ML23341A008: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML23341A008
| number = ML23341A008
| issue date = 12/07/2023
| issue date = 12/07/2023
| title = M231212: Slides - K. Wendtland - Discussion of the Administration'S Short- and Long-Term Domestic Uranium Fuel Strategy
| title = M231212: Slides - K. Wendtland - Discussion of the Administrations Short- and Long-Term Domestic Uranium Fuel Strategy
| author name = Wendtland K
| author name = Wendtland K
| author affiliation = NRC/OCM
| author affiliation = NRC/OCM
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Nuclear Regulatory Commission Short- and Long-Term Domestic Uranium Fuel Strategy and NRCs Readiness to Support Licensing Oversight Uranium Recovery Program Operations and License Applications in Wyoming NRC Commission December 12, 2023 Kyle Wendtland Wyoming Department of Environmental Quality Land Quality Division Administrator 1
{{#Wiki_filter:Nuclear Regulatory Commission Short-and Long-Term Domestic Uranium Fuel Strategy and NRCs Readiness to Support Licensing Oversight Uranium Recovery Program Operations and License Applications in Wyoming NRC Commission December 12, 2023 Kyle Wendtland Wyoming Department of Environmental Quality Land Quality Division Administrator 1


Conventional Mill/Tailings         In-situ Recovery
2 Conventional Mill/Tailings
: 1) Anadarko Bear Creek
: 2) ExxonMobil Highland
: 3) Orano LuckyMc
: 4) Umetco Gas Hills
: 5) Pathfinder Shirley Basin North
: 6) Kennecott Sweetwater In-situ Recovery
: 1) UR-Energy Lost Creek
: 1) UR-Energy Lost Creek
: 1) Anadarko Bear Creek
: 2) AUC Reno Creek
: 2) AUC Reno Creek
: 2) ExxonMobil Highland
: 3) Cameco Smith Ranch/Highland
: 3) Cameco Smith Ranch/Highland
: 3) Orano LuckyMc
: 4) UEC Uranium Corp. Willow Creek
: 4) UEC Uranium Corp. Willow Creek
: 4) Umetco Gas Hills
: 5) Strata Ross
: 5) Strata Ross
: 5) Pathfinder Shirley Basin North
: 6) Energy Fuels Nichols Ranch
: 6) Energy Fuels Nichols Ranch
: 6) Kennecott Sweetwater            7) UEC Wyoming Corp. Moore Ranch
: 7) UEC Wyoming Corp. Moore Ranch
: 8) Pathfinder Shirley Basin ISR 2
: 8) Pathfinder Shirley Basin ISR


Title II Site Summaries Company               Facility           Site Status Anadarko Petroleum     Bear Creek         Decommissioning - Near License Termination Corporation ExxonMobil Corporation Highland           Decommissioning Areva NC, Inc.         Lucky Mc Mill       Decommissioning Umetco Minerals       Gas Hills East     Decommissioning Corporation Pathfinder Mines       Shirley Basin North Accepting 11e.(2) waste Corporation Kennecott Uranium     Sweetwater Mill     Standby - company keeps all equipment Company                                    functional (4.1 Million Pounds of Yellowcake Annual Production Limit)
3 Title II Site Summaries Company Facility Site Status Anadarko Petroleum Corporation Bear Creek Decommissioning - Near License Termination ExxonMobil Corporation Highland Decommissioning Areva NC, Inc.
* Western Nuclear Inc. Split Rock         Decommissioning Complete Site Transferred to Department of Energy for Long Term Care and Maintenance 3
Lucky Mc Mill Decommissioning Umetco Minerals Corporation Gas Hills East Decommissioning Pathfinder Mines Corporation Shirley Basin North Accepting 11e.(2) waste Kennecott Uranium Company Sweetwater Mill Standby - company keeps all equipment functional (4.1 Million Pounds of Yellowcake Annual Production Limit)
* Western Nuclear Inc.
Split Rock Decommissioning Complete Site Transferred to Department of Energy for Long Term Care and Maintenance


ISR Licensed Annual Capacity Company       Facility               Site Status             Licensed Annual Production Capacity Cameco       1) Smith Ranch-Highland GW Restoration / Standby Resources
4 ISR Licensed Annual Capacity Company Facility Site Status Licensed Annual Production Capacity Cameco Resources
: 2) North Butte         GW Restoration / Standby Total capacity all sites 5.5 Million Pounds
: 1) Smith Ranch-Highland
: 3) Gas Hills           GW Restoration / Standby
: 2) North Butte
: 4) Ruth                 Not Yet Constructed
: 3) Gas Hills
: 5) Reynolds Ranch       Not Yet Constructed Energy Fuels Nichols Ranch           GW Restoration / Standby 2.0 Million Pounds Strata Energy Ross Facility           Producing               3.0 Million Pounds Inc.
: 4) Ruth
UEC Wyoming  1) Moore Ranch         Not Yet Constructed     3.0 Million Pounds Corp.
: 5) Reynolds Ranch GW Restoration / Standby GW Restoration / Standby GW Restoration / Standby Not Yet Constructed Not Yet Constructed Total capacity all sites 5.5 Million Pounds Energy Fuels Nichols Ranch GW Restoration / Standby 2.0 Million Pounds Strata Energy Inc.
4
Ross Facility Producing 3.0 Million Pounds UEC Wyoming Corp.
: 1) Moore Ranch Not Yet Constructed 3.0 Million Pounds


ISR Licensed Annual Capacity (Continued)
5 ISR Licensed Annual Capacity (Continued)
Company         Facility                   Site Status             Licensed Annual Production Capacity (continued)     2) Willow Creek             GW Restoration / Standby
Company Facility Site Status Licensed Annual Production Capacity (continued)
                *Christensen Ranch /Irigary UEC Uranium                                                          2.5 Million Pounds Corp.          3) Ludeman                 Not Yet Constructed Lost Creek ISR, Lost Creek                 Producing               2.2 Million Pounds LLC AUC LLC         Reno Creek                 Not Yet Constructed     2.0 Million Pounds Pathfinder     Shirley Basin ISR           Not Yet Constructed     2.0 Million Pounds Mines Corporation 5
UEC Uranium Corp.
: 2) Willow Creek  
*Christensen Ranch /Irigary
: 3) Ludeman GW Restoration / Standby Not Yet Constructed 2.5 Million Pounds Lost Creek ISR, LLC Lost Creek Producing 2.2 Million Pounds AUC LLC Reno Creek Not Yet Constructed 2.0 Million Pounds Pathfinder Mines Corporation Shirley Basin ISR Not Yet Constructed 2.0 Million Pounds


Wyoming Licensed Production Capacity Facility Type                                                                     Licensed Annual Production Capacity Title II Sites (conventional / surface) (Sweetwater)                               4.1 Million Pounds Producing (ISR) (Ross, Lost Creek)                                                 5.2 Million Pounds Standby (ISR) (Smith Ranch-Highland, North Butte, Gas Hills, Nichols Ranch, Willow 10 Million Pounds Creek)
6 Wyoming Licensed Production Capacity Facility Type Licensed Annual Production Capacity Title II Sites (conventional / surface) (Sweetwater) 4.1 Million Pounds Producing (ISR) (Ross, Lost Creek) 5.2 Million Pounds Standby (ISR) (Smith Ranch-Highland, North Butte, Gas Hills, Nichols Ranch, Willow Creek) 10 Million Pounds Not Yet Constructed (ISR) (Ruth, Reynolds Ranch, Moore Ranch, Ludeman, Reno Creek, Shirley Basin) 7 Million Pounds All Licensed Capacity (ISR) 22.2 Million Pounds All (Title II plus ISR) 26.3 Million Pounds
Not Yet Constructed (ISR) (Ruth, Reynolds Ranch, Moore Ranch, Ludeman, Reno       7 Million Pounds Creek, Shirley Basin)
All Licensed Capacity (ISR)                                                       22.2 Million Pounds All (Title II plus ISR)                                                           26.3 Million Pounds 6


Challenges to Production Increases Federal Regulatory Actions and Approvals (e.g. timely EPA aquifer exemption approvals)
7 Challenges to Production Increases Federal Regulatory Actions and Approvals (e.g. timely EPA aquifer exemption approvals)
Streamline and add certainty to the permitting process (e.g. clarification of EPAs role)
Streamline and add certainty to the permitting process (e.g. clarification of EPAs role)
Streamline and add certainty the NEPA process Supply chain and labor challenges Technical challenges (expected and unexpected)
Streamline and add certainty the NEPA process Supply chain and labor challenges Technical challenges (expected and unexpected)
Encourage exploration and new production Endangered species Litigation 7
Encourage exploration and new production Endangered species Litigation


Questions?
deq.wyoming.gov/land-quality/uranium/
deq.wyoming.gov/land-quality/uranium/
8}}
8 Questions?}}

Latest revision as of 07:35, 25 November 2024

M231212: Slides - K. Wendtland - Discussion of the Administrations Short- and Long-Term Domestic Uranium Fuel Strategy
ML23341A008
Person / Time
Issue date: 12/07/2023
From: Wendtland K
NRC/OCM
To:
Shared Package
ML23307A078 List:
References
M231212
Download: ML23341A008 (1)


Text

Nuclear Regulatory Commission Short-and Long-Term Domestic Uranium Fuel Strategy and NRCs Readiness to Support Licensing Oversight Uranium Recovery Program Operations and License Applications in Wyoming NRC Commission December 12, 2023 Kyle Wendtland Wyoming Department of Environmental Quality Land Quality Division Administrator 1

2 Conventional Mill/Tailings

1) Anadarko Bear Creek
2) ExxonMobil Highland
3) Orano LuckyMc
4) Umetco Gas Hills
5) Pathfinder Shirley Basin North
6) Kennecott Sweetwater In-situ Recovery
1) UR-Energy Lost Creek
2) AUC Reno Creek
3) Cameco Smith Ranch/Highland
4) UEC Uranium Corp. Willow Creek
5) Strata Ross
6) Energy Fuels Nichols Ranch
7) UEC Wyoming Corp. Moore Ranch
8) Pathfinder Shirley Basin ISR

3 Title II Site Summaries Company Facility Site Status Anadarko Petroleum Corporation Bear Creek Decommissioning - Near License Termination ExxonMobil Corporation Highland Decommissioning Areva NC, Inc.

Lucky Mc Mill Decommissioning Umetco Minerals Corporation Gas Hills East Decommissioning Pathfinder Mines Corporation Shirley Basin North Accepting 11e.(2) waste Kennecott Uranium Company Sweetwater Mill Standby - company keeps all equipment functional (4.1 Million Pounds of Yellowcake Annual Production Limit)

  • Western Nuclear Inc.

Split Rock Decommissioning Complete Site Transferred to Department of Energy for Long Term Care and Maintenance

4 ISR Licensed Annual Capacity Company Facility Site Status Licensed Annual Production Capacity Cameco Resources

1) Smith Ranch-Highland
2) North Butte
3) Gas Hills
4) Ruth
5) Reynolds Ranch GW Restoration / Standby GW Restoration / Standby GW Restoration / Standby Not Yet Constructed Not Yet Constructed Total capacity all sites 5.5 Million Pounds Energy Fuels Nichols Ranch GW Restoration / Standby 2.0 Million Pounds Strata Energy Inc.

Ross Facility Producing 3.0 Million Pounds UEC Wyoming Corp.

1) Moore Ranch Not Yet Constructed 3.0 Million Pounds

5 ISR Licensed Annual Capacity (Continued)

Company Facility Site Status Licensed Annual Production Capacity (continued)

UEC Uranium Corp.

2) Willow Creek
  • Christensen Ranch /Irigary
3) Ludeman GW Restoration / Standby Not Yet Constructed 2.5 Million Pounds Lost Creek ISR, LLC Lost Creek Producing 2.2 Million Pounds AUC LLC Reno Creek Not Yet Constructed 2.0 Million Pounds Pathfinder Mines Corporation Shirley Basin ISR Not Yet Constructed 2.0 Million Pounds

6 Wyoming Licensed Production Capacity Facility Type Licensed Annual Production Capacity Title II Sites (conventional / surface) (Sweetwater) 4.1 Million Pounds Producing (ISR) (Ross, Lost Creek) 5.2 Million Pounds Standby (ISR) (Smith Ranch-Highland, North Butte, Gas Hills, Nichols Ranch, Willow Creek) 10 Million Pounds Not Yet Constructed (ISR) (Ruth, Reynolds Ranch, Moore Ranch, Ludeman, Reno Creek, Shirley Basin) 7 Million Pounds All Licensed Capacity (ISR) 22.2 Million Pounds All (Title II plus ISR) 26.3 Million Pounds

7 Challenges to Production Increases Federal Regulatory Actions and Approvals (e.g. timely EPA aquifer exemption approvals)

Streamline and add certainty to the permitting process (e.g. clarification of EPAs role)

Streamline and add certainty the NEPA process Supply chain and labor challenges Technical challenges (expected and unexpected)

Encourage exploration and new production Endangered species Litigation

deq.wyoming.gov/land-quality/uranium/

8 Questions?