{{#Wiki_filter:7 December 9,1993 Docket Nos. 50-321, 50-366,                 DISTRIBUTION 50-424, and 50-425           tDocket File 1         ACRS (10)
{{#Wiki_filter:7 December 9,1993 Docket Nos. 50-321, 50-366, DISTRIBUTION 50-424, and 50-425 tDocket File 1 ACRS (10)
NRC/L:> cal PDRs     OGC Mr. Jack D. Woodard                         PDII-3 Reading       W. Haass, 904 Senior Vice President -                     K.Jabbour Nuclear Operations                       G. Carpenter Georgia Power Company                       L. Berry P. O. Box 1295                             G.Lainas Birmingham, Alabama 35201                   S.Varga E.Merschoff,RII
NRC/L:> cal PDRs OGC Mr. Jack D. Woodard PDII-3 Reading W. Haass, 904 Senior Vice President -
K.Jabbour Nuclear Operations G. Carpenter Georgia Power Company L. Berry P. O. Box 1295 G.Lainas Birmingham, Alabama 35201 S.Varga E.Merschoff,RII


==Dear Mr. Woodard:==
==Dear Mr. Woodard:==
==SUBJECT:==
==SUBJECT:==
PART 21 MONTHLY REPORT FOR NOVEMBER 1993 HATCH NUCLEAR PLANT, UNITS 1 AND 2; AND V0GTLE NUCLEAR PLANT, UNITS 1 AND 2 In order to provide expeditious dissemination of 10 CFR Part 21 matters, the U.S. Nuclear Regulatory Commission (NRC) will mail a copy of its 10 CFR Part 21 monthly report to licensees of nuclear power plants. The enclosed November 1993 monthly report is the initial mailing. These reports will continue to be made available to the public at the NRC public document room and at the local public document rooms.
PART 21 MONTHLY REPORT FOR NOVEMBER 1993 HATCH NUCLEAR PLANT, UNITS 1 AND 2; AND V0GTLE NUCLEAR PLANT, UNITS 1 AND 2 In order to provide expeditious dissemination of 10 CFR Part 21 matters, the U.S. Nuclear Regulatory Commission (NRC) will mail a copy of its 10 CFR Part 21 monthly report to licensees of nuclear power plants.
The enclosed November 1993 monthly report is the initial mailing. These reports will continue to be made available to the public at the NRC public document room and at the local public document rooms.
If you do not wish to receive this report, or you have a specific contact other than yourself, please provide this information to Walter P. Haass, U.S. Nuclear Regulatory Commission, OWFN, M/S 9D4, Washington, DC 20555.
If you do not wish to receive this report, or you have a specific contact other than yourself, please provide this information to Walter P. Haass, U.S. Nuclear Regulatory Commission, OWFN, M/S 9D4, Washington, DC 20555.
Sincerely,
Sincerely,
                                                  /s/
/s/
Loren R. Plisco, Acting Director Project Directorate II-3 Division of Reactor Projects - III Office of Nuclear Reactor Regulation
Loren R. Plisco, Acting Director Project Directorate II-3 Division of Reactor Projects - III Office of Nuclear Reactor Regulation


==Enclosure:==
==Enclosure:==
Part 21 Monthly Report for November 1993 cc w/o enclosure:
Part 21 Monthly Report for November 1993 cc w/o enclosure:
See next page                                         ./
See next page
om           PDIl-3/LA ) PDII-3/PM[ PDII-3/Pt       PDII-hj/
./
hw L.BERRfh K.JABBOUk GCARPENTb L.PLI[C0 om            12/ h /93 12/ 9 /93 12 / '') /93 12/ 9 /93                       _~
om PDIl-3/LA )
0FFICIAL RECORD COPY FILE NAME: G:\PART21/LTR O
PDII-3/PM[ PDII-3/Pt PDII-hj/
140048                                          y'O 9312160337 931209 hC &           95 h   t DR    ADOCK 0500      1                              Q,({h ggg&
L.BERRfh K.JABBOUk GCARPENTb L.PLI[C0 hw 12/ h /93 12/ 9 /93 12 / '')
                                                                    , ,. tr -   t"
/93 12/ 9 /93 om
_~
0FFICIAL RECORD COPY FILE NAME: G:\\PART21/LTR O
y'O 140048 hC &
95 h t
9312160337 931209 Q,({h gg&
g,,.
tr -
t" DR ADOCK 0500 1


8 8f G 4
8 8f G 4
y d         .k
d
    ;              E                       UNITED STATES                                 ,
.k y
i'             f           NUCLEAR PEGULATORY COMMISSION
E UNITED STATES i'
    %          ,#                      WASHINGTON D.C. 20S55-0001
f NUCLEAR PEGULATORY COMMISSION WASHINGTON D.C. 20S55-0001 December 9, 1993 Docket Nos. 50-321, 50-366, 50-424, and 50-425 Mr. Jack D. Woodard Senior Vice President -
        ***** '                          December 9, 1993 Docket Nos. 50-321, 50-366, 50-424, and 50-425 Mr. Jack D. Woodard                                                           .;
Nuclear Operations Georgia Power Company P. O. Box 1295 Birmingham, Alabama 35201
Senior Vice President -
Nuclear Operations Georgia Power Company P. O. Box 1295                                                                   :
Birmingham, Alabama 35201


==Dear Mr. Woodard:==
==Dear Mr. Woodard:==
==SUBJECT:==
==SUBJECT:==
PART 21 MONTHLY REPORT FOR NOVEMBER 1993 HATCH NUCLEAR PLANT, UNITS 1 AND 2; AND V0GTLE NUCLEAR PLANT, UNITS 1 AND 2 In order to provide expeditious dissemination of 10 CFR Part 21 matters, the U.S. Nuclear Regulatory Commission (NRC) will mail a copy of its 10 CFR Part 21 monthly report to licensees of nuclear power plants. The         -
PART 21 MONTHLY REPORT FOR NOVEMBER 1993 HATCH NUCLEAR PLANT, UNITS 1 AND 2; AND V0GTLE NUCLEAR PLANT, UNITS 1 AND 2 In order to provide expeditious dissemination of 10 CFR Part 21 matters, the U.S. Nuclear Regulatory Commission (NRC) will mail a copy of its 10 CFR Part 21 monthly report to licensees of nuclear power plants. The enclosed November 1993 monthly report is the initial mailing. These reports will continue to be made available to the public at the NRC public document room and at the local public document rooms.
enclosed November 1993 monthly report is the initial mailing. These reports will continue to be made available to the public at the NRC public document room and at the local public document rooms.
If you do not wish to receive this report, or you have a specific contact other than yourself, please provide this information to Walter P. Haass, U.S. Nuclear Regulatory Commission, 0WFN, M/S 9D4, Washington, DC 20555.
If you do not wish to receive this report, or you have a specific contact other than yourself, please provide this information to Walter P. Haass, U.S. Nuclear Regulatory Commission, 0WFN, M/S 9D4, Washington, DC 20555.
Sincerely, Loren R. Plisco, Acting Director       :
Sincerely, Loren R. Plisco, Acting Director Project Directorate II-3 Division of Reactor Projects - III Office of Nuclear Reactor Regulation
Project Directorate II-3 Division of Reactor Projects - III Office of Nuclear Reactor Regulation


==Enclosure:==
==Enclosure:==
Part 21 Monthly Report for November 1993 cc w/o enclosure:
Part 21 Monthly Report for November 1993 cc w/o enclosure:
See next page                                                                   ,
See next page l
l h
h 9
9


4 J-rE             a                     m. s Edwin I. Hatch Nuclear Plant Georgia Power Company               Vogtle Electric Generating Plant   -
4 J-rE a
cc:
m.
Mr. Ernest L. Blake, Jr.           Mr. Alan R. Herdt, Chief Shaw, Pittman, Potts and Trowbridge Project Branch #3 2300 N Street, NW.                 U. S. Nuclear Regulatory Commission ,
s Edwin I. Hatch Nuclear Plant Georgia Power Company Vogtle Electric Generating Plant cc:
Washington, DC 20037               101 Marietta Street, NW, Suite 2900 '
Mr. Ernest L. Blake, Jr.
Atlanta, Georgia 30323 Mr. J. T. Beckham, Jr.                                                 ;
Mr. Alan R. Herdt, Chief Shaw, Pittman, Potts and Trowbridge Project Branch #3 2300 N Street, NW.
Vice President - Plant Hatch       Mr. Dan H. Smith, Vice President Georgia Power Company               Power Supply Operations             ,
U. S. Nuclear Regulatory Commission Washington, DC 20037 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. J. T. Beckham, Jr.
P. O. Box 1295                     Oglethorpe Power Corporation Birmingham, Alabama 35201           2100 East Exchange Place Turker, Georgia 30085-1349         j Mr. S. J. Jethay                                                         ,
Vice President - Plant Hatch Mr. Dan H. Smith, Vice President Georgia Power Company Power Supply Operations P. O. Box 1295 Oglethorpe Power Corporation Birmingham, Alabama 35201 2100 East Exchange Place Turker, Georgia 30085-1349 j
Manager Licensing - Hatch           Charles A. Patrizia, Esquire       ,
Mr. S. J. Jethay Manager Licensing - Hatch Charles A. Patrizia, Esquire Georgia Power Company Paul, Hastings, Janofsky & Walker P. O. Box 1295 12th Floor Birmingham, Alabama 35201 1050 Connecticut Avenue, NW.
Georgia Power Company               Paul, Hastings, Janofsky & Walker   >
Washington, DC 20036 Mr. L. Sumner General Manager, Nuclear Plant Georgia Power Company Route 1, Box 439 Baxley,. Georgia 31513 Resident Inspector U. S. Nuclear Regulatory Commission Route 1, Box 725 Baxley, Georgia 31513 l
P. O. Box 1295                     12th Floor                         :
Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, NW. Suite 2900 i
Birmingham, Alabama 35201           1050 Connecticut Avenue, NW.
Atlanta, Georgia 30323 Mr. Charles H. Badger Office of Planning and Budget Room 610 1
Washington, DC 20036 Mr. L. Sumner General Manager, Nuclear Plant Georgia Power Company Route 1, Box 439                                                       ;
270 Washington Street, SW.
Baxley,. Georgia 31513                                                 '
l Atlanta, Georgia 30334 Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE., Suite 1252 Atlanta, Georgia 30334 Chairman I
Resident Inspector U. S. Nuclear Regulatory Commission Route 1, Box 725 Baxley, Georgia 31513 l
Appling County Commissioners County Courthouse Baxley, Georgia 31513 i
Regional Administrator, Region II U. S. Nuclear Regulatory Commission                                     ;
101 Marietta Street, NW. Suite 2900                                     i Atlanta, Georgia 30323 Mr. Charles H. Badger Office of Planning and Budget Room 610                                                               1 270 Washington Street, SW.                                             l Atlanta, Georgia 30334 Harold Reheis, Director Department of Natural Resources                                         !
205 Butler Street, SE., Suite 1252                                     ;
Atlanta, Georgia 30334                                                 '
Chairman I
Appling County Commissioners County Courthouse                                                         I Baxley, Georgia 31513                                                     ;
i l
I


4   4 k
4 4
1 Edwin I. Hatch Nuclear Plant Georgia Power Company           Vogtle Electric Generating Plant cc:
k 1
Mr. J. A. Bailey                 Office of the County Commissioner Manager - Licensing             Burke County Commission Georgia Power Company           Waynesboro, Georgia 30830                                       ,
Edwin I. Hatch Nuclear Plant Georgia Power Company Vogtle Electric Generating Plant cc:
P. O. Box 1295                                                                                   '
Mr. J. A. Bailey Office of the County Commissioner Manager - Licensing Burke County Commission Georgia Power Company Waynesboro, Georgia 30830 P. O. Box 1295 Birmingham, Alabama 35201 Resident inspector U. S. Nuclear Regulatory Commission Mr. J. B. Beasley P. O. Box 572 General Manager, Vogtle Electric Waynesboro, Georgia 30830 Generating Plant P. O. Box 1600 Mr. J. D. Woodard Waynesboro, Georgia 30830 Senior Vice President -
Birmingham, Alabama 35201       Resident inspector U. S. Nuclear Regulatory Commission                             ,
Nuclear Operations Office of Planning and Budget Georgia Power Company Room 615B P. O. Box 1295 270 Washington Street, SW.
Mr. J. B. Beasley               P. O. Box 572                                                   '
Birmingham, Alabama 35201 4
General Manager, Vogtle Electric Waynesboro, Georgia 30830 Generating Plant P. O. Box 1600                   Mr. J. D. Woodard Waynesboro, Georgia 30830       Senior Vice President -
Atlanta, Georgia 30334 Mr. C. K. McCoy Attorney General Vice President - Nuclear Law Department Vogtle Project 132 Judicial Building Georgia Power Company Atlanta, Georgia 30334 P. O. Box 1295 Birmingham, Alabama 35201 Arthur H. Domby, Esquire Troutman Sanders NationsBank Plaza 600 Peachtree Street, NE.
Nuclear Operations Office of Planning and Budget   Georgia Power Company Room 615B                       P. O. Box 1295 270 Washington Street, SW.       Birmingham, Alabama 35201                                       4 Atlanta, Georgia 30334 Mr. C. K. McCoy Attorney General                 Vice President - Nuclear Law Department                   Vogtle Project 132 Judicial Building           Georgia Power Company Atlanta, Georgia 30334           P. O. Box 1295 Birmingham, Alabama 35201                                       .
Suite 5200 l
Arthur H. Domby, Esquire Troutman Sanders NationsBank Plaza 600 Peachtree Street, NE.                                                                         l Suite 5200                                                                                         l Atlanta, Georgia 30308-2216 i
Atlanta, Georgia 30308-2216 i


_.x-     .
_.x-
                                                                            . - ~ . , , + >                 --. .              .          . . . .
. - ~.,, + >
4 PcBe b ' .       1 11/30s.3 10 CFR PART 21 ftACKIWG ST$ TEM
4 PcBe b '.
1 11/30s.3 10 CFR PART 21 ftACKIWG ST$ TEM
{
{
VEuoDR fuSPEtflou BRANCH                                                         l DIVl$1Du OF REACTOR 1mEPECT10m AND LICEk1EE PERFDt4ANCE                                           I LOG 8 *?B     R E PDa 7 ACCES$!Dn A55tGhED                 CLO$ DE$CRIPflDW                                                                     [
VEuoDR fuSPEtflou BRANCH l
ah?' DAtt         kg.gEt                             DUT tESO                                                 CDC E C U. E                                                                                                                                     #
DIVl$1Du OF REACTOR 1mEPECT10m AND LICEk1EE PERFDt4ANCE I
      $1.15 CPL 10/22/s3                       Evle: W.m AA 55           CAROLINA P&L/RDelmsDa 2 kEpotTS FAltuff 0F EDG p to EtAtt DUC t
LOG 8 *?B R E PDa 7 ACCES$!Dn A55tGhED CLO$ DE$CRIPflDW
[
ah?' DAtt kg.gEt DUT tESO CDC E C U. E
$1.15 CPL 10/22/s3 Evle: W.m AA 55 CAROLINA P&L/RDelmsDa 2 kEpotTS FAltuff 0F EDG p to EtAtt DUC t
I67L TDSADKEN $PalmGs ON THREE OF THE Alt staff Distal 80 TOR VALVES PREVEstikG AIR FROM ENTER 1tG CYLINDEt$ REDUIRED TO ROLL DIESEL.
I67L TDSADKEN $PalmGs ON THREE OF THE Alt staff Distal 80 TOR VALVES PREVEstikG AIR FROM ENTER 1tG CYLINDEt$ REDUIRED TO ROLL DIESEL.
DUE Bt: 1/3/9e             sPRIuGS WERE SEPL ACED BROKEm SPalWG3 SElWG EVALUATED.
DUE Bt: 1/3/9e sPRIuGS WERE SEPL ACED BROKEm SPalWG3 SElWG EVALUATED.
93 16 8120 11/C1/43 Rvit:G.CWALihA CTSI FISCMER 8 Pot 1Et REPotf S DEVI AflDW IN TEST!bG MEinDDOLOGY FDA                     !
93 16 8120 11/C1/43 Rvit:G.CWALihA CTSI FISCMER 8 Pot 1Et REPotf S DEVI AflDW IN TEST!bG MEinDDOLOGY FDA REC
                                                                                                                                                          +
+
REC CL AMP On utfRA$Dw!C FLOW METEts V5ED ON 12" SCM 4D PIPE CARRYlmG Cet WATER. BUTTERFLT VALVE IN TEST $ETUP CAUSE LO FLOW INDICAf!Du, DUE SY: 1/3/9e             LICENSEES MAVE BEEK N0flFIED. EEE LOG 893417/95438.
CL AMP On utfRA$Dw!C FLOW METEts V5ED ON 12" SCM 4D PIPE CARRYlmG Cet WATER. BUTTERFLT VALVE IN TEST $ETUP CAUSE LO FLOW INDICAf!Du, DUE SY: 1/3/9e LICENSEES MAVE BEEK N0flFIED. EEE LOG 893417/95438.
93417 7~20 11/C1/43                       tv!0t R. Wilson           F15Catt & Po#TER C0 PROVIDES FutiMER f uson REGARDimG DEVIAflDu ik REC TEstikG OF CL AMP Oh ULTRALOh!C FLOW p(Teas. TEST AttAmGEnfut C.!                                                                                                                                         ,
93417 7~20 11/C1/43 tv!0t R. Wilson F15Catt & Po#TER C0 PROVIDES FutiMER f uson REGARDimG DEVIAflDu ik REC TEstikG OF CL AMP Oh ULTRALOh!C FLOW p(Teas. TEST AttAmGEnfut C.!
DESCt! BED ThAT CAUSED LO FLOW luDICAflDh. SEE LOG F91416/93418.
DESCt! BED ThAT CAUSED LO FLOW luDICAflDh. SEE LOG F91416/93418.
DUE BT: 1/3/94 93.'t *s'     11/C1/;3                   58:8: R . Jont s           IkDI A> Polmf Uwit 3 AEPotts INtousl$f tktt OF Min TEMP FOR                   i 1?C CelTICALlif SETWEEN TECM SPEC & EAFEff AEALY$15. TECN $PEC CALL $             '
DUE BT: 1/3/94 93.'t
FDR 450 F WalLE 1AFETY ANALYSIS sAvs'540 F. CDOLANT TEMP CAk DUE Bf: 1/3/9.             AFFECT CORE PHYSICS PARAMETEas. $EE LOGr93137.
*s' 11/C1/;3 58:8: R. Jont s IkDI A> Polmf Uwit 3 AEPotts INtousl$f tktt OF Min TEMP FOR i
l 93e1C *FC       DB/13/G3                   avis: K.mAIDU     CTsl PAL 15ADEs/Uw!1 1 REPo#TS POTEWTIAL GEWERIC PROBLEM OF CLARK RELAf $, 80 DEL 5U12 76, klk! CONTACT OR Mutt, Wof MEEf!NG SEISM!C -
1?C CelTICALlif SETWEEN TECM SPEC & EAFEff AEALY$15. TECN $PEC CALL $
DUAL RE0nTS. LICENSEE REPLACED C0!L5 WITM STRomCED COILS & SOLVED               ,
FDR 450 F WalLE 1AFETY ANALYSIS sAvs'540 F. CDOLANT TEMP CAk DUE Bf: 1/3/9.
DUE st: 1/5/94             PROSLEN.                                                                       !
AFFECT CORE PHYSICS PARAMETEas. $EE LOGr93137.
03420 6007 11/05/S3 9311C80224 RVis: R.FRAnu                         4AMCO CONTROLS REP 0f f $ POTEWil AL Atm0RMAL OPERAfl0N OF limit -
l 93e1C *FC DB/13/G3 avis: K.mAIDU CTsl PAL 15ADEs/Uw!1 1 REPo#TS POTEWTIAL GEWERIC PROBLEM OF CLARK RELAf $, 80 DEL 5U12 76, klk! CONTACT OR Mutt, Wof MEEf!NG SEISM!C -
Cut SWITCHES EA740 & EA750 WWEu DPERATED BELOW 65 F DUE 70 thCREASE OF VISCOslif 0F GREASE.17 MAN RESPONSE flME l$ CRIfitAL, TEMP DUE Bf: 1/5/94             SMOULD BE ASOVE 70 F. COM40NWE ALTM EDIE0W 15 MAIN USER.
DUAL RE0nTS. LICENSEE REPLACED C0!L5 WITM STRomCED COILS & SOLVED DUE st: 1/5/94 PROSLEN.
0342' 30E D9/24/53                         RVIE: K.nAfDU       FRWW DEPatiMENT OF EkERGY REPDats FAltutE OF C!ttult BREAKER OPERATlhG                 i w120 LINKAGE DUE 10 IMPRDPER ALICwmEnt 0F PLA511C FACE PLATE. C/8s ARE 480 V, 3 PMA5E, TYPE EM WESTINGMOUSE.
03420 6007 11/05/S3 9311C80224 RVis: R.FRAnu 4AMCO CONTROLS REP 0f f $ POTEWil AL Atm0RMAL OPERAfl0N OF limit -
DUE tv: 1/5/94 03422 5340 10/19/93 5310280093 ECC8: G.BAGCM!                         SOElkG COMPUTER SERVICES REPORTS RECEIPT OF Ett3R WOTICE F#3M                   i FORMER EDFTWARE SUPPLIEt$ REGARD!sc PROBLEMS IN GilituDL. ALL                   ,
Cut SWITCHES EA740 & EA750 WWEu DPERATED BELOW 65 F DUE 70 thCREASE OF VISCOslif 0F GREASE.17 MAN RESPONSE flME l$ CRIfitAL, TEMP DUE Bf: 1/5/94 SMOULD BE ASOVE 70 F. COM40NWE ALTM EDIE0W 15 MAIN USER.
NUCLEAR CustumERS NOT WOTIFIED.                                                 j DUE 07: 1/10/94                                                                                             ,
0342' 30E D9/24/53 RVIE: K.nAfDU FRWW DEPatiMENT OF EkERGY REPDats FAltutE OF C!ttult BREAKER OPERATlhG i
03423 634C 10/22/73 9310270076 ECCB: G.tAGCal                       po[Inc C3=PUTER SERVICES REPotts RECE!PT D$ EttDR p0TICES RECE!VED FROM FORMER SOFTWARE SUPPLIERS REGARDlWG P908 tem 1 WifM Ak$Y$ COMPUTER CODE. kOf ALL NUCLE AR CU$1DMEt$ WERE hDilFIED.
w120 LINKAGE DUE 10 IMPRDPER ALICwmEnt 0F PLA511C FACE PLATE. C/8s ARE 480 V, 3 PMA5E, TYPE EM WESTINGMOUSE.
DUE tv: 1/5/94 03422 5340 10/19/93 5310280093 ECC8: G.BAGCM!
SOElkG COMPUTER SERVICES REPORTS RECEIPT OF Ett3R WOTICE F#3M i
FORMER EDFTWARE SUPPLIEt$ REGARD!sc PROBLEMS IN GilituDL. ALL NUCLEAR CustumERS NOT WOTIFIED.
j DUE 07: 1/10/94 03423 634C 10/22/73 9310270076 ECCB: G.tAGCal po[Inc C3=PUTER SERVICES REPotts RECE!PT D$ EttDR p0TICES RECE!VED FROM FORMER SOFTWARE SUPPLIERS REGARDlWG P908 tem 1 WifM Ak$Y$ COMPUTER CODE. kOf ALL NUCLE AR CU$1DMEt$ WERE hDilFIED.
DUE sv: 1/10/94 I
DUE sv: 1/10/94 I
i
i
        ,                          ~, . - - .                                               _ -- .-    . - -      .__      ._.    -_              _ ._
~,. - -.


4
4
          . Paar hc       2 11/30/53 10 CFR PART 21 TRACrimG SYSTEM VENDot It5PECTIOu stanCn DIVISION OF REACTOR ltSPECTIOh AND LICENSEE PERFfit4AkCE                                   ,
. Paar hc 2
LOG e sa Report       ACCE 5510% A551 Gwf D           CLOS DESCRIPTIOu AND CATE       h >46 E t                       OUT                                                                         '
11/30/53 10 CFR PART 21 TRACrimG SYSTEM VENDot It5PECTIOu stanCn DIVISION OF REACTOR ltSPECTIOh AND LICENSEE PERFfit4AkCE LOG e sa Report ACCE 5510% A551 Gwf D CLOS DESCRIPTIOu AND CATE h >46 E t OUT VEhD CCOE CODE 93424 63-0 10/11/93 931C210171 EGCs: G.tAGCat BOEING COMPUTER SEnvlCES REPonTS RECEIPT OF Ett0R NOTICES FROM FORMER SOFTWARE SUPPLIERS REGARD!kG GTsituDL. h0T ALL NUCLEAR CUSTCMEt$ MAVE BEEN NOTIFIED.
VEhD                                           CCOE CODE 93424 63-0 10/11/93 931C210171 EGCs: G.tAGCat BOEING COMPUTER SEnvlCES REPonTS RECEIPT OF Ett0R NOTICES FROM FORMER SOFTWARE SUPPLIERS REGARD!kG GTsituDL. h0T ALL NUCLEAR CUSTCMEt$ MAVE BEEN NOTIFIED.
DUE st: 1/10/94 i
DUE st: 1/10/94 i
93 25 E296 10/07/93 931G200279 tvil: a.FRAMu ENvit0TECM Couttois REPotts 085EnvAflow 0F P90BLENS Om W5f t0h!CS     !
93 25 E296 10/07/93 931G200279 tvil: a.FRAMu ENvit0TECM Couttois REPotts 085EnvAflow 0F P90BLENS Om W5f t0h!CS 8EJDEL 2100C SEnlES REcotDERS Om uu!TS su!LT PR!ce TO 1993 DutistEsm!C TESTING INC RESETTING AT PEAK ACCEL 8 FORCING OF DOOR DUE BY: 1/10/94 OFF 175 ATTACMmENT POINT. REPAlt KIT AVAILABLE.
8EJDEL 2100C SEnlES REcotDERS Om uu!TS su!LT PR!ce TO 1993             !
DutistEsm!C TESTING INC RESETTING AT PEAK ACCEL 8 FORCING OF DOOR     ,
DUE BY: 1/10/94           OFF 175 ATTACMmENT POINT. REPAlt KIT AVAILABLE.
934?e 69 A 1C/E1/13 G310C80C2G EGCs: G.sAGCn!
934?e 69 A 1C/E1/13 G310C80C2G EGCs: G.sAGCn!
stw voar POWER AUTuottf r/IP.3 REPotTS RECEIPT OF WEST NEAL w'2C                                                                                                                         t ADDRE55!mG DISCREP Ik VALVE WIGNTS/CCs USED Ik PIPlkG AhALYSES.         '
stw voar POWER AUTuottf r/IP.3 REPotTS RECEIPT OF WEST NEAL w'2C t
INCLUDED ARE VALVE 5 FROM ALOYCD, ANCMot DARLikG, 715MER & VELAk.     '
ADDRE55!mG DISCREP Ik VALVE WIGNTS/CCs USED Ik PIPlkG AhALYSES.
DUE Bf: 1/10/94         EVALUATION UNDEtwAv.
INCLUDED ARE VALVE 5 FROM ALOYCD, ANCMot DARLikG, 715MER & VELAk.
93427 n c 11/02/53                 kv!B: s. ROGER 5 DUQUEskE LIGNT/ BEAVER VALLEY 2 REP 0tTS FAILURE OF 2 EDG               !
DUE Bf: 1/10/94 EVALUATION UNDEtwAv.
AC1 SE0JEWCER5 DUE TO CIRCUIT DE5f Gs PROBLEM RESULTitG FROM USE OF
93427 n c 11/02/53 kv!B: s. ROGER 5 DUQUEskE LIGNT/ BEAVER VALLEY 2 REP 0tTS FAILURE OF 2 EDG AC1 SE0JEWCER5 DUE TO CIRCUIT DE5f Gs PROBLEM RESULTitG FROM USE OF
                .331                                                                                                                         ;
.331 ATC =00EL365A LomG RAmGE TIMER RELAYS. htC/AIT REVIEWihG.
ATC =00EL365A LomG RAmGE TIMER RELAYS. htC/AIT REVIEWihG.
DUE BY: 1/10/96 I
DUE BY: 1/10/96 I
I 93 2e a109 11/02/93 931108:211 tvle: s.80CERS CTal AmEtACE/ACASTAT REPonT5 TMAT TME 30 GPIA RELAYS SUBJECTE
I 93 2e a109 11/02/93 931108:211 tvle: s.80CERS CTal AmEtACE/ACASTAT REPonT5 TMAT TME 30 GPIA RELAYS SUBJECTE*
* V336 NUCLE AR QUAL TESTING AT WYLE LA85 ARE seWFtD As CopenERCI AL GRADE &   '
V336 NUCLE AR QUAL TESTING AT WYLE LA85 ARE seWFtD As CopenERCI AL GRADE &
ARE NOT DE51GufD TO MEET /ttcassetWDED FOR MAREN NUCLEAR ENVIRON.      .
ARE NOT DE51GufD TO MEET /ttcassetWDED FOR MAREN NUCLEAR ENVIRON.
DUE BY: 12/6/93           SEE LOG 893362.
DUE BY: 12/6/93 SEE LOG 893362.
i 93429 rGE 10/18/93 931029D090 Stat: R. jones PACIFIC G&E/DIAsLO CAutou 1 REPonTS NEAT FLUK NOT CMAmmEL FACTOR       ,
i 93429 rGE 10/18/93 931029D090 Stat: R. jones PACIFIC G&E/DIAsLO CAutou 1 REPonTS NEAT FLUK NOT CMAmmEL FACTOR W120 PEmALTY OF 25 A5 BElmG PCTENT woucousttV DUE TO OVEts]GMT ST WEST. Is NOT DEVIslNG ETN@0 LOGY TO ACCmJWT FOR CERTAIN DUE BY: 1/10/94 F ACT0ts. WEST PROVIDED INTEtlN MEINOD. TO CottECT.
W120 PEmALTY OF 25 A5 BElmG PCTENT woucousttV DUE TO OVEts]GMT ST WEST. Is NOT DEVIslNG ETN@0 LOGY TO ACCmJWT FOR CERTAIN DUE BY: 1/10/94           F ACT0ts. WEST PROVIDED INTEtlN MEINOD. TO CottECT.
93'3C CFL 11/19/G3 tV!8:5.mATTMEv5-CAROLINA P&L REPotts LACE OF Compt 1AmCE OF LOCAT10h or SK0 thTO: St*B AS LOADEDCAD0 Lit! A PlWS la FUEL A55Em8LY RELAf AVE 10 OE51Gu i
93'3C CFL 11/19/G3                   tV!8:5.mATTMEv5-         CAROLINA P&L REPotts LACE OF Compt 1AmCE OF LOCAT10h or SK0                                                                                                                         ;
SPEC 5. CALC 5 INDICATE NOT ChAhmEL FACT 0tt CAk ErCEED TECM SPEC DUE tv: 1/24/94 DE0muTS SY 91 Ekton DCCURRED WITNik $IEMEks DUE TO lhADQT. C0pecuh 4
thTO: St*B               AS LOADEDCAD0 Lit! A PlWS la FUEL A55Em8LY RELAf AVE 10 OE51Gu           i SPEC 5. CALC 5 INDICATE NOT ChAhmEL FACT 0tt CAk ErCEED TECM SPEC DUE tv: 1/24/94           DE0muTS SY 91 Ekton DCCURRED WITNik $IEMEks DUE TO lhADQT. C0pecuh   4 93431 FFL T1/21/43                 EMCB:STR05=lDER           PEkkSYLVaula P&L & GRAND GULF REPott FAILutEs OF JET PLMP Ewb5 MOLD Dobe BE AMS DUE TO IG5CC TMAT CAN CAUSL DAMAGE TO OTwEt             !
93431 FFL T1/21/43 EMCB:STR05=lDER PEkkSYLVaula P&L & GRAND GULF REPott FAILutEs OF JET PLMP Ewb5 MOLD Dobe BE AMS DUE TO IG5CC TMAT CAN CAUSL DAMAGE TO OTwEt COBG REACTOR IkTEtnALE DUE TO NYDRAULIC FORCES. K REcossefu S EARLv
COBG REACTOR IkTEtnALE DUE TO NYDRAULIC FORCES. K REcossefu S EARLv         'f DUE BY: 1/24/94           REPLACEMEhi TO AVolD DAMAGE. SEE LOG 893437 i,
' f DUE BY: 1/24/94 REPLACEMEhi TO AVolD DAMAGE. SEE LOG 893437 i
93432 C*.:     11/17/93             tvis:U.POTAP0v5                                                                                     "
93432 C*.:
GPU uuCLEAR REPotts REPLACEMENT OF manual DECLUTCN LEVEt$ on L2CD EIGNT WALVE ACTUATORS WITN THE RESULT ThAT ELECTRICAL OPERAtlon WAS IMPAlRED DUE TO PAlkT Ik A MACM!mED NOLE & USE OF A MAsesEt to DUE BY: 1/24/94           TAP LEVER Okt0175 $MAFT.
11/17 93 tvis:U.POTAP0v5 GPU uuCLEAR REPotts REPLACEMENT OF manual DECLUTCN LEVEt$ on
                                                                                                                                            ;?
/
* i e}}
L2CD EIGNT WALVE ACTUATORS WITN THE RESULT ThAT ELECTRICAL OPERAtlon WAS IMPAlRED DUE TO PAlkT Ik A MACM!mED NOLE & USE OF A MAsesEt to DUE BY: 1/24/94 TAP LEVER Okt0175 $MAFT.
; ?
i e}}

Latest revision as of 08:17, 17 December 2024

Forwards Part 21 Monthly Rept for Nov 1993.Repts Will Continue to Be Made Available to Public at NRC PDR & Local PDR
ML20058L423
Person / Time
Site: Hatch, Vogtle  Southern Nuclear icon.png
Issue date: 12/09/1993
From: Plisco L
Office of Nuclear Reactor Regulation
To: Woodard J
GEORGIA POWER CO.
References
NUDOCS 9312160337
Download: ML20058L423 (6)


Text

7 December 9,1993 Docket Nos. 50-321, 50-366, DISTRIBUTION 50-424, and 50-425 tDocket File 1 ACRS (10)

NRC/L:> cal PDRs OGC Mr. Jack D. Woodard PDII-3 Reading W. Haass, 904 Senior Vice President -

K.Jabbour Nuclear Operations G. Carpenter Georgia Power Company L. Berry P. O. Box 1295 G.Lainas Birmingham, Alabama 35201 S.Varga E.Merschoff,RII

Dear Mr. Woodard:

SUBJECT:

PART 21 MONTHLY REPORT FOR NOVEMBER 1993 HATCH NUCLEAR PLANT, UNITS 1 AND 2; AND V0GTLE NUCLEAR PLANT, UNITS 1 AND 2 In order to provide expeditious dissemination of 10 CFR Part 21 matters, the U.S. Nuclear Regulatory Commission (NRC) will mail a copy of its 10 CFR Part 21 monthly report to licensees of nuclear power plants.

The enclosed November 1993 monthly report is the initial mailing. These reports will continue to be made available to the public at the NRC public document room and at the local public document rooms.

If you do not wish to receive this report, or you have a specific contact other than yourself, please provide this information to Walter P. Haass, U.S. Nuclear Regulatory Commission, OWFN, M/S 9D4, Washington, DC 20555.

Sincerely,

/s/

Loren R. Plisco, Acting Director Project Directorate II-3 Division of Reactor Projects - III Office of Nuclear Reactor Regulation

Enclosure:

Part 21 Monthly Report for November 1993 cc w/o enclosure:

See next page

./

om PDIl-3/LA )

PDII-3/PM[ PDII-3/Pt PDII-hj/

L.BERRfh K.JABBOUk GCARPENTb L.PLI[C0 hw 12/ h /93 12/ 9 /93 12 / )

/93 12/ 9 /93 om

_~

0FFICIAL RECORD COPY FILE NAME: G:\\PART21/LTR O

y'O 140048 hC &

95 h t

9312160337 931209 Q,({h gg&

g,,.

tr -

t" DR ADOCK 0500 1

8 8f G 4

d

.k y

E UNITED STATES i'

f NUCLEAR PEGULATORY COMMISSION WASHINGTON D.C. 20S55-0001 December 9, 1993 Docket Nos. 50-321, 50-366, 50-424, and 50-425 Mr. Jack D. Woodard Senior Vice President -

Nuclear Operations Georgia Power Company P. O. Box 1295 Birmingham, Alabama 35201

Dear Mr. Woodard:

SUBJECT:

PART 21 MONTHLY REPORT FOR NOVEMBER 1993 HATCH NUCLEAR PLANT, UNITS 1 AND 2; AND V0GTLE NUCLEAR PLANT, UNITS 1 AND 2 In order to provide expeditious dissemination of 10 CFR Part 21 matters, the U.S. Nuclear Regulatory Commission (NRC) will mail a copy of its 10 CFR Part 21 monthly report to licensees of nuclear power plants. The enclosed November 1993 monthly report is the initial mailing. These reports will continue to be made available to the public at the NRC public document room and at the local public document rooms.

If you do not wish to receive this report, or you have a specific contact other than yourself, please provide this information to Walter P. Haass, U.S. Nuclear Regulatory Commission, 0WFN, M/S 9D4, Washington, DC 20555.

Sincerely, Loren R. Plisco, Acting Director Project Directorate II-3 Division of Reactor Projects - III Office of Nuclear Reactor Regulation

Enclosure:

Part 21 Monthly Report for November 1993 cc w/o enclosure:

See next page l

h 9

4 J-rE a

m.

s Edwin I. Hatch Nuclear Plant Georgia Power Company Vogtle Electric Generating Plant cc:

Mr. Ernest L. Blake, Jr.

Mr. Alan R. Herdt, Chief Shaw, Pittman, Potts and Trowbridge Project Branch #3 2300 N Street, NW.

U. S. Nuclear Regulatory Commission Washington, DC 20037 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. J. T. Beckham, Jr.

Vice President - Plant Hatch Mr. Dan H. Smith, Vice President Georgia Power Company Power Supply Operations P. O. Box 1295 Oglethorpe Power Corporation Birmingham, Alabama 35201 2100 East Exchange Place Turker, Georgia 30085-1349 j

Mr. S. J. Jethay Manager Licensing - Hatch Charles A. Patrizia, Esquire Georgia Power Company Paul, Hastings, Janofsky & Walker P. O. Box 1295 12th Floor Birmingham, Alabama 35201 1050 Connecticut Avenue, NW.

Washington, DC 20036 Mr. L. Sumner General Manager, Nuclear Plant Georgia Power Company Route 1, Box 439 Baxley,. Georgia 31513 Resident Inspector U. S. Nuclear Regulatory Commission Route 1, Box 725 Baxley, Georgia 31513 l

Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, NW. Suite 2900 i

Atlanta, Georgia 30323 Mr. Charles H. Badger Office of Planning and Budget Room 610 1

270 Washington Street, SW.

l Atlanta, Georgia 30334 Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE., Suite 1252 Atlanta, Georgia 30334 Chairman I

Appling County Commissioners County Courthouse Baxley, Georgia 31513 i

4 4

k 1

Edwin I. Hatch Nuclear Plant Georgia Power Company Vogtle Electric Generating Plant cc:

Mr. J. A. Bailey Office of the County Commissioner Manager - Licensing Burke County Commission Georgia Power Company Waynesboro, Georgia 30830 P. O. Box 1295 Birmingham, Alabama 35201 Resident inspector U. S. Nuclear Regulatory Commission Mr. J. B. Beasley P. O. Box 572 General Manager, Vogtle Electric Waynesboro, Georgia 30830 Generating Plant P. O. Box 1600 Mr. J. D. Woodard Waynesboro, Georgia 30830 Senior Vice President -

Nuclear Operations Office of Planning and Budget Georgia Power Company Room 615B P. O. Box 1295 270 Washington Street, SW.

Birmingham, Alabama 35201 4

Atlanta, Georgia 30334 Mr. C. K. McCoy Attorney General Vice President - Nuclear Law Department Vogtle Project 132 Judicial Building Georgia Power Company Atlanta, Georgia 30334 P. O. Box 1295 Birmingham, Alabama 35201 Arthur H. Domby, Esquire Troutman Sanders NationsBank Plaza 600 Peachtree Street, NE.

Suite 5200 l

Atlanta, Georgia 30308-2216 i

_.x-

. - ~.,, + >

4 PcBe b '.

1 11/30s.3 10 CFR PART 21 ftACKIWG ST$ TEM

{

VEuoDR fuSPEtflou BRANCH l

DIVl$1Du OF REACTOR 1mEPECT10m AND LICEk1EE PERFDt4ANCE I

LOG 8 *?B R E PDa 7 ACCES$!Dn A55tGhED CLO$ DE$CRIPflDW

[

ah?' DAtt kg.gEt DUT tESO CDC E C U. E

$1.15 CPL 10/22/s3 Evle: W.m AA 55 CAROLINA P&L/RDelmsDa 2 kEpotTS FAltuff 0F EDG p to EtAtt DUC t

I67L TDSADKEN $PalmGs ON THREE OF THE Alt staff Distal 80 TOR VALVES PREVEstikG AIR FROM ENTER 1tG CYLINDEt$ REDUIRED TO ROLL DIESEL.

DUE Bt: 1/3/9e sPRIuGS WERE SEPL ACED BROKEm SPalWG3 SElWG EVALUATED.

93 16 8120 11/C1/43 Rvit:G.CWALihA CTSI FISCMER 8 Pot 1Et REPotf S DEVI AflDW IN TEST!bG MEinDDOLOGY FDA REC

+

CL AMP On utfRA$Dw!C FLOW METEts V5ED ON 12" SCM 4D PIPE CARRYlmG Cet WATER. BUTTERFLT VALVE IN TEST $ETUP CAUSE LO FLOW INDICAf!Du, DUE SY: 1/3/9e LICENSEES MAVE BEEK N0flFIED. EEE LOG 893417/95438.

93417 7~20 11/C1/43 tv!0t R. Wilson F15Catt & Po#TER C0 PROVIDES FutiMER f uson REGARDimG DEVIAflDu ik REC TEstikG OF CL AMP Oh ULTRALOh!C FLOW p(Teas. TEST AttAmGEnfut C.!

DESCt! BED ThAT CAUSED LO FLOW luDICAflDh. SEE LOG F91416/93418.

DUE BT: 1/3/94 93.'t

  • s' 11/C1/;3 58:8: R. Jont s IkDI A> Polmf Uwit 3 AEPotts INtousl$f tktt OF Min TEMP FOR i

1?C CelTICALlif SETWEEN TECM SPEC & EAFEff AEALY$15. TECN $PEC CALL $

FDR 450 F WalLE 1AFETY ANALYSIS sAvs'540 F. CDOLANT TEMP CAk DUE Bf: 1/3/9.

AFFECT CORE PHYSICS PARAMETEas. $EE LOGr93137.

l 93e1C *FC DB/13/G3 avis: K.mAIDU CTsl PAL 15ADEs/Uw!1 1 REPo#TS POTEWTIAL GEWERIC PROBLEM OF CLARK RELAf $, 80 DEL 5U12 76, klk! CONTACT OR Mutt, Wof MEEf!NG SEISM!C -

DUAL RE0nTS. LICENSEE REPLACED C0!L5 WITM STRomCED COILS & SOLVED DUE st: 1/5/94 PROSLEN.

03420 6007 11/05/S3 9311C80224 RVis: R.FRAnu 4AMCO CONTROLS REP 0f f $ POTEWil AL Atm0RMAL OPERAfl0N OF limit -

Cut SWITCHES EA740 & EA750 WWEu DPERATED BELOW 65 F DUE 70 thCREASE OF VISCOslif 0F GREASE.17 MAN RESPONSE flME l$ CRIfitAL, TEMP DUE Bf: 1/5/94 SMOULD BE ASOVE 70 F. COM40NWE ALTM EDIE0W 15 MAIN USER.

0342' 30E D9/24/53 RVIE: K.nAfDU FRWW DEPatiMENT OF EkERGY REPDats FAltutE OF C!ttult BREAKER OPERATlhG i

w120 LINKAGE DUE 10 IMPRDPER ALICwmEnt 0F PLA511C FACE PLATE. C/8s ARE 480 V, 3 PMA5E, TYPE EM WESTINGMOUSE.

DUE tv: 1/5/94 03422 5340 10/19/93 5310280093 ECC8: G.BAGCM!

SOElkG COMPUTER SERVICES REPORTS RECEIPT OF Ett3R WOTICE F#3M i

FORMER EDFTWARE SUPPLIEt$ REGARD!sc PROBLEMS IN GilituDL. ALL NUCLEAR CustumERS NOT WOTIFIED.

j DUE 07: 1/10/94 03423 634C 10/22/73 9310270076 ECCB: G.tAGCal po[Inc C3=PUTER SERVICES REPotts RECE!PT D$ EttDR p0TICES RECE!VED FROM FORMER SOFTWARE SUPPLIERS REGARDlWG P908 tem 1 WifM Ak$Y$ COMPUTER CODE. kOf ALL NUCLE AR CU$1DMEt$ WERE hDilFIED.

DUE sv: 1/10/94 I

i

~,. - -.

4

. Paar hc 2

11/30/53 10 CFR PART 21 TRACrimG SYSTEM VENDot It5PECTIOu stanCn DIVISION OF REACTOR ltSPECTIOh AND LICENSEE PERFfit4AkCE LOG e sa Report ACCE 5510% A551 Gwf D CLOS DESCRIPTIOu AND CATE h >46 E t OUT VEhD CCOE CODE 93424 63-0 10/11/93 931C210171 EGCs: G.tAGCat BOEING COMPUTER SEnvlCES REPonTS RECEIPT OF Ett0R NOTICES FROM FORMER SOFTWARE SUPPLIERS REGARD!kG GTsituDL. h0T ALL NUCLEAR CUSTCMEt$ MAVE BEEN NOTIFIED.

DUE st: 1/10/94 i

93 25 E296 10/07/93 931G200279 tvil: a.FRAMu ENvit0TECM Couttois REPotts 085EnvAflow 0F P90BLENS Om W5f t0h!CS 8EJDEL 2100C SEnlES REcotDERS Om uu!TS su!LT PR!ce TO 1993 DutistEsm!C TESTING INC RESETTING AT PEAK ACCEL 8 FORCING OF DOOR DUE BY: 1/10/94 OFF 175 ATTACMmENT POINT. REPAlt KIT AVAILABLE.

934?e 69 A 1C/E1/13 G310C80C2G EGCs: G.sAGCn!

stw voar POWER AUTuottf r/IP.3 REPotTS RECEIPT OF WEST NEAL w'2C t

ADDRE55!mG DISCREP Ik VALVE WIGNTS/CCs USED Ik PIPlkG AhALYSES.

INCLUDED ARE VALVE 5 FROM ALOYCD, ANCMot DARLikG, 715MER & VELAk.

DUE Bf: 1/10/94 EVALUATION UNDEtwAv.

93427 n c 11/02/53 kv!B: s. ROGER 5 DUQUEskE LIGNT/ BEAVER VALLEY 2 REP 0tTS FAILURE OF 2 EDG AC1 SE0JEWCER5 DUE TO CIRCUIT DE5f Gs PROBLEM RESULTitG FROM USE OF

.331 ATC =00EL365A LomG RAmGE TIMER RELAYS. htC/AIT REVIEWihG.

DUE BY: 1/10/96 I

I 93 2e a109 11/02/93 931108:211 tvle: s.80CERS CTal AmEtACE/ACASTAT REPonT5 TMAT TME 30 GPIA RELAYS SUBJECTE*

V336 NUCLE AR QUAL TESTING AT WYLE LA85 ARE seWFtD As CopenERCI AL GRADE &

ARE NOT DE51GufD TO MEET /ttcassetWDED FOR MAREN NUCLEAR ENVIRON.

DUE BY: 12/6/93 SEE LOG 893362.

i 93429 rGE 10/18/93 931029D090 Stat: R. jones PACIFIC G&E/DIAsLO CAutou 1 REPonTS NEAT FLUK NOT CMAmmEL FACTOR W120 PEmALTY OF 25 A5 BElmG PCTENT woucousttV DUE TO OVEts]GMT ST WEST. Is NOT DEVIslNG ETN@0 LOGY TO ACCmJWT FOR CERTAIN DUE BY: 1/10/94 F ACT0ts. WEST PROVIDED INTEtlN MEINOD. TO CottECT.

93'3C CFL 11/19/G3 tV!8:5.mATTMEv5-CAROLINA P&L REPotts LACE OF Compt 1AmCE OF LOCAT10h or SK0 thTO: St*B AS LOADEDCAD0 Lit! A PlWS la FUEL A55Em8LY RELAf AVE 10 OE51Gu i

SPEC 5. CALC 5 INDICATE NOT ChAhmEL FACT 0tt CAk ErCEED TECM SPEC DUE tv: 1/24/94 DE0muTS SY 91 Ekton DCCURRED WITNik $IEMEks DUE TO lhADQT. C0pecuh 4

93431 FFL T1/21/43 EMCB:STR05=lDER PEkkSYLVaula P&L & GRAND GULF REPott FAILutEs OF JET PLMP Ewb5 MOLD Dobe BE AMS DUE TO IG5CC TMAT CAN CAUSL DAMAGE TO OTwEt COBG REACTOR IkTEtnALE DUE TO NYDRAULIC FORCES. K REcossefu S EARLv

' f DUE BY: 1/24/94 REPLACEMEhi TO AVolD DAMAGE. SEE LOG 893437 i

93432 C*.:

11/17 93 tvis:U.POTAP0v5 GPU uuCLEAR REPotts REPLACEMENT OF manual DECLUTCN LEVEt$ on

/

L2CD EIGNT WALVE ACTUATORS WITN THE RESULT ThAT ELECTRICAL OPERAtlon WAS IMPAlRED DUE TO PAlkT Ik A MACM!mED NOLE & USE OF A MAsesEt to DUE BY: 1/24/94 TAP LEVER Okt0175 $MAFT.

?

i e