ML20087Q076: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:.             __ _                      . _ . __  _ _ _ _ _                              _ _ _ _ _ _ _ _ _ _ _ _
{{#Wiki_filter:.
4 TI''!'n  ra-i. r ' V.."
4
                                    ;' t      <t;u''n   ,''~"v.n'"
<t;u''n
L ,_
,''~"v.n'"
i t: i-i t:. 'f .sI ,t ~ ~si' "s n !a        T i "' ''O r~
i t
v 'd ,a "<
'f. I t ~ ~ ' "s n T i "' ''O r~ 'd,a "<
at P O, DOX 5000 - CLEVELAND, OHiQ 44131 - TELEPHONE (216) 622-9800 - lLLUM!NATING BLDG. - 55 PUBLICSQUARE Serving The Best Location in the Nation MURRAY R. EDELMAN VICE PRESIDENT NUCLEAR April 5, 1984 PY-CEI/NRR-0103 L Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Design Verification Program
i at TI''!'n r i. r ' ;' t si
!a v
a-V.."
L,_
t: i-s,
P O, DOX 5000 - CLEVELAND, OHiQ 44131 - TELEPHONE (216) 622-9800 - lLLUM!NATING BLDG. - 55 PUBLICSQUARE Serving The Best Location in the Nation MURRAY R. EDELMAN VICE PRESIDENT NUCLEAR April 5, 1984 PY-CEI/NRR-0103 L Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Design Verification Program


==Dear Mr. Eisenhut:==
==Dear Mr. Eisenhut:==
 
In your {{letter dated|date=January 4, 1984|text=letter dated January 4, 1984}}, you requested our plans for assuring that the Perry Nuclear Power Plant (PNPP) has been designed and constructed in accordance with regulations and Safety Analysis Report commitments.
In your {{letter dated|date=January 4, 1984|text=letter dated January 4, 1984}}, you requested our plans for assuring that the Perry Nuclear Power Plant (PNPP) has been designed and constructed in accordance with regulations and Safety Analysis Report commitments.                                                       As a
As a
          . result of your letter, we met with members of your staff and of the Quality Assurance Branch, Office of Inspection and Enforcement (I&E) on March 12, 1984.
. result of your letter, we met with members of your staff and of the Quality Assurance Branch, Office of Inspection and Enforcement (I&E) on March 12, 1984.
During that meeting, we presented the programs which are underway and those already completed which address design and construction assurance for PNPP.
During that meeting, we presented the programs which are underway and those already completed which address design and construction assurance for PNPP.
The programs discussed included Quality Assurance programs and Engineering Design Verification programs. In the area of Quality Assurance, we discussed Design Control Audits, the Inpo-Self-Initiated Evaluation, the Region III Special Inspection results,                           the Construction Assessment Team Inspection results, and the future Inpo Phase II review.
The programs discussed included Quality Assurance programs and Engineering Design Verification programs.
In the area of Engineering Design Verification we discussed the completed Design Verification of Raceway and Cable Routing, and Piping Design Review programs. We also described a Third Party Review of System Functional Capability, our FSAR Verification and Commitment Tracking, and the As-Built Drawing programs which are in progress.
In the area of Quality Assurance, we discussed Design Control Audits, the Inpo-Self-Initiated Evaluation, the Region III Special Inspection results, the Construction Assessment Team Inspection results, and the future Inpo Phase II review.
Af ter reviewing our presentation, members of the I&E staf f related the history and future plans for Design Assurance Programs. They stated that the Quality Assurance Branch in I&E has assumed responsibility for these programs. Their assessment of the programs we discussed was positive and they requested a submittal on the Piping Design Review and the System Functional Capability Review when completed.
In the area of Engineering Design Verification we discussed the completed Design Verification of Raceway and Cable Routing, and Piping Design Review programs.
8404100282 840405                                                                                                 fjAf i
We also described a Third Party Review of System Functional Capability, our FSAR Verification and Commitment Tracking, and the As-Built Drawing programs which are in progress.
PDR ADOCK 05000440         PDR A
Af ter reviewing our presentation, members of the I&E staf f related the history and future plans for Design Assurance Programs.
0
They stated that the Quality Assurance Branch in I&E has assumed responsibility for these programs.
Their assessment of the programs we discussed was positive and they requested a submittal on the Piping Design Review and the System Functional Capability Review when completed.
i 8404100282 840405 fjAf PDR ADOCK 05000440 A
PDR 0


p' r
p' c r
c t::e-
t::e-
            . Mr. Eicanhut                                                       April 5,.1984 We will . provide final reports on these programs within the next few months and.
. Mr. Eicanhut April 5,.1984 We will. provide final reports on these programs within the next few months and.
plan 1 future discussions with the staff to resolve any questions. We believe
plan 1 future discussions with the staff to resolve any questions.
              - these programs, along with any initiatives you may plan, will demonstrate the design adequacy of our plant.
We believe
Very truly yours, h,U       d fgg$_--]             _
- these programs, along with any initiatives you may plan, will demonstrate the design adequacy of our plant.
Very truly yours, h,U dfgg$_--]
Murray R. Edelman Vice President Nuclear Group
Murray R. Edelman Vice President Nuclear Group
          ' MRE:kay
' MRE:kay
            - cc: Jay- Silberg ,- Esq. --
- cc: Jay-Silberg,- Esq. --
John Stefano Max Gildner.
John Stefano Max Gildner.
e m .}}
e m
.}}

Latest revision as of 13:47, 13 December 2024

Responds to 840104 Request for Assurance That Designs & Const in Conformance W/Sar Commitments.Final Repts on Design Assurance Programs Will Be Submitted Upon Completion
ML20087Q076
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 04/05/1984
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
NUDOCS 8404100282
Download: ML20087Q076 (2)


Text

.

4

<t;un

,~"v.n'"

i t

'f. I t ~ ~ ' "s n T i "' O r~ 'd,a "<

i at TI!'n r i. r ' ;' t si

!a v

a-V.."

L,_

t: i-s,

P O, DOX 5000 - CLEVELAND, OHiQ 44131 - TELEPHONE (216) 622-9800 - lLLUM!NATING BLDG. - 55 PUBLICSQUARE Serving The Best Location in the Nation MURRAY R. EDELMAN VICE PRESIDENT NUCLEAR April 5, 1984 PY-CEI/NRR-0103 L Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Design Verification Program

Dear Mr. Eisenhut:

In your letter dated January 4, 1984, you requested our plans for assuring that the Perry Nuclear Power Plant (PNPP) has been designed and constructed in accordance with regulations and Safety Analysis Report commitments.

As a

. result of your letter, we met with members of your staff and of the Quality Assurance Branch, Office of Inspection and Enforcement (I&E) on March 12, 1984.

During that meeting, we presented the programs which are underway and those already completed which address design and construction assurance for PNPP.

The programs discussed included Quality Assurance programs and Engineering Design Verification programs.

In the area of Quality Assurance, we discussed Design Control Audits, the Inpo-Self-Initiated Evaluation, the Region III Special Inspection results, the Construction Assessment Team Inspection results, and the future Inpo Phase II review.

In the area of Engineering Design Verification we discussed the completed Design Verification of Raceway and Cable Routing, and Piping Design Review programs.

We also described a Third Party Review of System Functional Capability, our FSAR Verification and Commitment Tracking, and the As-Built Drawing programs which are in progress.

Af ter reviewing our presentation, members of the I&E staf f related the history and future plans for Design Assurance Programs.

They stated that the Quality Assurance Branch in I&E has assumed responsibility for these programs.

Their assessment of the programs we discussed was positive and they requested a submittal on the Piping Design Review and the System Functional Capability Review when completed.

i 8404100282 840405 fjAf PDR ADOCK 05000440 A

PDR 0

p' c r

t::e-

. Mr. Eicanhut April 5,.1984 We will. provide final reports on these programs within the next few months and.

plan 1 future discussions with the staff to resolve any questions.

We believe

- these programs, along with any initiatives you may plan, will demonstrate the design adequacy of our plant.

Very truly yours, h,U dfgg$_--]

Murray R. Edelman Vice President Nuclear Group

' MRE:kay

- cc: Jay-Silberg,- Esq. --

John Stefano Max Gildner.

e m

.