{{#Wiki_filter:. Malling Address Alabama Power Company 600 North 18th Street P;st Offica Box 2641
{{#Wiki_filter:Malling Address Alabama Power Company 600 North 18th Street P;st Offica Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.
* Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.
%2's'* 027"'
      %2's'*d    027"'                                                     AlabamaPower the Southern dectrC System June 10, 1983 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washi ngton, D. C. 20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units 1 and 2 Licensing items Requesting NRC Approval Gentlemen:
AlabamaPower d
the Southern dectrC System June 10, 1983 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washi ngton, D. C.
20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units 1 and 2 Licensing items Requesting NRC Approval Gentlemen:
Attached for your information is a status of all licensing items identified in Alabama Power Company's {{letter dated|date=January 13, 1983|text=letter dated January 13, 1983}}.
Attached for your information is a status of all licensing items identified in Alabama Power Company's {{letter dated|date=January 13, 1983|text=letter dated January 13, 1983}}.
This status is provided on a monthly basis and updated to include any additional submittals requesting NRC approval.
This status is provided on a monthly basis and updated to include any additional submittals requesting NRC approval.
Line 26: Line 28:
F. L. Clayton, Jr.
F. L. Clayton, Jr.
FLCJr/GGY:lsh-D39 Attachment cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford Dr. I. L. Myers 8306160278 830610 FDR ADOCK 05000348 P
FLCJr/GGY:lsh-D39 Attachment cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford Dr. I. L. Myers 8306160278 830610 FDR ADOCK 05000348 P
PDR I '
PDR I
(
(


ATTAOSIENT                                 Page 1 STATUS OF LIE NSING ITEMS REQUIRING Inc APPROVAL Ji3IE 10, 1983 PROPOSED         ACTUAL   REQESTED APCo           AR:o       16tC SIAINITTAL     SWINITTAL APPROVAL     ACTUAL 16tC       TAC ITEM                           DATE           DATE       DATE     APPROVAL DATE       ND.
ATTAOSIENT Page 1 STATUS OF LIE NSING ITEMS REQUIRING Inc APPROVAL Ji3IE 10, 1983 PROPOSED ACTUAL REQESTED APCo AR:o 16tC SIAINITTAL SWINITTAL APPROVAL ACTUAL 16tC TAC ITEM DATE DATE DATE APPROVAL DATE ND.
1   Movable Control Rod Assemblies for     02-22-83       03-04-83   07-15-83 3                     49951 FNP 1 and 2 (T.S. 3/4.1.3)                                                                       49952 2   Charcoal Filters for FNP 1 and 2       03-01-83       03-04-83   09-01-83                     49953 (T.S. 4.7.7, 4.7.8 and 4.9.14)                                                                   49954 3 River Water System for FNP 1 and 2           N/A           12-30-82   07-01-83 2                    49374 (T.S. 3/4.7.5)                                                                                   49375 4   Diesel Generator Overload Test for         N/A         08-03-82   10-01-83 I                   49374 FNP 1 and 2 (T.S. 4.8.1.1.2.c.5)                         12-30-82                                 49375 5 BIT Reduction for FNP 1 and 2               N/A           12-30-82   03-31-83   03-15-83         N/A (T.S. 3/4.5.4)                                         03-04-83   03-18-83 6   Turbine Valve Surveillance for FNP 2       N/A           10-08-82   12-01-82   NRC letter       49973 (T.S. 3/4.3.4)                                           12-10-82               of 04-29-83 01-18-83               stated NRC pos it lon.
1 Movable Control Rod Assemblies for 02-22-83 03-04-83 07-15-83 3 49951 FNP 1 and 2 (T.S. 3/4.1.3) 49952 2
APCo submltied appeal on 05-31-83 7   RCS Pressure Isolation Valves             N/A         08-10-82   07-01-83 2                    48714 for FNP 1 and 2 (T.S. 3/4.4.7.2                         12-23-82                                 48715 and 3/4.4.7.3) 8 Mechanical Snubber Functional Test           N/A           11-05-82   12-01-82   01-31-83         N/A Exemption for FNP 1 (T.S.4.7.9.e) 9   Waste Gas Hydrogen /0xygen Analyzer     12-01-83 3                 06-01-84 3 for FNP 1 and 2 (T.S. Table 4.5-9) 1 Revised by APCo letter dated 06-03-83                                                                   ;
Charcoal Filters for FNP 1 and 2 03-01-83 03-04-83 09-01-83 49953 (T.S. 4.7.7, 4.7.8 and 4.9.14) 49954 2
2 Delay of approval will adversely af fect the FNP 2 Ref ueling Outage in September 1983 or precipitate a special outage.
3 River Water System for FNP 1 and 2 N/A 12-30-82 07-01-83 49374 (T.S. 3/4.7.5) 49375 4
Diesel Generator Overload Test for N/A 08-03-82 10-01-83 I 49374 FNP 1 and 2 (T.S. 4.8.1.1.2.c.5) 12-30-82 49375 5 BIT Reduction for FNP 1 and 2 N/A 12-30-82 03-31-83 03-15-83 N/A (T.S. 3/4.5.4) 03-04-83 03-18-83 6
Turbine Valve Surveillance for FNP 2 N/A 10-08-82 12-01-82 NRC letter 49973 (T.S. 3/4.3.4) 12-10-82 of 04-29-83 01-18-83 stated NRC pos it lon.
APCo submltied appeal on 05-31-83 2
7 RCS Pressure Isolation Valves N/A 08-10-82 07-01-83 48714 for FNP 1 and 2 (T.S. 3/4.4.7.2 12-23-82 48715 and 3/4.4.7.3) 8 Mechanical Snubber Functional Test N/A 11-05-82 12-01-82 01-31-83 N/A Exemption for FNP 1 (T.S.4.7.9.e) 9 Waste Gas Hydrogen /0xygen Analyzer 12-01-83 3 06-01-84 3 for FNP 1 and 2 (T.S. Table 4.5-9) 1 Revised by APCo letter dated 06-03-83 2 Delay of approval will adversely af fect the FNP 2 Ref ueling Outage in September 1983 or precipitate a special outage.
3, Revised due to reevaluation.
3, Revised due to reevaluation.
4   APCo currently evaluating NRC SER.
4 APCo currently evaluating NRC SER.
5   FNP 2 Hydraulic Snubber List will be submitted 60 days af ter startup following the Unit 2, 2nd Ref ueling Outage scheduled to commence September,1983                                                   )
5 FNP 2 Hydraulic Snubber List will be submitted 60 days af ter startup following the Unit 2, 2nd Ref ueling Outage scheduled to commence September,1983 O.
I O. New request per this status which, if not approved, would precipitate a special outage.
New request per this status which, if not approved, would precipitate a special outage.


ATTACHIENT                                 Page 2 STATUS OF LICENSIps ITEMS REQUIRING 154C APPROVAL Jt2E 10,1983 PROPOSED       ACTUAL     REQUESTED APCo           APCo         MC SusselTTAL     SLEINITTAL APPROVAL     ACTUAL petC         TAC ITEM                         DATE           DATE       DATE     APPROVAL DATE         10 10   ISl/IST Licensing Program
ATTACHIENT Page 2 STATUS OF LICENSIps ITEMS REQUIRING 154C APPROVAL Jt2E 10,1983 PROPOSED ACTUAL REQUESTED APCo APCo MC SusselTTAL SLEINITTAL APPROVAL ACTUAL petC TAC ITEM DATE DATE DATE APPROVAL DATE 10 10 ISl/IST Licensing Program a.
: a. Unit 1 Inservice Inspection (ISI)                         .
Unit 1 Inservice Inspection (ISI)
Program for ASME Code Class 1, 2 and 3 Components
Program for ASME Code Class 1, 2 and 3 Components
: 1) Rollef Requests on vessel         N/A         04-17-81   09-01-83                     48559 cladding examinations                         01-10-83
: 1) Rollef Requests on vessel N/A 04-17-81 09-01-83 48559 cladding examinations 01-10-83
: 2) Rollef Requests on hydro-       01-18-83       01-28-83   09-01-83                     49547 static test requirements
: 2) Rollef Requests on hydro-01-18-83 01-28-83 09-01-83 49547 static test requirements b.
: b. Unit 2 Inservice inspection (ISI) Program for ASME Code Class 1, 2 and 3 Components
Unit 2 Inservice inspection (ISI) Program for ASME Code Class 1, 2 and 3 Components 2
: 1) Revision 0 Rollef Requests           N/A       07-25-80   09-01-83 2
: 1) Revision 0 Rollef Requests N/A 07-25-80 09-01-83 2
: 2) Rollef Requests on vessel             N/A       01-10-83   09-01-83 2                    49373 cladding examinations
: 2) Rollef Requests on vessel N/A 01-10-83 09-01-83 49373 cladding examinations 2
: 3) Rollef Request on hydrostatic 01-18-83         01-28-83   09-01-83 2 test requirements
: 3) Rollef Request on hydrostatic 01-18-83 01-28-83 09-01-83 test requirements c.
: c. Unit 1 Inservice Testing (IST)
Unit 1 Inservice Testing (IST)
Program for AMSE Code Class 1, 2 and 3 Components
Program for AMSE Code Class 1, 2 and 3 Components 4
: 1) Revision 2 Relief Requests           N/A       04-21-80   03-15-83   05-02-83 4          N/A
: 1) Revision 2 Relief Requests N/A 04-21-80 03-15-83 05-02-83 N/A 4
: 2) Revision 3 Rollef Requests           N/A       07-16-81   03-15-83   05-02-83 4          N/A
: 2) Revision 3 Rollef Requests N/A 07-16-81 03-15-83 05-02-83 N/A 4
: 3) Revision 4 Rollef Requests           N/A       10-25-82   03-15-83   05-02-83 4          N/A 1 Revised by APCo letter dated 06-03-83 2 Delay of approval will adversely af fect the FNP 2 Refueling Outage In September 1983 or precipitate a special outage.
: 3) Revision 4 Rollef Requests N/A 10-25-82 03-15-83 05-02-83 N/A 1
Revised by APCo letter dated 06-03-83 2 Delay of approval will adversely af fect the FNP 2 Refueling Outage In September 1983 or precipitate a special outage.
3 Revised due to reevaluation.
3 Revised due to reevaluation.
4 APCo currently evaluating P51C SER.
4 APCo currently evaluating P51C SER.
5, FNP 2 Hydraulle Snubber List will be submitted 60 days af ter startup following the Unit 2, 2nd Ref ueling Outage scheduled to commence September,1983 O. New request per this status which, if not approved, would precipitate a special outage.
5, FNP 2 Hydraulle Snubber List will be submitted 60 days af ter startup following the Unit 2, 2nd Ref ueling Outage scheduled to commence September,1983 O.
r     w w
New request per this status which, if not approved, would precipitate a special outage.
r w
w


ATTACHENT                                   Page 3 STATUS OF LICENSIIS ITEMS REQUIRiis IRC APPRDVAL JimE 10, 1983 PROPOSED         ACTUAL     REQUESTED APCo           AR:o         mc SUBMITTAL       SUBMITTAL   APPROVAL       ACTUAL MtC     TAC ITEM                             DATE           DATE         DATE _     APPROVAL DATE   80
ATTACHENT Page 3 STATUS OF LICENSIIS ITEMS REQUIRiis IRC APPRDVAL JimE 10, 1983 PROPOSED ACTUAL REQUESTED APCo AR:o mc SUBMITTAL SUBMITTAL APPROVAL ACTUAL MtC TAC ITEM DATE DATE DATE _
: d. Unit 2 Inservice Testing (IST)     Program for ASME Code Class 1, 2 and 3 Components
APPROVAL DATE 80 d.
: 1) Revision 0 Relief Requests             N/A       03-12-80     02-15-83     04-08-83 4      N/A
Unit 2 Inservice Testing (IST)
: 2) Revision 1 Relief Requests             N/A       03-17-82     02-15-83     04-08-83 4      N/A
Program for ASME Code Class 1, 2 and 3 Components 4
: 3) Revision 2 Relief Requests             N/A       08-06-82     02-15-83     04-08-83 4      N/A 11 Spent Fuel Pool Storage Additions               N/A       03-19-82     11-01-82     04-15-03       N/A for FNP 1                                                             05-01-83 (revised need date) 12 Change 18 Month Interval to RefueIIng 04-01-83           04-05-83     10-01-83 13 Meteorological Tower Surveillance for 02-01-83           01-24-83     08-01-83 FNP 1 and 2 (T.S. 3/4.3.3.4) 14   in-Core Thimbles for FNP 1 and 2               N/A         N/A         N/A           N/A         N/A (T.S. 3.3.3.2) 15 Safety Evaluations for Next Fuel Reloads:
: 1) Revision 0 Relief Requests N/A 03-12-80 02-15-83 04-08-83 N/A 4
: a. Unit 1 Upflow Modification                 N/A       08-16-82       N/A           N/A       N/A
: 2) Revision 1 Relief Requests N/A 03-17-82 02-15-83 04-08-83 N/A 4
: b. Unit 1 Cycle 5                       03-14-83       03-17-83       N/A           N/A       N/A
: 3) Revision 2 Relief Requests N/A 08-06-82 02-15-83 04-08-83 N/A 11 Spent Fuel Pool Storage Additions N/A 03-19-82 11-01-82 04-15-03 N/A for FNP 1 05-01-83 (revised need date) 12 Change 18 Month Interval to RefueIIng 04-01-83 04-05-83 10-01-83 13 Meteorological Tower Surveillance for 02-01-83 01-24-83 08-01-83 FNP 1 and 2 (T.S. 3/4.3.3.4) 14 in-Core Thimbles for FNP 1 and 2 N/A N/A N/A N/A N/A (T.S. 3.3.3.2) 15 Safety Evaluations for Next Fuel Reloads:
: c. Unit 2 Cycle 318 Month Fuel           09-01-83                       N/A           N/A       N/A Cycle 16 FAH and Positive Moderator Temper-       09-15-83 3                   02-01-84 ature Coef fIciont 17 Containment Spray                             N/A           N/A         N/A           N/A       N/A l
a.
Unit 1 Upflow Modification N/A 08-16-82 N/A N/A N/A b.
Unit 1 Cycle 5 03-14-83 03-17-83 N/A N/A N/A c.
Unit 2 Cycle 318 Month Fuel 09-01-83 N/A N/A N/A Cycle 16 FAH and Positive Moderator Temper-09-15-83 3 02-01-84 ature Coef fIciont 17 Containment Spray N/A N/A N/A N/A N/A l
1 Revised by APCo letter dated 06-03-83 2 Delay of approval will adversely af fect the FNP 2 Ref ueling Outage in September 1983 or precipitate a speclei outage.
1 Revised by APCo letter dated 06-03-83 2 Delay of approval will adversely af fect the FNP 2 Ref ueling Outage in September 1983 or precipitate a speclei outage.
3 Revised due to reevaluation.
3 Revised due to reevaluation.
4 APCo currently evaluating EC SER.
4 APCo currently evaluating EC SER.
5 FNP 2 Hydraulle Snubber List will be submitted 60 days af ter startup following the Unit 2, 2nd Ref ueling Outage scheduled to commence September,1983 O. New request per this status which, if not approved, would precipitate a special outage.
5 FNP 2 Hydraulle Snubber List will be submitted 60 days af ter startup following the Unit 2, 2nd Ref ueling Outage scheduled to commence September,1983 O.
New request per this status which, if not approved, would precipitate a special outage.


ATTA00ENT                                     Page 4         ;
ATTA00ENT Page 4 STATUS OF LICENSilS ITEMS REQUIRilS NRC APPROVAL JtME 10,1983 190 POSED ACTUAL REQtESTED APCo APCo MtC SUBIITTAL SIENITTAL APPROVAL ACTUAL IGtC TAC ITEM DATE DATE DATE APPROVAL DATE 80 18 Technical Specification Optimization N/A N/A N/A N/A N/A Westinghouse Owners Group 19 Safety Related Battery Changes 04-15-83 05-03-83 11-03-83 20 Rod Swap Test During Low Power 03-01-83 03-01-83 N/A N/A N/A Physics Testing 21 Rod Drop Timing During Low Power N/A N/A N/A N/A N/A Physics Testing 22 Auto Rod Control Above 90% Power N/A 01-11-83 04-01-83 03-24-83 N/A for Unit 2, Cycle 2 and Unit 1, 09-14-82 12-01-82 Cycle 5 23 Unit 2 Licensing Deletion Amendment 01-12-83 01-07-83 N/A N/A N/A Clarification Letter 24 FSAR Update 07-01-83 N/A N/A N/A 25 Administrative Changes a.
STATUS OF LICENSilS ITEMS REQUIRilS                                           ;
Accumulator and ECCS Subsystem 02-01-83 02-01-83 09-01-83 49184 for FNP 1 and 2 (T.S. 4.5.1.1 49185 (c) and 4.5.2.(a))
NRC APPROVAL                                                     l JtME 10,1983 190 POSED     ACTUAL       REQtESTED APCo         APCo           MtC SUBIITTAL     SIENITTAL     APPROVAL   ACTUAL IGtC         TAC ITEM                           DATE         DATE           DATE     APPROVAL DATE         80 18 Technical Specification Optimization         N/A             N/A         N/A       N/A           N/A Westinghouse Owners Group 19   Safety Related Battery Changes         04-15-83     05-03-83       11-03-83 20 Rod Swap Test During Low Power           03-01-83     03-01-83         N/A       N/A           N/A Physics Testing 21 Rod Drop Timing During Low Power             N/A             N/A         N/A       N/A           N/A Physics Testing 22 Auto Rod Control Above 90% Power             N/A       01-11-83       04-01-83   03-24-83         N/A for Unit 2, Cycle 2 and Unit 1,                       09-14-82       12-01-82 Cycle 5 23 Unit 2 Licensing Deletion Amendment     01-12-83     01-07-83         N/A       N/A           N/A Clarification Letter 24   FSAR Update                             07-01-83                       N/A       N/A           N/A 25   Administrative Changes
b.
: a. Accumulator and ECCS Subsystem       02-01-83     02-01-83       09-01-83                   49184 for FNP 1 and 2 (T.S. 4.5.1.1                                                               49185 (c) and 4.5.2.(a))
Generic Letter 82-17 on Audit of N/A 10-25-82 09-01-83 49068 Emergency Plan for FNP 1 and 2 49069 (T.S. 6.5.2.8.e) c.
: b. Generic Letter 82-17 on Audit of         N/A       10-25-82       09-01-83                       49068 Emergency Plan for FNP 1 and 2                                                                 49069 (T.S. 6.5.2.8.e)
Machanical and Hydraulle Snubber 06-01-83 05-27-83 09-01-83 Lists for FNP 1 (T.S. Table 5
: c. Machanical and Hydraulle Snubber 06-01-83         05-27-83       09-01-83 Lists for FNP 1 (T.S. Table 3.7-4A and 3.7-4b) 5 e
3.7-4A and 3.7-4b) e 1
Revised by APCo letter dated 06-03-83, 2 Delay of approval will adversely af fect the FNP 2 Ref ueling Outage in September 1983 or precipitate a special outage.
Revised by APCo letter dated 06-03-83, 2 Delay of approval will adversely af fect the FNP 2 Ref ueling Outage in September 1983 or precipitate a special outage.
3 Revised due to reevaluation.
3 Revised due to reevaluation.
4   APCo currently evaluating MIC SER.
4 APCo currently evaluating MIC SER.
5   FNP 2 Hydraulic Snubber List will be submitted 60 days af ter startup following the Unit 2, 2nd Refueling Outage scheduled to commence September,1983.
5 FNP 2 Hydraulic Snubber List will be submitted 60 days af ter startup following the Unit 2, 2nd Refueling Outage scheduled to commence September,1983.
C. New request per this status which, if not approved, would precipitate a special outage.
C.
New request per this status which, if not approved, would precipitate a special outage.


  .                                                          ATTACMENT                                 Page 5 J
ATTACMENT Page 5 STATUS OF LICENS10E ITEMS REQU".ING J
STATUS OF LICENS10E ITEMS REQU".ING ISIC APPROVAL
ISIC APPROVAL JtBE 10,1983 PROR)$ED ACTUAL REQLESTED APCo AFCo IGtC SLEBelTTAL SWIMITTAL APPROVAL ACTUAL IGtC TAC ITEM DATE Dn?I DATE APPROVAL DATE BE).
* JtBE 10,1983 PROR)$ED         ACTUAL     REQLESTED APCo           AFCo         IGtC SLEBelTTAL     SWIMITTAL   APPROVAL   ACTUAL IGtC       TAC ITEM                           DATE           Dn?I       DATE     APPROVAL DATE       BE).
d.
: d. Administrative Changes for FNP       03-01-83       02-01-83   09-01-83                     49184 1 and 2:                                                                                     49185
Administrative Changes for FNP 03-01-83 02-01-83 09-01-83 49184 1 and 2:
49185
: 1) Fire Detectors Table 3.5-12
: 1) Fire Detectors Table 3.5-12
: 2) RHR isolation 4.5.2.d.1
: 2) RHR isolation 4.5.2.d.1
Line 91: Line 106:
: 4) Yard Fire Hydrant Table 3.7-7
: 4) Yard Fire Hydrant Table 3.7-7
: 5) Service Water Battery 4.8.2.5.2(d) 2
: 5) Service Water Battery 4.8.2.5.2(d) 2
: 6) Organization Chart Figure 6.2-2
: 6) Organization Chart Figure 6.2-2 e.
: e. Unit 2 Pressurizer Sensor Table     03-01-83       02-01-83   09-01-83                     49185 (T.S. 3.3.3.7)
Unit 2 Pressurizer Sensor Table 03-01-83 02-01-83 09-01-83 49185 (T.S. 3.3.3.7) f.
: f. Unit 1 Refueling Outage Change:     03-01-83       02-01-83   09-01-83                     49184 Containment Vent
Unit 1 Refueling Outage Change:
: g. Turbine Building Hydraulic             N/A         12-10-82   09-01-83                     49287 Snubbers for FNP 2
03-01-83 02-01-83 09-01-83 49184 Containment Vent g.
: h. Incorporation of Licensing             N/A         11-24-82   09-01-83 Requirements for FNP 2
Turbine Building Hydraulic N/A 12-10-82 09-01-83 49287 Snubbers for FNP 2 h.
: 1) FNP 2 License Condition                                                                   49479 2.C.(17) - Containment Vent Line
Incorporation of Licensing N/A 11-24-82 09-01-83 Requirements for FNP 2
: 1) FNP 2 License Condition 49479 2.C.(17) - Containment Vent Line
: 2) Mechanical Snubber List for FNP 2 (T.S. Table 3.7-4b)
: 2) Mechanical Snubber List for FNP 2 (T.S. Table 3.7-4b)
: 3) FNP 2 License Condition                                                                   48687 2.C.(19)(b) - Containment Overcurrent Protection I. Organization Change to Of fsite       N/A         11-16-82   09-01-83                     49184 Management for FNP 1 and 2                                                                   49185 1 Revised by APCo letter dated 06-03-83 2 Delay of approval will adversely af fect the FNP 2 Ref ueling Outage in September 1983 or precipitate a special outage.
: 3) FNP 2 License Condition 48687 2.C.(19)(b) - Containment Overcurrent Protection I.
Organization Change to Of fsite N/A 11-16-82 09-01-83 49184 Management for FNP 1 and 2 49185 1
Revised by APCo letter dated 06-03-83 2 Delay of approval will adversely af fect the FNP 2 Ref ueling Outage in September 1983 or precipitate a special outage.
3, Revised due to reevaluation.
3, Revised due to reevaluation.
4 APCo currently evaluating E C SER.
4 APCo currently evaluating E C SER.
5, FNP 2 Hydraulic Snubber List will be submitted 60 days af ter startup following the Unit 2, 2nd Ref ueling Outage scheduled to commence September,1983 6, New request per this status which, If not approved, would precipitate a special outage.
5, FNP 2 Hydraulic Snubber List will be submitted 60 days af ter startup following the Unit 2, 2nd Ref ueling Outage scheduled to commence September,1983 6,
New request per this status which, If not approved, would precipitate a special outage.
(
(


.                                                            ATTACHIENT                               Page 6 LICDISIIS ITEFS REQUESTED SIBSEQUENT TO APCo's JANUARY 13, 1983 LETTER
ATTACHIENT Page 6 LICDISIIS ITEFS REQUESTED SIBSEQUENT TO APCo's JANUARY 13, 1983 LETTER JIME 10,1985 PROPOSED ACTUAL REQUESTED APCo APCo istC SUBMITTAL SIEMITTAL APPROVAL ACTUAL lstC TAC ITEM DATE DATE DATE APPROVAL DATE NO.
* JIME 10,1985 PROPOSED       ACTUAL   REQUESTED APCo         APCo       istC SUBMITTAL     SIEMITTAL APPROVAL     ACTUAL lstC       TAC ITEM                             DATE         DATE       DATE     APPROVAL DATE     NO.
1 Administrative Changes N/A 02-01-83 09-01-83 49184 a.
1 Administrative Changes                     N/A           02-01-83   09-01-83                     49184
Engineered Safety Actuation System Instrumentation ACTION Statement 20 Error b.
: a. Engineered Safety Actuation System Instrumentation ACTION Statement 20 Error
Security Plan Audit Frequency c.
: b. Security Plan Audit Frequency
Environmental Qualification (FNP 1) d.
: c. Environmental Qualification (FNP 1)
Augmented Low Power Test Program (FNP 2) 2 Turbine Valve Surveillance N/A 05-27-83 07-29-83 One-Time Change (T.S. 3/4.3.4) 3.
: d. Augmented Low Power Test Program (FNP 2) 2 Turbine Valve Surveillance                 N/A           05-27-83   07-29-83 One-Time Change (T.S. 3/4.3.4)
Snubber Visual Inspection 06-17-83 10-01-83 0 One-Time Change (T.S. 3/4.7.9) 1 Revised by APCo letter dated 06-03-83.
: 3. Snubber Visual Inspection                   06-17-83                 10-01-83 0 One-Time Change (T.S. 3/4.7.9) 1 Revised by APCo letter dated 06-03-83.
2 Delay of approval will adversely af fect the FNP 2 Ref ueling Outage in September 1983 or precipitate a special outage.
2 Delay of approval will adversely af fect the FNP 2 Ref ueling Outage in September 1983 or precipitate a special outage.
3, Revised due to reevaluation.
3, Revised due to reevaluation.
4 APCo currently evaluating NRC SER.
4 APCo currently evaluating NRC SER.
5, FNP 2 Hydraulic Snubber List will be submitted 60 days af ter startup following the Unit 2, 2nd Ref ueling Outage scheduled to commence September,1983 6, New request per this status which, if not approved, would precipitate a special outage.
5, FNP 2 Hydraulic Snubber List will be submitted 60 days af ter startup following the Unit 2, 2nd Ref ueling Outage scheduled to commence September,1983 6,
New request per this status which, if not approved, would precipitate a special outage.
_.}}
_.}}

Latest revision as of 02:38, 15 December 2024

Forwards Status of All Licensing Items Identified in Util
ML20076G858
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/10/1983
From: Clayton F
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
GL-82-17, NUDOCS 8306160278
Download: ML20076G858 (7)


Text

Malling Address Alabama Power Company 600 North 18th Street P;st Offica Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.

%2's'* 027"'

AlabamaPower d

the Southern dectrC System June 10, 1983 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washi ngton, D. C.

20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units 1 and 2 Licensing items Requesting NRC Approval Gentlemen:

Attached for your information is a status of all licensing items identified in Alabama Power Company's letter dated January 13, 1983.

This status is provided on a monthly basis and updated to include any additional submittals requesting NRC approval.

If you have any questions, please advise.

Yours very t uly, b

F. L. Clayton, Jr.

FLCJr/GGY:lsh-D39 Attachment cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford Dr. I. L. Myers 8306160278 830610 FDR ADOCK 05000348 P

PDR I

(

ATTAOSIENT Page 1 STATUS OF LIE NSING ITEMS REQUIRING Inc APPROVAL Ji3IE 10, 1983 PROPOSED ACTUAL REQESTED APCo AR:o 16tC SIAINITTAL SWINITTAL APPROVAL ACTUAL 16tC TAC ITEM DATE DATE DATE APPROVAL DATE ND.

1 Movable Control Rod Assemblies for 02-22-83 03-04-83 07-15-83 3 49951 FNP 1 and 2 (T.S. 3/4.1.3) 49952 2

Charcoal Filters for FNP 1 and 2 03-01-83 03-04-83 09-01-83 49953 (T.S. 4.7.7, 4.7.8 and 4.9.14) 49954 2

3 River Water System for FNP 1 and 2 N/A 12-30-82 07-01-83 49374 (T.S. 3/4.7.5) 49375 4

Diesel Generator Overload Test for N/A 08-03-82 10-01-83 I 49374 FNP 1 and 2 (T.S. 4.8.1.1.2.c.5) 12-30-82 49375 5 BIT Reduction for FNP 1 and 2 N/A 12-30-82 03-31-83 03-15-83 N/A (T.S. 3/4.5.4) 03-04-83 03-18-83 6

Turbine Valve Surveillance for FNP 2 N/A 10-08-82 12-01-82 NRC letter 49973 (T.S. 3/4.3.4) 12-10-82 of 04-29-83 01-18-83 stated NRC pos it lon.

APCo submltied appeal on 05-31-83 2

7 RCS Pressure Isolation Valves N/A 08-10-82 07-01-83 48714 for FNP 1 and 2 (T.S. 3/4.4.7.2 12-23-82 48715 and 3/4.4.7.3) 8 Mechanical Snubber Functional Test N/A 11-05-82 12-01-82 01-31-83 N/A Exemption for FNP 1 (T.S.4.7.9.e) 9 Waste Gas Hydrogen /0xygen Analyzer 12-01-83 3 06-01-84 3 for FNP 1 and 2 (T.S. Table 4.5-9) 1 Revised by APCo letter dated 06-03-83 2 Delay of approval will adversely af fect the FNP 2 Ref ueling Outage in September 1983 or precipitate a special outage.

3, Revised due to reevaluation.

4 APCo currently evaluating NRC SER.

5 FNP 2 Hydraulic Snubber List will be submitted 60 days af ter startup following the Unit 2, 2nd Ref ueling Outage scheduled to commence September,1983 O.

New request per this status which, if not approved, would precipitate a special outage.

ATTACHIENT Page 2 STATUS OF LICENSIps ITEMS REQUIRING 154C APPROVAL Jt2E 10,1983 PROPOSED ACTUAL REQUESTED APCo APCo MC SusselTTAL SLEINITTAL APPROVAL ACTUAL petC TAC ITEM DATE DATE DATE APPROVAL DATE 10 10 ISl/IST Licensing Program a.

Unit 1 Inservice Inspection (ISI)

Program for ASME Code Class 1, 2 and 3 Components

1) Rollef Requests on vessel N/A 04-17-81 09-01-83 48559 cladding examinations 01-10-83
2) Rollef Requests on hydro-01-18-83 01-28-83 09-01-83 49547 static test requirements b.

Unit 2 Inservice inspection (ISI) Program for ASME Code Class 1, 2 and 3 Components 2

1) Revision 0 Rollef Requests N/A 07-25-80 09-01-83 2
2) Rollef Requests on vessel N/A 01-10-83 09-01-83 49373 cladding examinations 2
3) Rollef Request on hydrostatic 01-18-83 01-28-83 09-01-83 test requirements c.

Unit 1 Inservice Testing (IST)

Program for AMSE Code Class 1, 2 and 3 Components 4

1) Revision 2 Relief Requests N/A 04-21-80 03-15-83 05-02-83 N/A 4
2) Revision 3 Rollef Requests N/A 07-16-81 03-15-83 05-02-83 N/A 4
3) Revision 4 Rollef Requests N/A 10-25-82 03-15-83 05-02-83 N/A 1

Revised by APCo letter dated 06-03-83 2 Delay of approval will adversely af fect the FNP 2 Refueling Outage In September 1983 or precipitate a special outage.

3 Revised due to reevaluation.

4 APCo currently evaluating P51C SER.

5, FNP 2 Hydraulle Snubber List will be submitted 60 days af ter startup following the Unit 2, 2nd Ref ueling Outage scheduled to commence September,1983 O.

New request per this status which, if not approved, would precipitate a special outage.

r w

w

ATTACHENT Page 3 STATUS OF LICENSIIS ITEMS REQUIRiis IRC APPRDVAL JimE 10, 1983 PROPOSED ACTUAL REQUESTED APCo AR:o mc SUBMITTAL SUBMITTAL APPROVAL ACTUAL MtC TAC ITEM DATE DATE DATE _

APPROVAL DATE 80 d.

Unit 2 Inservice Testing (IST)

Program for ASME Code Class 1, 2 and 3 Components 4

1) Revision 0 Relief Requests N/A 03-12-80 02-15-83 04-08-83 N/A 4
2) Revision 1 Relief Requests N/A 03-17-82 02-15-83 04-08-83 N/A 4
3) Revision 2 Relief Requests N/A 08-06-82 02-15-83 04-08-83 N/A 11 Spent Fuel Pool Storage Additions N/A 03-19-82 11-01-82 04-15-03 N/A for FNP 1 05-01-83 (revised need date) 12 Change 18 Month Interval to RefueIIng 04-01-83 04-05-83 10-01-83 13 Meteorological Tower Surveillance for 02-01-83 01-24-83 08-01-83 FNP 1 and 2 (T.S. 3/4.3.3.4) 14 in-Core Thimbles for FNP 1 and 2 N/A N/A N/A N/A N/A (T.S. 3.3.3.2) 15 Safety Evaluations for Next Fuel Reloads:

a.

Unit 1 Upflow Modification N/A 08-16-82 N/A N/A N/A b.

Unit 1 Cycle 5 03-14-83 03-17-83 N/A N/A N/A c.

Unit 2 Cycle 318 Month Fuel 09-01-83 N/A N/A N/A Cycle 16 FAH and Positive Moderator Temper-09-15-83 3 02-01-84 ature Coef fIciont 17 Containment Spray N/A N/A N/A N/A N/A l

1 Revised by APCo letter dated 06-03-83 2 Delay of approval will adversely af fect the FNP 2 Ref ueling Outage in September 1983 or precipitate a speclei outage.

3 Revised due to reevaluation.

4 APCo currently evaluating EC SER.

5 FNP 2 Hydraulle Snubber List will be submitted 60 days af ter startup following the Unit 2, 2nd Ref ueling Outage scheduled to commence September,1983 O.

New request per this status which, if not approved, would precipitate a special outage.

ATTA00ENT Page 4 STATUS OF LICENSilS ITEMS REQUIRilS NRC APPROVAL JtME 10,1983 190 POSED ACTUAL REQtESTED APCo APCo MtC SUBIITTAL SIENITTAL APPROVAL ACTUAL IGtC TAC ITEM DATE DATE DATE APPROVAL DATE 80 18 Technical Specification Optimization N/A N/A N/A N/A N/A Westinghouse Owners Group 19 Safety Related Battery Changes 04-15-83 05-03-83 11-03-83 20 Rod Swap Test During Low Power 03-01-83 03-01-83 N/A N/A N/A Physics Testing 21 Rod Drop Timing During Low Power N/A N/A N/A N/A N/A Physics Testing 22 Auto Rod Control Above 90% Power N/A 01-11-83 04-01-83 03-24-83 N/A for Unit 2, Cycle 2 and Unit 1, 09-14-82 12-01-82 Cycle 5 23 Unit 2 Licensing Deletion Amendment 01-12-83 01-07-83 N/A N/A N/A Clarification Letter 24 FSAR Update 07-01-83 N/A N/A N/A 25 Administrative Changes a.

Accumulator and ECCS Subsystem 02-01-83 02-01-83 09-01-83 49184 for FNP 1 and 2 (T.S. 4.5.1.1 49185 (c) and 4.5.2.(a))

b.

Generic Letter 82-17 on Audit of N/A 10-25-82 09-01-83 49068 Emergency Plan for FNP 1 and 2 49069 (T.S. 6.5.2.8.e) c.

Machanical and Hydraulle Snubber 06-01-83 05-27-83 09-01-83 Lists for FNP 1 (T.S. Table 5

3.7-4A and 3.7-4b) e 1

Revised by APCo letter dated 06-03-83, 2 Delay of approval will adversely af fect the FNP 2 Ref ueling Outage in September 1983 or precipitate a special outage.

3 Revised due to reevaluation.

4 APCo currently evaluating MIC SER.

5 FNP 2 Hydraulic Snubber List will be submitted 60 days af ter startup following the Unit 2, 2nd Refueling Outage scheduled to commence September,1983.

C.

New request per this status which, if not approved, would precipitate a special outage.

ATTACMENT Page 5 STATUS OF LICENS10E ITEMS REQU".ING J

ISIC APPROVAL JtBE 10,1983 PROR)$ED ACTUAL REQLESTED APCo AFCo IGtC SLEBelTTAL SWIMITTAL APPROVAL ACTUAL IGtC TAC ITEM DATE Dn?I DATE APPROVAL DATE BE).

d.

Administrative Changes for FNP 03-01-83 02-01-83 09-01-83 49184 1 and 2:

49185

1) Fire Detectors Table 3.5-12
2) RHR isolation 4.5.2.d.1
3) River Water Sury 3/4.7.5
4) Yard Fire Hydrant Table 3.7-7
5) Service Water Battery 4.8.2.5.2(d) 2
6) Organization Chart Figure 6.2-2 e.

Unit 2 Pressurizer Sensor Table 03-01-83 02-01-83 09-01-83 49185 (T.S. 3.3.3.7) f.

Unit 1 Refueling Outage Change:

03-01-83 02-01-83 09-01-83 49184 Containment Vent g.

Turbine Building Hydraulic N/A 12-10-82 09-01-83 49287 Snubbers for FNP 2 h.

Incorporation of Licensing N/A 11-24-82 09-01-83 Requirements for FNP 2

1) FNP 2 License Condition 49479 2.C.(17) - Containment Vent Line
2) Mechanical Snubber List for FNP 2 (T.S. Table 3.7-4b)
3) FNP 2 License Condition 48687 2.C.(19)(b) - Containment Overcurrent Protection I.

Organization Change to Of fsite N/A 11-16-82 09-01-83 49184 Management for FNP 1 and 2 49185 1

Revised by APCo letter dated 06-03-83 2 Delay of approval will adversely af fect the FNP 2 Ref ueling Outage in September 1983 or precipitate a special outage.

3, Revised due to reevaluation.

4 APCo currently evaluating E C SER.

5, FNP 2 Hydraulic Snubber List will be submitted 60 days af ter startup following the Unit 2, 2nd Ref ueling Outage scheduled to commence September,1983 6,

New request per this status which, If not approved, would precipitate a special outage.

(

ATTACHIENT Page 6 LICDISIIS ITEFS REQUESTED SIBSEQUENT TO APCo's JANUARY 13, 1983 LETTER JIME 10,1985 PROPOSED ACTUAL REQUESTED APCo APCo istC SUBMITTAL SIEMITTAL APPROVAL ACTUAL lstC TAC ITEM DATE DATE DATE APPROVAL DATE NO.

1 Administrative Changes N/A 02-01-83 09-01-83 49184 a.

Engineered Safety Actuation System Instrumentation ACTION Statement 20 Error b.

Security Plan Audit Frequency c.

Environmental Qualification (FNP 1) d.

Augmented Low Power Test Program (FNP 2) 2 Turbine Valve Surveillance N/A 05-27-83 07-29-83 One-Time Change (T.S. 3/4.3.4) 3.

Snubber Visual Inspection 06-17-83 10-01-83 0 One-Time Change (T.S. 3/4.7.9) 1 Revised by APCo letter dated 06-03-83.

2 Delay of approval will adversely af fect the FNP 2 Ref ueling Outage in September 1983 or precipitate a special outage.

3, Revised due to reevaluation.

4 APCo currently evaluating NRC SER.

5, FNP 2 Hydraulic Snubber List will be submitted 60 days af ter startup following the Unit 2, 2nd Ref ueling Outage scheduled to commence September,1983 6,

New request per this status which, if not approved, would precipitate a special outage.