IR 05000324/2020010: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20097E835
| number = ML20097E835
| issue date = 04/06/2020
| issue date = 04/06/2020
| title = NRC Fire Protection Team Inspection (Fpti) (NRC Inspection Report 05000324/2020010 and 05000325/2020010)
| title = NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000324/2020010 and 05000325/2020010)
| author name = Shaeffer S
| author name = Shaeffer S
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS
Line 31: Line 31:


Sincerely,
Sincerely,
/RA/
/RA/  
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 05000324 and 05000325 License Nos. DPR-62 and DPR-71
 
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety  
 
Docket Nos. 05000324 and 05000325 License Nos. DPR-62 and DPR-71  


===Enclosure:===
===Enclosure:===
As stated
As stated  


==Inspection Report==
==Inspection Report==
Docket Numbers: 05000324 and 05000325 License Numbers: DPR-62 and DPR-71 Report Numbers: 05000324/2020010 and 05000325/2020010 Enterprise Identifier: I-2020-010-0028 Licensee: Duke Energy Progress, LLC Facility: Brunswick Steam Electric Plant, Units 1 & 2 Location: Southport, NC Inspection Dates: February 03, 2020 to February 27, 2020 Inspectors: R. Fanner, Senior Reactor Inspector J. Dymek, Reactor Inspector W. Monk, Senior Reactor Inspector D. Strickland, Reactor Inspector Approved By: Scott Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Enclosure
Docket Numbers:
05000324 and 05000325  
 
License Numbers:
DPR-62 and DPR-71  
 
Report Numbers:
05000324/2020010 and 05000325/2020010  
 
Enterprise Identifier: I-2020-010-0028  
 
Licensee:
Duke Energy Progress, LLC  
 
Facility:
Brunswick Steam Electric Plant, Units 1 & 2  
 
Location:
Southport, NC  
 
Inspection Dates:
February 03, 2020 to February 27, 2020  
 
Inspectors:
R. Fanner, Senior Reactor Inspector  
 
J. Dymek, Reactor Inspector  
 
W. Monk, Senior Reactor Inspector  
 
D. Strickland, Reactor Inspector  
 
Approved By:
Scott Shaeffer, Chief
Engineering Branch 2
Division of Reactor Safety  


=SUMMARY=
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring licensees performance by conducting Inspection Procedure 711111 Attachment 21N.05, Fire Protection Team Inspection (FPTI), at the Brunswick Steam Electric Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring licensees performance by conducting Inspection Procedure 711111 Attachment 21N.05, Fire Protection Team Inspection (FPTI), at the Brunswick Steam Electric Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.


LIST OF FINDINGS AND VIOLATIONS No findings were identified.
LIST OF FINDINGS AND VIOLATIONS  
 
No findings were identified.
 
ADDITIONAL TRACKING ITEMS


ADDITIONAL TRACKING ITEMS None.
None.


=INSPECTION SCOPES=
=INSPECTION SCOPES=
Line 52: Line 94:


==REACTOR SAFETY==
==REACTOR SAFETY==
===71111.21N.05 - Fire Protection Team Inspection (FPTI)


===71111.21N.05 - Fire Protection Team Inspection (FPTI) SSC Credited for Fire Prevention, Detection, Suppression, or Post-Fire SSD Review (IP Section 03.01) ===
SSC Credited for Fire Prevention, Detection, Suppression, or Post-Fire SSD Review (IP Section 03.01)===
{{IP sample|IP=IP 71111.21|count=4}}
{{IP sample|IP=IP 71111.21|count=4}}
The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA). The inspectors performed the following:
 
The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA). The inspectors performed the following:  
 
a. Review of deficiencies or open fire protection impairments for the selected system, including any temporary modifications, operator workarounds, or compensatory measures.
a. Review of deficiencies or open fire protection impairments for the selected system, including any temporary modifications, operator workarounds, or compensatory measures.


Line 70: Line 115:
g. If a review of operating experience issues will be completed for the selected inspection sample, verify that the licensee adequately reviewed and dis-positioned the operating experience in accordance with their processes.
g. If a review of operating experience issues will be completed for the selected inspection sample, verify that the licensee adequately reviewed and dis-positioned the operating experience in accordance with their processes.


The samples for this section included:
The samples for this section included:  
: (1) 2-CAC-LR-2602, Suppression Pool Level
 
: (2) 2-E11-PDV-F068A, RHR HX 2A SW Discharge Valve
(1)2-CAC-LR-2602, Suppression Pool Level (2)2-E11-PDV-F068A, RHR HX 2A SW Discharge Valve
: (3) Suppression SSCs
: (3) Suppression SSCs
: (4) Detection SSCs
: (4) Detection SSCs  


===Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)===
===Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)===
Line 81: Line 126:
The samples for this section included:
The samples for this section included:
: (1) NPFA 805 Monitoring Program
: (1) NPFA 805 Monitoring Program
: (2) Fire System Impairments Program
: (2) Fire System Impairments Program  


===Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)===
===Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)===
Line 107: Line 152:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection   Type             Designation   Description or Title                                     Revision or
Inspection
Procedure                                                                                              Date
Procedure
71111.21N.05 Calculations     2-FP-0049     Qualification of Selected Door Transoms in the Diesel   Rev. 0
Type
Designation
Description or Title
Revision or
Date
71111.21N.05 Calculations
2-FP-0049
Qualification of Selected Door Transoms in the Diesel
Generator Building
Generator Building
71111.21N.05 Calculations     2-FP-0076     Hydraulic Calculation Unit 2, Reactor Building-SE RHR   Rev. 1
Rev. 0
71111.21N.05 Calculations
2-FP-0076
Hydraulic Calculation Unit 2, Reactor Building-SE RHR
and Water Curtain
and Water Curtain
71111.21N.05 Calculations     BNP-E-9.007   ASSD Recovery Action Feasibility                         Rev. 1
Rev. 1
71111.21N.05 Calculations     BNP-E-9.010   Safe Shutdown Equipment List                             Rev. 3
71111.21N.05 Calculations
71111.21N.05 Calculations     BNP-E-9.011   NFPA 805 Transition - Non Power Operational Modes       Rev. 2
BNP-E-9.007
ASSD Recovery Action Feasibility
Rev. 1
71111.21N.05 Calculations
BNP-E-9.010
Safe Shutdown Equipment List
Rev. 3
71111.21N.05 Calculations
BNP-E-9.011
NFPA 805 Transition - Non Power Operational Modes
Review
Review
71111.21N.05 Calculations     BNP-E-9.011   NFPA 805 Transition - Non-Power Operational Modes       12/04/2018
Rev. 2
71111.21N.05 Calculations
BNP-E-9.011
NFPA 805 Transition - Non-Power Operational Modes
Review
Review
71111.21N.05 Calculations     BNP-PSA-080   BNP FPRA Quantification Calculation                     Rev. 6
2/04/2018
71111.21N.05 Corrective Action AR 02258766    U2 N Core Spray Pmp FLR Drn not fixed in 30 days        02/20/2019
71111.21N.05 Calculations
BNP-PSA-080
BNP FPRA Quantification Calculation
Rev. 6
71111.21N.05 Corrective Action
Documents
Documents
71111.21N.05 Corrective Action AR-02135608-02 Prompt Functionality Assessment Electric Fire Pump 2-    7/17/2017
AR 02258766
Documents                        FP-P2
U2 N Core Spray Pmp FLR Drn not fixed in 30 days
71111.21N.05 Corrective Action CR2045218      Trend in Improper Storage of Transient Combustible
2/20/2019
Documents                        Materials
71111.21N.05 Corrective Action
71111.21N.05 Corrective Action CR2139276      Fire Protection Health Report status change green to red
Documents
Documents
71111.21N.05 Corrective Action NCR 02304493  FSA Updates due to BNP-E-9.010 Update                    2/25/2020
AR-02135608-02
Prompt Functionality Assessment Electric Fire Pump 2-
FP-P2
7/17/2017
71111.21N.05 Corrective Action
Documents
CR2045218
Trend in Improper Storage of Transient Combustible
Materials
 
71111.21N.05 Corrective Action
Documents
CR2139276
Fire Protection Health Report status change green to red
 
71111.21N.05 Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
71111.21N.05 Corrective Action NCR 02314376  QFPI- Housekeeping Inside AFFF Enclosure                02/04/2020
NCR 02304493
FSA Updates due to BNP-E-9.010 Update
2/25/2020
71111.21N.05 Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
Inspection   Type             Designation Description or Title                               Revision or
NCR 02314376
Procedure                                                                                      Date
QFPI-Housekeeping Inside AFFF Enclosure
71111.21N.05 Corrective Action NCR 02314509 QFPI-Sprinkler Head Potential Corrosion            02/05/2020
2/04/2020
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.21N.05 Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
71111.21N.05 Corrective Action NCR 02314918 QFPI - Potential Transient Combustible Violation    2/6/2020
NCR 02314509
QFPI-Sprinkler Head Potential Corrosion
2/05/2020
71111.21N.05 Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
71111.21N.05 Corrective Action NCR 02315670 QFPI 2020- Calculation Verbiage Clarification      02/12/2020
NCR 02314918
QFPI - Potential Transient Combustible Violation
2/6/2020
71111.21N.05 Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
71111.21N.05 Corrective Action NCR 02317935 2020 NRC QFPI - Missing Reference in 0FP-1213, NFPA 2/26/2020
NCR 02315670
Documents                     805 Code
QFPI 2020- Calculation Verbiage Clarification
2/12/2020
71111.21N.05 Corrective Action
Documents
Resulting from
Resulting from
Inspection
Inspection
71111.21N.05 Corrective Action NCR 02318054 2020 NRC QFPI - Steps missing in 2ASSD-06          02/26/2020
NCR 02317935
20 NRC QFPI - Missing Reference in 0FP-1213, NFPA
805 Code
2/26/2020
71111.21N.05 Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
71111.21N.05 Corrective Action NCR 02318122 2020 NRC Fire Protection Inspection QFPI 2-VA-DG-  02/26/2020
NCR 02318054
Documents                     FDMP-101
20 NRC QFPI - Steps missing in 2ASSD-06
2/26/2020
71111.21N.05 Corrective Action
Documents
Resulting from
Resulting from
Inspection
Inspection
71111.21N.05 Corrective Action NCR 02318123 2020 NRC QFPI - Electric Heat Blower in Aux Boiler  2/26/2020
NCR 02318122
Documents                     House
20 NRC Fire Protection Inspection QFPI 2-VA-DG-
FDMP-101
2/26/2020
71111.21N.05 Corrective Action
Documents
Resulting from
Resulting from
Inspection
Inspection
71111.21N.05 Corrective Action NCR 02318276 2020 NRC QFPI - Pre-Fire Plan FP Features          2/27/2020
NCR 02318123
20 NRC QFPI - Electric Heat Blower in Aux Boiler
House
2/26/2020
71111.21N.05 Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
71111.21N.05 Corrective Action WR 20167491 2020 NRC QFPI - INSTALL LADDER RACKS IN U2 RB -     2/27/2020
NCR 02318276
Documents                      17'
20 NRC QFPI - Pre-Fire Plan FP Features
Inspection   Type           Designation     Description or Title                                     Revision or
2/27/2020
Procedure                                                                                            Date
71111.21N.05 Corrective Action
Documents
WR 20167491
20 NRC QFPI - INSTALL LADDER RACKS IN U2 RB -
17'
2/27/2020  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Resulting from
Resulting from
Inspection
Inspection
71111.21N.05 Drawings       2FP-20589       Fire Protection Piping Isometric, Reactor Building Unit 2 Rev. E
71111.21N.05 Drawings
2FP-20589
Fire Protection Piping Isometric, Reactor Building Unit 2
SE RHR
SE RHR
71111.21N.05 Drawings       D-02299         Reactor Building Fire Protection Piping                   Rev. 12
Rev. E
71111.21N.05 Drawings       F-01926         Diesel Generator Building-Building Plans                 Rev.21
71111.21N.05 Drawings
71111.21N.05 Drawings       F-01926         Diesel Generator Building-Building Plans                 Rev.21
D-02299
71111.21N.05 Drawings       F-01928         Diesel Generator Building-Door and Hardware Schedule     Rev.22
Reactor Building Fire Protection Piping
Rev. 12
71111.21N.05 Drawings
F-01926
Diesel Generator Building-Building Plans
Rev.21
71111.21N.05 Drawings
F-01926
Diesel Generator Building-Building Plans
Rev.21
71111.21N.05 Drawings
F-01928
Diesel Generator Building-Door and Hardware Schedule
and Details
and Details
71111.21N.05 Drawings       F-03049         480 Volt System MCC 2XA, 2XC, 2XE, 2XG, 2XJ, 2XL         Rev. 85
Rev.22
71111.21N.05 Drawings
F-03049
480 Volt System MCC 2XA, 2XC, 2XE, 2XG, 2XJ, 2XL
Auxiliary One Line Diagram
Auxiliary One Line Diagram
71111.21N.05 Drawings       F-04093         Diesel Generator Building Ventilation System-Plans at     Rev.21
Rev. 85
71111.21N.05 Drawings
F-04093
Diesel Generator Building Ventilation System-Plans at
Elevation 23'-0" and 50'-0"
Elevation 23'-0" and 50'-0"
71111.21N.05 Drawings       LL-09046 - SHT: CAC System 2-CAC Level Transmitter and Recorder 2-       Rev. 5
Rev.21
I100            CAC-LT-2602 and 2-CAC-LR-2602 Control Wiring
71111.21N.05 Drawings
LL-09046 - SHT:
I100
CAC System 2-CAC Level Transmitter and Recorder 2-
CAC-LT-2602 and 2-CAC-LR-2602 Control Wiring
Diagram
Diagram
71111.21N.05 Drawings       LL-09046 - SHT: CAC System 2-CAC Level Transmitter and Recorder 2-       Rev. 4
Rev. 5
I101            CAC-LT-2602 and 2-CAC-LR-2602 Cable Diagram
71111.21N.05 Drawings
71111.21N.05 Drawings       LL-09236 - SH: RHR HX 2A Service Water Discharge Valve 2-E11-PDV-       Rev. 9
LL-09046 - SHT:
I101
CAC System 2-CAC Level Transmitter and Recorder 2-
CAC-LT-2602 and 2-CAC-LR-2602 Cable Diagram
Rev. 4
71111.21N.05 Drawings
LL-09236 - SH:
RHR HX 2A Service Water Discharge Valve 2-E11-PDV-
F068A Cable Wiring Diagram
F068A Cable Wiring Diagram
71111.21N.05 Drawings       LL-09236 - SH: RHR HX 2A Service Water Discharge Valve 2-E11-PDV-       Rev. 8
Rev. 9
71111.21N.05 Drawings
LL-09236 - SH:
RHR HX 2A Service Water Discharge Valve 2-E11-PDV-
F068A Cable Diagram
F068A Cable Diagram
71111.21N.05 Drawings       O-FP-15062     Sonicbar Door Division, Ryson Products Company,           Rev.7
Rev. 8
71111.21N.05 Drawings
O-FP-15062
Sonicbar Door Division, Ryson Products Company,
Schedule Sheet
Schedule Sheet
71111.21N.05 Drawings       O-FP-15063     1 & 3/4 Door, Sections and Elevations                     Rev. 5
Rev.7
71111.21N.05 Engineering   EC 0407614     Permanent Resolution of Temporary Change Ecs on E11-     Rev. 0
71111.21N.05 Drawings
Changes                        F020 Valves
O-FP-15063  
71111.21N.05 Engineering   EC 407358       Diesel Fire Pump Charger Modification Package             Rev. 0
& 3/4 Door, Sections and Elevations
Rev. 5
71111.21N.05 Engineering
Changes
EC 0407614
Permanent Resolution of Temporary Change Ecs on E11-
F020 Valves
Rev. 0
71111.21N.05 Engineering
Changes
EC 407358
Diesel Fire Pump Charger Modification Package
Rev. 0
71111.21N.05 Engineering
Changes
Changes
71111.21N.05 Engineering    EC 416723       Abandon 2-FO-12-1-1/2-U-6 Diesel Fire Pump Fuel Oil       Rev. 0
EC 416723
Changes                        Supply Line
Abandon 2-FO-12-1-1/2-U-6 Diesel Fire Pump Fuel Oil
71111.21N.05 Engineering   BNP 98-032      Response to Water Hammer Event WNP-2                      Rev. 0
Supply Line
Rev. 0
71111.21N.05 Engineering
Evaluations
Evaluations
71111.21N.05 Engineering   EC-413079       Equivalency Evaluation of Diesel Driven Centrifugal Split Rev. 3
BNP 98-032
Inspection   Type         Designation Description or Title                                     Revision or
Response to Water Hammer Event WNP-2
Procedure                                                                                        Date
Rev. 0
Evaluations               Case Horizontal 2000 GPM Fire Pump
71111.21N.05 Engineering
71111.21N.05 Engineering   EGR-NGGC-   Random Sample Program of FB Penetration Seals             Rev. 12
EC-413079
Evaluations  0005
Equivalency Evaluation of Diesel Driven Centrifugal Split
71111.21N.05 Engineering   ESR-9700571 Fire Door Problem Resolution                              Rev. 0
Rev. 3  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Evaluations
Case Horizontal 2000 GPM Fire Pump
71111.21N.05 Engineering
Evaluations
EGR-NGGC-
0005
Random Sample Program of FB Penetration Seals
Rev. 12
71111.21N.05 Engineering
Evaluations
Evaluations
71111.21N.05 Engineering   ESR-9900328 Fire Barrier Penetration Seal Statistical Sample          Rev. 0
ESR-9700571
Fire Door Problem Resolution
Rev. 0
71111.21N.05 Engineering
Evaluations
Evaluations
71111.21N.05 Engineering   OFP-0086   Code Compliance Evaluation NFPA 20, Flammable and         Rev. 4
ESR-9900328
Evaluations              Combustible Liquids Code
Fire Barrier Penetration Seal Statistical Sample
71111.21N.05 Engineering   OFP-0089   Code Compliance Evaluation NFPA 22, Water Tanks for       Rev. 1
Rev. 0
Evaluations              Private Fire Protection
71111.21N.05 Engineering
71111.21N.05 Engineering   OFP-1017   Code Compliance Evaluation NFPA 24, Standard for         Rev. 4
Evaluations
Evaluations              Outside Protection
OFP-0086
71111.21N.05 Engineering   OFP-1020   Code Compliance Evaluation NFPA 11B, Synthetic Foam       Rev. 3
Code Compliance Evaluation NFPA 20, Flammable and
Evaluations              and Combined Agent Systems
Combustible Liquids Code
71111.21N.05 Engineering   OFP-1020,   Code Compliance Evaluation NFPA 16, Foam Water           Rev. 3
Rev. 4
Evaluations              Spray and Sprinkler Systems
71111.21N.05 Engineering
71111.21N.05 Engineering   OFP-1024   Code Compliance Evaluation NFPA 15, Standard on           Rev. 4
Evaluations
Evaluations              Fixed Water Spray Systems Unit 1 and 2 Reactor Building
OFP-0089
71111.21N.05 Engineering   OFP-1027   Code Compliance Evaluation NFPA 14, Standard on the       Rev. 4
Code Compliance Evaluation NFPA 22, Water Tanks for
Evaluations              Installation of Standpipes and Hose Systems, Reactor
Private Fire Protection
Rev. 1
71111.21N.05 Engineering
Evaluations
OFP-1017
Code Compliance Evaluation NFPA 24, Standard for
Outside Protection
Rev. 4
71111.21N.05 Engineering
Evaluations
OFP-1020
Code Compliance Evaluation NFPA 11B, Synthetic Foam
and Combined Agent Systems
Rev. 3
71111.21N.05 Engineering
Evaluations
OFP-1020,
Code Compliance Evaluation NFPA 16, Foam Water
Spray and Sprinkler Systems
Rev. 3
71111.21N.05 Engineering
Evaluations
OFP-1024
Code Compliance Evaluation NFPA 15, Standard on
Fixed Water Spray Systems Unit 1 and 2 Reactor Building
Rev. 4
71111.21N.05 Engineering
Evaluations
OFP-1027
Code Compliance Evaluation NFPA 14, Standard on the
Installation of Standpipes and Hose Systems, Reactor
Building
Building
71111.21N.05 Engineering   OFP-1028   Code Compliance Evaluation NFPA 14, Standard on the       Rev. 4
Rev. 4
Evaluations              Installation of Standpipes and Hose Systems, Radwaste
71111.21N.05 Engineering
Evaluations
OFP-1028
Code Compliance Evaluation NFPA 14, Standard on the
Installation of Standpipes and Hose Systems, Radwaste
Building
Building
71111.21N.05 Engineering   OFP-1213   Code Compliance Evaluation NFPA 805, Performance-         Rev. 3
Rev. 4
Evaluations              Based Standard for Fire Protection for Light Water
71111.21N.05 Engineering
Evaluations
OFP-1213
Code Compliance Evaluation NFPA 805, Performance-
Based Standard for Fire Protection for Light Water
REactor Electric Generating Plants-2001 Edition
REactor Electric Generating Plants-2001 Edition
71111.21N.05 Miscellaneous             Specification 024-001 for Special Doors for BNP Units 1 & Rev. 9
Rev. 3
71111.21N.05 Miscellaneous             NFPA 90A-1985, Standard for the Installation of Air
71111.21N.05 Miscellaneous
Specification 024-001 for Special Doors for BNP Units 1 &
Rev. 9
71111.21N.05 Miscellaneous
NFPA 90A-1985, Standard for the Installation of Air
conditioning and Ventilation Systems
conditioning and Ventilation Systems
71111.21N.05 Miscellaneous             NUREG 1856-Safety Evaluation Report Related to
71111.21N.05 Miscellaneous
License Renewal of Brunswick Steam Electric Plant Unit 1
NUREG 1856-Safety Evaluation Report Related to
Inspection   Type         Designation   Description or Title                                     Revision or
License Renewal of Brunswick Steam Electric Plant Unit 1  
Procedure                                                                                          Date
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
and 2
and 2
71111.21N.05 Miscellaneous 01028015       Brunswick Steam Electric Plant unit 1 and 2, Issuance of 1/28/2015
71111.21N.05 Miscellaneous
01028015
Brunswick Steam Electric Plant unit 1 and 2, Issuance of
Amendment regarding Transition to a Risk Informed-
Amendment regarding Transition to a Risk Informed-
Performance Based Fire Protection program in
Performance Based Fire Protection program in
Accordance with 10CFR50.48
Accordance with 10CFR50.48
71111.21N.05 Miscellaneous 02282014      Brunswick Steam Electric Plant Unit 1 and 2 Renewed       12/28/2014
1/28/2015
71111.21N.05 Miscellaneous
282014
Brunswick Steam Electric Plant Unit 1 and 2 Renewed
Facility Operating License Amendment DPR-71 and DPR-
Facility Operating License Amendment DPR-71 and DPR-
2, Docket No. 50-325 and 50-324, Response to Second
2, Docket No. 50-325 and 50-324, Response to Second
Line 256: Line 516:
Initiative-National Fire Protection Association Standard
Initiative-National Fire Protection Association Standard
805
805
71111.21N.05 Miscellaneous DBD-38         Fuel Oil System Design Basis                             Rev. 8
2/28/2014
71111.21N.05 Miscellaneous LAR           BNP LAR Attachments compiled through Nov 20 2014
71111.21N.05 Miscellaneous
submittal
DBD-38
71111.21N.05 Miscellaneous Operating     Operating License and Technical Specifications-           Updated
Fuel Oil System Design Basis
License and    Brunswick Steam electric Plant Unit 1                     through
Rev. 8
Technical                                                                Amendment
71111.21N.05 Miscellaneous
Specifications                                                          292
LAR
71111.21N.05 Miscellaneous SD-17         Residual Heat Removal System (RHR)                       Rev. 19
BNP LAR Attachments compiled through Nov 20 2014
71111.21N.05 Procedures   0AP-33         Fire Protection Program Manual                           Rev. 23
submittal  
71111.21N.05 Procedures   0ASSD-01       Alternative Safe Shutdown Procedure Index                 Rev. 41
 
71111.21N.05 Procedures   0FP-1222       BNP NFPA 805 Monitoring                                   Rev. 2
71111.21N.05 Miscellaneous
71111.21N.05 Procedures   0MMM-055       Cleanliness and Flushing Requirements                     Rev. 28
Operating
71111.21N.05 Procedures   0MST-BATT10R   Diesel Fire Pump Starting Batteries 18 Month Operability Rev. 10
License and
Technical
Specifications
Operating License and Technical Specifications-
Brunswick Steam electric Plant Unit 1
Updated
through
Amendment
2
71111.21N.05 Miscellaneous
SD-17
Residual Heat Removal System (RHR)
Rev. 19
71111.21N.05 Procedures
0AP-33
Fire Protection Program Manual
Rev. 23
71111.21N.05 Procedures
0ASSD-01
Alternative Safe Shutdown Procedure Index
Rev. 41
71111.21N.05 Procedures
0FP-1222
BNP NFPA 805 Monitoring
Rev. 2
71111.21N.05 Procedures
0MMM-055
Cleanliness and Flushing Requirements
Rev. 28
71111.21N.05 Procedures
0MST-BATT10R
Diesel Fire Pump Starting Batteries 18 Month Operability
Test
Test
71111.21N.05 Procedures   0MST-BATT12Q   Diesel Fire Pump Starting Batteries Quarterly Operability Rev. 10
Rev. 10
71111.21N.05 Procedures
0MST-BATT12Q
Diesel Fire Pump Starting Batteries Quarterly Operability
Test
Test
71111.21N.05 Procedures   0MST-BATT12W   Diesel Fire Pump Starting Batteries Weekly Operability   Rev. 11
Rev. 10
71111.21N.05 Procedures
0MST-BATT12W
Diesel Fire Pump Starting Batteries Weekly Operability
Test
Test
71111.21N.05 Procedures   0OP-41         Fire Pump Manual Start and Stop Completed Procedure       Rev. 142
Rev. 11
Inspection   Type       Designation   Description or Title                                 Revision or
71111.21N.05 Procedures
Procedure                                                                                  Date
0OP-41
71111.21N.05 Procedures 0PLP-01.2     Fire Protection System Functionality, Action, and   Rev. 52
Fire Pump Manual Start and Stop Completed Procedure
Rev. 142  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.21N.05 Procedures
0PLP-01.2
Fire Protection System Functionality, Action, and
Surveillance Requirements
Surveillance Requirements
71111.21N.05 Procedures 0PLP-01.5     ALTERNATIVE SHUTDOWN CAPABILITY CONTROLS             Rev. 15
Rev. 52
71111.21N.05 Procedures 0PT-08.1.4A   RHR SERVICE WATER SYSTEM OPERABILITY TEST -         Rev. 88
71111.21N.05 Procedures
0PLP-01.5
ALTERNATIVE SHUTDOWN CAPABILITY CONTROLS
Rev. 15
71111.21N.05 Procedures
0PT-08.1.4A
RHR SERVICE WATER SYSTEM OPERABILITY TEST -
LOOP A
LOOP A
71111.21N.05 Procedures 0PT-08.1.6     SUPPRESSION POOL LEVEL INDICATOR                     Rev. 38
Rev. 88
71111.21N.05 Procedures
0PT-08.1.6
SUPPRESSION POOL LEVEL INDICATOR
OPERABILITY
OPERABILITY
71111.21N.05 Procedures 0PT-08.2.4     RHR SERVICE WATER SYSTEM COMPONENT TEST             Rev. 32
Rev. 38
71111.21N.05 Procedures 0PT-48.1       Public Address System Speaker Test                   Rev. 58
71111.21N.05 Procedures
71111.21N.05 Procedures 2ASSD-06       REACTOR BUILDING SOUTH                               Rev. 31
0PT-08.2.4
71111.21N.05 Procedures 2FP-1183       NFPA 805 TRANSITION - FIRE AREA RB2-1 FIRE           Rev. 2
RHR SERVICE WATER SYSTEM COMPONENT TEST
Rev. 32
71111.21N.05 Procedures
0PT-48.1
Public Address System Speaker Test
Rev. 58
71111.21N.05 Procedures
2ASSD-06
REACTOR BUILDING SOUTH
Rev. 31
71111.21N.05 Procedures
2FP-1183
NFPA 805 TRANSITION - FIRE AREA RB2-1 FIRE
SAFETY ANALYSIS FOR UNIT 2
SAFETY ANALYSIS FOR UNIT 2
71111.21N.05 Procedures 2OP-17         RESIDUAL HEAT REMOVAL SYSTEM OPERATING               Rev. 181
Rev. 2
71111.21N.05 Procedures
2OP-17
RESIDUAL HEAT REMOVAL SYSTEM OPERATING
PROCEDURE
PROCEDURE
71111.21N.05 Procedures 2OP-43         SERVICE WATER SYSTEM OPERATING PROCEDURE             Rev. 168
Rev. 181
71111.21N.05 Procedures AD-EG-ALL-1132 Preparation and Control of Design Change Engineering Rev. 15
71111.21N.05 Procedures
2OP-43
SERVICE WATER SYSTEM OPERATING PROCEDURE
Rev. 168
71111.21N.05 Procedures
AD-EG-ALL-1132
Preparation and Control of Design Change Engineering
Changes
Changes
71111.21N.05 Procedures AD-EG-ALL-1501 Fire Protection Change Process                       Rev. 2
Rev. 15
71111.21N.05 Procedures AD-EG-ALL-1503 NFPA Monitoring                                     Rev. 2
71111.21N.05 Procedures
71111.21N.05 Procedures AD-EG-ALL-1520 TRANSIENT COMBUSTIBLE CONTROL                       Rev. 12
AD-EG-ALL-1501
71111.21N.05 Procedures AD-EG-ALL-1522 Duties of A Compensatory Fire Watch                 Rev. 9
Fire Protection Change Process
71111.21N.05 Procedures AD-EG-ALL-1532 NFPA 805 PRE-FIRE PLANS                             Rev. 1
Rev. 2
71111.21N.05 Procedures AD-LS-ALL-0005 UFSAR Updates                                       Rev. 7
71111.21N.05 Procedures
71111.21N.05 Procedures BN-MECH-       Fire Periodic Test Qualification                    Rev. 0
AD-EG-ALL-1503
NFPA Monitoring
Rev. 2
71111.21N.05 Procedures
AD-EG-ALL-1520
TRANSIENT COMBUSTIBLE CONTROL
Rev. 12
71111.21N.05 Procedures
AD-EG-ALL-1522
Duties of A Compensatory Fire Watch
Rev. 9
71111.21N.05 Procedures
AD-EG-ALL-1532
NFPA 805 PRE-FIRE PLANS
Rev. 1
71111.21N.05 Procedures
AD-LS-ALL-0005
UFSAR Updates
Rev. 7
71111.21N.05 Procedures
BN-MECH-
MEQ0031B
MEQ0031B
71111.21N.05 Procedures BNP-E-9.007   ASSD RECOVERY ACTION FEASIBILITY                     Rev. 1
Fire Periodic Test Qualification
71111.21N.05 Procedures OFPP-020       Impairment Notification                             Rev. 25
Rev. 0
71111.21N.05 Procedures OPLP-01.2     Fire Protection System Functionality, Action and     Rev. 4
71111.21N.05 Procedures
BNP-E-9.007
ASSD RECOVERY ACTION FEASIBILITY
Rev. 1
71111.21N.05 Procedures
OFPP-020
Impairment Notification
Rev. 25
71111.21N.05 Procedures
OPLP-01.2
Fire Protection System Functionality, Action and
Surveillance Requirements
Surveillance Requirements
71111.21N.05 Procedures OPT-34.1.1.0   Fire Pump Test (Electric and Diesel)                 Rev. 28
Rev. 4
71111.21N.05 Procedures OPT-34.5.5.0   Diesel and Electric Fire Pump Functional Test       Rev. 35
71111.21N.05 Procedures
Inspection   Type       Designation   Description or Title                                     Revision or
OPT-34.1.1.0
Procedure                                                                                        Date
Fire Pump Test (Electric and Diesel)
71111.21N.05 Procedures OPT-34.5.5.0   Diesel and Electric Fire Protection Functional Test       Rev. 39
Rev. 28
71111.21N.05 Procedures OPT-34.6.7.10 Fire Barrier Penetration Seals Diesel Generator Building Rev. 20
71111.21N.05 Procedures
71111.21N.05 Procedures PD-EG-ALL-1500 Fleet Fire Protection Program Manual                     Rev. 2
OPT-34.5.5.0
71111.21N.05 Work Orders MWO 12246953   Preventative Maintenance Task Instructions 2VA-DGB-       Rev. 0
Diesel and Electric Fire Pump Functional Test
Rev. 35  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.21N.05 Procedures
OPT-34.5.5.0
Diesel and Electric Fire Protection Functional Test
Rev. 39
71111.21N.05 Procedures
OPT-34.6.7.10
Fire Barrier Penetration Seals Diesel Generator Building
Rev. 20
71111.21N.05 Procedures
PD-EG-ALL-1500
Fleet Fire Protection Program Manual
Rev. 2
71111.21N.05 Work Orders
MWO 12246953
Preventative Maintenance Task Instructions 2VA-DGB-
FDMP-101
FDMP-101
71111.21N.05 Work Orders MWO 13356194   Work Order Task Instructions, Diesel Generator Building   Rev. 0
Rev. 0
71111.21N.05 Work Orders
MWO 13356194
Work Order Task Instructions, Diesel Generator Building
Fire Dampers
Fire Dampers
71111.21N.05 Work Orders OPT-34.5.5.0   Diesel and Electric Fire Pump Functional Test (Motor     7/18/2017
Rev. 0
71111.21N.05 Work Orders
OPT-34.5.5.0
Diesel and Electric Fire Pump Functional Test (Motor
Driven)
Driven)
71111.21N.05 Work Orders OPT-34.5.5.0   Diesel and Electric Fire Pump Functional Test (Diesel     10/18/2018
7/18/2017
71111.21N.05 Work Orders
OPT-34.5.5.0
Diesel and Electric Fire Pump Functional Test (Diesel
Driven)
Driven)
71111.21N.05 Work Orders OPT-34.5.5.0   Diesel and Electric Fire Pump Functional Test (Diesel     10/09/2019
10/18/2018
71111.21N.05 Work Orders
OPT-34.5.5.0
Diesel and Electric Fire Pump Functional Test (Diesel
Driven)
Driven)
71111.21N.05 Work Orders OPT34.5.5.0   Diesel and Electric Fire Pump Functional Test (Motor     12/22/2018
10/09/2019
71111.21N.05 Work Orders
OPT34.5.5.0
Diesel and Electric Fire Pump Functional Test (Motor
Driven)
Driven)
71111.21N.05 Work Orders WO 12104983-01 2FP-V-122 Material Condition Issues                     3/30/2017
2/22/2018
71111.21N.05 Work Orders WO 12247251   Inspection and Cleaning Fire Damper 2VA-DG-FDMP-101       7/30/2014
71111.21N.05 Work Orders
71111.21N.05 Work Orders WO 20161112-02 Fire Barrier Penetration Seals, Diesel Generator Building 5/29/2019
WO 12104983-01 2FP-V-122 Material Condition Issues
71111.21N.05 Work Orders WO 20345205   LPCI/RHR SYSTEM OPERABILITY TEST - LOOP B                 11/14/2019
3/30/2017
71111.21N.05 Work Orders WO 20346874-01 November 2019 PA System Speaker Test                     11/12/2019
71111.21N.05 Work Orders
71111.21N.05 Work Orders WO 20363358-01 February 2020 PA System Speaker Test                     02/14/2020
WO 12247251
71111.21N.05 Work Orders WO 20380541   SUPPRESSION POOL LEVEL INDICATOR                         1/27/2020
Inspection and Cleaning Fire Damper 2VA-DG-FDMP-101 7/30/2014
71111.21N.05 Work Orders
WO 20161112-02 Fire Barrier Penetration Seals, Diesel Generator Building
5/29/2019
71111.21N.05 Work Orders
WO 20345205
LPCI/RHR SYSTEM OPERABILITY TEST - LOOP B
11/14/2019
71111.21N.05 Work Orders
WO 20346874-01 November 2019 PA System Speaker Test
11/12/2019
71111.21N.05 Work Orders
WO 20363358-01 February 2020 PA System Speaker Test
2/14/2020
71111.21N.05 Work Orders
WO 20380541
SUPPRESSION POOL LEVEL INDICATOR
OPERABILITY
OPERABILITY
71111.21N.05 Work Orders WO- 12104983- 2FP-V-122 Material Condition Issues                       2/21/2018
1/27/2020
2
71111.21N.05 Work Orders
WO-12104983-
2FP-V-122 Material Condition Issues
2/21/2018
}}
}}

Latest revision as of 07:30, 13 December 2024

NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000324/2020010 and 05000325/2020010)
ML20097E835
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 04/06/2020
From: Scott Shaeffer
Division of Reactor Safety II
To: Krakuszeski J
Duke Energy Carolinas
References
IR 2020010
Preceding documents:
Download: ML20097E835 (14)


Text

April 6, 2020

SUBJECT:

BRUNSWICK STEAM ELECTRIC PLANT - NRC FIRE PROTECTION TEAM INSPECTION (FPTI) (NRC INSPECTION REPORT 05000324/2020010 and 05000325/2020010)

Dear Mr. Krakuszeski:

On February 27, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Brunswick Steam Electric Plant. The NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of the inspection is documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety

Docket Nos. 05000324 and 05000325 License Nos. DPR-62 and DPR-71

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000324 and 05000325

License Numbers:

DPR-62 and DPR-71

Report Numbers:

05000324/2020010 and 05000325/2020010

Enterprise Identifier: I-2020-010-0028

Licensee:

Duke Energy Progress, LLC

Facility:

Brunswick Steam Electric Plant, Units 1 & 2

Location:

Southport, NC

Inspection Dates:

February 03, 2020 to February 27, 2020

Inspectors:

R. Fanner, Senior Reactor Inspector

J. Dymek, Reactor Inspector

W. Monk, Senior Reactor Inspector

D. Strickland, Reactor Inspector

Approved By:

Scott Shaeffer, Chief

Engineering Branch 2

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring licensees performance by conducting Inspection Procedure 711111 Attachment 21N.05, Fire Protection Team Inspection (FPTI), at the Brunswick Steam Electric Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

LIST OF FINDINGS AND VIOLATIONS

No findings were identified.

ADDITIONAL TRACKING ITEMS

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

===71111.21N.05 - Fire Protection Team Inspection (FPTI)

SSC Credited for Fire Prevention, Detection, Suppression, or Post-Fire SSD Review (IP Section 03.01)===

The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA). The inspectors performed the following:

a. Review of deficiencies or open fire protection impairments for the selected system, including any temporary modifications, operator workarounds, or compensatory measures.

b. Verify that operator actions can be accomplished as assumed in the licensees FHA, or as assumed in the licensees fire probabilistic risk assessment (FPRA) analysis and SSA.

c. Review repetitive or similar maintenance work requests which could be an indicator of a design deficiency and could affect the ability of the components to perform their functions, when needed.

d. Ensure that post maintenance and/or surveillance activities are performed as scheduled.

e. Perform a walk-down inspection to identify equipment alignment discrepancies. Inspect for deficient conditions such as corrosion, missing fasteners, cracks, and degraded insulation.

f. Ensure the selected SSCs that are subject to aging management review (AMR) pursuant to 10 CFR Part 54 are being managed for aging (e.g., loss of material, cracking, reduction of heat transfer) in accordance with appropriate aging management programs. Verify the licensees aging management program activities (such as Fuel Oil Analysis or Selective Leaching Aging Management Program) associated with FP equipment are being implemented.

g. If a review of operating experience issues will be completed for the selected inspection sample, verify that the licensee adequately reviewed and dis-positioned the operating experience in accordance with their processes.

The samples for this section included:

(1)2-CAC-LR-2602, Suppression Pool Level (2)2-E11-PDV-F068A, RHR HX 2A SW Discharge Valve

(3) Suppression SSCs
(4) Detection SSCs

Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)

The inspectors verified that the selected control or process was implemented in accordance with the licensees current licensing basis. Ensured that the licensees FPP contains adequate procedures to implement the selected administrative control. Verified that the selected administrative control meets the requirements of all committed industry standards.

The samples for this section included:

(1) NPFA 805 Monitoring Program
(2) Fire System Impairments Program

Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)

The inspectors verified the following:

a. Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.

b. The adequacy of the design modification, if applicable.

c. Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.

d. The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.

e. Post-fire SSD operating procedures, such as abnormal operating procedures, affected by the modification were updated.

The samples for this section included:

(1) EC 407358, Diesel Fire Pump Charger
(2) EC 407614, E11-F020, Suppression Pool Suction Valve

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

On February 27, 2020, the inspectors presented the NRC inspection results to Mr. Krakuszeski and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.21N.05 Calculations

2-FP-0049

Qualification of Selected Door Transoms in the Diesel

Generator Building

Rev. 0

71111.21N.05 Calculations

2-FP-0076

Hydraulic Calculation Unit 2, Reactor Building-SE RHR

and Water Curtain

Rev. 1

71111.21N.05 Calculations

BNP-E-9.007

ASSD Recovery Action Feasibility

Rev. 1

71111.21N.05 Calculations

BNP-E-9.010

Safe Shutdown Equipment List

Rev. 3

71111.21N.05 Calculations

BNP-E-9.011

NFPA 805 Transition - Non Power Operational Modes

Review

Rev. 2

71111.21N.05 Calculations

BNP-E-9.011

NFPA 805 Transition - Non-Power Operational Modes

Review

2/04/2018

71111.21N.05 Calculations

BNP-PSA-080

BNP FPRA Quantification Calculation

Rev. 6

71111.21N.05 Corrective Action

Documents

AR 02258766

U2 N Core Spray Pmp FLR Drn not fixed in 30 days

2/20/2019

71111.21N.05 Corrective Action

Documents

AR-02135608-02

Prompt Functionality Assessment Electric Fire Pump 2-

FP-P2

7/17/2017

71111.21N.05 Corrective Action

Documents

CR2045218

Trend in Improper Storage of Transient Combustible

Materials

71111.21N.05 Corrective Action

Documents

CR2139276

Fire Protection Health Report status change green to red

71111.21N.05 Corrective Action

Documents

Resulting from

Inspection

NCR 02304493

FSA Updates due to BNP-E-9.010 Update

2/25/2020

71111.21N.05 Corrective Action

Documents

Resulting from

Inspection

NCR 02314376

QFPI-Housekeeping Inside AFFF Enclosure

2/04/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.21N.05 Corrective Action

Documents

Resulting from

Inspection

NCR 02314509

QFPI-Sprinkler Head Potential Corrosion

2/05/2020

71111.21N.05 Corrective Action

Documents

Resulting from

Inspection

NCR 02314918

QFPI - Potential Transient Combustible Violation

2/6/2020

71111.21N.05 Corrective Action

Documents

Resulting from

Inspection

NCR 02315670

QFPI 2020- Calculation Verbiage Clarification

2/12/2020

71111.21N.05 Corrective Action

Documents

Resulting from

Inspection

NCR 02317935

20 NRC QFPI - Missing Reference in 0FP-1213, NFPA

805 Code

2/26/2020

71111.21N.05 Corrective Action

Documents

Resulting from

Inspection

NCR 02318054

20 NRC QFPI - Steps missing in 2ASSD-06

2/26/2020

71111.21N.05 Corrective Action

Documents

Resulting from

Inspection

NCR 02318122

20 NRC Fire Protection Inspection QFPI 2-VA-DG-

FDMP-101

2/26/2020

71111.21N.05 Corrective Action

Documents

Resulting from

Inspection

NCR 02318123

20 NRC QFPI - Electric Heat Blower in Aux Boiler

House

2/26/2020

71111.21N.05 Corrective Action

Documents

Resulting from

Inspection

NCR 02318276

20 NRC QFPI - Pre-Fire Plan FP Features

2/27/2020

71111.21N.05 Corrective Action

Documents

WR 20167491

20 NRC QFPI - INSTALL LADDER RACKS IN U2 RB -

17'

2/27/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Resulting from

Inspection

71111.21N.05 Drawings

2FP-20589

Fire Protection Piping Isometric, Reactor Building Unit 2

SE RHR

Rev. E

71111.21N.05 Drawings

D-02299

Reactor Building Fire Protection Piping

Rev. 12

71111.21N.05 Drawings

F-01926

Diesel Generator Building-Building Plans

Rev.21

71111.21N.05 Drawings

F-01926

Diesel Generator Building-Building Plans

Rev.21

71111.21N.05 Drawings

F-01928

Diesel Generator Building-Door and Hardware Schedule

and Details

Rev.22

71111.21N.05 Drawings

F-03049

480 Volt System MCC 2XA, 2XC, 2XE, 2XG, 2XJ, 2XL

Auxiliary One Line Diagram

Rev. 85

71111.21N.05 Drawings

F-04093

Diesel Generator Building Ventilation System-Plans at

Elevation 23'-0" and 50'-0"

Rev.21

71111.21N.05 Drawings

LL-09046 - SHT:

I100

CAC System 2-CAC Level Transmitter and Recorder 2-

CAC-LT-2602 and 2-CAC-LR-2602 Control Wiring

Diagram

Rev. 5

71111.21N.05 Drawings

LL-09046 - SHT:

I101

CAC System 2-CAC Level Transmitter and Recorder 2-

CAC-LT-2602 and 2-CAC-LR-2602 Cable Diagram

Rev. 4

71111.21N.05 Drawings

LL-09236 - SH:

RHR HX 2A Service Water Discharge Valve 2-E11-PDV-

F068A Cable Wiring Diagram

Rev. 9

71111.21N.05 Drawings

LL-09236 - SH:

RHR HX 2A Service Water Discharge Valve 2-E11-PDV-

F068A Cable Diagram

Rev. 8

71111.21N.05 Drawings

O-FP-15062

Sonicbar Door Division, Ryson Products Company,

Schedule Sheet

Rev.7

71111.21N.05 Drawings

O-FP-15063

& 3/4 Door, Sections and Elevations

Rev. 5

71111.21N.05 Engineering

Changes

EC 0407614

Permanent Resolution of Temporary Change Ecs on E11-

F020 Valves

Rev. 0

71111.21N.05 Engineering

Changes

EC 407358

Diesel Fire Pump Charger Modification Package

Rev. 0

71111.21N.05 Engineering

Changes

EC 416723

Abandon 2-FO-12-1-1/2-U-6 Diesel Fire Pump Fuel Oil

Supply Line

Rev. 0

71111.21N.05 Engineering

Evaluations

BNP 98-032

Response to Water Hammer Event WNP-2

Rev. 0

71111.21N.05 Engineering

EC-413079

Equivalency Evaluation of Diesel Driven Centrifugal Split

Rev. 3

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Evaluations

Case Horizontal 2000 GPM Fire Pump

71111.21N.05 Engineering

Evaluations

EGR-NGGC-

0005

Random Sample Program of FB Penetration Seals

Rev. 12

71111.21N.05 Engineering

Evaluations

ESR-9700571

Fire Door Problem Resolution

Rev. 0

71111.21N.05 Engineering

Evaluations

ESR-9900328

Fire Barrier Penetration Seal Statistical Sample

Rev. 0

71111.21N.05 Engineering

Evaluations

OFP-0086

Code Compliance Evaluation NFPA 20, Flammable and

Combustible Liquids Code

Rev. 4

71111.21N.05 Engineering

Evaluations

OFP-0089

Code Compliance Evaluation NFPA 22, Water Tanks for

Private Fire Protection

Rev. 1

71111.21N.05 Engineering

Evaluations

OFP-1017

Code Compliance Evaluation NFPA 24, Standard for

Outside Protection

Rev. 4

71111.21N.05 Engineering

Evaluations

OFP-1020

Code Compliance Evaluation NFPA 11B, Synthetic Foam

and Combined Agent Systems

Rev. 3

71111.21N.05 Engineering

Evaluations

OFP-1020,

Code Compliance Evaluation NFPA 16, Foam Water

Spray and Sprinkler Systems

Rev. 3

71111.21N.05 Engineering

Evaluations

OFP-1024

Code Compliance Evaluation NFPA 15, Standard on

Fixed Water Spray Systems Unit 1 and 2 Reactor Building

Rev. 4

71111.21N.05 Engineering

Evaluations

OFP-1027

Code Compliance Evaluation NFPA 14, Standard on the

Installation of Standpipes and Hose Systems, Reactor

Building

Rev. 4

71111.21N.05 Engineering

Evaluations

OFP-1028

Code Compliance Evaluation NFPA 14, Standard on the

Installation of Standpipes and Hose Systems, Radwaste

Building

Rev. 4

71111.21N.05 Engineering

Evaluations

OFP-1213

Code Compliance Evaluation NFPA 805, Performance-

Based Standard for Fire Protection for Light Water

REactor Electric Generating Plants-2001 Edition

Rev. 3

71111.21N.05 Miscellaneous

Specification 024-001 for Special Doors for BNP Units 1 &

Rev. 9

71111.21N.05 Miscellaneous

NFPA 90A-1985, Standard for the Installation of Air

conditioning and Ventilation Systems

71111.21N.05 Miscellaneous

NUREG 1856-Safety Evaluation Report Related to

License Renewal of Brunswick Steam Electric Plant Unit 1

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

and 2

71111.21N.05 Miscellaneous

01028015

Brunswick Steam Electric Plant unit 1 and 2, Issuance of

Amendment regarding Transition to a Risk Informed-

Performance Based Fire Protection program in

Accordance with 10CFR50.48

1/28/2015

71111.21N.05 Miscellaneous

282014

Brunswick Steam Electric Plant Unit 1 and 2 Renewed

Facility Operating License Amendment DPR-71 and DPR-

2, Docket No. 50-325 and 50-324, Response to Second

Request for Additional Information Voluntary Risk

Initiative-National Fire Protection Association Standard

805

2/28/2014

71111.21N.05 Miscellaneous

DBD-38

Fuel Oil System Design Basis

Rev. 8

71111.21N.05 Miscellaneous

LAR

BNP LAR Attachments compiled through Nov 20 2014

submittal

71111.21N.05 Miscellaneous

Operating

License and

Technical

Specifications

Operating License and Technical Specifications-

Brunswick Steam electric Plant Unit 1

Updated

through

Amendment

2

71111.21N.05 Miscellaneous

SD-17

Residual Heat Removal System (RHR)

Rev. 19

71111.21N.05 Procedures

0AP-33

Fire Protection Program Manual

Rev. 23

71111.21N.05 Procedures

0ASSD-01

Alternative Safe Shutdown Procedure Index

Rev. 41

71111.21N.05 Procedures

0FP-1222

BNP NFPA 805 Monitoring

Rev. 2

71111.21N.05 Procedures

0MMM-055

Cleanliness and Flushing Requirements

Rev. 28

71111.21N.05 Procedures

0MST-BATT10R

Diesel Fire Pump Starting Batteries 18 Month Operability

Test

Rev. 10

71111.21N.05 Procedures

0MST-BATT12Q

Diesel Fire Pump Starting Batteries Quarterly Operability

Test

Rev. 10

71111.21N.05 Procedures

0MST-BATT12W

Diesel Fire Pump Starting Batteries Weekly Operability

Test

Rev. 11

71111.21N.05 Procedures

0OP-41

Fire Pump Manual Start and Stop Completed Procedure

Rev. 142

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.21N.05 Procedures

0PLP-01.2

Fire Protection System Functionality, Action, and

Surveillance Requirements

Rev. 52

71111.21N.05 Procedures

0PLP-01.5

ALTERNATIVE SHUTDOWN CAPABILITY CONTROLS

Rev. 15

71111.21N.05 Procedures

0PT-08.1.4A

RHR SERVICE WATER SYSTEM OPERABILITY TEST -

LOOP A

Rev. 88

71111.21N.05 Procedures

0PT-08.1.6

SUPPRESSION POOL LEVEL INDICATOR

OPERABILITY

Rev. 38

71111.21N.05 Procedures

0PT-08.2.4

RHR SERVICE WATER SYSTEM COMPONENT TEST

Rev. 32

71111.21N.05 Procedures

0PT-48.1

Public Address System Speaker Test

Rev. 58

71111.21N.05 Procedures

2ASSD-06

REACTOR BUILDING SOUTH

Rev. 31

71111.21N.05 Procedures

2FP-1183

NFPA 805 TRANSITION - FIRE AREA RB2-1 FIRE

SAFETY ANALYSIS FOR UNIT 2

Rev. 2

71111.21N.05 Procedures

2OP-17

RESIDUAL HEAT REMOVAL SYSTEM OPERATING

PROCEDURE

Rev. 181

71111.21N.05 Procedures

2OP-43

SERVICE WATER SYSTEM OPERATING PROCEDURE

Rev. 168

71111.21N.05 Procedures

AD-EG-ALL-1132

Preparation and Control of Design Change Engineering

Changes

Rev. 15

71111.21N.05 Procedures

AD-EG-ALL-1501

Fire Protection Change Process

Rev. 2

71111.21N.05 Procedures

AD-EG-ALL-1503

NFPA Monitoring

Rev. 2

71111.21N.05 Procedures

AD-EG-ALL-1520

TRANSIENT COMBUSTIBLE CONTROL

Rev. 12

71111.21N.05 Procedures

AD-EG-ALL-1522

Duties of A Compensatory Fire Watch

Rev. 9

71111.21N.05 Procedures

AD-EG-ALL-1532

NFPA 805 PRE-FIRE PLANS

Rev. 1

71111.21N.05 Procedures

AD-LS-ALL-0005

UFSAR Updates

Rev. 7

71111.21N.05 Procedures

BN-MECH-

MEQ0031B

Fire Periodic Test Qualification

Rev. 0

71111.21N.05 Procedures

BNP-E-9.007

ASSD RECOVERY ACTION FEASIBILITY

Rev. 1

71111.21N.05 Procedures

OFPP-020

Impairment Notification

Rev. 25

71111.21N.05 Procedures

OPLP-01.2

Fire Protection System Functionality, Action and

Surveillance Requirements

Rev. 4

71111.21N.05 Procedures

OPT-34.1.1.0

Fire Pump Test (Electric and Diesel)

Rev. 28

71111.21N.05 Procedures

OPT-34.5.5.0

Diesel and Electric Fire Pump Functional Test

Rev. 35

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.21N.05 Procedures

OPT-34.5.5.0

Diesel and Electric Fire Protection Functional Test

Rev. 39

71111.21N.05 Procedures

OPT-34.6.7.10

Fire Barrier Penetration Seals Diesel Generator Building

Rev. 20

71111.21N.05 Procedures

PD-EG-ALL-1500

Fleet Fire Protection Program Manual

Rev. 2

71111.21N.05 Work Orders

MWO 12246953

Preventative Maintenance Task Instructions 2VA-DGB-

FDMP-101

Rev. 0

71111.21N.05 Work Orders

MWO 13356194

Work Order Task Instructions, Diesel Generator Building

Fire Dampers

Rev. 0

71111.21N.05 Work Orders

OPT-34.5.5.0

Diesel and Electric Fire Pump Functional Test (Motor

Driven)

7/18/2017

71111.21N.05 Work Orders

OPT-34.5.5.0

Diesel and Electric Fire Pump Functional Test (Diesel

Driven)

10/18/2018

71111.21N.05 Work Orders

OPT-34.5.5.0

Diesel and Electric Fire Pump Functional Test (Diesel

Driven)

10/09/2019

71111.21N.05 Work Orders

OPT34.5.5.0

Diesel and Electric Fire Pump Functional Test (Motor

Driven)

2/22/2018

71111.21N.05 Work Orders

WO 12104983-01 2FP-V-122 Material Condition Issues

3/30/2017

71111.21N.05 Work Orders

WO 12247251

Inspection and Cleaning Fire Damper 2VA-DG-FDMP-101 7/30/2014

71111.21N.05 Work Orders

WO 20161112-02 Fire Barrier Penetration Seals, Diesel Generator Building

5/29/2019

71111.21N.05 Work Orders

WO 20345205

LPCI/RHR SYSTEM OPERABILITY TEST - LOOP B

11/14/2019

71111.21N.05 Work Orders

WO 20346874-01 November 2019 PA System Speaker Test

11/12/2019

71111.21N.05 Work Orders

WO 20363358-01 February 2020 PA System Speaker Test

2/14/2020

71111.21N.05 Work Orders

WO 20380541

SUPPRESSION POOL LEVEL INDICATOR

OPERABILITY

1/27/2020

71111.21N.05 Work Orders

WO-12104983-

2FP-V-122 Material Condition Issues

2/21/2018