ML20087Q076: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. | {{#Wiki_filter:. | ||
4 | 4 | ||
<t;u''n | |||
,''~"v.n'" | |||
i t | i t | ||
'f. I t ~ ~ ' "s n T i "' ''O r~ 'd,a "< | |||
at P O, DOX 5000 - CLEVELAND, OHiQ 44131 - TELEPHONE (216) 622-9800 - lLLUM!NATING BLDG. - 55 PUBLICSQUARE Serving The Best Location in the Nation MURRAY R. EDELMAN VICE PRESIDENT NUCLEAR April 5, 1984 PY-CEI/NRR-0103 L Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Design Verification Program | i at TI''!'n r i. r ' ;' t si | ||
!a v | |||
a-V.." | |||
L,_ | |||
t: i-s, | |||
P O, DOX 5000 - CLEVELAND, OHiQ 44131 - TELEPHONE (216) 622-9800 - lLLUM!NATING BLDG. - 55 PUBLICSQUARE Serving The Best Location in the Nation MURRAY R. EDELMAN VICE PRESIDENT NUCLEAR April 5, 1984 PY-CEI/NRR-0103 L Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Design Verification Program | |||
==Dear Mr. Eisenhut:== | ==Dear Mr. Eisenhut:== | ||
In your {{letter dated|date=January 4, 1984|text=letter dated January 4, 1984}}, you requested our plans for assuring that the Perry Nuclear Power Plant (PNPP) has been designed and constructed in accordance with regulations and Safety Analysis Report commitments. | |||
In your {{letter dated|date=January 4, 1984|text=letter dated January 4, 1984}}, you requested our plans for assuring that the Perry Nuclear Power Plant (PNPP) has been designed and constructed in accordance with regulations and Safety Analysis Report commitments. | As a | ||
. result of your letter, we met with members of your staff and of the Quality Assurance Branch, Office of Inspection and Enforcement (I&E) on March 12, 1984. | |||
During that meeting, we presented the programs which are underway and those already completed which address design and construction assurance for PNPP. | During that meeting, we presented the programs which are underway and those already completed which address design and construction assurance for PNPP. | ||
The programs discussed included Quality Assurance programs and Engineering Design Verification programs. In the area of Quality Assurance, we discussed Design Control Audits, the Inpo-Self-Initiated Evaluation, the Region III Special Inspection results, | The programs discussed included Quality Assurance programs and Engineering Design Verification programs. | ||
In the area of Engineering Design Verification we discussed the completed Design Verification of Raceway and Cable Routing, and Piping Design Review programs. We also described a Third Party Review of System Functional Capability, our FSAR Verification and Commitment Tracking, and the As-Built Drawing programs which are in progress. | In the area of Quality Assurance, we discussed Design Control Audits, the Inpo-Self-Initiated Evaluation, the Region III Special Inspection results, the Construction Assessment Team Inspection results, and the future Inpo Phase II review. | ||
Af ter reviewing our presentation, members of the I&E staf f related the history and future plans for Design Assurance Programs. They stated that the Quality Assurance Branch in I&E has assumed responsibility for these programs. Their assessment of the programs we discussed was positive and they requested a submittal on the Piping Design Review and the System Functional Capability Review when completed. | In the area of Engineering Design Verification we discussed the completed Design Verification of Raceway and Cable Routing, and Piping Design Review programs. | ||
8404100282 840405 | We also described a Third Party Review of System Functional Capability, our FSAR Verification and Commitment Tracking, and the As-Built Drawing programs which are in progress. | ||
PDR ADOCK 05000440 | Af ter reviewing our presentation, members of the I&E staf f related the history and future plans for Design Assurance Programs. | ||
0 | They stated that the Quality Assurance Branch in I&E has assumed responsibility for these programs. | ||
Their assessment of the programs we discussed was positive and they requested a submittal on the Piping Design Review and the System Functional Capability Review when completed. | |||
i 8404100282 840405 fjAf PDR ADOCK 05000440 A | |||
PDR 0 | |||
p' r | p' c r | ||
t::e- | |||
. Mr. Eicanhut April 5,.1984 We will. provide final reports on these programs within the next few months and. | |||
plan 1 future discussions with the staff to resolve any questions. We believe | plan 1 future discussions with the staff to resolve any questions. | ||
We believe | |||
Very truly yours, h,U | - these programs, along with any initiatives you may plan, will demonstrate the design adequacy of our plant. | ||
Very truly yours, h,U dfgg$_--] | |||
Murray R. Edelman Vice President Nuclear Group | Murray R. Edelman Vice President Nuclear Group | ||
' MRE:kay | |||
- cc: Jay-Silberg,- Esq. -- | |||
John Stefano Max Gildner. | John Stefano Max Gildner. | ||
e m | e m | ||
.}} | |||
Latest revision as of 13:47, 13 December 2024
| ML20087Q076 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 04/05/1984 |
| From: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8404100282 | |
| Download: ML20087Q076 (2) | |
Text
.
4
<t;un
,~"v.n'"
i t
'f. I t ~ ~ ' "s n T i "' O r~ 'd,a "<
i at TI!'n r i. r ' ;' t si
!a v
a-V.."
L,_
t: i-s,
P O, DOX 5000 - CLEVELAND, OHiQ 44131 - TELEPHONE (216) 622-9800 - lLLUM!NATING BLDG. - 55 PUBLICSQUARE Serving The Best Location in the Nation MURRAY R. EDELMAN VICE PRESIDENT NUCLEAR April 5, 1984 PY-CEI/NRR-0103 L Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Design Verification Program
Dear Mr. Eisenhut:
In your letter dated January 4, 1984, you requested our plans for assuring that the Perry Nuclear Power Plant (PNPP) has been designed and constructed in accordance with regulations and Safety Analysis Report commitments.
As a
. result of your letter, we met with members of your staff and of the Quality Assurance Branch, Office of Inspection and Enforcement (I&E) on March 12, 1984.
During that meeting, we presented the programs which are underway and those already completed which address design and construction assurance for PNPP.
The programs discussed included Quality Assurance programs and Engineering Design Verification programs.
In the area of Quality Assurance, we discussed Design Control Audits, the Inpo-Self-Initiated Evaluation, the Region III Special Inspection results, the Construction Assessment Team Inspection results, and the future Inpo Phase II review.
In the area of Engineering Design Verification we discussed the completed Design Verification of Raceway and Cable Routing, and Piping Design Review programs.
We also described a Third Party Review of System Functional Capability, our FSAR Verification and Commitment Tracking, and the As-Built Drawing programs which are in progress.
Af ter reviewing our presentation, members of the I&E staf f related the history and future plans for Design Assurance Programs.
They stated that the Quality Assurance Branch in I&E has assumed responsibility for these programs.
Their assessment of the programs we discussed was positive and they requested a submittal on the Piping Design Review and the System Functional Capability Review when completed.
i 8404100282 840405 fjAf PDR ADOCK 05000440 A
PDR 0
p' c r
t::e-
. Mr. Eicanhut April 5,.1984 We will. provide final reports on these programs within the next few months and.
plan 1 future discussions with the staff to resolve any questions.
We believe
- these programs, along with any initiatives you may plan, will demonstrate the design adequacy of our plant.
Very truly yours, h,U dfgg$_--]
Murray R. Edelman Vice President Nuclear Group
' MRE:kay
- cc: Jay-Silberg,- Esq. --
John Stefano Max Gildner.
e m
.