{{#Wiki_filter: | {{#Wiki_filter:Sarah McDaniel | ||
Sarah McDaniel | |||
Sr. Nuclear Engineer | Sr. Nuclear Engineer | ||
Shearon Harris Nuclear Power Plant | Shearon Harris Nuclear Power Plant | ||
Mail Code HNP03 | Mail Code HNP03 | ||
5413 Shearon Harris Rd. | 5413 Shearon Harris Rd. | ||
New Hill, NC 27562-9300 | New Hill, NC 27562-9300 | ||
SUBJECT: | SUBJECT: | ||
SHEARON HARRIS, UNIT 1 - NOTIFICATION OF TARGET SET INSPECTION | |||
AND REQUEST FOR INFORMATION (NRC INSPECTION REPORT NO. | |||
05000400/2023403) | |||
Dear Ms. McDaniel: | Dear Ms. McDaniel: | ||
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) | The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) | ||
Region II (RII) staff will conduct an inspection of the Target Sets specified by the conditions of | Region II (RII) staff will conduct an inspection of the Target Sets specified by the conditions of | ||
your operating license at the Shearon Harris Nuclear Power Plant, Unit 1 on March 6 - 8, 2023. | your operating license at the Shearon Harris Nuclear Power Plant, Unit 1 on March 6 - 8, 2023. | ||
The inspection will be led by Mr. Jonathan Montgomery, Sr. Reactor Inspector, of the NRC RII | The inspection will be led by Mr. Jonathan Montgomery, Sr. Reactor Inspector, of the NRC RII | ||
office. The inspection will be conducted in accordance with Inspection Procedure 71130.14, | office. The inspection will be conducted in accordance with Inspection Procedure 71130.14, | ||
Review of Power Reactor Target Sets, and effective as of January 1, 2018. | Review of Power Reactor Target Sets, and effective as of January 1, 2018. | ||
On January 19, 2023, via e-mail with Ms. Sarah McDaniel of your staff, and Mr. Jonathan | On January 19, 2023, via e-mail with Ms. Sarah McDaniel of your staff, and Mr. Jonathan | ||
Montgomery, NRC RII, our respective staff, confirmed arrangements for a three-day onsite | Montgomery, NRC RII, our respective staff, confirmed arrangements for a three-day onsite | ||
inspection. The schedule is as follows: | inspection. The schedule is as follows: | ||
Onsite preparation / SGI review: March 6, 2023 | |||
In order to complete the inspection in the time allotted, Mr. Montgomery needs to review your | |||
non-SGI target sets program references and other pertinent documents prior to the inspection. | Onsite inspection: March 7-8, 2023 | ||
Please provide the non-SGI documents listed below via email or CERTREC upload by | In order to complete the inspection in the time allotted, Mr. Montgomery needs to review your | ||
non-SGI target sets program references and other pertinent documents prior to the inspection. | |||
Please provide the non-SGI documents listed below via email or CERTREC upload by | |||
February 27, 2023. | February 27, 2023. | ||
Please indicate how you would like our staff to dispose of any SGI documents after we have | Please indicate how you would like our staff to dispose of any SGI documents after we have | ||
completed our review. Mr. Montgomery plans to only review SGI material onsite in your secure | completed our review. Mr. Montgomery plans to only review SGI material onsite in your secure | ||
spaces and return materials to your staff at the end of each day. | spaces and return materials to your staff at the end of each day. | ||
January 23, 2023 | |||
S. McDaniel | S. McDaniel | ||
2 | |||
The types of documents the team will be reviewing during the conduct of the inspection are | |||
listed below. Please contact Mr. Montgomery at (404) 997-4880 prior to preparing copies | |||
and sending/uploading the files if there are any questions. The inspection team will try to | |||
minimize your administrative burden by specifically identifying those documents required for | |||
inspection preparation. | |||
Provide the following documents: | |||
* | |||
All non-SGI procedures that relate to the Target Set identification, maintenance | |||
and development | |||
* | |||
Site Target Sets (ready for review once onsite) | |||
* | |||
List of the Target Set Expert Panel members (names, qualifications, and positions) | |||
* | |||
Response to security event operations procedure | |||
* | |||
Any procedure listed as a credited operator action (OMA) in the target sets | |||
* | |||
Results of the last two target set expert panel reviews (meeting minutes) | |||
* | |||
Corrective action program (CAP) procedures and LIST of CRs associated with | |||
Target Sets and the program since the last triennial target set inspection (last 3 | |||
years) | |||
* | |||
A list of any issue/condition reports since the last target set inspection (3 | |||
years) directly related to target sets and/or Safety/Security interface | |||
* | |||
A LIST of design change packages or modification packages that affected target | |||
sets | |||
* | |||
A summary or list of any changes that have occurred to the target sets since the | |||
last inspection | |||
* | |||
A copy of the sites Safety / Security Interface procedure | |||
Items needed during the Inspection Week: | |||
* | |||
Access to all NON-SGI and SGI procedures related to Target Sets | |||
* | |||
A point of contact knowledgeable in Target Sets and the protective defensive | |||
strategy | |||
This letter does not contain new or amended information collection requirements subject to the | * | ||
We will require a meeting with Target Set knowledgeable personnel | |||
(including operations) to discuss target set content | |||
We will keep the requested information only as long as it is necessary to complete the | |||
inspection activity. Additionally, if you feel that any requested documents would contain | |||
proprietary or company sensitive information, please make sure they are appropriately | |||
marked and attached to an appropriate affidavit for withholding in accordance with | |||
10 CFR 2.390. | |||
This letter does not contain new or amended information collection requirements subject to | |||
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information | |||
collection requirements were approved by the Office of Management and Budget, under | |||
control number 3150-0011. The NRC may not conduct or sponsor, and a person is not | |||
required to respond to, a request for information or an information collection requirement | |||
unless the requesting document displays a currently valid Office of Management and Budget | |||
control number. | |||
This letter does not contain new or amended information collection requirements subject to the | |||
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). | Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). | ||
S. McDaniel | S. McDaniel | ||
Existing information collection requirements were approved by the Office of Management and | 3 | ||
Budget under control number 3150-0011. The NRC may not conduct or sponsor, and a person | Existing information collection requirements were approved by the Office of Management and | ||
is not required to respond to, a request for information or an information collection requirement | Budget under control number 3150-0011. The NRC may not conduct or sponsor, and a person | ||
unless the requesting document displays a currently valid Office of Management and Budget | is not required to respond to, a request for information or an information collection requirement | ||
unless the requesting document displays a currently valid Office of Management and Budget | |||
control number. | control number. | ||
This letter and its enclosure will be made available for public inspection and copying at | This letter and its enclosure will be made available for public inspection and copying at | ||
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in | http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in | ||
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. | accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. | ||
Your cooperation and support during this inspection will be appreciated. If you have | Your cooperation and support during this inspection will be appreciated. If you have | ||
questions concerning this inspection or the inspection teams information or logistical | questions concerning this inspection or the inspection teams information or logistical | ||
needs, please contact Jonathan Montgomery, the team lead inspector, in the Region II | needs, please contact Jonathan Montgomery, the team lead inspector, in the Region II | ||
office at (404) 997-4880 or jonathan.montgomery@nrc.gov or me at (404) 997-4506. | office at (404) 997-4880 or jonathan.montgomery@nrc.gov or me at (404) 997-4506. | ||
Sincerely, | |||
James Baptist, Branch Chief | |||
Engineering Branch 1 | |||
Division of Reactor Safety | |||
Docket Nos.: 50-400 | |||
License Nos.: NPF-63 | |||
Signed by Baptist, James | |||
on 01/23/23 | |||
ML23020A125 | ML23020A125 | ||
X | |||
SUNSI Review | |||
X | |||
Non-Sensitive | |||
Sensitive | |||
X | |||
Publicly Available | |||
Non-Publicly Available | |||
OFFICE | |||
RII/DRS | |||
RII/DRS | |||
NAME | |||
J. Montgomery | |||
J. Baptist | |||
DATE | |||
01/20/2023 | |||
01/23/2023 | |||
}} | }} | ||
Latest revision as of 19:16, 2 January 2025
| ML23020A125 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 01/23/2023 |
| From: | James Baptist Division of Reactor Safety II |
| To: | Mcdaniel S Progress Energy Carolinas |
| References | |
| IR 2023403 | |
| Download: ML23020A125 (4) | |
See also: IR 05000400/2023403
Text
Sarah McDaniel
Sr. Nuclear Engineer
Shearon Harris Nuclear Power Plant
Mail Code HNP03
5413 Shearon Harris Rd.
New Hill, NC 27562-9300
SUBJECT:
SHEARON HARRIS, UNIT 1 - NOTIFICATION OF TARGET SET INSPECTION
AND REQUEST FOR INFORMATION (NRC INSPECTION REPORT NO.
Dear Ms. McDaniel:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II (RII) staff will conduct an inspection of the Target Sets specified by the conditions of
your operating license at the Shearon Harris Nuclear Power Plant, Unit 1 on March 6 - 8, 2023.
The inspection will be led by Mr. Jonathan Montgomery, Sr. Reactor Inspector, of the NRC RII
office. The inspection will be conducted in accordance with Inspection Procedure 71130.14,
Review of Power Reactor Target Sets, and effective as of January 1, 2018.
On January 19, 2023, via e-mail with Ms. Sarah McDaniel of your staff, and Mr. Jonathan
Montgomery, NRC RII, our respective staff, confirmed arrangements for a three-day onsite
inspection. The schedule is as follows:
Onsite preparation / SGI review: March 6, 2023
Onsite inspection: March 7-8, 2023
In order to complete the inspection in the time allotted, Mr. Montgomery needs to review your
non-SGI target sets program references and other pertinent documents prior to the inspection.
Please provide the non-SGI documents listed below via email or CERTREC upload by
February 27, 2023.
Please indicate how you would like our staff to dispose of any SGI documents after we have
completed our review. Mr. Montgomery plans to only review SGI material onsite in your secure
spaces and return materials to your staff at the end of each day.
January 23, 2023
S. McDaniel
2
The types of documents the team will be reviewing during the conduct of the inspection are
listed below. Please contact Mr. Montgomery at (404) 997-4880 prior to preparing copies
and sending/uploading the files if there are any questions. The inspection team will try to
minimize your administrative burden by specifically identifying those documents required for
inspection preparation.
Provide the following documents:
All non-SGI procedures that relate to the Target Set identification, maintenance
and development
Site Target Sets (ready for review once onsite)
List of the Target Set Expert Panel members (names, qualifications, and positions)
Response to security event operations procedure
Any procedure listed as a credited operator action (OMA) in the target sets
Results of the last two target set expert panel reviews (meeting minutes)
Corrective action program (CAP) procedures and LIST of CRs associated with
Target Sets and the program since the last triennial target set inspection (last 3
years)
A list of any issue/condition reports since the last target set inspection (3
years) directly related to target sets and/or Safety/Security interface
A LIST of design change packages or modification packages that affected target
sets
A summary or list of any changes that have occurred to the target sets since the
last inspection
A copy of the sites Safety / Security Interface procedure
Items needed during the Inspection Week:
Access to all NON-SGI and SGI procedures related to Target Sets
A point of contact knowledgeable in Target Sets and the protective defensive
strategy
We will require a meeting with Target Set knowledgeable personnel
(including operations) to discuss target set content
We will keep the requested information only as long as it is necessary to complete the
inspection activity. Additionally, if you feel that any requested documents would contain
proprietary or company sensitive information, please make sure they are appropriately
marked and attached to an appropriate affidavit for withholding in accordance with
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, under
control number 3150-0011. The NRC may not conduct or sponsor, and a person is not
required to respond to, a request for information or an information collection requirement
unless the requesting document displays a currently valid Office of Management and Budget
control number.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).
S. McDaniel
3
Existing information collection requirements were approved by the Office of Management and
Budget under control number 3150-0011. The NRC may not conduct or sponsor, and a person
is not required to respond to, a request for information or an information collection requirement
unless the requesting document displays a currently valid Office of Management and Budget
control number.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Your cooperation and support during this inspection will be appreciated. If you have
questions concerning this inspection or the inspection teams information or logistical
needs, please contact Jonathan Montgomery, the team lead inspector, in the Region II
office at (404) 997-4880 or jonathan.montgomery@nrc.gov or me at (404) 997-4506.
Sincerely,
James Baptist, Branch Chief
Engineering Branch 1
Division of Reactor Safety
Docket Nos.: 50-400
License Nos.: NPF-63
Signed by Baptist, James
on 01/23/23
X
SUNSI Review
X
Non-Sensitive
Sensitive
X
Publicly Available
Non-Publicly Available
OFFICE
RII/DRS
RII/DRS
NAME
J. Montgomery
J. Baptist
DATE
01/20/2023
01/23/2023