 930411-0508.Major areas inspected:plant operations,radiological controls, maint,surveillance,emergency planning,security
& safety assessment/quality verification activities.
Author Affiliation:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Accession Number:
ML20056C166 Document Date:
Fri Mar 12 06:00:00 EST 1993 Document
Title:
Insp repts 50-220/93-01 & 50-410/93-01 on 930124-0227. Violations noted.Major areas inspected:plant operations, radiological controls,maintenance,surveillance,security & safety assessment/quality verification activities.
Author Affiliation:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Accession Number:
ML20062M238 Document Date:
Tue Dec 28 06:00:00 EST 1993 Document
Title:
Provides results of Nine Mile Point Unit 2 plant specific technical assessment for instruments assumed to operate in USAR Chapters 6 & 15 & for which Instrument Setpoint Methodology Group calculations developed,per TR NEDC-31336.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML20066G358 Document Date:
Tue Jun 11 06:00:00 EDT 1985 Document
Title:
Forwards proposed implementing license condition & listing of revs to SER statement for plant re physical security plan.
Author Affiliation:
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Accession Number:
ML20070D160 Document Date:
Fri Jun 24 06:00:00 EDT 1994 Document
Title:
Insp repts 50-220/94-07 & 50-410/94-07 on 940417-0528. Violations noted.Major areas inspected:plant operations, maint,engineering,plant support & safety assessment/quality verification.
Author Affiliation:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
12 Accession Number:
ML20073C571 Document Date:
Thu Sep 08 06:00:00 EDT 1994 Document
Title:
Insp repts 50-220/94-13 & 50-410/94-15 on 940710-0820.No violations noted.Major areas inspected:plant operations, maint,engineering & plant support.
Author Affiliation:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Accession Number:
ML20080H840 Document Date:
Thu Jan 26 06:00:00 EST 1984 Document
Title:
IE Const Appraisal Insp Rept 50-410/83-18 on 831107-19 & 28-1209.Major areas inspected:detailed exam of selected hardware subsequent to QC insps,selective exam of procedures & representative records & observation of in process work.
Author Affiliation:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Accession Number:
ML20087N144 Document Date:
Sat Mar 31 06:00:00 EST 1984 Document
Title:
Suppl 6 to environ rept - OL stage.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML20091J357 Document Date:
Mon Jan 06 06:00:00 EST 1992 Document
Title:
Identifies & assigns responsibility for generic & plant-specific actions resulting from investigations of 910813 incident at Unit 2 (NUREG-1455).Staff actions resulting from subj incident encl.
Author Affiliation:
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Accession Number:
ML20204C399 Document Date:
Wed Mar 18 06:00:00 EST 1987 Document
Title:
LER 86-011-01:on 861127 & 1208,automatic initiation of standby gas treatment sys Divs I & II occurred.Caused by spurious reactor bldg exhaust ventilation duct high radiation signals.Accumulator added to lines.W/870318 ltr.
Author Affiliation:
NIAGARA MOHAWK POWER CORP.
Accession Number:
ML031060589 Document Date:
Thu Mar 17 00:00:00 EST 1994 Document
Title:
NRC Information Notice 1994-020: Common-Cause Failures Due to Inadequate Design Control and Dedication.
13 Author Affiliation:
NRC/NRR Accession Number:
ML031070324 Document Date:
Fri Sep 17 00:00:00 EDT 1993 Document
Title:
NRC Information Notice 1993-075: Spurious Tripping of Low-Voltage Power Circuit Breakers with GE RMS-9 Digital Trip Units.
Author Affiliation:
NRC/NRR Accession Number:
ML031130479 Document Date:
Fri Dec 04 00:00:00 EST 1987 Document
Title:
NRC Information Notice 1987-060: Depressurization of Reactor Coolant Systems in Pressurized-Water Reactors.
Author Affiliation:
NRC/NRR Accession Number:
ML031190235 Document Date:
Tue Sep 24 00:00:00 EDT 1991 Document
Title:
NRC Information Notice 1991-060: False Alarms of Alarm Ratemeters Because of Radiofrequency Interference.
Author Affiliation:
NRC/NMSS/IMNS Accession Number:
ML031190579 Document Date:
Tue Mar 05 00:00:00 EST 1991 Document
Title:
NRC Information Notice 1991-014: Recent Safety-Related Incidents at Large Irradiators.
Author Affiliation:
NRC/NRR Accession Number:
ML031190682 Document Date:
Mon Feb 04 00:00:00 EST 1991 Document
Title:
NRC Information Notice 1991-007: Maintenance Deficiency Associated with General Electric Horizontal Custom 8000 Induction Motors.
Author Affiliation:
NRC/NRR Accession Number:
ML031220597 Document Date:
Mon Mar 10 00:00:00 EST 1986 Document
Title:
NRC Information Notice 1986-015: Loss of Offsite Power Caused by Problems in Fiber Optics Systems.
Author Affiliation:
NRC/IE
14 Accession Number:
ML031250230 Document Date:
Tue Dec 02 00:00:00 EST 1986 Document
Title:
NRC Information Notice 1986-098: Offsite Medical Services.
Author Affiliation:
NRC/IE Accession Number:
ML082670424 Document Date:
Wed Feb 15 06:00:00 EST 1984 Document
Title:
IE Info Notice 83-63,Suppl 1, "Potential Failures of Westinghouse Type SA-1 Differential Relays." Svc list encl.
Author Affiliation:
NRC/IE