NMP2L2877 April 19, 2024 U.S. Nuclear Regulatory Commission Attn:
Appendix              B
Document Control Desk Washington, DC 20555-0001  
 
NMP2L2877 April 19, 2024
 
U                 .S. Nuclear           Regulatory                 Commission Attn:                                 Document                                         Control     Desk Washington                                 , DC 20555-0001
 
Nine Mile Point Nuclear          Station, Unit      2 Renewed                        Facility Operating License      No          . NPF-69 Docket      No            . 50-410


==Subject:==
==Subject:==
2023   Annual                               Environmental                         Operating             Report
Nine Mile Point Nuclear Station, Unit 2 Renewed Facility Operating License No. NPF-69 Docket No. 50-410 2023 Annual Environmental Operating Report Appendix B In accordance with Appendix B, Environmental Protection Plan, of the Renewed Facility Operating License No. NPF-69 for Nine Mile Point Nuclear Station, Unit 2, attached is the 2023 Annual Environmental Operating Report for the period of January 1, 2023 through December 31, 2023.
 
This submittal does not contain any new regulatory commitments.
In                         accordance                                                                       with Appendix                         B ,             Environmental                                     Protection               Plan           ,             of           the       Renewed                                         Faci    lity Operating License     No           . NPF-69 for Nine Mile Point Nuclear           Station, Unit       2 , attached             is the 2023 Annual                                     Environmental                               Operating Report for the period of   January                                                       1,     2023     through             December 31       , 2023 .
Should you have questions regarding the information in this submittal, please contact Brandon Shultz, Site Regulatory Assurance Manager, at (315) 349-7012.
 
Sincerely,  
Th  is submittal does           not           contain                         any                                   new                   regulatory         commitments                           .
~
 
M UfL~-
Should             you                                   have             questions         regarding   the information                 in this submittal,   please contact                             Brandon Shultz, Site Regulatory               Assurance                               Manager                         , at (315)   349-7012 .
Peter M. Orphanos Site Vice President, Nine Mile Point Nuclear Station PMO/EEK  
 
Sincerely,
~                                                                                                                                                                                                                                                                                     M                                       UfL~-
 
Peter M . Orphanos Site Vice           President, Nine Mile Point Nuclear           Station
 
PMO/EEK
 
Enclosure                    :                                                              Nine Mile Point Nuclear            Station, Un                            it 2 2023  Annual                                Environmenta                                    l Operating Report
 
cc              :                                                              NRC      Regional          Administrator, Region            I NRC      Project Manager NRC    Resident Inspector Enclosure
 
Nine  Mile Point    Nuclear              Station,        Unit          2
 
2023 Annual                                    Environmental                                    Operating      Report ATTACHMENT
 
NMPNS        UNIT        2  2023    ANNUAL        ENVIRONMENTAL                              OPERATING                        REPORT
 
Subsection                        5 .4.1              of      the              Environmental                              Protection                      Plan              (EPP),                  as            contained                                in              Appendix                        B            of      the Renewed              Operating                  License              for          the        Nine            Mile            Point          Nuclear                Station                Unit          2,          requires                that          an          Annual Environmental                        Operating                Report                be        submitted                  to        the          Commission                          prior            to          May                  l          of  each            year.                                  The following                  addresses                  the            requirements                      found                    in              Subsection                      5.4.1            of    the          EPP            for          the            submittal                  of    the Annual        Environmental                  Operating            Report:
: 1.                                    Provide    summaries      and  analyses    of the  results  of the  environmental    protection        activities    required by  Subsection  4.2    (if any)      of the    EPP  for        the  report    period,          including    a      comparison          with related preoperational                        studies,            operational                  controls                  (as                appropriate),                  and        previous                  non-radiological environmental                monitoring              reports,                and              an                assessment          of the            observed                impacts            of the        plant operation                  on              the          environment.                          If harmful              effects    or              evidence        of trends              towards              irreversible damage            to    the    environment    are          observed,      a      detailed      analysis      of the  data        and    a  proposed        course of mitigating  action  shall    be provided.
 
Subsection          4.2    of the    EPP  denotes        three      areas    of environmental                    monitoring:
* Subsection              4.2.1        (Aquatic          Monitoring)            has        no      specific          monitoring                requirements                although it      is    noted      that    the    Commission                  will      rely      on    the    decisions            made        by    the    State      of New      York under              the            authority                  of      the            Clean                Water                Act          (CW A)              for            any                requirements.                                            Aquatic monitoring                            is            specified                      in            the          station's                      State              Pollutant                  Discharge                  Elimination                      System Permit              (SPDES                  Permit)              which                  is          a        site            permit            applicable                    to        Nine              Mile            Point        Nuclear Station              Unit              I        and          Unit            2.                      The          SPDES              Permit              requires              a          limited              Aquatic                Monitoring Program            (referred            to        in      the      permit            as      Biological            Monitoring              Requirements)                    which,        at    the present              time,                      is            only              applicable                  to            Unit                      1.                                Unit            2              is                in            compliance                        with              the          CW A.
Therefore,              no    Aquatic        Monitoring              Program              is      presently          required          for    Unit    2.
* Subsection          4.2.2      (Terrestrial            Monitoring)          does    not    contain        any      monitoring              requirements.
* Subsection            4.2.3      (Noise      Monitoring)            does      not  contai\\1 any        monitoring              requirements.
: 2.                                Provide        a  list  of EPP      non-compliances  and  corrective    actions  taken  to    remedy    them.
 
A    review        of the      EPP      requirements                and        plant      records          showed        that      there        were        no      non-compliances with    the    EPP    requirements              during      2023.
: 3.                                    Provide              a            list        of all            changes              in            station            design          or            operation,                tests,          and            experiments          made              in accordance                        with                EPP                    Subsection                3.1                  which              involved              a            potentially                      significant                  unreviewed environmental    question (non-radiological).


A            review                of      plant              records,                 including                environmental                            evaluations,                      showed                  that              there              were                      no changes              in      station        design/operation,        tests,       or  experiments                during        2023        that      could        have          involved                a potentially            significant          unreviewed            environmental                  question        (non-radiological).
==Enclosure:==
Nine Mile Point Nuclear Station, Unit 2 2023 Annual Environmental Operating Report cc:
NRC Regional Administrator, Region I NRC Project Manager NRC Resident Inspector


Page        I  of2
Enclosure Nine Mile Point Nuclear Station, Unit 2 2023 Annual Environmental Operating Report
./.                      List all non-routine    reports    submilled  in accordance          with Subsection 5 . ./.2 of the EPP.


During      2023,       there        were        no      non-routine            reports       submitted                to     the     Commission                         in   accordance              with Subsection           5.4.2     of the     EPP.
ATTACHMENT NMPNS UNIT 2 2023 ANNUAL ENVIRONMENTAL OPERATING REPORT Subsection 5.4.1 of the Environmental Protection Plan (EPP), as contained in Appendix B of the Renewed Operating License for the Nine Mile Point Nuclear Station Unit 2, requires that an Annual Environmental Operating Report be submitted to the Commission prior to May l of each year. The following addresses the requirements found in Subsection 5.4.1 of the EPP for the submittal of the Annual Environmental Operating Report:
: 1.
Provide summaries and analyses of the results of the environmental protection activities required by Subsection 4.2 (if any) of the EPP for the report period, including a comparison with related preoperational studies, operational controls (as appropriate), and previous non-radiological environmental monitoring reports, and an assessment of the observed impacts of the plant operation on the environment. If harmful effects or evidence of trends towards irreversible damage to the environment are observed, a detailed analysis of the data and a proposed course of mitigating action shall be provided.
Subsection 4.2 of the EPP denotes three areas of environmental monitoring:
Subsection 4.2.1 (Aquatic Monitoring) has no specific monitoring requirements although it is noted that the Commission will rely on the decisions made by the State of New York under the authority of the Clean Water Act (CW A) for any requirements.
Aquatic monitoring is specified in the station's State Pollutant Discharge Elimination System Permit (SPDES Permit) which is a site permit applicable to Nine Mile Point Nuclear Station Unit I and Unit 2. The SPDES Permit requires a limited Aquatic Monitoring Program (referred to in the permit as Biological Monitoring Requirements) which, at the present time, is only applicable to Unit 1.
Unit 2 is in compliance with the CW A.
Therefore, no Aquatic Monitoring Program is presently required for Unit 2.
Subsection 4.2.2 (Terrestrial Monitoring) does not contain any monitoring requirements.
Subsection 4.2.3 (Noise Monitoring) does not contai\\1 any monitoring requirements.
: 2.
Provide a list of EPP non-compliances and corrective actions taken to remedy them.
A review of the EPP requirements and plant records showed that there were no non-compliances with the EPP requirements during 2023.
: 3.
Provide a list of all changes in station design or operation, tests, and experiments made in accordance with EPP Subsection 3.1 which involved a potentially significant unreviewed environmental question (non-radiological).
A review of plant records, including environmental evaluations, showed that there were no changes in station design/operation, tests, or experiments during 2023 that could have involved a potentially significant unreviewed environmental question (non-radiological).
Page I of2


Page 2 of2}}
./.
List all non-routine reports submilled in accordance with Subsection 5../.2 of the EPP.
During 2023, there were no non-routine reports submitted to the Commission in accordance with Subsection 5.4.2 of the EPP.
Page 2 of2}}

Latest revision as of 18:19, 24 November 2024

2023 Annual Environmental Operating Report
ML24136A102
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 04/19/2024
From: Orphanos P
Constellation Energy Generation
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMP2L2877
Download: ML24136A102 (1)


Text

Constellation~

NMP2L2877 April 19, 2024 U.S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555-0001

Subject:

Nine Mile Point Nuclear Station, Unit 2 Renewed Facility Operating License No. NPF-69 Docket No. 50-410 2023 Annual Environmental Operating Report Appendix B In accordance with Appendix B, Environmental Protection Plan, of the Renewed Facility Operating License No. NPF-69 for Nine Mile Point Nuclear Station, Unit 2, attached is the 2023 Annual Environmental Operating Report for the period of January 1, 2023 through December 31, 2023.

This submittal does not contain any new regulatory commitments.

Should you have questions regarding the information in this submittal, please contact Brandon Shultz, Site Regulatory Assurance Manager, at (315) 349-7012.

Sincerely,

~

M UfL~-

Peter M. Orphanos Site Vice President, Nine Mile Point Nuclear Station PMO/EEK

Enclosure:

Nine Mile Point Nuclear Station, Unit 2 2023 Annual Environmental Operating Report cc:

NRC Regional Administrator, Region I NRC Project Manager NRC Resident Inspector

Enclosure Nine Mile Point Nuclear Station, Unit 2 2023 Annual Environmental Operating Report

ATTACHMENT NMPNS UNIT 2 2023 ANNUAL ENVIRONMENTAL OPERATING REPORT Subsection 5.4.1 of the Environmental Protection Plan (EPP), as contained in Appendix B of the Renewed Operating License for the Nine Mile Point Nuclear Station Unit 2, requires that an Annual Environmental Operating Report be submitted to the Commission prior to May l of each year. The following addresses the requirements found in Subsection 5.4.1 of the EPP for the submittal of the Annual Environmental Operating Report:

1.

Provide summaries and analyses of the results of the environmental protection activities required by Subsection 4.2 (if any) of the EPP for the report period, including a comparison with related preoperational studies, operational controls (as appropriate), and previous non-radiological environmental monitoring reports, and an assessment of the observed impacts of the plant operation on the environment. If harmful effects or evidence of trends towards irreversible damage to the environment are observed, a detailed analysis of the data and a proposed course of mitigating action shall be provided.

Subsection 4.2 of the EPP denotes three areas of environmental monitoring:

Subsection 4.2.1 (Aquatic Monitoring) has no specific monitoring requirements although it is noted that the Commission will rely on the decisions made by the State of New York under the authority of the Clean Water Act (CW A) for any requirements.

Aquatic monitoring is specified in the station's State Pollutant Discharge Elimination System Permit (SPDES Permit) which is a site permit applicable to Nine Mile Point Nuclear Station Unit I and Unit 2. The SPDES Permit requires a limited Aquatic Monitoring Program (referred to in the permit as Biological Monitoring Requirements) which, at the present time, is only applicable to Unit 1.

Unit 2 is in compliance with the CW A.

Therefore, no Aquatic Monitoring Program is presently required for Unit 2.

Subsection 4.2.2 (Terrestrial Monitoring) does not contain any monitoring requirements.

Subsection 4.2.3 (Noise Monitoring) does not contai\\1 any monitoring requirements.

2.

Provide a list of EPP non-compliances and corrective actions taken to remedy them.

A review of the EPP requirements and plant records showed that there were no non-compliances with the EPP requirements during 2023.

3.

Provide a list of all changes in station design or operation, tests, and experiments made in accordance with EPP Subsection 3.1 which involved a potentially significant unreviewed environmental question (non-radiological).

A review of plant records, including environmental evaluations, showed that there were no changes in station design/operation, tests, or experiments during 2023 that could have involved a potentially significant unreviewed environmental question (non-radiological).

Page I of2

./.

List all non-routine reports submilled in accordance with Subsection 5../.2 of the EPP.

During 2023, there were no non-routine reports submitted to the Commission in accordance with Subsection 5.4.2 of the EPP.

Page 2 of2