{{#Wiki_filter:7 December 9,1993 Docket Nos. 50-321, 50-366, | {{#Wiki_filter:7 December 9,1993 Docket Nos. 50-321, 50-366, DISTRIBUTION 50-424, and 50-425 tDocket File 1 ACRS (10) | ||
NRC/L:> cal PDRs | NRC/L:> cal PDRs OGC Mr. Jack D. Woodard PDII-3 Reading W. Haass, 904 Senior Vice President - | ||
K.Jabbour Nuclear Operations G. Carpenter Georgia Power Company L. Berry P. O. Box 1295 G.Lainas Birmingham, Alabama 35201 S.Varga E.Merschoff,RII | |||
==Dear Mr. Woodard:== | ==Dear Mr. Woodard:== | ||
==SUBJECT:== | ==SUBJECT:== | ||
PART 21 MONTHLY REPORT FOR NOVEMBER 1993 HATCH NUCLEAR PLANT, UNITS 1 AND 2; AND V0GTLE NUCLEAR PLANT, UNITS 1 AND 2 In order to provide expeditious dissemination of 10 CFR Part 21 matters, the U.S. Nuclear Regulatory Commission (NRC) will mail a copy of its 10 CFR Part 21 monthly report to licensees of nuclear power plants. The enclosed November 1993 monthly report is the initial mailing. These reports will continue to be made available to the public at the NRC public document room and at the local public document rooms. | PART 21 MONTHLY REPORT FOR NOVEMBER 1993 HATCH NUCLEAR PLANT, UNITS 1 AND 2; AND V0GTLE NUCLEAR PLANT, UNITS 1 AND 2 In order to provide expeditious dissemination of 10 CFR Part 21 matters, the U.S. Nuclear Regulatory Commission (NRC) will mail a copy of its 10 CFR Part 21 monthly report to licensees of nuclear power plants. | ||
The enclosed November 1993 monthly report is the initial mailing. These reports will continue to be made available to the public at the NRC public document room and at the local public document rooms. | |||
If you do not wish to receive this report, or you have a specific contact other than yourself, please provide this information to Walter P. Haass, U.S. Nuclear Regulatory Commission, OWFN, M/S 9D4, Washington, DC 20555. | If you do not wish to receive this report, or you have a specific contact other than yourself, please provide this information to Walter P. Haass, U.S. Nuclear Regulatory Commission, OWFN, M/S 9D4, Washington, DC 20555. | ||
Sincerely, | Sincerely, | ||
/s/ | |||
Loren R. Plisco, Acting Director Project Directorate II-3 Division of Reactor Projects - III Office of Nuclear Reactor Regulation | Loren R. Plisco, Acting Director Project Directorate II-3 Division of Reactor Projects - III Office of Nuclear Reactor Regulation | ||
==Enclosure:== | ==Enclosure:== | ||
Part 21 Monthly Report for November 1993 cc w/o enclosure: | Part 21 Monthly Report for November 1993 cc w/o enclosure: | ||
See next page | See next page | ||
om | ./ | ||
om PDIl-3/LA ) | |||
0FFICIAL RECORD COPY FILE NAME: G:\PART21/LTR O | PDII-3/PM[ PDII-3/Pt PDII-hj/ | ||
L.BERRfh K.JABBOUk GCARPENTb L.PLI[C0 hw 12/ h /93 12/ 9 /93 12 / '') | |||
/93 12/ 9 /93 om | |||
_~ | |||
0FFICIAL RECORD COPY FILE NAME: G:\\PART21/LTR O | |||
y'O 140048 hC & | |||
95 h t | |||
9312160337 931209 Q,({h gg& | |||
g,,. | |||
tr - | |||
t" DR ADOCK 0500 1 | |||
8 8f G 4 | 8 8f G 4 | ||
d | |||
.k y | |||
i' | E UNITED STATES i' | ||
f NUCLEAR PEGULATORY COMMISSION WASHINGTON D.C. 20S55-0001 December 9, 1993 Docket Nos. 50-321, 50-366, 50-424, and 50-425 Mr. Jack D. Woodard Senior Vice President - | |||
Nuclear Operations Georgia Power Company P. O. Box 1295 Birmingham, Alabama 35201 | |||
Senior Vice President - | |||
Nuclear Operations Georgia Power Company P. O. Box 1295 | |||
Birmingham, Alabama 35201 | |||
==Dear Mr. Woodard:== | ==Dear Mr. Woodard:== | ||
==SUBJECT:== | ==SUBJECT:== | ||
PART 21 MONTHLY REPORT FOR NOVEMBER 1993 HATCH NUCLEAR PLANT, UNITS 1 AND 2; AND V0GTLE NUCLEAR PLANT, UNITS 1 AND 2 In order to provide expeditious dissemination of 10 CFR Part 21 matters, the U.S. Nuclear Regulatory Commission (NRC) will mail a copy of its 10 CFR Part 21 monthly report to licensees of nuclear power plants. The | PART 21 MONTHLY REPORT FOR NOVEMBER 1993 HATCH NUCLEAR PLANT, UNITS 1 AND 2; AND V0GTLE NUCLEAR PLANT, UNITS 1 AND 2 In order to provide expeditious dissemination of 10 CFR Part 21 matters, the U.S. Nuclear Regulatory Commission (NRC) will mail a copy of its 10 CFR Part 21 monthly report to licensees of nuclear power plants. The enclosed November 1993 monthly report is the initial mailing. These reports will continue to be made available to the public at the NRC public document room and at the local public document rooms. | ||
enclosed November 1993 monthly report is the initial mailing. These reports will continue to be made available to the public at the NRC public document room and at the local public document rooms. | |||
If you do not wish to receive this report, or you have a specific contact other than yourself, please provide this information to Walter P. Haass, U.S. Nuclear Regulatory Commission, 0WFN, M/S 9D4, Washington, DC 20555. | If you do not wish to receive this report, or you have a specific contact other than yourself, please provide this information to Walter P. Haass, U.S. Nuclear Regulatory Commission, 0WFN, M/S 9D4, Washington, DC 20555. | ||
Sincerely, Loren R. Plisco, Acting Director | Sincerely, Loren R. Plisco, Acting Director Project Directorate II-3 Division of Reactor Projects - III Office of Nuclear Reactor Regulation | ||
Project Directorate II-3 Division of Reactor Projects - III Office of Nuclear Reactor Regulation | |||
==Enclosure:== | ==Enclosure:== | ||
Part 21 Monthly Report for November 1993 cc w/o enclosure: | Part 21 Monthly Report for November 1993 cc w/o enclosure: | ||
See next page | See next page l | ||
h 9 | |||
9 | |||
4 J-rE | 4 J-rE a | ||
cc: | m. | ||
Mr. Ernest L. Blake, Jr. | s Edwin I. Hatch Nuclear Plant Georgia Power Company Vogtle Electric Generating Plant cc: | ||
Washington, DC 20037 | Mr. Ernest L. Blake, Jr. | ||
Atlanta, Georgia 30323 Mr. J. T. Beckham, Jr. | Mr. Alan R. Herdt, Chief Shaw, Pittman, Potts and Trowbridge Project Branch #3 2300 N Street, NW. | ||
Vice President - Plant Hatch | U. S. Nuclear Regulatory Commission Washington, DC 20037 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. J. T. Beckham, Jr. | ||
P. O. Box 1295 | Vice President - Plant Hatch Mr. Dan H. Smith, Vice President Georgia Power Company Power Supply Operations P. O. Box 1295 Oglethorpe Power Corporation Birmingham, Alabama 35201 2100 East Exchange Place Turker, Georgia 30085-1349 j | ||
Manager Licensing - Hatch | Mr. S. J. Jethay Manager Licensing - Hatch Charles A. Patrizia, Esquire Georgia Power Company Paul, Hastings, Janofsky & Walker P. O. Box 1295 12th Floor Birmingham, Alabama 35201 1050 Connecticut Avenue, NW. | ||
Georgia Power Company | Washington, DC 20036 Mr. L. Sumner General Manager, Nuclear Plant Georgia Power Company Route 1, Box 439 Baxley,. Georgia 31513 Resident Inspector U. S. Nuclear Regulatory Commission Route 1, Box 725 Baxley, Georgia 31513 l | ||
P. O. Box 1295 | Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, NW. Suite 2900 i | ||
Birmingham, Alabama 35201 | Atlanta, Georgia 30323 Mr. Charles H. Badger Office of Planning and Budget Room 610 1 | ||
Washington, DC 20036 Mr. L. Sumner General Manager, Nuclear Plant Georgia Power Company Route 1, Box 439 | 270 Washington Street, SW. | ||
Baxley,. Georgia 31513 | l Atlanta, Georgia 30334 Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE., Suite 1252 Atlanta, Georgia 30334 Chairman I | ||
Resident Inspector U. S. Nuclear Regulatory Commission Route 1, Box 725 Baxley, Georgia 31513 l | Appling County Commissioners County Courthouse Baxley, Georgia 31513 i | ||
Regional Administrator, Region II U. S. Nuclear Regulatory Commission | |||
101 Marietta Street, NW. Suite 2900 | |||
205 Butler Street, SE., Suite 1252 | |||
Atlanta, Georgia 30334 | |||
Chairman I | |||
Appling County Commissioners County Courthouse | |||
i | |||
4 | 4 4 | ||
k 1 | |||
Mr. J. A. Bailey | Edwin I. Hatch Nuclear Plant Georgia Power Company Vogtle Electric Generating Plant cc: | ||
P. O. Box 1295 | Mr. J. A. Bailey Office of the County Commissioner Manager - Licensing Burke County Commission Georgia Power Company Waynesboro, Georgia 30830 P. O. Box 1295 Birmingham, Alabama 35201 Resident inspector U. S. Nuclear Regulatory Commission Mr. J. B. Beasley P. O. Box 572 General Manager, Vogtle Electric Waynesboro, Georgia 30830 Generating Plant P. O. Box 1600 Mr. J. D. Woodard Waynesboro, Georgia 30830 Senior Vice President - | ||
Birmingham, Alabama 35201 | Nuclear Operations Office of Planning and Budget Georgia Power Company Room 615B P. O. Box 1295 270 Washington Street, SW. | ||
Mr. J. B. Beasley | Birmingham, Alabama 35201 4 | ||
General Manager, Vogtle Electric Waynesboro, Georgia 30830 Generating Plant P. O. Box 1600 | Atlanta, Georgia 30334 Mr. C. K. McCoy Attorney General Vice President - Nuclear Law Department Vogtle Project 132 Judicial Building Georgia Power Company Atlanta, Georgia 30334 P. O. Box 1295 Birmingham, Alabama 35201 Arthur H. Domby, Esquire Troutman Sanders NationsBank Plaza 600 Peachtree Street, NE. | ||
Nuclear Operations Office of Planning and Budget | Suite 5200 l | ||
Arthur H. Domby, Esquire Troutman Sanders NationsBank Plaza 600 Peachtree Street, NE. | Atlanta, Georgia 30308-2216 i | ||
_.x- | _.x- | ||
. - ~.,, + > | |||
4 PcBe b ' . | 4 PcBe b '. | ||
1 11/30s.3 10 CFR PART 21 ftACKIWG ST$ TEM | |||
{ | { | ||
VEuoDR fuSPEtflou BRANCH | VEuoDR fuSPEtflou BRANCH l | ||
ah?' DAtt | DIVl$1Du OF REACTOR 1mEPECT10m AND LICEk1EE PERFDt4ANCE I | ||
LOG 8 *?B R E PDa 7 ACCES$!Dn A55tGhED CLO$ DE$CRIPflDW | |||
[ | |||
ah?' DAtt kg.gEt DUT tESO CDC E C U. E | |||
$1.15 CPL 10/22/s3 Evle: W.m AA 55 CAROLINA P&L/RDelmsDa 2 kEpotTS FAltuff 0F EDG p to EtAtt DUC t | |||
I67L TDSADKEN $PalmGs ON THREE OF THE Alt staff Distal 80 TOR VALVES PREVEstikG AIR FROM ENTER 1tG CYLINDEt$ REDUIRED TO ROLL DIESEL. | I67L TDSADKEN $PalmGs ON THREE OF THE Alt staff Distal 80 TOR VALVES PREVEstikG AIR FROM ENTER 1tG CYLINDEt$ REDUIRED TO ROLL DIESEL. | ||
DUE Bt: 1/3/9e | DUE Bt: 1/3/9e sPRIuGS WERE SEPL ACED BROKEm SPalWG3 SElWG EVALUATED. | ||
93 16 8120 11/C1/43 Rvit:G.CWALihA CTSI FISCMER 8 Pot 1Et REPotf S DEVI AflDW IN TEST!bG MEinDDOLOGY FDA | 93 16 8120 11/C1/43 Rvit:G.CWALihA CTSI FISCMER 8 Pot 1Et REPotf S DEVI AflDW IN TEST!bG MEinDDOLOGY FDA REC | ||
+ | |||
CL AMP On utfRA$Dw!C FLOW METEts V5ED ON 12" SCM 4D PIPE CARRYlmG Cet WATER. BUTTERFLT VALVE IN TEST $ETUP CAUSE LO FLOW INDICAf!Du, DUE SY: 1/3/9e LICENSEES MAVE BEEK N0flFIED. EEE LOG 893417/95438. | |||
93417 7~20 11/C1/43 | 93417 7~20 11/C1/43 tv!0t R. Wilson F15Catt & Po#TER C0 PROVIDES FutiMER f uson REGARDimG DEVIAflDu ik REC TEstikG OF CL AMP Oh ULTRALOh!C FLOW p(Teas. TEST AttAmGEnfut C.! | ||
DESCt! BED ThAT CAUSED LO FLOW luDICAflDh. SEE LOG F91416/93418. | DESCt! BED ThAT CAUSED LO FLOW luDICAflDh. SEE LOG F91416/93418. | ||
DUE BT: 1/3/94 93.'t *s' | DUE BT: 1/3/94 93.'t | ||
FDR 450 F WalLE 1AFETY ANALYSIS sAvs'540 F. CDOLANT TEMP CAk DUE Bf: 1/3/9. | *s' 11/C1/;3 58:8: R. Jont s IkDI A> Polmf Uwit 3 AEPotts INtousl$f tktt OF Min TEMP FOR i | ||
l 93e1C *FC | 1?C CelTICALlif SETWEEN TECM SPEC & EAFEff AEALY$15. TECN $PEC CALL $ | ||
DUAL RE0nTS. LICENSEE REPLACED C0!L5 WITM STRomCED COILS & SOLVED | FDR 450 F WalLE 1AFETY ANALYSIS sAvs'540 F. CDOLANT TEMP CAk DUE Bf: 1/3/9. | ||
DUE st: 1/5/94 | AFFECT CORE PHYSICS PARAMETEas. $EE LOGr93137. | ||
03420 6007 11/05/S3 9311C80224 RVis: R.FRAnu | l 93e1C *FC DB/13/G3 avis: K.mAIDU CTsl PAL 15ADEs/Uw!1 1 REPo#TS POTEWTIAL GEWERIC PROBLEM OF CLARK RELAf $, 80 DEL 5U12 76, klk! CONTACT OR Mutt, Wof MEEf!NG SEISM!C - | ||
Cut SWITCHES EA740 & EA750 WWEu DPERATED BELOW 65 F DUE 70 thCREASE OF VISCOslif 0F GREASE.17 MAN RESPONSE flME l$ CRIfitAL, TEMP DUE Bf: 1/5/94 | DUAL RE0nTS. LICENSEE REPLACED C0!L5 WITM STRomCED COILS & SOLVED DUE st: 1/5/94 PROSLEN. | ||
0342' 30E D9/24/53 | 03420 6007 11/05/S3 9311C80224 RVis: R.FRAnu 4AMCO CONTROLS REP 0f f $ POTEWil AL Atm0RMAL OPERAfl0N OF limit - | ||
DUE tv: 1/5/94 03422 5340 10/19/93 5310280093 ECC8: G.BAGCM! | Cut SWITCHES EA740 & EA750 WWEu DPERATED BELOW 65 F DUE 70 thCREASE OF VISCOslif 0F GREASE.17 MAN RESPONSE flME l$ CRIfitAL, TEMP DUE Bf: 1/5/94 SMOULD BE ASOVE 70 F. COM40NWE ALTM EDIE0W 15 MAIN USER. | ||
NUCLEAR CustumERS NOT WOTIFIED. | 0342' 30E D9/24/53 RVIE: K.nAfDU FRWW DEPatiMENT OF EkERGY REPDats FAltutE OF C!ttult BREAKER OPERATlhG i | ||
03423 634C 10/22/73 9310270076 ECCB: G.tAGCal | w120 LINKAGE DUE 10 IMPRDPER ALICwmEnt 0F PLA511C FACE PLATE. C/8s ARE 480 V, 3 PMA5E, TYPE EM WESTINGMOUSE. | ||
DUE tv: 1/5/94 03422 5340 10/19/93 5310280093 ECC8: G.BAGCM! | |||
SOElkG COMPUTER SERVICES REPORTS RECEIPT OF Ett3R WOTICE F#3M i | |||
FORMER EDFTWARE SUPPLIEt$ REGARD!sc PROBLEMS IN GilituDL. ALL NUCLEAR CustumERS NOT WOTIFIED. | |||
j DUE 07: 1/10/94 03423 634C 10/22/73 9310270076 ECCB: G.tAGCal po[Inc C3=PUTER SERVICES REPotts RECE!PT D$ EttDR p0TICES RECE!VED FROM FORMER SOFTWARE SUPPLIERS REGARDlWG P908 tem 1 WifM Ak$Y$ COMPUTER CODE. kOf ALL NUCLE AR CU$1DMEt$ WERE hDilFIED. | |||
DUE sv: 1/10/94 I | DUE sv: 1/10/94 I | ||
i | i | ||
~,. - -. | |||
4 | 4 | ||
. Paar hc 2 | |||
LOG e sa Report | 11/30/53 10 CFR PART 21 TRACrimG SYSTEM VENDot It5PECTIOu stanCn DIVISION OF REACTOR ltSPECTIOh AND LICENSEE PERFfit4AkCE LOG e sa Report ACCE 5510% A551 Gwf D CLOS DESCRIPTIOu AND CATE h >46 E t OUT VEhD CCOE CODE 93424 63-0 10/11/93 931C210171 EGCs: G.tAGCat BOEING COMPUTER SEnvlCES REPonTS RECEIPT OF Ett0R NOTICES FROM FORMER SOFTWARE SUPPLIERS REGARD!kG GTsituDL. h0T ALL NUCLEAR CUSTCMEt$ MAVE BEEN NOTIFIED. | ||
VEhD | |||
DUE st: 1/10/94 i | DUE st: 1/10/94 i | ||
93 25 E296 10/07/93 931G200279 tvil: a.FRAMu ENvit0TECM Couttois REPotts 085EnvAflow 0F P90BLENS Om W5f t0h!CS | 93 25 E296 10/07/93 931G200279 tvil: a.FRAMu ENvit0TECM Couttois REPotts 085EnvAflow 0F P90BLENS Om W5f t0h!CS 8EJDEL 2100C SEnlES REcotDERS Om uu!TS su!LT PR!ce TO 1993 DutistEsm!C TESTING INC RESETTING AT PEAK ACCEL 8 FORCING OF DOOR DUE BY: 1/10/94 OFF 175 ATTACMmENT POINT. REPAlt KIT AVAILABLE. | ||
8EJDEL 2100C SEnlES REcotDERS Om uu!TS su!LT PR!ce TO 1993 | |||
DutistEsm!C TESTING INC RESETTING AT PEAK ACCEL 8 FORCING OF DOOR | |||
DUE BY: 1/10/94 | |||
934?e 69 A 1C/E1/13 G310C80C2G EGCs: G.sAGCn! | 934?e 69 A 1C/E1/13 G310C80C2G EGCs: G.sAGCn! | ||
stw voar POWER AUTuottf r/IP.3 REPotTS RECEIPT OF WEST NEAL w'2C | stw voar POWER AUTuottf r/IP.3 REPotTS RECEIPT OF WEST NEAL w'2C t | ||
INCLUDED ARE VALVE 5 FROM ALOYCD, ANCMot DARLikG, 715MER & VELAk. | ADDRE55!mG DISCREP Ik VALVE WIGNTS/CCs USED Ik PIPlkG AhALYSES. | ||
DUE Bf: 1/10/94 | INCLUDED ARE VALVE 5 FROM ALOYCD, ANCMot DARLikG, 715MER & VELAk. | ||
93427 n c 11/02/53 | DUE Bf: 1/10/94 EVALUATION UNDEtwAv. | ||
AC1 SE0JEWCER5 DUE TO CIRCUIT DE5f Gs PROBLEM RESULTitG FROM USE OF | 93427 n c 11/02/53 kv!B: s. ROGER 5 DUQUEskE LIGNT/ BEAVER VALLEY 2 REP 0tTS FAILURE OF 2 EDG AC1 SE0JEWCER5 DUE TO CIRCUIT DE5f Gs PROBLEM RESULTitG FROM USE OF | ||
.331 ATC =00EL365A LomG RAmGE TIMER RELAYS. htC/AIT REVIEWihG. | |||
ATC =00EL365A LomG RAmGE TIMER RELAYS. htC/AIT REVIEWihG. | |||
DUE BY: 1/10/96 I | DUE BY: 1/10/96 I | ||
I 93 2e a109 11/02/93 931108:211 tvle: s.80CERS CTal AmEtACE/ACASTAT REPonT5 TMAT TME 30 GPIA RELAYS SUBJECTE | I 93 2e a109 11/02/93 931108:211 tvle: s.80CERS CTal AmEtACE/ACASTAT REPonT5 TMAT TME 30 GPIA RELAYS SUBJECTE* | ||
V336 NUCLE AR QUAL TESTING AT WYLE LA85 ARE seWFtD As CopenERCI AL GRADE & | |||
ARE NOT DE51GufD TO MEET /ttcassetWDED FOR MAREN NUCLEAR ENVIRON | ARE NOT DE51GufD TO MEET /ttcassetWDED FOR MAREN NUCLEAR ENVIRON. | ||
DUE BY: 12/6/93 | DUE BY: 12/6/93 SEE LOG 893362. | ||
i 93429 rGE 10/18/93 931029D090 Stat: R. jones PACIFIC G&E/DIAsLO CAutou 1 REPonTS NEAT FLUK NOT CMAmmEL FACTOR | i 93429 rGE 10/18/93 931029D090 Stat: R. jones PACIFIC G&E/DIAsLO CAutou 1 REPonTS NEAT FLUK NOT CMAmmEL FACTOR W120 PEmALTY OF 25 A5 BElmG PCTENT woucousttV DUE TO OVEts]GMT ST WEST. Is NOT DEVIslNG ETN@0 LOGY TO ACCmJWT FOR CERTAIN DUE BY: 1/10/94 F ACT0ts. WEST PROVIDED INTEtlN MEINOD. TO CottECT. | ||
W120 PEmALTY OF 25 A5 BElmG PCTENT woucousttV DUE TO OVEts]GMT ST WEST. Is NOT DEVIslNG ETN@0 LOGY TO ACCmJWT FOR CERTAIN DUE BY: 1/10/94 | 93'3C CFL 11/19/G3 tV!8:5.mATTMEv5-CAROLINA P&L REPotts LACE OF Compt 1AmCE OF LOCAT10h or SK0 thTO: St*B AS LOADEDCAD0 Lit! A PlWS la FUEL A55Em8LY RELAf AVE 10 OE51Gu i | ||
93'3C CFL 11/19/G3 | SPEC 5. CALC 5 INDICATE NOT ChAhmEL FACT 0tt CAk ErCEED TECM SPEC DUE tv: 1/24/94 DE0muTS SY 91 Ekton DCCURRED WITNik $IEMEks DUE TO lhADQT. C0pecuh 4 | ||
thTO: St*B | 93431 FFL T1/21/43 EMCB:STR05=lDER PEkkSYLVaula P&L & GRAND GULF REPott FAILutEs OF JET PLMP Ewb5 MOLD Dobe BE AMS DUE TO IG5CC TMAT CAN CAUSL DAMAGE TO OTwEt COBG REACTOR IkTEtnALE DUE TO NYDRAULIC FORCES. K REcossefu S EARLv | ||
COBG REACTOR IkTEtnALE DUE TO NYDRAULIC FORCES. K REcossefu S EARLv | ' f DUE BY: 1/24/94 REPLACEMEhi TO AVolD DAMAGE. SEE LOG 893437 i | ||
93432 C*.: | 93432 C*.: | ||
GPU uuCLEAR REPotts REPLACEMENT OF manual DECLUTCN LEVEt$ on L2CD EIGNT WALVE ACTUATORS WITN THE RESULT ThAT ELECTRICAL OPERAtlon WAS IMPAlRED DUE TO PAlkT Ik A MACM!mED NOLE & USE OF A MAsesEt to DUE BY: 1/24/94 | 11/17 93 tvis:U.POTAP0v5 GPU uuCLEAR REPotts REPLACEMENT OF manual DECLUTCN LEVEt$ on | ||
/ | |||
L2CD EIGNT WALVE ACTUATORS WITN THE RESULT ThAT ELECTRICAL OPERAtlon WAS IMPAlRED DUE TO PAlkT Ik A MACM!mED NOLE & USE OF A MAsesEt to DUE BY: 1/24/94 TAP LEVER Okt0175 $MAFT. | |||
; ? | |||
i e}} | |||
Latest revision as of 08:17, 17 December 2024
| ML20058L423 | |
| Person / Time | |
|---|---|
| Site: | Hatch, Vogtle |
| Issue date: | 12/09/1993 |
| From: | Plisco L Office of Nuclear Reactor Regulation |
| To: | Woodard J GEORGIA POWER CO. |
| References | |
| NUDOCS 9312160337 | |
| Download: ML20058L423 (6) | |
Text
7 December 9,1993 Docket Nos. 50-321, 50-366, DISTRIBUTION 50-424, and 50-425 tDocket File 1 ACRS (10)
NRC/L:> cal PDRs OGC Mr. Jack D. Woodard PDII-3 Reading W. Haass, 904 Senior Vice President -
K.Jabbour Nuclear Operations G. Carpenter Georgia Power Company L. Berry P. O. Box 1295 G.Lainas Birmingham, Alabama 35201 S.Varga E.Merschoff,RII
Dear Mr. Woodard:
SUBJECT:
PART 21 MONTHLY REPORT FOR NOVEMBER 1993 HATCH NUCLEAR PLANT, UNITS 1 AND 2; AND V0GTLE NUCLEAR PLANT, UNITS 1 AND 2 In order to provide expeditious dissemination of 10 CFR Part 21 matters, the U.S. Nuclear Regulatory Commission (NRC) will mail a copy of its 10 CFR Part 21 monthly report to licensees of nuclear power plants.
The enclosed November 1993 monthly report is the initial mailing. These reports will continue to be made available to the public at the NRC public document room and at the local public document rooms.
If you do not wish to receive this report, or you have a specific contact other than yourself, please provide this information to Walter P. Haass, U.S. Nuclear Regulatory Commission, OWFN, M/S 9D4, Washington, DC 20555.
Sincerely,
/s/
Loren R. Plisco, Acting Director Project Directorate II-3 Division of Reactor Projects - III Office of Nuclear Reactor Regulation
Enclosure:
Part 21 Monthly Report for November 1993 cc w/o enclosure:
See next page
./
om PDIl-3/LA )
PDII-3/PM[ PDII-3/Pt PDII-hj/
L.BERRfh K.JABBOUk GCARPENTb L.PLI[C0 hw 12/ h /93 12/ 9 /93 12 / )
/93 12/ 9 /93 om
_~
0FFICIAL RECORD COPY FILE NAME: G:\\PART21/LTR O
y'O 140048 hC &
95 h t
9312160337 931209 Q,({h gg&
g,,.
tr -
t" DR ADOCK 0500 1
8 8f G 4
d
.k y
E UNITED STATES i'
f NUCLEAR PEGULATORY COMMISSION WASHINGTON D.C. 20S55-0001 December 9, 1993 Docket Nos. 50-321, 50-366, 50-424, and 50-425 Mr. Jack D. Woodard Senior Vice President -
Nuclear Operations Georgia Power Company P. O. Box 1295 Birmingham, Alabama 35201
Dear Mr. Woodard:
SUBJECT:
PART 21 MONTHLY REPORT FOR NOVEMBER 1993 HATCH NUCLEAR PLANT, UNITS 1 AND 2; AND V0GTLE NUCLEAR PLANT, UNITS 1 AND 2 In order to provide expeditious dissemination of 10 CFR Part 21 matters, the U.S. Nuclear Regulatory Commission (NRC) will mail a copy of its 10 CFR Part 21 monthly report to licensees of nuclear power plants. The enclosed November 1993 monthly report is the initial mailing. These reports will continue to be made available to the public at the NRC public document room and at the local public document rooms.
If you do not wish to receive this report, or you have a specific contact other than yourself, please provide this information to Walter P. Haass, U.S. Nuclear Regulatory Commission, 0WFN, M/S 9D4, Washington, DC 20555.
Sincerely, Loren R. Plisco, Acting Director Project Directorate II-3 Division of Reactor Projects - III Office of Nuclear Reactor Regulation
Enclosure:
Part 21 Monthly Report for November 1993 cc w/o enclosure:
See next page l
h 9
4 J-rE a
m.
s Edwin I. Hatch Nuclear Plant Georgia Power Company Vogtle Electric Generating Plant cc:
Mr. Ernest L. Blake, Jr.
Mr. Alan R. Herdt, Chief Shaw, Pittman, Potts and Trowbridge Project Branch #3 2300 N Street, NW.
U. S. Nuclear Regulatory Commission Washington, DC 20037 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. J. T. Beckham, Jr.
Vice President - Plant Hatch Mr. Dan H. Smith, Vice President Georgia Power Company Power Supply Operations P. O. Box 1295 Oglethorpe Power Corporation Birmingham, Alabama 35201 2100 East Exchange Place Turker, Georgia 30085-1349 j
Mr. S. J. Jethay Manager Licensing - Hatch Charles A. Patrizia, Esquire Georgia Power Company Paul, Hastings, Janofsky & Walker P. O. Box 1295 12th Floor Birmingham, Alabama 35201 1050 Connecticut Avenue, NW.
Washington, DC 20036 Mr. L. Sumner General Manager, Nuclear Plant Georgia Power Company Route 1, Box 439 Baxley,. Georgia 31513 Resident Inspector U. S. Nuclear Regulatory Commission Route 1, Box 725 Baxley, Georgia 31513 l
Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, NW. Suite 2900 i
Atlanta, Georgia 30323 Mr. Charles H. Badger Office of Planning and Budget Room 610 1
270 Washington Street, SW.
l Atlanta, Georgia 30334 Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE., Suite 1252 Atlanta, Georgia 30334 Chairman I
Appling County Commissioners County Courthouse Baxley, Georgia 31513 i
4 4
k 1
Edwin I. Hatch Nuclear Plant Georgia Power Company Vogtle Electric Generating Plant cc:
Mr. J. A. Bailey Office of the County Commissioner Manager - Licensing Burke County Commission Georgia Power Company Waynesboro, Georgia 30830 P. O. Box 1295 Birmingham, Alabama 35201 Resident inspector U. S. Nuclear Regulatory Commission Mr. J. B. Beasley P. O. Box 572 General Manager, Vogtle Electric Waynesboro, Georgia 30830 Generating Plant P. O. Box 1600 Mr. J. D. Woodard Waynesboro, Georgia 30830 Senior Vice President -
Nuclear Operations Office of Planning and Budget Georgia Power Company Room 615B P. O. Box 1295 270 Washington Street, SW.
Birmingham, Alabama 35201 4
Atlanta, Georgia 30334 Mr. C. K. McCoy Attorney General Vice President - Nuclear Law Department Vogtle Project 132 Judicial Building Georgia Power Company Atlanta, Georgia 30334 P. O. Box 1295 Birmingham, Alabama 35201 Arthur H. Domby, Esquire Troutman Sanders NationsBank Plaza 600 Peachtree Street, NE.
Suite 5200 l
Atlanta, Georgia 30308-2216 i
_.x-
. - ~.,, + >
4 PcBe b '.
1 11/30s.3 10 CFR PART 21 ftACKIWG ST$ TEM
{
VEuoDR fuSPEtflou BRANCH l
DIVl$1Du OF REACTOR 1mEPECT10m AND LICEk1EE PERFDt4ANCE I
LOG 8 *?B R E PDa 7 ACCES$!Dn A55tGhED CLO$ DE$CRIPflDW
[
ah?' DAtt kg.gEt DUT tESO CDC E C U. E
$1.15 CPL 10/22/s3 Evle: W.m AA 55 CAROLINA P&L/RDelmsDa 2 kEpotTS FAltuff 0F EDG p to EtAtt DUC t
I67L TDSADKEN $PalmGs ON THREE OF THE Alt staff Distal 80 TOR VALVES PREVEstikG AIR FROM ENTER 1tG CYLINDEt$ REDUIRED TO ROLL DIESEL.
DUE Bt: 1/3/9e sPRIuGS WERE SEPL ACED BROKEm SPalWG3 SElWG EVALUATED.
93 16 8120 11/C1/43 Rvit:G.CWALihA CTSI FISCMER 8 Pot 1Et REPotf S DEVI AflDW IN TEST!bG MEinDDOLOGY FDA REC
+
CL AMP On utfRA$Dw!C FLOW METEts V5ED ON 12" SCM 4D PIPE CARRYlmG Cet WATER. BUTTERFLT VALVE IN TEST $ETUP CAUSE LO FLOW INDICAf!Du, DUE SY: 1/3/9e LICENSEES MAVE BEEK N0flFIED. EEE LOG 893417/95438.
93417 7~20 11/C1/43 tv!0t R. Wilson F15Catt & Po#TER C0 PROVIDES FutiMER f uson REGARDimG DEVIAflDu ik REC TEstikG OF CL AMP Oh ULTRALOh!C FLOW p(Teas. TEST AttAmGEnfut C.!
DESCt! BED ThAT CAUSED LO FLOW luDICAflDh. SEE LOG F91416/93418.
DUE BT: 1/3/94 93.'t
- s' 11/C1/;3 58:8: R. Jont s IkDI A> Polmf Uwit 3 AEPotts INtousl$f tktt OF Min TEMP FOR i
1?C CelTICALlif SETWEEN TECM SPEC & EAFEff AEALY$15. TECN $PEC CALL $
FDR 450 F WalLE 1AFETY ANALYSIS sAvs'540 F. CDOLANT TEMP CAk DUE Bf: 1/3/9.
AFFECT CORE PHYSICS PARAMETEas. $EE LOGr93137.
l 93e1C *FC DB/13/G3 avis: K.mAIDU CTsl PAL 15ADEs/Uw!1 1 REPo#TS POTEWTIAL GEWERIC PROBLEM OF CLARK RELAf $, 80 DEL 5U12 76, klk! CONTACT OR Mutt, Wof MEEf!NG SEISM!C -
DUAL RE0nTS. LICENSEE REPLACED C0!L5 WITM STRomCED COILS & SOLVED DUE st: 1/5/94 PROSLEN.
03420 6007 11/05/S3 9311C80224 RVis: R.FRAnu 4AMCO CONTROLS REP 0f f $ POTEWil AL Atm0RMAL OPERAfl0N OF limit -
Cut SWITCHES EA740 & EA750 WWEu DPERATED BELOW 65 F DUE 70 thCREASE OF VISCOslif 0F GREASE.17 MAN RESPONSE flME l$ CRIfitAL, TEMP DUE Bf: 1/5/94 SMOULD BE ASOVE 70 F. COM40NWE ALTM EDIE0W 15 MAIN USER.
0342' 30E D9/24/53 RVIE: K.nAfDU FRWW DEPatiMENT OF EkERGY REPDats FAltutE OF C!ttult BREAKER OPERATlhG i
w120 LINKAGE DUE 10 IMPRDPER ALICwmEnt 0F PLA511C FACE PLATE. C/8s ARE 480 V, 3 PMA5E, TYPE EM WESTINGMOUSE.
DUE tv: 1/5/94 03422 5340 10/19/93 5310280093 ECC8: G.BAGCM!
SOElkG COMPUTER SERVICES REPORTS RECEIPT OF Ett3R WOTICE F#3M i
FORMER EDFTWARE SUPPLIEt$ REGARD!sc PROBLEMS IN GilituDL. ALL NUCLEAR CustumERS NOT WOTIFIED.
j DUE 07: 1/10/94 03423 634C 10/22/73 9310270076 ECCB: G.tAGCal po[Inc C3=PUTER SERVICES REPotts RECE!PT D$ EttDR p0TICES RECE!VED FROM FORMER SOFTWARE SUPPLIERS REGARDlWG P908 tem 1 WifM Ak$Y$ COMPUTER CODE. kOf ALL NUCLE AR CU$1DMEt$ WERE hDilFIED.
DUE sv: 1/10/94 I
i
~,. - -.
4
. Paar hc 2
11/30/53 10 CFR PART 21 TRACrimG SYSTEM VENDot It5PECTIOu stanCn DIVISION OF REACTOR ltSPECTIOh AND LICENSEE PERFfit4AkCE LOG e sa Report ACCE 5510% A551 Gwf D CLOS DESCRIPTIOu AND CATE h >46 E t OUT VEhD CCOE CODE 93424 63-0 10/11/93 931C210171 EGCs: G.tAGCat BOEING COMPUTER SEnvlCES REPonTS RECEIPT OF Ett0R NOTICES FROM FORMER SOFTWARE SUPPLIERS REGARD!kG GTsituDL. h0T ALL NUCLEAR CUSTCMEt$ MAVE BEEN NOTIFIED.
DUE st: 1/10/94 i
93 25 E296 10/07/93 931G200279 tvil: a.FRAMu ENvit0TECM Couttois REPotts 085EnvAflow 0F P90BLENS Om W5f t0h!CS 8EJDEL 2100C SEnlES REcotDERS Om uu!TS su!LT PR!ce TO 1993 DutistEsm!C TESTING INC RESETTING AT PEAK ACCEL 8 FORCING OF DOOR DUE BY: 1/10/94 OFF 175 ATTACMmENT POINT. REPAlt KIT AVAILABLE.
934?e 69 A 1C/E1/13 G310C80C2G EGCs: G.sAGCn!
stw voar POWER AUTuottf r/IP.3 REPotTS RECEIPT OF WEST NEAL w'2C t
ADDRE55!mG DISCREP Ik VALVE WIGNTS/CCs USED Ik PIPlkG AhALYSES.
INCLUDED ARE VALVE 5 FROM ALOYCD, ANCMot DARLikG, 715MER & VELAk.
DUE Bf: 1/10/94 EVALUATION UNDEtwAv.
93427 n c 11/02/53 kv!B: s. ROGER 5 DUQUEskE LIGNT/ BEAVER VALLEY 2 REP 0tTS FAILURE OF 2 EDG AC1 SE0JEWCER5 DUE TO CIRCUIT DE5f Gs PROBLEM RESULTitG FROM USE OF
.331 ATC =00EL365A LomG RAmGE TIMER RELAYS. htC/AIT REVIEWihG.
DUE BY: 1/10/96 I
I 93 2e a109 11/02/93 931108:211 tvle: s.80CERS CTal AmEtACE/ACASTAT REPonT5 TMAT TME 30 GPIA RELAYS SUBJECTE*
V336 NUCLE AR QUAL TESTING AT WYLE LA85 ARE seWFtD As CopenERCI AL GRADE &
ARE NOT DE51GufD TO MEET /ttcassetWDED FOR MAREN NUCLEAR ENVIRON.
DUE BY: 12/6/93 SEE LOG 893362.
i 93429 rGE 10/18/93 931029D090 Stat: R. jones PACIFIC G&E/DIAsLO CAutou 1 REPonTS NEAT FLUK NOT CMAmmEL FACTOR W120 PEmALTY OF 25 A5 BElmG PCTENT woucousttV DUE TO OVEts]GMT ST WEST. Is NOT DEVIslNG ETN@0 LOGY TO ACCmJWT FOR CERTAIN DUE BY: 1/10/94 F ACT0ts. WEST PROVIDED INTEtlN MEINOD. TO CottECT.
93'3C CFL 11/19/G3 tV!8:5.mATTMEv5-CAROLINA P&L REPotts LACE OF Compt 1AmCE OF LOCAT10h or SK0 thTO: St*B AS LOADEDCAD0 Lit! A PlWS la FUEL A55Em8LY RELAf AVE 10 OE51Gu i
SPEC 5. CALC 5 INDICATE NOT ChAhmEL FACT 0tt CAk ErCEED TECM SPEC DUE tv: 1/24/94 DE0muTS SY 91 Ekton DCCURRED WITNik $IEMEks DUE TO lhADQT. C0pecuh 4
93431 FFL T1/21/43 EMCB:STR05=lDER PEkkSYLVaula P&L & GRAND GULF REPott FAILutEs OF JET PLMP Ewb5 MOLD Dobe BE AMS DUE TO IG5CC TMAT CAN CAUSL DAMAGE TO OTwEt COBG REACTOR IkTEtnALE DUE TO NYDRAULIC FORCES. K REcossefu S EARLv
' f DUE BY: 1/24/94 REPLACEMEhi TO AVolD DAMAGE. SEE LOG 893437 i
93432 C*.:
11/17 93 tvis:U.POTAP0v5 GPU uuCLEAR REPotts REPLACEMENT OF manual DECLUTCN LEVEt$ on
/
L2CD EIGNT WALVE ACTUATORS WITN THE RESULT ThAT ELECTRICAL OPERAtlon WAS IMPAlRED DUE TO PAlkT Ik A MACM!mED NOLE & USE OF A MAsesEt to DUE BY: 1/24/94 TAP LEVER Okt0175 $MAFT.
- ?