{{#Wiki_filter:Operational Program Inspection Status Table Scheduled or Actual              Inspection Report Operational Program       Inspection Status         Program Implementation                 Number(s)
{{#Wiki_filter:Enclosure Operational Program Inspection Status Table Operational Program Inspection Status Scheduled or Actual Program Implementation Milestone (d)
Milestone (d)            (ADAMS Accession No.)
Inspection Report Number(s)
1   Inservice Inspection         Not Started         Prior to commercial service                  N/A Program              (After 10 CFR 52.103(g))
(ADAMS Accession No.)
2   Inservice Testing         Partially Complete     After generator online on         2021002 (ML21133A105)
1 Inservice Inspection Program Not Started (After 10 CFR 52.103(g))
Program                                          nuclear heat(a)                   2021005 (ML21316A057) 2021008 (ML22040A213) 2022002 (ML22091A316) 2022004 (ML22192A175) 3   Environmental                 Complete           Prior to initial fuel load       2016004 (ML18032A756)
Prior to commercial service N/A 2
Qualification Program                                                              2017001 (ML17132A345) 2017002 (ML17226A034) 2017004 (ML18094A897) 2018002 (ML18226A348) 2021005 (ML21316A057) 2022004 (ML22192A175) 4   Preservice Inspection     Partially Complete     Completion prior to initial plant 2016004 (ML18032A756)
Inservice Testing Program Partially Complete After generator online on nuclear heat(a) 2021002 (ML21133A105) 2021005 (ML21316A057) 2021008 (ML22040A213) 2022002 (ML22091A316) 2022004 (ML22192A175) 3 Environmental Qualification Program Complete Prior to initial fuel load 2016004 (ML18032A756) 2017001 (ML17132A345) 2017002 (ML17226A034) 2017004 (ML18094A897) 2018002 (ML18226A348) 2021005 (ML21316A057) 2022004 (ML22192A175) 4 Preservice Inspection Program Partially Complete Completion prior to initial plant startup 2016004 (ML18032A756) 2017003 (ML17317A527) 2019001 (ML19135A691) 2019003 (ML19309D596) 2019004 (ML20042E292) 2020008 (ML20224A009) 2021005 (ML21316A057) 5 Reactor Vessel Material Surveillance Program Complete Prior to initial criticality 2017002 (ML17226A034) 2021005 (ML21316A057)  
Program                                          startup                          2017003 (ML17317A527) 2019001 (ML19135A691) 2019003 (ML19309D596) 2019004 (ML20042E292) 2020008 (ML20224A009) 2021005 (ML21316A057) 5   Reactor Vessel               Complete           Prior to initial criticality     2017002 (ML17226A034)
Material Surveillance                                                              2021005 (ML21316A057)
Program Enclosure


Scheduled or Actual              Inspection Report Operational Program       Inspection Status     Program Implementation                 Number(s)
2 Operational Program Inspection Status Scheduled or Actual Program Implementation Milestone (d)
Milestone (d)            (ADAMS Accession No.)
Inspection Report Number(s)
6   Preservice Testing     Partially Complete   Prior to initial fuel load       2019004 (ML20042E292)
(ADAMS Accession No.)
Program                                                                      2020008 (ML20224A009) 2021002 (ML21133A105) 2021004 (ML21224A183) 2021005 (ML21316A057) 2021008 (ML22040A213) 2022002 (ML22091A316) 2022004 (ML22192A175) 7   Containment Leakage         Complete         Prior to initial fuel load       2020008 (ML20224A009)
6 Preservice Testing Program Partially Complete Prior to initial fuel load 2019004 (ML20042E292) 2020008 (ML20224A009) 2021002 (ML21133A105) 2021004 (ML21224A183) 2021005 (ML21316A057) 2021008 (ML22040A213) 2022002 (ML22091A316) 2022004 (ML22192A175) 7 Containment Leakage Rate Testing Program Complete Prior to initial fuel load 2020008 (ML20224A009) 8 Fire Protection Program Partially Complete Prior to receipt of fuel on site for buildings storing new fuel and adjacent fire areas.
Rate Testing Program 8   Fire Protection         Partially Complete   Prior to receipt of fuel on site 2020009 (ML20315A137)
Prior to initial fuel load for other required elements.
Program                                      for buildings storing new fuel   2020010 (ML21041A242) and adjacent fire areas.         2021005 (ML21316A057)
2020009 (ML20315A137) 2020010 (ML21041A242) 2021005 (ML21316A057) 2022002 (ML22091A316)
Prior to initial fuel load for   2022002 (ML22091A316) other required elements.
Fire Protection Program (portions applicable to radioactive material)
Fire Protection         Partially Complete   Prior to initial receipt of     2020009 (ML20315A137)
Partially Complete Prior to initial receipt of byproduct, source, or special nuclear materials (excluding exempt quantities as described in Title 10 of the Code Federal Regulations (10 CFR) 30.18) 2020009 (ML20315A137) 2020010 (ML21041A242) 2021005 (ML21316A057) 2022002 (ML22091A316) 9 Process and Effluent Monitoring and Sampling Program:
Program (portions                            byproduct, source, or special   2020010 (ML21041A242) applicable to                                nuclear materials (excluding     2021005 (ML21316A057) radioactive material)                        exempt quantities as             2022002 (ML22091A316) described in Title 10 of the Code Federal Regulations (10 CFR) 30.18) 9   Process and Effluent   Partially Complete   N/A                             2017004 (ML18094A897)
Partially Complete N/A 2017004 (ML18094A897) 2020008 (ML20224A009) 2022002 (ML22091A316) 2022004 (ML22192A175)
Monitoring and                                                                2020008 (ML20224A009)
Radiological Effluent Technical Specifications/Standard Radiological Effluent Controls Partially Complete Prior to initial fuel load 2022002 (ML22091A316)  
Sampling Program:                                                            2022002 (ML22091A316) 2022004 (ML22192A175)
Radiological Effluent   Partially Complete   Prior to initial fuel load       2022002 (ML22091A316)
Technical Specifications/Standard Radiological Effluent Controls 2


Scheduled or Actual              Inspection Report Operational Program     Inspection Status     Program Implementation                 Number(s)
3 Operational Program Inspection Status Scheduled or Actual Program Implementation Milestone (d)
Milestone (d)            (ADAMS Accession No.)
Inspection Report Number(s)
Offsite Dose           Partially Complete   Prior to initial fuel load       2017004 (ML18094A897)
(ADAMS Accession No.)
Calculation Manual                                                          2022004 (ML22192A175)
Offsite Dose Calculation Manual Partially Complete Prior to initial fuel load 2017004 (ML18094A897) 2022004 (ML22192A175)
Radiological               Complete         Prior to initial fuel load       2017004 (ML18094A897)
Radiological Environmental Monitoring Program Complete Prior to initial fuel load 2017004 (ML18094A897) 2020008 (ML20224A009) 2022004 (ML22192A175)
Environmental                                                                2020008 (ML20224A009)
Process Control Program Partially Complete Prior to initial fuel load 2022002 (ML22091A316) 2022004 (ML22192A175) 10 Radiation Protection Program (including as low as reasonably achievable principle)
Monitoring Program                                                          2022004 (ML22192A175)
Complete Prior to initial receipt of byproduct, source, or special nuclear materials (excluding exempt quantities as described in 10 CFR 30.18) 2020008 (ML20224A009)
Process Control       Partially Complete   Prior to initial fuel load       2022002 (ML22091A316)
Radioactive Source Control (assignment of Radiation Protection Supervisor)
Program                                                                      2022004 (ML22192A175) 10   Radiation Protection       Complete         Prior to initial receipt of     2020008 (ML20224A009)
Complete Assignment of Radiation Protection Supervisor Complete Minimization of Contamination Complete Personnel Dosimetry Complete Prior to receipt of fuel on site 2020008 (ML20224A009)
Program (including as                      byproduct, source, or special low as reasonably                          nuclear materials (excluding achievable principle)                      exempt quantities as Radioactive Source        Complete        described in 10 CFR 30.18)
Radiation Monitoring and Surveys Complete Radiation Work Permits Complete Assignment of Radiation Protection Manager Complete Prior to initial fuel load 2020008 (ML20224A009)  
Control (assignment of Radiation Protection Supervisor)
Assignment of             Complete Radiation Protection Supervisor Minimization of           Complete Contamination Personnel Dosimetry       Complete         Prior to receipt of fuel on site 2020008 (ML20224A009)
Radiation Monitoring       Complete and Surveys Radiation Work Permits     Complete Assignment of             Complete         Prior to initial fuel load       2020008 (ML20224A009)
Radiation Protection Manager 3


Scheduled or Actual            Inspection Report Operational Program       Inspection Status     Program Implementation               Number(s)
4 Operational Program Inspection Status Scheduled or Actual Program Implementation Milestone (d)
Milestone (d)        (ADAMS Accession No.)
Inspection Report Number(s)
Respiratory Protection     Complete Bioassay                   Complete Effluents and               Complete Environmental Monitoring and Assessment Job Coverage               Complete       Prior to initial fuel load     2020008 (ML20224A009)
(ADAMS Accession No.)
Radioactive Waste           Complete       Prior to first shipment of     2020008 (ML20224A009)
Respiratory Protection Complete Bioassay Complete Effluents and Environmental Monitoring and Assessment Complete Job Coverage Complete Prior to initial fuel load 2020008 (ML20224A009)
Shipping                                    radioactive waste              2022004 (ML22192A175) 11   Non-Licensed Plant         Complete       18 months prior to scheduled   2016002 (ML16210A448)
Radioactive Waste Shipping Complete Prior to first shipment of radioactive waste 2020008 (ML20224A009) 2022004 (ML22192A175) 11 Non-Licensed Plant Staff Training Program Complete 18 months prior to scheduled date of initial fuel load 2016002 (ML16210A448)
Staff Training Program                      date of initial fuel load (Portions applicable to     Complete       Prior to initial receipt of   2016002 (ML16210A448) radioactive material)                      byproduct, source, or special nuclear materials (excluding exempt quantities as described in 10 CFR 30.18) 12   Reactor Operator           Complete       18 months prior to scheduled   2015301 (ML15113A028)
(Portions applicable to radioactive material)
Training Program                            date of initial fuel load     2020007 (ML20114E071) 2016002 (ML16210A448) 13   Reactor Operator           Complete       Within 3 months after the date 2016002 (ML16210A448)
Complete Prior to initial receipt of byproduct, source, or special nuclear materials (excluding exempt quantities as described in 10 CFR 30.18) 2016002 (ML16210A448) 12 Reactor Operator Training Program Complete 18 months prior to scheduled date of initial fuel load 2015301 (ML15113A028) 2020007 (ML20114E071) 2016002 (ML16210A448) 13 Reactor Operator Requalification Program Complete Within 3 months after the date the NRC makes the finding under 10 CFR 52.103(g) 2016002 (ML16210A448) 2022006 (report to be issued) 14 Emergency Planning Complete Full-participation exercise conducted within 2 years of scheduled date for initial loading of fuel(b) 2020008 (ML20224A009)
Requalification                            the NRC makes the finding     2022006 (report to be issued)
Program                                    under 10 CFR 52.103(g) 14   Emergency Planning         Complete       Full-participation exercise   2020008 (ML20224A009) conducted within 2 years of scheduled date for initial loading of fuel(b) 4


Scheduled or Actual            Inspection Report Operational Program         Inspection Status     Program Implementation             Number(s)
5 Operational Program Inspection Status Scheduled or Actual Program Implementation Milestone (d)
Milestone (d)          (ADAMS Accession No.)
Inspection Report Number(s)
Complete       Onsite exercise conducted     2020010 (ML21041A242) within 1 year before the       2021008 (ML22040A213) scheduled date for initial loading of fuel Complete       Applicants detailed           2020007 (ML20114E071) implementing procedures for its emergency plan submitted at least 180 days prior to the scheduled date for initial loading of fuel 15   Security Program             Complete       N/A                           2017001 (ML17132A345) 2018001 (ML18134A348) 2018002 (ML18226A348) 2019002 (ML19220B678) 2019004 (ML20042E292) 2020008 (ML20224A009) 2020009 (ML20315A137) 2020010 (ML21041A242) 2021004 (ML21224A183) 2022002 (ML22091A316) 2022006 (report to be issued)
(ADAMS Accession No.)
Physical Protection           Complete        Prior to initial receipt of    2020010 (ML21041A242)
Complete Onsite exercise conducted within 1 year before the scheduled date for initial loading of fuel 2020010 (ML21041A242) 2021008 (ML22040A213)
Program (applicable to                       special nuclear material protection of special nuclear material prior to the protected area being declared operational) 5
Complete Applicants detailed implementing procedures for its emergency plan submitted at least 180 days prior to the scheduled date for initial loading of fuel 2020007 (ML20114E071) 15 Security Program Complete N/A 2017001 (ML17132A345) 2018001 (ML18134A348) 2018002 (ML18226A348) 2019002 (ML19220B678) 2019004 (ML20042E292) 2020008 (ML20224A009) 2020009 (ML20315A137) 2020010 (ML21041A242) 2021004 (ML21224A183) 2022002 (ML22091A316) 2022006 (report to be issued)
Physical Protection Program (applicable to protection of special nuclear material prior to the protected area being declared operational)
Complete Prior to initial receipt of special nuclear material 2020010 (ML21041A242)


Scheduled or Actual                  Inspection Report Operational Program     Inspection Status     Program Implementation                   Number(s)
6 Operational Program Inspection Status Scheduled or Actual Program Implementation Milestone (d)
Milestone (d)              (ADAMS Accession No.)
Inspection Report Number(s)
Physical Security         Complete         Prior to initial fuel load into the 2017001 (ML17132A345)
(ADAMS Accession No.)
Program                                    reactor(e)                          2018001 (ML18134A348) 2018002 (ML18226A348) 2019002 (ML19220B678) 2019004 (ML20042E292) 2020008 (ML20224A009) 2020009 (ML20315A137) 2021004 (ML21224A183) 2022002 (ML22091A316) 2022006 (report to be issued)
Physical Security Program Complete Prior to initial fuel load into the reactor(e) 2017001 (ML17132A345) 2018001 (ML18134A348) 2018002 (ML18226A348) 2019002 (ML19220B678) 2019004 (ML20042E292) 2020008 (ML20224A009) 2020009 (ML20315A137) 2021004 (ML21224A183) 2022002 (ML22091A316) 2022006 (report to be issued)
Safeguards               Complete         Prior to initial fuel load into the 2019411 (ML21036A317)
Safeguards Contingency Program Complete Prior to initial fuel load into the reactor(e) 2019411 (ML21036A317)
Contingency Program                        reactor(e)
Training and Qualification Program Complete Prior to initial fuel load into the reactor(e) 2020009 (ML20315A137) 16 Quality Assurance Program - Operation Complete Combined license issuance 2020008 (ML20224A009) 2020010 (ML21041A242) 2021002 (ML21133A105) 2022004 (ML22192A175) 17 Maintenance Rule Complete Prior to fuel load authorization per 10 CFR 52.103(g) 2020007 (ML20114E071) 18 Motor-Operated Valve Testing Partially Complete Prior to initial fuel load 2021002 (ML21133A105) 2021005 (ML21316A057) 2022004 (ML22192A175)  
Training and             Complete         Prior to initial fuel load into the 2020009 (ML20315A137)
Qualification Program                      reactor(e) 16   Quality Assurance         Complete         Combined license issuance           2020008 (ML20224A009)
Program - Operation                                                            2020010 (ML21041A242) 2021002 (ML21133A105) 2022004 (ML22192A175) 17   Maintenance Rule         Complete         Prior to fuel load authorization   2020007 (ML20114E071) per 10 CFR 52.103(g) 18   Motor-Operated Valve Partially Complete   Prior to initial fuel load         2021002 (ML21133A105)
Testing                                                                        2021005 (ML21316A057) 2022004 (ML22192A175) 6


Scheduled or Actual                Inspection Report Operational Program     Inspection Status     Program Implementation                   Number(s)
7 Operational Program Inspection Status Scheduled or Actual Program Implementation Milestone (d)
Milestone (d)            (ADAMS Accession No.)
Inspection Report Number(s)
19   Initial Test Program     Complete       Prior to the first preoperational 2019004 (ML20042E292) test for the Preoperational        2020007 (ML20114E071)
(ADAMS Accession No.)
Test Program                      2020008 (ML20224A009) 2020009 (ML20315A137)
19 Initial Test Program Complete Prior to the first preoperational test for the Preoperational Test Program 2019004 (ML20042E292) 2020007 (ML20114E071) 2020008 (ML20224A009) 2020009 (ML20315A137)
Complete       Prior to initial fuel load for the 2020008 (ML20224A009)
Complete Prior to initial fuel load for the Startup Test Program 2020008 (ML20224A009) 20 Fitness-for-Duty Program for Construction (workers and first-line supervisors)
Startup Test Program 20   Fitness-for-Duty         Complete       Prior to initiating               2010003 (ML102810444)
Complete Prior to initiating 10 CFR Part 26 construction activities 2010003 (ML102810444) 2011008 (ML112660579; ML112660577(c))
Program for                              10 CFR Part 26 construction       2011008 (ML112660579; Construction (workers                    activities                                  ML112660577(c))
2012010 (ML12272A147; ML12272A118(c))
and first-line                                                              2012010 (ML12272A147; supervisors)                                                                          ML12272A118(c))
2012011 (ML12356A516; ML12356A511(c))
2012011 (ML12356A516; ML12356A511(c))
2014401 (ML14290A385; ML14290A358(c))
2014401 (ML14290A385; ML14290A358(c))
2016403 (ML16302A420) 2018411 (ML18225A218) 2018413 (ML19031C931) 2019001 (ML19135A691) 7
2016403 (ML16302A420) 2018411 (ML18225A218) 2018413 (ML19031C931) 2019001 (ML19135A691)  


Scheduled or Actual            Inspection Report Operational Program   Inspection Status     Program Implementation               Number(s)
8 Operational Program Inspection Status Scheduled or Actual Program Implementation Milestone (d)
Milestone (d)          (ADAMS Accession No.)
Inspection Report Number(s)
Fitness-for-Duty         Complete       Prior to initiating             2010003 (ML102810444)
(ADAMS Accession No.)
Program for                              10 CFR Part 26 construction     2011008 (ML112660579; Construction                            activities                              ML112660577(c))
Fitness-for-Duty Program for Construction (management and oversight personnel)
(management and                                                          2012010 (ML12272A147; oversight personnel)                                                              ML12272A118(c))
Complete Prior to initiating 10 CFR Part 26 construction activities 2010003 (ML102810444) 2011008 (ML112660579; ML112660577(c))
2012010 (ML12272A147; ML12272A118(c))
2012011 (ML12356A516; ML12356A511(c))
2012011 (ML12356A516; ML12356A511(c))
2014401 (ML14290A385; ML14290A358(c))
2014401 (ML14290A385; ML14290A358(c))
2016403 (ML16302A420) 2018411 (ML18225A218) 2018413 (ML19031C931) 2019001 (ML19135A691)
2016403 (ML16302A420) 2018411 (ML18225A218) 2018413 (ML19031C931) 2019001 (ML19135A691)
Fitness-for-Duty         Complete       Prior to initiating             2019411 (ML21036A317)
Fitness-for-Duty Program for Security Personnel Complete Prior to initiating 10 CFR Part 26 construction activities (source requirement:
Program for Security                    10 CFR Part 26 construction Personnel                                activities (source requirement:
10 CFR 26.4(e)(1)).
10 CFR 26.4(e)(1)).
Prior to the earlier of (1) licensees receipt of special nuclear material in the form of fuel assemblies or (2) establishment of a protected area(f) (source requirement:
Prior to the earlier of (1) licensees receipt of special nuclear material in the form of fuel assemblies or (2) establishment of a protected area(f) (source requirement:
10 CFR 26.4(a)(5) or 10 CFR 26.4(e)(1)).
10 CFR 26.4(a)(5) or 10 CFR 26.4(e)(1)).
Fitness-for-Duty         Complete       Prior to initiating             2019411 (ML20044C867)
2019411 (ML21036A317)
Program for Fitness-                    10 CFR Part 26 construction for-Duty Program                        activities Personnel 8
Fitness-for-Duty Program for Fitness-for-Duty Program Personnel Complete Prior to initiating 10 CFR Part 26 construction activities 2019411 (ML20044C867)


Scheduled or Actual                        Inspection Report Operational Program                         Inspection Status                 Program Implementation                             Number(s)
9 Operational Program Inspection Status Scheduled or Actual Program Implementation Milestone (d)
Milestone (d)                    (ADAMS Accession No.)
Inspection Report Number(s)
Fitness-for-Duty                               Complete                   Prior to the conduct of the first         2019411 (ML20044C867)
(ADAMS Accession No.)
Program for Persons                                                        full-participation emergency Required to Physically                                                    preparedness exercise under Report to the Technical                                                    10 CFR Part 50, Appendix E, Support Center or                                                          Section F.2.a Emergency Operations Facility Fitness-for-Duty                               Complete                   Prior to establishment of a               2019411 (ML20044C867)
Fitness-for-Duty Program for Persons Required to Physically Report to the Technical Support Center or Emergency Operations Facility Complete Prior to the conduct of the first full-participation emergency preparedness exercise under 10 CFR Part 50, Appendix E, Section F.2.a 2019411 (ML20044C867)
Program for Operation                                                      protected area(f) 21   Cyber Security                             Partially Complete             Prior to initial fuel load into the       2020401 (ML20323A377)
Fitness-for-Duty Program for Operation Complete Prior to establishment of a protected area(f) 2019411 (ML20044C867) 21 Cyber Security Program Partially Complete Prior to initial fuel load into the reactor (e) 2020401 (ML20323A377) 22 Special Nuclear Material Control and Accounting Program Complete Prior to receipt of special nuclear material 2017401 (ML17135A132) 2018410 (ML18129A409) 2019401 (ML19220B358) 23 10 CFR Part 37 Physical Protection Program Complete Prior to possession of aggregated Category 1 or Category 2 quantity of radioactive material 2020010 (ML21041A242)
Program                                                                    reactor (e) 22   Special Nuclear                                 Complete                   Prior to receipt of special               2017401 (ML17135A132)
(a)
Material Control and                                                      nuclear material                          2018410 (ML18129A409)
The Inservice Testing Program will be fully implemented when turbine generator is online and on nuclear heat. Appropriate portions of the program are implemented as necessary to support the system operability requirements of the technical specifications.
Accounting Program                                                                                                    2019401 (ML19220B358) 23   10 CFR Part 37                                 Complete                   Prior to possession of                     2020010 (ML21041A242)
(b)
Physical Protection                                                        aggregated Category 1 or Program                                                                    Category 2 quantity of radioactive material (a)     The Inservice Testing Program will be fully implemented when turbine generator is online and on nuclear heat. Appropriate portions of the program are implemented as necessary to support the system operability requirements of the technical specifications.
License Amendments 95 and 94 for the Vogtle Electric Generating Plant, Units 3 and 4, respectively, approved a change such that the Units 3 and 4 exercises will be partial-participation exercises. As permitted by 10 CFR Part 50, Domestic licensing of production and utilization facilities, Appendix E, Emergency Planning and Preparedness for Production and Utilization Facilities, Section IV.F.2.a(iii), the full-participation exercise requirement will be satisfied by the biennial exercise conducted for the Vogtle Electric Generating Plant, Units 1 and 2.
(b)     License Amendments 95 and 94 for the Vogtle Electric Generating Plant, Units 3 and 4, respectively, approved a change such that the Units 3 and 4 exercises will be partial-participation exercises. As permitted by 10 CFR Part 50, Domestic licensing of production and utilization facilities, Appendix E, Emergency Planning and Preparedness for Production and Utilization Facilities, Section IV.F.2.a(iii), the full-participation exercise requirement will be satisfied by the biennial exercise conducted for the Vogtle Electric Generating Plant, Units 1 and 2.
(c)
(c)     This document is not publicly available in the Agencywide Documents Access and Management System (ADAMS).
This document is not publicly available in the Agencywide Documents Access and Management System (ADAMS).
(d)     Operational programs must be implemented by the milestones identified in license conditions, but NRC inspections may be completed after these milestones.
(d)
9
Operational programs must be implemented by the milestones identified in license conditions, but NRC inspections may be completed after these milestones.  


(e) On November 23, 2021, the NRC approved an exemption request authorizing VEGP Units 3 and 4 to implement the requirements of 10 CFR 73.55 and 10 CFR 73.56 for each unit after the NRC makes its finding under 10 CFR 52.103(g) for the unit but before initial fuel load into the reactor for that unit.
10 (e)
On November 23, 2021, the NRC approved an exemption request authorizing VEGP Units 3 and 4 to implement the requirements of 10 CFR 73.55 and 10 CFR 73.56 for each unit after the NRC makes its finding under 10 CFR 52.103(g) for the unit but before initial fuel load into the reactor for that unit.
The stated milestones have been updated to reflect this NRC-approved exemption.
The stated milestones have been updated to reflect this NRC-approved exemption.
(f) On December 21, 2021, the NRC approved an exemption request authorizing VEGP Units 3 and 4 to implement for each unit a Fitness-for-Duty program that meets all requirements of 10 CFR Part 26, except for Subpart K, at a point after the NRC makes its finding under 10 CFR 52.103(g) for the unit but before initial fuel load for that unit. This exemption allows the licensee to continue implementing for each unit its construction Fitness-for-Duty program for those individuals in 10 CFR 26.4(e) and (f) until the licensee implements a Fitness-for-Duty program that meets all requirements of 10 CFR Part 26, except for Subpart K, for the unit.
(f)
10}}
On December 21, 2021, the NRC approved an exemption request authorizing VEGP Units 3 and 4 to implement for each unit a Fitness-for-Duty program that meets all requirements of 10 CFR Part 26, except for Subpart K, at a point after the NRC makes its finding under 10 CFR 52.103(g) for the unit but before initial fuel load for that unit. This exemption allows the licensee to continue implementing for each unit its construction Fitness-for-Duty program for those individuals in 10 CFR 26.4(e) and (f) until the licensee implements a Fitness-for-Duty program that meets all requirements of 10 CFR Part 26, except for Subpart K, for the unit.}}

Latest revision as of 16:19, 27 November 2024

103g - Final Memorandum - Enclosure
ML22208A024
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 08/01/2022
From: Cayetano Santos
NRC/NRR/VPOB
To: Jeff Baran, Christopher Hanson, Wright
NRC/Chairman, NRC/OCM
Santos C
Shared Package
ML20290A280 List:
References
Download: ML22208A024 (10)


Text

Enclosure Operational Program Inspection Status Table Operational Program Inspection Status Scheduled or Actual Program Implementation Milestone (d)

Inspection Report Number(s)

(ADAMS Accession No.)

1 Inservice Inspection Program Not Started (After 10 CFR 52.103(g))

Prior to commercial service N/A 2

Inservice Testing Program Partially Complete After generator online on nuclear heat(a) 2021002 (ML21133A105) 2021005 (ML21316A057) 2021008 (ML22040A213) 2022002 (ML22091A316) 2022004 (ML22192A175) 3 Environmental Qualification Program Complete Prior to initial fuel load 2016004 (ML18032A756) 2017001 (ML17132A345) 2017002 (ML17226A034) 2017004 (ML18094A897) 2018002 (ML18226A348) 2021005 (ML21316A057) 2022004 (ML22192A175) 4 Preservice Inspection Program Partially Complete Completion prior to initial plant startup 2016004 (ML18032A756) 2017003 (ML17317A527) 2019001 (ML19135A691) 2019003 (ML19309D596) 2019004 (ML20042E292) 2020008 (ML20224A009) 2021005 (ML21316A057) 5 Reactor Vessel Material Surveillance Program Complete Prior to initial criticality 2017002 (ML17226A034) 2021005 (ML21316A057)

2 Operational Program Inspection Status Scheduled or Actual Program Implementation Milestone (d)

Inspection Report Number(s)

(ADAMS Accession No.)

6 Preservice Testing Program Partially Complete Prior to initial fuel load 2019004 (ML20042E292) 2020008 (ML20224A009) 2021002 (ML21133A105) 2021004 (ML21224A183) 2021005 (ML21316A057) 2021008 (ML22040A213) 2022002 (ML22091A316) 2022004 (ML22192A175) 7 Containment Leakage Rate Testing Program Complete Prior to initial fuel load 2020008 (ML20224A009) 8 Fire Protection Program Partially Complete Prior to receipt of fuel on site for buildings storing new fuel and adjacent fire areas.

Prior to initial fuel load for other required elements.

2020009 (ML20315A137) 2020010 (ML21041A242) 2021005 (ML21316A057) 2022002 (ML22091A316)

Fire Protection Program (portions applicable to radioactive material)

Partially Complete Prior to initial receipt of byproduct, source, or special nuclear materials (excluding exempt quantities as described in Title 10 of the Code Federal Regulations (10 CFR) 30.18) 2020009 (ML20315A137) 2020010 (ML21041A242) 2021005 (ML21316A057) 2022002 (ML22091A316) 9 Process and Effluent Monitoring and Sampling Program:

Partially Complete N/A 2017004 (ML18094A897) 2020008 (ML20224A009) 2022002 (ML22091A316) 2022004 (ML22192A175)

Radiological Effluent Technical Specifications/Standard Radiological Effluent Controls Partially Complete Prior to initial fuel load 2022002 (ML22091A316)

3 Operational Program Inspection Status Scheduled or Actual Program Implementation Milestone (d)

Inspection Report Number(s)

(ADAMS Accession No.)

Offsite Dose Calculation Manual Partially Complete Prior to initial fuel load 2017004 (ML18094A897) 2022004 (ML22192A175)

Radiological Environmental Monitoring Program Complete Prior to initial fuel load 2017004 (ML18094A897) 2020008 (ML20224A009) 2022004 (ML22192A175)

Process Control Program Partially Complete Prior to initial fuel load 2022002 (ML22091A316) 2022004 (ML22192A175) 10 Radiation Protection Program (including as low as reasonably achievable principle)

Complete Prior to initial receipt of byproduct, source, or special nuclear materials (excluding exempt quantities as described in 10 CFR 30.18) 2020008 (ML20224A009)

Radioactive Source Control (assignment of Radiation Protection Supervisor)

Complete Assignment of Radiation Protection Supervisor Complete Minimization of Contamination Complete Personnel Dosimetry Complete Prior to receipt of fuel on site 2020008 (ML20224A009)

Radiation Monitoring and Surveys Complete Radiation Work Permits Complete Assignment of Radiation Protection Manager Complete Prior to initial fuel load 2020008 (ML20224A009)

4 Operational Program Inspection Status Scheduled or Actual Program Implementation Milestone (d)

Inspection Report Number(s)

(ADAMS Accession No.)

Respiratory Protection Complete Bioassay Complete Effluents and Environmental Monitoring and Assessment Complete Job Coverage Complete Prior to initial fuel load 2020008 (ML20224A009)

Radioactive Waste Shipping Complete Prior to first shipment of radioactive waste 2020008 (ML20224A009) 2022004 (ML22192A175) 11 Non-Licensed Plant Staff Training Program Complete 18 months prior to scheduled date of initial fuel load 2016002 (ML16210A448)

(Portions applicable to radioactive material)

Complete Prior to initial receipt of byproduct, source, or special nuclear materials (excluding exempt quantities as described in 10 CFR 30.18) 2016002 (ML16210A448) 12 Reactor Operator Training Program Complete 18 months prior to scheduled date of initial fuel load 2015301 (ML15113A028) 2020007 (ML20114E071) 2016002 (ML16210A448) 13 Reactor Operator Requalification Program Complete Within 3 months after the date the NRC makes the finding under 10 CFR 52.103(g) 2016002 (ML16210A448) 2022006 (report to be issued) 14 Emergency Planning Complete Full-participation exercise conducted within 2 years of scheduled date for initial loading of fuel(b) 2020008 (ML20224A009)

5 Operational Program Inspection Status Scheduled or Actual Program Implementation Milestone (d)

Inspection Report Number(s)

(ADAMS Accession No.)

Complete Onsite exercise conducted within 1 year before the scheduled date for initial loading of fuel 2020010 (ML21041A242) 2021008 (ML22040A213)

Complete Applicants detailed implementing procedures for its emergency plan submitted at least 180 days prior to the scheduled date for initial loading of fuel 2020007 (ML20114E071) 15 Security Program Complete N/A 2017001 (ML17132A345) 2018001 (ML18134A348) 2018002 (ML18226A348) 2019002 (ML19220B678) 2019004 (ML20042E292) 2020008 (ML20224A009) 2020009 (ML20315A137) 2020010 (ML21041A242) 2021004 (ML21224A183) 2022002 (ML22091A316) 2022006 (report to be issued)

Physical Protection Program (applicable to protection of special nuclear material prior to the protected area being declared operational)

Complete Prior to initial receipt of special nuclear material 2020010 (ML21041A242)

6 Operational Program Inspection Status Scheduled or Actual Program Implementation Milestone (d)

Inspection Report Number(s)

(ADAMS Accession No.)

Physical Security Program Complete Prior to initial fuel load into the reactor(e) 2017001 (ML17132A345) 2018001 (ML18134A348) 2018002 (ML18226A348) 2019002 (ML19220B678) 2019004 (ML20042E292) 2020008 (ML20224A009) 2020009 (ML20315A137) 2021004 (ML21224A183) 2022002 (ML22091A316) 2022006 (report to be issued)

Safeguards Contingency Program Complete Prior to initial fuel load into the reactor(e) 2019411 (ML21036A317)

Training and Qualification Program Complete Prior to initial fuel load into the reactor(e) 2020009 (ML20315A137) 16 Quality Assurance Program - Operation Complete Combined license issuance 2020008 (ML20224A009) 2020010 (ML21041A242) 2021002 (ML21133A105) 2022004 (ML22192A175) 17 Maintenance Rule Complete Prior to fuel load authorization per 10 CFR 52.103(g) 2020007 (ML20114E071) 18 Motor-Operated Valve Testing Partially Complete Prior to initial fuel load 2021002 (ML21133A105) 2021005 (ML21316A057) 2022004 (ML22192A175)

7 Operational Program Inspection Status Scheduled or Actual Program Implementation Milestone (d)

Inspection Report Number(s)

(ADAMS Accession No.)

19 Initial Test Program Complete Prior to the first preoperational test for the Preoperational Test Program 2019004 (ML20042E292) 2020007 (ML20114E071) 2020008 (ML20224A009) 2020009 (ML20315A137)

Complete Prior to initial fuel load for the Startup Test Program 2020008 (ML20224A009) 20 Fitness-for-Duty Program for Construction (workers and first-line supervisors)

Complete Prior to initiating 10 CFR Part 26 construction activities 2010003 (ML102810444) 2011008 (ML112660579; ML112660577(c))

2012010 (ML12272A147; ML12272A118(c))

2012011 (ML12356A516; ML12356A511(c))

2014401 (ML14290A385; ML14290A358(c))

2016403 (ML16302A420) 2018411 (ML18225A218) 2018413 (ML19031C931) 2019001 (ML19135A691)

8 Operational Program Inspection Status Scheduled or Actual Program Implementation Milestone (d)

Inspection Report Number(s)

(ADAMS Accession No.)

Fitness-for-Duty Program for Construction (management and oversight personnel)

Complete Prior to initiating 10 CFR Part 26 construction activities 2010003 (ML102810444) 2011008 (ML112660579; ML112660577(c))

2012010 (ML12272A147; ML12272A118(c))

2012011 (ML12356A516; ML12356A511(c))

2014401 (ML14290A385; ML14290A358(c))

2016403 (ML16302A420) 2018411 (ML18225A218) 2018413 (ML19031C931) 2019001 (ML19135A691)

Fitness-for-Duty Program for Security Personnel Complete Prior to initiating 10 CFR Part 26 construction activities (source requirement:

10 CFR 26.4(e)(1)).

Prior to the earlier of (1) licensees receipt of special nuclear material in the form of fuel assemblies or (2) establishment of a protected area(f) (source requirement:

10 CFR 26.4(a)(5) or 10 CFR 26.4(e)(1)).

2019411 (ML21036A317)

Fitness-for-Duty Program for Fitness-for-Duty Program Personnel Complete Prior to initiating 10 CFR Part 26 construction activities 2019411 (ML20044C867)

9 Operational Program Inspection Status Scheduled or Actual Program Implementation Milestone (d)

Inspection Report Number(s)

(ADAMS Accession No.)

Fitness-for-Duty Program for Persons Required to Physically Report to the Technical Support Center or Emergency Operations Facility Complete Prior to the conduct of the first full-participation emergency preparedness exercise under 10 CFR Part 50, Appendix E, Section F.2.a 2019411 (ML20044C867)

Fitness-for-Duty Program for Operation Complete Prior to establishment of a protected area(f) 2019411 (ML20044C867) 21 Cyber Security Program Partially Complete Prior to initial fuel load into the reactor (e) 2020401 (ML20323A377) 22 Special Nuclear Material Control and Accounting Program Complete Prior to receipt of special nuclear material 2017401 (ML17135A132) 2018410 (ML18129A409) 2019401 (ML19220B358) 23 10 CFR Part 37 Physical Protection Program Complete Prior to possession of aggregated Category 1 or Category 2 quantity of radioactive material 2020010 (ML21041A242)

(a)

The Inservice Testing Program will be fully implemented when turbine generator is online and on nuclear heat. Appropriate portions of the program are implemented as necessary to support the system operability requirements of the technical specifications.

(b)

License Amendments 95 and 94 for the Vogtle Electric Generating Plant, Units 3 and 4, respectively, approved a change such that the Units 3 and 4 exercises will be partial-participation exercises. As permitted by 10 CFR Part 50, Domestic licensing of production and utilization facilities, Appendix E, Emergency Planning and Preparedness for Production and Utilization Facilities,Section IV.F.2.a(iii), the full-participation exercise requirement will be satisfied by the biennial exercise conducted for the Vogtle Electric Generating Plant, Units 1 and 2.

(c)

This document is not publicly available in the Agencywide Documents Access and Management System (ADAMS).

(d)

Operational programs must be implemented by the milestones identified in license conditions, but NRC inspections may be completed after these milestones.

10 (e)

On November 23, 2021, the NRC approved an exemption request authorizing VEGP Units 3 and 4 to implement the requirements of 10 CFR 73.55 and 10 CFR 73.56 for each unit after the NRC makes its finding under 10 CFR 52.103(g) for the unit but before initial fuel load into the reactor for that unit.

The stated milestones have been updated to reflect this NRC-approved exemption.

(f)

On December 21, 2021, the NRC approved an exemption request authorizing VEGP Units 3 and 4 to implement for each unit a Fitness-for-Duty program that meets all requirements of 10 CFR Part 26, except for Subpart K, at a point after the NRC makes its finding under 10 CFR 52.103(g) for the unit but before initial fuel load for that unit. This exemption allows the licensee to continue implementing for each unit its construction Fitness-for-Duty program for those individuals in 10 CFR 26.4(e) and (f) until the licensee implements a Fitness-for-Duty program that meets all requirements of 10 CFR Part 26, except for Subpart K, for the unit.