IR 05000324/2020010: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML20097E835 | | number = ML20097E835 | ||
| issue date = 04/06/2020 | | issue date = 04/06/2020 | ||
| title = NRC Fire Protection Team Inspection ( | | title = NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000324/2020010 and 05000325/2020010) | ||
| author name = Shaeffer S | | author name = Shaeffer S | ||
| author affiliation = NRC/RGN-II/DRS | | author affiliation = NRC/RGN-II/DRS | ||
| Line 31: | Line 31: | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 05000324 and 05000325 License Nos. DPR-62 and DPR-71 | |||
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety | |||
Docket Nos. 05000324 and 05000325 License Nos. DPR-62 and DPR-71 | |||
===Enclosure:=== | ===Enclosure:=== | ||
As stated | As stated | ||
==Inspection Report== | ==Inspection Report== | ||
Docket Numbers: 05000324 and 05000325 License Numbers: DPR-62 and DPR-71 Report Numbers: 05000324/2020010 and 05000325/2020010 Enterprise Identifier: I-2020-010-0028 Licensee: Duke Energy Progress, LLC Facility: Brunswick Steam Electric Plant, Units 1 & 2 Location: Southport, NC Inspection Dates: February 03, 2020 to February 27, 2020 Inspectors: R. Fanner, Senior Reactor Inspector J. Dymek, Reactor Inspector W. Monk, Senior Reactor Inspector D. Strickland, Reactor Inspector Approved By: Scott Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety | Docket Numbers: | ||
05000324 and 05000325 | |||
License Numbers: | |||
DPR-62 and DPR-71 | |||
Report Numbers: | |||
05000324/2020010 and 05000325/2020010 | |||
Enterprise Identifier: I-2020-010-0028 | |||
Licensee: | |||
Duke Energy Progress, LLC | |||
Facility: | |||
Brunswick Steam Electric Plant, Units 1 & 2 | |||
Location: | |||
Southport, NC | |||
Inspection Dates: | |||
February 03, 2020 to February 27, 2020 | |||
Inspectors: | |||
R. Fanner, Senior Reactor Inspector | |||
J. Dymek, Reactor Inspector | |||
W. Monk, Senior Reactor Inspector | |||
D. Strickland, Reactor Inspector | |||
Approved By: | |||
Scott Shaeffer, Chief | |||
Engineering Branch 2 | |||
Division of Reactor Safety | |||
=SUMMARY= | =SUMMARY= | ||
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring licensees performance by conducting Inspection Procedure 711111 Attachment 21N.05, Fire Protection Team Inspection (FPTI), at the Brunswick Steam Electric Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. | The U.S. Nuclear Regulatory Commission (NRC) continued monitoring licensees performance by conducting Inspection Procedure 711111 Attachment 21N.05, Fire Protection Team Inspection (FPTI), at the Brunswick Steam Electric Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. | ||
LIST OF FINDINGS AND VIOLATIONS No findings were identified. | LIST OF FINDINGS AND VIOLATIONS | ||
No findings were identified. | |||
ADDITIONAL TRACKING ITEMS | |||
None. | |||
=INSPECTION SCOPES= | =INSPECTION SCOPES= | ||
| Line 52: | Line 94: | ||
==REACTOR SAFETY== | ==REACTOR SAFETY== | ||
===71111.21N.05 - Fire Protection Team Inspection (FPTI) | |||
SSC Credited for Fire Prevention, Detection, Suppression, or Post-Fire SSD Review (IP Section 03.01)=== | |||
{{IP sample|IP=IP 71111.21|count=4}} | {{IP sample|IP=IP 71111.21|count=4}} | ||
The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA). The inspectors performed the following: | |||
The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA). The inspectors performed the following: | |||
a. Review of deficiencies or open fire protection impairments for the selected system, including any temporary modifications, operator workarounds, or compensatory measures. | a. Review of deficiencies or open fire protection impairments for the selected system, including any temporary modifications, operator workarounds, or compensatory measures. | ||
| Line 70: | Line 115: | ||
g. If a review of operating experience issues will be completed for the selected inspection sample, verify that the licensee adequately reviewed and dis-positioned the operating experience in accordance with their processes. | g. If a review of operating experience issues will be completed for the selected inspection sample, verify that the licensee adequately reviewed and dis-positioned the operating experience in accordance with their processes. | ||
The samples for this section included: | The samples for this section included: | ||
(1)2-CAC-LR-2602, Suppression Pool Level (2)2-E11-PDV-F068A, RHR HX 2A SW Discharge Valve | |||
: (3) Suppression SSCs | : (3) Suppression SSCs | ||
: (4) Detection SSCs | : (4) Detection SSCs | ||
===Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)=== | ===Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)=== | ||
| Line 81: | Line 126: | ||
The samples for this section included: | The samples for this section included: | ||
: (1) NPFA 805 Monitoring Program | : (1) NPFA 805 Monitoring Program | ||
: (2) Fire System Impairments Program | : (2) Fire System Impairments Program | ||
===Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)=== | ===Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)=== | ||
| Line 107: | Line 152: | ||
=DOCUMENTS REVIEWED= | =DOCUMENTS REVIEWED= | ||
Inspection | Inspection | ||
Procedure | |||
71111.21N.05 Calculations | Type | ||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
71111.21N.05 Calculations | |||
2-FP-0049 | |||
Qualification of Selected Door Transoms in the Diesel | |||
Generator Building | Generator Building | ||
71111.21N.05 Calculations | Rev. 0 | ||
71111.21N.05 Calculations | |||
2-FP-0076 | |||
Hydraulic Calculation Unit 2, Reactor Building-SE RHR | |||
and Water Curtain | and Water Curtain | ||
71111.21N.05 Calculations | Rev. 1 | ||
71111.21N.05 Calculations | 71111.21N.05 Calculations | ||
71111.21N.05 Calculations | BNP-E-9.007 | ||
ASSD Recovery Action Feasibility | |||
Rev. 1 | |||
71111.21N.05 Calculations | |||
BNP-E-9.010 | |||
Safe Shutdown Equipment List | |||
Rev. 3 | |||
71111.21N.05 Calculations | |||
BNP-E-9.011 | |||
NFPA 805 Transition - Non Power Operational Modes | |||
Review | Review | ||
71111.21N.05 Calculations | Rev. 2 | ||
71111.21N.05 Calculations | |||
BNP-E-9.011 | |||
NFPA 805 Transition - Non-Power Operational Modes | |||
Review | Review | ||
71111.21N.05 Calculations | 2/04/2018 | ||
71111.21N.05 Corrective Action | 71111.21N.05 Calculations | ||
BNP-PSA-080 | |||
BNP FPRA Quantification Calculation | |||
Rev. 6 | |||
71111.21N.05 Corrective Action | |||
Documents | Documents | ||
AR 02258766 | |||
U2 N Core Spray Pmp FLR Drn not fixed in 30 days | |||
2/20/2019 | |||
71111.21N.05 Corrective Action | |||
71111.21N.05 Corrective Action | |||
Documents | Documents | ||
71111.21N.05 Corrective Action | AR-02135608-02 | ||
Prompt Functionality Assessment Electric Fire Pump 2- | |||
FP-P2 | |||
7/17/2017 | |||
71111.21N.05 Corrective Action | |||
Documents | |||
CR2045218 | |||
Trend in Improper Storage of Transient Combustible | |||
Materials | |||
71111.21N.05 Corrective Action | |||
Documents | |||
CR2139276 | |||
Fire Protection Health Report status change green to red | |||
71111.21N.05 Corrective Action | |||
Documents | Documents | ||
Resulting from | Resulting from | ||
Inspection | Inspection | ||
71111.21N.05 Corrective Action | NCR 02304493 | ||
FSA Updates due to BNP-E-9.010 Update | |||
2/25/2020 | |||
71111.21N.05 Corrective Action | |||
Documents | Documents | ||
Resulting from | Resulting from | ||
Inspection | Inspection | ||
Inspection | NCR 02314376 | ||
QFPI-Housekeeping Inside AFFF Enclosure | |||
71111.21N.05 Corrective Action | 2/04/2020 | ||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
71111.21N.05 Corrective Action | |||
Documents | Documents | ||
Resulting from | Resulting from | ||
Inspection | Inspection | ||
NCR 02314509 | |||
QFPI-Sprinkler Head Potential Corrosion | |||
2/05/2020 | |||
71111.21N.05 Corrective Action | |||
Documents | Documents | ||
Resulting from | Resulting from | ||
Inspection | Inspection | ||
71111.21N.05 Corrective Action | NCR 02314918 | ||
QFPI - Potential Transient Combustible Violation | |||
2/6/2020 | |||
71111.21N.05 Corrective Action | |||
Documents | Documents | ||
Resulting from | Resulting from | ||
Inspection | Inspection | ||
71111.21N.05 Corrective Action | NCR 02315670 | ||
Documents | QFPI 2020- Calculation Verbiage Clarification | ||
2/12/2020 | |||
71111.21N.05 Corrective Action | |||
Documents | |||
Resulting from | Resulting from | ||
Inspection | Inspection | ||
NCR 02317935 | |||
20 NRC QFPI - Missing Reference in 0FP-1213, NFPA | |||
805 Code | |||
2/26/2020 | |||
71111.21N.05 Corrective Action | |||
Documents | Documents | ||
Resulting from | Resulting from | ||
Inspection | Inspection | ||
NCR 02318054 | |||
Documents | 20 NRC QFPI - Steps missing in 2ASSD-06 | ||
2/26/2020 | |||
71111.21N.05 Corrective Action | |||
Documents | |||
Resulting from | Resulting from | ||
Inspection | Inspection | ||
NCR 02318122 | |||
Documents | 20 NRC Fire Protection Inspection QFPI 2-VA-DG- | ||
FDMP-101 | |||
2/26/2020 | |||
71111.21N.05 Corrective Action | |||
Documents | |||
Resulting from | Resulting from | ||
Inspection | Inspection | ||
NCR 02318123 | |||
20 NRC QFPI - Electric Heat Blower in Aux Boiler | |||
House | |||
2/26/2020 | |||
71111.21N.05 Corrective Action | |||
Documents | Documents | ||
Resulting from | Resulting from | ||
Inspection | Inspection | ||
71111.21N.05 Corrective Action WR 20167491 | NCR 02318276 | ||
20 NRC QFPI - Pre-Fire Plan FP Features | |||
Inspection | 2/27/2020 | ||
71111.21N.05 Corrective Action | |||
Documents | |||
WR 20167491 | |||
20 NRC QFPI - INSTALL LADDER RACKS IN U2 RB - | |||
17' | |||
2/27/2020 | |||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
Resulting from | Resulting from | ||
Inspection | Inspection | ||
71111.21N.05 Drawings | 71111.21N.05 Drawings | ||
2FP-20589 | |||
Fire Protection Piping Isometric, Reactor Building Unit 2 | |||
SE RHR | SE RHR | ||
71111.21N.05 Drawings | Rev. E | ||
71111.21N.05 Drawings | 71111.21N.05 Drawings | ||
71111.21N.05 Drawings | D-02299 | ||
71111.21N.05 Drawings | Reactor Building Fire Protection Piping | ||
Rev. 12 | |||
71111.21N.05 Drawings | |||
F-01926 | |||
Diesel Generator Building-Building Plans | |||
Rev.21 | |||
71111.21N.05 Drawings | |||
F-01926 | |||
Diesel Generator Building-Building Plans | |||
Rev.21 | |||
71111.21N.05 Drawings | |||
F-01928 | |||
Diesel Generator Building-Door and Hardware Schedule | |||
and Details | and Details | ||
71111.21N.05 Drawings | Rev.22 | ||
71111.21N.05 Drawings | |||
F-03049 | |||
480 Volt System MCC 2XA, 2XC, 2XE, 2XG, 2XJ, 2XL | |||
Auxiliary One Line Diagram | Auxiliary One Line Diagram | ||
71111.21N.05 Drawings | Rev. 85 | ||
71111.21N.05 Drawings | |||
F-04093 | |||
Diesel Generator Building Ventilation System-Plans at | |||
Elevation 23'-0" and 50'-0" | Elevation 23'-0" and 50'-0" | ||
71111.21N.05 Drawings | Rev.21 | ||
71111.21N.05 Drawings | |||
LL-09046 - SHT: | |||
I100 | |||
CAC System 2-CAC Level Transmitter and Recorder 2- | |||
CAC-LT-2602 and 2-CAC-LR-2602 Control Wiring | |||
Diagram | Diagram | ||
71111.21N.05 Drawings | Rev. 5 | ||
71111.21N.05 Drawings | |||
71111.21N.05 Drawings | LL-09046 - SHT: | ||
I101 | |||
CAC System 2-CAC Level Transmitter and Recorder 2- | |||
CAC-LT-2602 and 2-CAC-LR-2602 Cable Diagram | |||
Rev. 4 | |||
71111.21N.05 Drawings | |||
LL-09236 - SH: | |||
RHR HX 2A Service Water Discharge Valve 2-E11-PDV- | |||
F068A Cable Wiring Diagram | F068A Cable Wiring Diagram | ||
71111.21N.05 Drawings | Rev. 9 | ||
71111.21N.05 Drawings | |||
LL-09236 - SH: | |||
RHR HX 2A Service Water Discharge Valve 2-E11-PDV- | |||
F068A Cable Diagram | F068A Cable Diagram | ||
71111.21N.05 Drawings | Rev. 8 | ||
71111.21N.05 Drawings | |||
O-FP-15062 | |||
Sonicbar Door Division, Ryson Products Company, | |||
Schedule Sheet | Schedule Sheet | ||
71111.21N.05 Drawings | Rev.7 | ||
71111.21N.05 Engineering | 71111.21N.05 Drawings | ||
O-FP-15063 | |||
71111.21N.05 Engineering | & 3/4 Door, Sections and Elevations | ||
Rev. 5 | |||
71111.21N.05 Engineering | |||
Changes | |||
EC 0407614 | |||
Permanent Resolution of Temporary Change Ecs on E11- | |||
F020 Valves | |||
Rev. 0 | |||
71111.21N.05 Engineering | |||
Changes | |||
EC 407358 | |||
Diesel Fire Pump Charger Modification Package | |||
Rev. 0 | |||
71111.21N.05 Engineering | |||
Changes | Changes | ||
EC 416723 | |||
Abandon 2-FO-12-1-1/2-U-6 Diesel Fire Pump Fuel Oil | |||
71111.21N.05 Engineering | Supply Line | ||
Rev. 0 | |||
71111.21N.05 Engineering | |||
Evaluations | Evaluations | ||
71111.21N.05 Engineering | BNP 98-032 | ||
Inspection | Response to Water Hammer Event WNP-2 | ||
Rev. 0 | |||
Evaluations | 71111.21N.05 Engineering | ||
71111.21N.05 Engineering | EC-413079 | ||
Equivalency Evaluation of Diesel Driven Centrifugal Split | |||
71111.21N.05 Engineering | Rev. 3 | ||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
Evaluations | |||
Case Horizontal 2000 GPM Fire Pump | |||
71111.21N.05 Engineering | |||
Evaluations | |||
EGR-NGGC- | |||
0005 | |||
Random Sample Program of FB Penetration Seals | |||
Rev. 12 | |||
71111.21N.05 Engineering | |||
Evaluations | Evaluations | ||
71111.21N.05 Engineering | ESR-9700571 | ||
Fire Door Problem Resolution | |||
Rev. 0 | |||
71111.21N.05 Engineering | |||
Evaluations | Evaluations | ||
71111.21N.05 Engineering | ESR-9900328 | ||
Fire Barrier Penetration Seal Statistical Sample | |||
71111.21N.05 Engineering | Rev. 0 | ||
71111.21N.05 Engineering | |||
71111.21N.05 Engineering | Evaluations | ||
OFP-0086 | |||
71111.21N.05 Engineering | Code Compliance Evaluation NFPA 20, Flammable and | ||
Combustible Liquids Code | |||
71111.21N.05 Engineering | Rev. 4 | ||
71111.21N.05 Engineering | |||
71111.21N.05 Engineering | Evaluations | ||
OFP-0089 | |||
71111.21N.05 Engineering | Code Compliance Evaluation NFPA 22, Water Tanks for | ||
Private Fire Protection | |||
Rev. 1 | |||
71111.21N.05 Engineering | |||
Evaluations | |||
OFP-1017 | |||
Code Compliance Evaluation NFPA 24, Standard for | |||
Outside Protection | |||
Rev. 4 | |||
71111.21N.05 Engineering | |||
Evaluations | |||
OFP-1020 | |||
Code Compliance Evaluation NFPA 11B, Synthetic Foam | |||
and Combined Agent Systems | |||
Rev. 3 | |||
71111.21N.05 Engineering | |||
Evaluations | |||
OFP-1020, | |||
Code Compliance Evaluation NFPA 16, Foam Water | |||
Spray and Sprinkler Systems | |||
Rev. 3 | |||
71111.21N.05 Engineering | |||
Evaluations | |||
OFP-1024 | |||
Code Compliance Evaluation NFPA 15, Standard on | |||
Fixed Water Spray Systems Unit 1 and 2 Reactor Building | |||
Rev. 4 | |||
71111.21N.05 Engineering | |||
Evaluations | |||
OFP-1027 | |||
Code Compliance Evaluation NFPA 14, Standard on the | |||
Installation of Standpipes and Hose Systems, Reactor | |||
Building | Building | ||
71111.21N.05 Engineering | Rev. 4 | ||
71111.21N.05 Engineering | |||
Evaluations | |||
OFP-1028 | |||
Code Compliance Evaluation NFPA 14, Standard on the | |||
Installation of Standpipes and Hose Systems, Radwaste | |||
Building | Building | ||
71111.21N.05 Engineering | Rev. 4 | ||
71111.21N.05 Engineering | |||
Evaluations | |||
OFP-1213 | |||
Code Compliance Evaluation NFPA 805, Performance- | |||
Based Standard for Fire Protection for Light Water | |||
REactor Electric Generating Plants-2001 Edition | REactor Electric Generating Plants-2001 Edition | ||
71111.21N.05 Miscellaneous | Rev. 3 | ||
71111.21N.05 Miscellaneous | 71111.21N.05 Miscellaneous | ||
Specification 024-001 for Special Doors for BNP Units 1 & | |||
Rev. 9 | |||
71111.21N.05 Miscellaneous | |||
NFPA 90A-1985, Standard for the Installation of Air | |||
conditioning and Ventilation Systems | conditioning and Ventilation Systems | ||
71111.21N.05 Miscellaneous | 71111.21N.05 Miscellaneous | ||
License Renewal of Brunswick Steam Electric Plant Unit 1 | NUREG 1856-Safety Evaluation Report Related to | ||
Inspection | License Renewal of Brunswick Steam Electric Plant Unit 1 | ||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
and 2 | and 2 | ||
71111.21N.05 Miscellaneous 01028015 | 71111.21N.05 Miscellaneous | ||
01028015 | |||
Brunswick Steam Electric Plant unit 1 and 2, Issuance of | |||
Amendment regarding Transition to a Risk Informed- | Amendment regarding Transition to a Risk Informed- | ||
Performance Based Fire Protection program in | Performance Based Fire Protection program in | ||
Accordance with 10CFR50.48 | Accordance with 10CFR50.48 | ||
71111.21N.05 Miscellaneous | 1/28/2015 | ||
71111.21N.05 Miscellaneous | |||
282014 | |||
Brunswick Steam Electric Plant Unit 1 and 2 Renewed | |||
Facility Operating License Amendment DPR-71 and DPR- | Facility Operating License Amendment DPR-71 and DPR- | ||
2, Docket No. 50-325 and 50-324, Response to Second | 2, Docket No. 50-325 and 50-324, Response to Second | ||
| Line 256: | Line 516: | ||
Initiative-National Fire Protection Association Standard | Initiative-National Fire Protection Association Standard | ||
805 | 805 | ||
71111.21N.05 Miscellaneous DBD-38 | 2/28/2014 | ||
71111.21N.05 Miscellaneous LAR | 71111.21N.05 Miscellaneous | ||
submittal | DBD-38 | ||
71111.21N.05 Miscellaneous Operating | Fuel Oil System Design Basis | ||
Rev. 8 | |||
71111.21N.05 Miscellaneous | |||
LAR | |||
71111.21N.05 Miscellaneous SD-17 | BNP LAR Attachments compiled through Nov 20 2014 | ||
71111.21N.05 Procedures | submittal | ||
71111.21N.05 Procedures | |||
71111.21N.05 Procedures | 71111.21N.05 Miscellaneous | ||
71111.21N.05 Procedures | Operating | ||
71111.21N.05 Procedures | License and | ||
Technical | |||
Specifications | |||
Operating License and Technical Specifications- | |||
Brunswick Steam electric Plant Unit 1 | |||
Updated | |||
through | |||
Amendment | |||
2 | |||
71111.21N.05 Miscellaneous | |||
SD-17 | |||
Residual Heat Removal System (RHR) | |||
Rev. 19 | |||
71111.21N.05 Procedures | |||
0AP-33 | |||
Fire Protection Program Manual | |||
Rev. 23 | |||
71111.21N.05 Procedures | |||
0ASSD-01 | |||
Alternative Safe Shutdown Procedure Index | |||
Rev. 41 | |||
71111.21N.05 Procedures | |||
0FP-1222 | |||
BNP NFPA 805 Monitoring | |||
Rev. 2 | |||
71111.21N.05 Procedures | |||
0MMM-055 | |||
Cleanliness and Flushing Requirements | |||
Rev. 28 | |||
71111.21N.05 Procedures | |||
0MST-BATT10R | |||
Diesel Fire Pump Starting Batteries 18 Month Operability | |||
Test | Test | ||
71111.21N.05 Procedures | Rev. 10 | ||
71111.21N.05 Procedures | |||
0MST-BATT12Q | |||
Diesel Fire Pump Starting Batteries Quarterly Operability | |||
Test | Test | ||
71111.21N.05 Procedures | Rev. 10 | ||
71111.21N.05 Procedures | |||
0MST-BATT12W | |||
Diesel Fire Pump Starting Batteries Weekly Operability | |||
Test | Test | ||
71111.21N.05 Procedures | Rev. 11 | ||
Inspection | 71111.21N.05 Procedures | ||
0OP-41 | |||
71111.21N.05 Procedures 0PLP-01.2 | Fire Pump Manual Start and Stop Completed Procedure | ||
Rev. 142 | |||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
71111.21N.05 Procedures | |||
0PLP-01.2 | |||
Fire Protection System Functionality, Action, and | |||
Surveillance Requirements | Surveillance Requirements | ||
71111.21N.05 Procedures 0PLP-01.5 | Rev. 52 | ||
71111.21N.05 Procedures 0PT-08.1.4A | 71111.21N.05 Procedures | ||
0PLP-01.5 | |||
ALTERNATIVE SHUTDOWN CAPABILITY CONTROLS | |||
Rev. 15 | |||
71111.21N.05 Procedures | |||
0PT-08.1.4A | |||
RHR SERVICE WATER SYSTEM OPERABILITY TEST - | |||
LOOP A | LOOP A | ||
71111.21N.05 Procedures 0PT-08.1.6 | Rev. 88 | ||
71111.21N.05 Procedures | |||
0PT-08.1.6 | |||
SUPPRESSION POOL LEVEL INDICATOR | |||
OPERABILITY | OPERABILITY | ||
71111.21N.05 Procedures 0PT-08.2.4 | Rev. 38 | ||
71111.21N.05 Procedures 0PT-48.1 | 71111.21N.05 Procedures | ||
71111.21N.05 Procedures 2ASSD-06 | 0PT-08.2.4 | ||
71111.21N.05 Procedures 2FP-1183 | RHR SERVICE WATER SYSTEM COMPONENT TEST | ||
Rev. 32 | |||
71111.21N.05 Procedures | |||
0PT-48.1 | |||
Public Address System Speaker Test | |||
Rev. 58 | |||
71111.21N.05 Procedures | |||
2ASSD-06 | |||
REACTOR BUILDING SOUTH | |||
Rev. 31 | |||
71111.21N.05 Procedures | |||
2FP-1183 | |||
NFPA 805 TRANSITION - FIRE AREA RB2-1 FIRE | |||
SAFETY ANALYSIS FOR UNIT 2 | SAFETY ANALYSIS FOR UNIT 2 | ||
71111.21N.05 Procedures 2OP-17 | Rev. 2 | ||
71111.21N.05 Procedures | |||
2OP-17 | |||
RESIDUAL HEAT REMOVAL SYSTEM OPERATING | |||
PROCEDURE | PROCEDURE | ||
71111.21N.05 Procedures 2OP-43 | Rev. 181 | ||
71111.21N.05 Procedures AD-EG-ALL-1132 Preparation and Control of Design Change Engineering | 71111.21N.05 Procedures | ||
2OP-43 | |||
SERVICE WATER SYSTEM OPERATING PROCEDURE | |||
Rev. 168 | |||
71111.21N.05 Procedures | |||
AD-EG-ALL-1132 | |||
Preparation and Control of Design Change Engineering | |||
Changes | Changes | ||
71111.21N.05 Procedures AD-EG-ALL-1501 Fire Protection Change Process | Rev. 15 | ||
71111.21N.05 Procedures AD-EG-ALL-1503 NFPA Monitoring | 71111.21N.05 Procedures | ||
71111.21N.05 Procedures AD-EG-ALL-1520 TRANSIENT COMBUSTIBLE CONTROL | AD-EG-ALL-1501 | ||
71111.21N.05 Procedures AD-EG-ALL-1522 Duties of A Compensatory Fire Watch | Fire Protection Change Process | ||
71111.21N.05 Procedures AD-EG-ALL-1532 NFPA 805 PRE-FIRE PLANS | Rev. 2 | ||
71111.21N.05 Procedures AD-LS-ALL-0005 UFSAR Updates | 71111.21N.05 Procedures | ||
71111.21N.05 Procedures BN-MECH- | AD-EG-ALL-1503 | ||
NFPA Monitoring | |||
Rev. 2 | |||
71111.21N.05 Procedures | |||
AD-EG-ALL-1520 | |||
TRANSIENT COMBUSTIBLE CONTROL | |||
Rev. 12 | |||
71111.21N.05 Procedures | |||
AD-EG-ALL-1522 | |||
Duties of A Compensatory Fire Watch | |||
Rev. 9 | |||
71111.21N.05 Procedures | |||
AD-EG-ALL-1532 | |||
NFPA 805 PRE-FIRE PLANS | |||
Rev. 1 | |||
71111.21N.05 Procedures | |||
AD-LS-ALL-0005 | |||
UFSAR Updates | |||
Rev. 7 | |||
71111.21N.05 Procedures | |||
BN-MECH- | |||
MEQ0031B | MEQ0031B | ||
71111.21N.05 Procedures BNP-E-9.007 | Fire Periodic Test Qualification | ||
71111.21N.05 Procedures OFPP-020 | Rev. 0 | ||
71111.21N.05 Procedures OPLP-01.2 | 71111.21N.05 Procedures | ||
BNP-E-9.007 | |||
ASSD RECOVERY ACTION FEASIBILITY | |||
Rev. 1 | |||
71111.21N.05 Procedures | |||
OFPP-020 | |||
Impairment Notification | |||
Rev. 25 | |||
71111.21N.05 Procedures | |||
OPLP-01.2 | |||
Fire Protection System Functionality, Action and | |||
Surveillance Requirements | Surveillance Requirements | ||
71111.21N.05 Procedures OPT-34.1.1.0 | Rev. 4 | ||
71111.21N.05 Procedures OPT-34.5.5.0 | 71111.21N.05 Procedures | ||
Inspection | OPT-34.1.1.0 | ||
Fire Pump Test (Electric and Diesel) | |||
71111.21N.05 Procedures | Rev. 28 | ||
71111.21N.05 Procedures | 71111.21N.05 Procedures | ||
71111.21N.05 Procedures | OPT-34.5.5.0 | ||
71111.21N.05 Work Orders MWO 12246953 | Diesel and Electric Fire Pump Functional Test | ||
Rev. 35 | |||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
71111.21N.05 Procedures | |||
OPT-34.5.5.0 | |||
Diesel and Electric Fire Protection Functional Test | |||
Rev. 39 | |||
71111.21N.05 Procedures | |||
OPT-34.6.7.10 | |||
Fire Barrier Penetration Seals Diesel Generator Building | |||
Rev. 20 | |||
71111.21N.05 Procedures | |||
PD-EG-ALL-1500 | |||
Fleet Fire Protection Program Manual | |||
Rev. 2 | |||
71111.21N.05 Work Orders | |||
MWO 12246953 | |||
Preventative Maintenance Task Instructions 2VA-DGB- | |||
FDMP-101 | FDMP-101 | ||
71111.21N.05 Work Orders MWO 13356194 | Rev. 0 | ||
71111.21N.05 Work Orders | |||
MWO 13356194 | |||
Work Order Task Instructions, Diesel Generator Building | |||
Fire Dampers | Fire Dampers | ||
71111.21N.05 Work Orders OPT-34.5.5.0 | Rev. 0 | ||
71111.21N.05 Work Orders | |||
OPT-34.5.5.0 | |||
Diesel and Electric Fire Pump Functional Test (Motor | |||
Driven) | Driven) | ||
71111.21N.05 Work Orders OPT-34.5.5.0 | 7/18/2017 | ||
71111.21N.05 Work Orders | |||
OPT-34.5.5.0 | |||
Diesel and Electric Fire Pump Functional Test (Diesel | |||
Driven) | Driven) | ||
71111.21N.05 Work Orders OPT-34.5.5.0 | 10/18/2018 | ||
71111.21N.05 Work Orders | |||
OPT-34.5.5.0 | |||
Diesel and Electric Fire Pump Functional Test (Diesel | |||
Driven) | Driven) | ||
71111.21N.05 Work Orders OPT34.5.5.0 | 10/09/2019 | ||
71111.21N.05 Work Orders | |||
OPT34.5.5.0 | |||
Diesel and Electric Fire Pump Functional Test (Motor | |||
Driven) | Driven) | ||
71111.21N.05 Work Orders WO 12104983-01 | 2/22/2018 | ||
71111.21N.05 Work Orders WO 12247251 | 71111.21N.05 Work Orders | ||
71111.21N.05 Work Orders WO 20161112-02 Fire Barrier Penetration Seals, Diesel Generator Building 5/29/2019 | WO 12104983-01 2FP-V-122 Material Condition Issues | ||
71111.21N.05 Work Orders WO 20345205 | 3/30/2017 | ||
71111.21N.05 Work Orders WO 20346874-01 November 2019 PA System Speaker Test | 71111.21N.05 Work Orders | ||
71111.21N.05 Work Orders WO 20363358-01 February 2020 PA System Speaker Test | WO 12247251 | ||
71111.21N.05 Work Orders WO 20380541 | Inspection and Cleaning Fire Damper 2VA-DG-FDMP-101 7/30/2014 | ||
71111.21N.05 Work Orders | |||
WO 20161112-02 Fire Barrier Penetration Seals, Diesel Generator Building | |||
5/29/2019 | |||
71111.21N.05 Work Orders | |||
WO 20345205 | |||
LPCI/RHR SYSTEM OPERABILITY TEST - LOOP B | |||
11/14/2019 | |||
71111.21N.05 Work Orders | |||
WO 20346874-01 November 2019 PA System Speaker Test | |||
11/12/2019 | |||
71111.21N.05 Work Orders | |||
WO 20363358-01 February 2020 PA System Speaker Test | |||
2/14/2020 | |||
71111.21N.05 Work Orders | |||
WO 20380541 | |||
SUPPRESSION POOL LEVEL INDICATOR | |||
OPERABILITY | OPERABILITY | ||
71111.21N.05 Work Orders WO- 12104983- | 1/27/2020 | ||
71111.21N.05 Work Orders | |||
WO-12104983- | |||
2FP-V-122 Material Condition Issues | |||
2/21/2018 | |||
}} | }} | ||
Latest revision as of 07:30, 13 December 2024
| ML20097E835 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 04/06/2020 |
| From: | Scott Shaeffer Division of Reactor Safety II |
| To: | Krakuszeski J Duke Energy Carolinas |
| References | |
| IR 2020010 | |
| Preceding documents: |
|
| Download: ML20097E835 (14) | |
Text
April 6, 2020
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT - NRC FIRE PROTECTION TEAM INSPECTION (FPTI) (NRC INSPECTION REPORT 05000324/2020010 and 05000325/2020010)
Dear Mr. Krakuszeski:
On February 27, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Brunswick Steam Electric Plant. The NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of the inspection is documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety
Docket Nos. 05000324 and 05000325 License Nos. DPR-62 and DPR-71
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000324 and 05000325
License Numbers:
Report Numbers:
05000324/2020010 and 05000325/2020010
Enterprise Identifier: I-2020-010-0028
Licensee:
Duke Energy Progress, LLC
Facility:
Brunswick Steam Electric Plant, Units 1 & 2
Location:
Southport, NC
Inspection Dates:
February 03, 2020 to February 27, 2020
Inspectors:
R. Fanner, Senior Reactor Inspector
J. Dymek, Reactor Inspector
W. Monk, Senior Reactor Inspector
D. Strickland, Reactor Inspector
Approved By:
Scott Shaeffer, Chief
Engineering Branch 2
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring licensees performance by conducting Inspection Procedure 711111 Attachment 21N.05, Fire Protection Team Inspection (FPTI), at the Brunswick Steam Electric Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
LIST OF FINDINGS AND VIOLATIONS
No findings were identified.
ADDITIONAL TRACKING ITEMS
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
===71111.21N.05 - Fire Protection Team Inspection (FPTI)
SSC Credited for Fire Prevention, Detection, Suppression, or Post-Fire SSD Review (IP Section 03.01)===
The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA). The inspectors performed the following:
a. Review of deficiencies or open fire protection impairments for the selected system, including any temporary modifications, operator workarounds, or compensatory measures.
b. Verify that operator actions can be accomplished as assumed in the licensees FHA, or as assumed in the licensees fire probabilistic risk assessment (FPRA) analysis and SSA.
c. Review repetitive or similar maintenance work requests which could be an indicator of a design deficiency and could affect the ability of the components to perform their functions, when needed.
d. Ensure that post maintenance and/or surveillance activities are performed as scheduled.
e. Perform a walk-down inspection to identify equipment alignment discrepancies. Inspect for deficient conditions such as corrosion, missing fasteners, cracks, and degraded insulation.
f. Ensure the selected SSCs that are subject to aging management review (AMR) pursuant to 10 CFR Part 54 are being managed for aging (e.g., loss of material, cracking, reduction of heat transfer) in accordance with appropriate aging management programs. Verify the licensees aging management program activities (such as Fuel Oil Analysis or Selective Leaching Aging Management Program) associated with FP equipment are being implemented.
g. If a review of operating experience issues will be completed for the selected inspection sample, verify that the licensee adequately reviewed and dis-positioned the operating experience in accordance with their processes.
The samples for this section included:
(1)2-CAC-LR-2602, Suppression Pool Level (2)2-E11-PDV-F068A, RHR HX 2A SW Discharge Valve
- (3) Suppression SSCs
- (4) Detection SSCs
Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)
The inspectors verified that the selected control or process was implemented in accordance with the licensees current licensing basis. Ensured that the licensees FPP contains adequate procedures to implement the selected administrative control. Verified that the selected administrative control meets the requirements of all committed industry standards.
The samples for this section included:
- (1) NPFA 805 Monitoring Program
- (2) Fire System Impairments Program
Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)
The inspectors verified the following:
a. Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.
b. The adequacy of the design modification, if applicable.
c. Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.
d. The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.
e. Post-fire SSD operating procedures, such as abnormal operating procedures, affected by the modification were updated.
The samples for this section included:
- (1) EC 407358, Diesel Fire Pump Charger
- (2) EC 407614, E11-F020, Suppression Pool Suction Valve
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
On February 27, 2020, the inspectors presented the NRC inspection results to Mr. Krakuszeski and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.21N.05 Calculations
2-FP-0049
Qualification of Selected Door Transoms in the Diesel
Generator Building
Rev. 0
71111.21N.05 Calculations
2-FP-0076
Hydraulic Calculation Unit 2, Reactor Building-SE RHR
and Water Curtain
Rev. 1
71111.21N.05 Calculations
BNP-E-9.007
ASSD Recovery Action Feasibility
Rev. 1
71111.21N.05 Calculations
BNP-E-9.010
Safe Shutdown Equipment List
Rev. 3
71111.21N.05 Calculations
BNP-E-9.011
NFPA 805 Transition - Non Power Operational Modes
Review
Rev. 2
71111.21N.05 Calculations
BNP-E-9.011
NFPA 805 Transition - Non-Power Operational Modes
Review
2/04/2018
71111.21N.05 Calculations
BNP-PSA-080
BNP FPRA Quantification Calculation
Rev. 6
71111.21N.05 Corrective Action
Documents
U2 N Core Spray Pmp FLR Drn not fixed in 30 days
2/20/2019
71111.21N.05 Corrective Action
Documents
AR-02135608-02
Prompt Functionality Assessment Electric Fire Pump 2-
7/17/2017
71111.21N.05 Corrective Action
Documents
CR2045218
Trend in Improper Storage of Transient Combustible
Materials
71111.21N.05 Corrective Action
Documents
CR2139276
Fire Protection Health Report status change green to red
71111.21N.05 Corrective Action
Documents
Resulting from
Inspection
FSA Updates due to BNP-E-9.010 Update
2/25/2020
71111.21N.05 Corrective Action
Documents
Resulting from
Inspection
QFPI-Housekeeping Inside AFFF Enclosure
2/04/2020
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.21N.05 Corrective Action
Documents
Resulting from
Inspection
QFPI-Sprinkler Head Potential Corrosion
2/05/2020
71111.21N.05 Corrective Action
Documents
Resulting from
Inspection
QFPI - Potential Transient Combustible Violation
2/6/2020
71111.21N.05 Corrective Action
Documents
Resulting from
Inspection
QFPI 2020- Calculation Verbiage Clarification
2/12/2020
71111.21N.05 Corrective Action
Documents
Resulting from
Inspection
20 NRC QFPI - Missing Reference in 0FP-1213, NFPA
805 Code
2/26/2020
71111.21N.05 Corrective Action
Documents
Resulting from
Inspection
20 NRC QFPI - Steps missing in 2ASSD-06
2/26/2020
71111.21N.05 Corrective Action
Documents
Resulting from
Inspection
20 NRC Fire Protection Inspection QFPI 2-VA-DG-
FDMP-101
2/26/2020
71111.21N.05 Corrective Action
Documents
Resulting from
Inspection
20 NRC QFPI - Electric Heat Blower in Aux Boiler
House
2/26/2020
71111.21N.05 Corrective Action
Documents
Resulting from
Inspection
20 NRC QFPI - Pre-Fire Plan FP Features
2/27/2020
71111.21N.05 Corrective Action
Documents
20 NRC QFPI - INSTALL LADDER RACKS IN U2 RB -
17'
2/27/2020
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Resulting from
Inspection
71111.21N.05 Drawings
Fire Protection Piping Isometric, Reactor Building Unit 2
Rev. E
71111.21N.05 Drawings
D-02299
Reactor Building Fire Protection Piping
Rev. 12
71111.21N.05 Drawings
F-01926
Diesel Generator Building-Building Plans
Rev.21
71111.21N.05 Drawings
F-01926
Diesel Generator Building-Building Plans
Rev.21
71111.21N.05 Drawings
F-01928
Diesel Generator Building-Door and Hardware Schedule
and Details
Rev.22
71111.21N.05 Drawings
F-03049
480 Volt System MCC 2XA, 2XC, 2XE, 2XG, 2XJ, 2XL
Auxiliary One Line Diagram
Rev. 85
71111.21N.05 Drawings
F-04093
Diesel Generator Building Ventilation System-Plans at
Elevation 23'-0" and 50'-0"
Rev.21
71111.21N.05 Drawings
LL-09046 - SHT:
I100
CAC System 2-CAC Level Transmitter and Recorder 2-
CAC-LT-2602 and 2-CAC-LR-2602 Control Wiring
Diagram
Rev. 5
71111.21N.05 Drawings
LL-09046 - SHT:
I101
CAC System 2-CAC Level Transmitter and Recorder 2-
CAC-LT-2602 and 2-CAC-LR-2602 Cable Diagram
Rev. 4
71111.21N.05 Drawings
LL-09236 - SH:
RHR HX 2A Service Water Discharge Valve 2-E11-PDV-
F068A Cable Wiring Diagram
Rev. 9
71111.21N.05 Drawings
LL-09236 - SH:
RHR HX 2A Service Water Discharge Valve 2-E11-PDV-
F068A Cable Diagram
Rev. 8
71111.21N.05 Drawings
O-FP-15062
Sonicbar Door Division, Ryson Products Company,
Schedule Sheet
Rev.7
71111.21N.05 Drawings
O-FP-15063
& 3/4 Door, Sections and Elevations
Rev. 5
71111.21N.05 Engineering
Changes
Permanent Resolution of Temporary Change Ecs on E11-
F020 Valves
Rev. 0
71111.21N.05 Engineering
Changes
Diesel Fire Pump Charger Modification Package
Rev. 0
71111.21N.05 Engineering
Changes
Abandon 2-FO-12-1-1/2-U-6 Diesel Fire Pump Fuel Oil
Supply Line
Rev. 0
71111.21N.05 Engineering
Evaluations
BNP 98-032
Response to Water Hammer Event WNP-2
Rev. 0
71111.21N.05 Engineering
Equivalency Evaluation of Diesel Driven Centrifugal Split
Rev. 3
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Evaluations
Case Horizontal 2000 GPM Fire Pump
71111.21N.05 Engineering
Evaluations
EGR-NGGC-
0005
Random Sample Program of FB Penetration Seals
Rev. 12
71111.21N.05 Engineering
Evaluations
ESR-9700571
Fire Door Problem Resolution
Rev. 0
71111.21N.05 Engineering
Evaluations
ESR-9900328
Fire Barrier Penetration Seal Statistical Sample
Rev. 0
71111.21N.05 Engineering
Evaluations
OFP-0086
Code Compliance Evaluation NFPA 20, Flammable and
Combustible Liquids Code
Rev. 4
71111.21N.05 Engineering
Evaluations
OFP-0089
Code Compliance Evaluation NFPA 22, Water Tanks for
Private Fire Protection
Rev. 1
71111.21N.05 Engineering
Evaluations
OFP-1017
Code Compliance Evaluation NFPA 24, Standard for
Outside Protection
Rev. 4
71111.21N.05 Engineering
Evaluations
OFP-1020
Code Compliance Evaluation NFPA 11B, Synthetic Foam
and Combined Agent Systems
Rev. 3
71111.21N.05 Engineering
Evaluations
OFP-1020,
Code Compliance Evaluation NFPA 16, Foam Water
Spray and Sprinkler Systems
Rev. 3
71111.21N.05 Engineering
Evaluations
OFP-1024
Code Compliance Evaluation NFPA 15, Standard on
Fixed Water Spray Systems Unit 1 and 2 Reactor Building
Rev. 4
71111.21N.05 Engineering
Evaluations
OFP-1027
Code Compliance Evaluation NFPA 14, Standard on the
Installation of Standpipes and Hose Systems, Reactor
Building
Rev. 4
71111.21N.05 Engineering
Evaluations
OFP-1028
Code Compliance Evaluation NFPA 14, Standard on the
Installation of Standpipes and Hose Systems, Radwaste
Building
Rev. 4
71111.21N.05 Engineering
Evaluations
OFP-1213
Code Compliance Evaluation NFPA 805, Performance-
Based Standard for Fire Protection for Light Water
REactor Electric Generating Plants-2001 Edition
Rev. 3
71111.21N.05 Miscellaneous
Specification 024-001 for Special Doors for BNP Units 1 &
Rev. 9
71111.21N.05 Miscellaneous
NFPA 90A-1985, Standard for the Installation of Air
conditioning and Ventilation Systems
71111.21N.05 Miscellaneous
NUREG 1856-Safety Evaluation Report Related to
License Renewal of Brunswick Steam Electric Plant Unit 1
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
and 2
71111.21N.05 Miscellaneous
01028015
Brunswick Steam Electric Plant unit 1 and 2, Issuance of
Amendment regarding Transition to a Risk Informed-
Performance Based Fire Protection program in
Accordance with 10CFR50.48
1/28/2015
71111.21N.05 Miscellaneous
282014
Brunswick Steam Electric Plant Unit 1 and 2 Renewed
Facility Operating License Amendment DPR-71 and DPR-
2, Docket No. 50-325 and 50-324, Response to Second
Request for Additional Information Voluntary Risk
Initiative-National Fire Protection Association Standard
805
2/28/2014
71111.21N.05 Miscellaneous
Fuel Oil System Design Basis
Rev. 8
71111.21N.05 Miscellaneous
BNP LAR Attachments compiled through Nov 20 2014
submittal
71111.21N.05 Miscellaneous
Operating
License and
Technical
Specifications
Operating License and Technical Specifications-
Brunswick Steam electric Plant Unit 1
Updated
through
Amendment
2
71111.21N.05 Miscellaneous
SD-17
Residual Heat Removal System (RHR)
Rev. 19
71111.21N.05 Procedures
Fire Protection Program Manual
Rev. 23
71111.21N.05 Procedures
Alternative Safe Shutdown Procedure Index
Rev. 41
71111.21N.05 Procedures
BNP NFPA 805 Monitoring
Rev. 2
71111.21N.05 Procedures
Cleanliness and Flushing Requirements
Rev. 28
71111.21N.05 Procedures
Diesel Fire Pump Starting Batteries 18 Month Operability
Test
Rev. 10
71111.21N.05 Procedures
Diesel Fire Pump Starting Batteries Quarterly Operability
Test
Rev. 10
71111.21N.05 Procedures
Diesel Fire Pump Starting Batteries Weekly Operability
Test
Rev. 11
71111.21N.05 Procedures
Fire Pump Manual Start and Stop Completed Procedure
Rev. 142
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.21N.05 Procedures
0PLP-01.2
Fire Protection System Functionality, Action, and
Surveillance Requirements
Rev. 52
71111.21N.05 Procedures
0PLP-01.5
ALTERNATIVE SHUTDOWN CAPABILITY CONTROLS
Rev. 15
71111.21N.05 Procedures
0PT-08.1.4A
RHR SERVICE WATER SYSTEM OPERABILITY TEST -
LOOP A
Rev. 88
71111.21N.05 Procedures
0PT-08.1.6
SUPPRESSION POOL LEVEL INDICATOR
Rev. 38
71111.21N.05 Procedures
0PT-08.2.4
RHR SERVICE WATER SYSTEM COMPONENT TEST
Rev. 32
71111.21N.05 Procedures
0PT-48.1
Public Address System Speaker Test
Rev. 58
71111.21N.05 Procedures
REACTOR BUILDING SOUTH
Rev. 31
71111.21N.05 Procedures
NFPA 805 TRANSITION - FIRE AREA RB2-1 FIRE
SAFETY ANALYSIS FOR UNIT 2
Rev. 2
71111.21N.05 Procedures
RESIDUAL HEAT REMOVAL SYSTEM OPERATING
PROCEDURE
Rev. 181
71111.21N.05 Procedures
SERVICE WATER SYSTEM OPERATING PROCEDURE
Rev. 168
71111.21N.05 Procedures
AD-EG-ALL-1132
Preparation and Control of Design Change Engineering
Changes
Rev. 15
71111.21N.05 Procedures
AD-EG-ALL-1501
Fire Protection Change Process
Rev. 2
71111.21N.05 Procedures
AD-EG-ALL-1503
NFPA Monitoring
Rev. 2
71111.21N.05 Procedures
AD-EG-ALL-1520
TRANSIENT COMBUSTIBLE CONTROL
Rev. 12
71111.21N.05 Procedures
AD-EG-ALL-1522
Duties of A Compensatory Fire Watch
Rev. 9
71111.21N.05 Procedures
AD-EG-ALL-1532
NFPA 805 PRE-FIRE PLANS
Rev. 1
71111.21N.05 Procedures
AD-LS-ALL-0005
UFSAR Updates
Rev. 7
71111.21N.05 Procedures
BN-MECH-
MEQ0031B
Fire Periodic Test Qualification
Rev. 0
71111.21N.05 Procedures
BNP-E-9.007
ASSD RECOVERY ACTION FEASIBILITY
Rev. 1
71111.21N.05 Procedures
OFPP-020
Impairment Notification
Rev. 25
71111.21N.05 Procedures
OPLP-01.2
Fire Protection System Functionality, Action and
Surveillance Requirements
Rev. 4
71111.21N.05 Procedures
OPT-34.1.1.0
Fire Pump Test (Electric and Diesel)
Rev. 28
71111.21N.05 Procedures
OPT-34.5.5.0
Diesel and Electric Fire Pump Functional Test
Rev. 35
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.21N.05 Procedures
OPT-34.5.5.0
Diesel and Electric Fire Protection Functional Test
Rev. 39
71111.21N.05 Procedures
OPT-34.6.7.10
Fire Barrier Penetration Seals Diesel Generator Building
Rev. 20
71111.21N.05 Procedures
PD-EG-ALL-1500
Fleet Fire Protection Program Manual
Rev. 2
71111.21N.05 Work Orders
MWO 12246953
Preventative Maintenance Task Instructions 2VA-DGB-
FDMP-101
Rev. 0
71111.21N.05 Work Orders
MWO 13356194
Work Order Task Instructions, Diesel Generator Building
Fire Dampers
Rev. 0
71111.21N.05 Work Orders
OPT-34.5.5.0
Diesel and Electric Fire Pump Functional Test (Motor
Driven)
7/18/2017
71111.21N.05 Work Orders
OPT-34.5.5.0
Diesel and Electric Fire Pump Functional Test (Diesel
Driven)
10/18/2018
71111.21N.05 Work Orders
OPT-34.5.5.0
Diesel and Electric Fire Pump Functional Test (Diesel
Driven)
10/09/2019
71111.21N.05 Work Orders
OPT34.5.5.0
Diesel and Electric Fire Pump Functional Test (Motor
Driven)
2/22/2018
71111.21N.05 Work Orders
WO 12104983-01 2FP-V-122 Material Condition Issues
3/30/2017
71111.21N.05 Work Orders
Inspection and Cleaning Fire Damper 2VA-DG-FDMP-101 7/30/2014
71111.21N.05 Work Orders
WO 20161112-02 Fire Barrier Penetration Seals, Diesel Generator Building
5/29/2019
71111.21N.05 Work Orders
LPCI/RHR SYSTEM OPERABILITY TEST - LOOP B
11/14/2019
71111.21N.05 Work Orders
WO 20346874-01 November 2019 PA System Speaker Test
11/12/2019
71111.21N.05 Work Orders
WO 20363358-01 February 2020 PA System Speaker Test
2/14/2020
71111.21N.05 Work Orders
SUPPRESSION POOL LEVEL INDICATOR
1/27/2020
71111.21N.05 Work Orders
2FP-V-122 Material Condition Issues
2/21/2018