ML20132A804: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:__ - - | {{#Wiki_filter:__ - - | ||
DUKE POWER GOMPANY P.O. BOX 33180 CIKARLOTTE, N.C. 28242 HALH. TUCKER | DUKE POWER GOMPANY P.O. BOX 33180 CIKARLOTTE, N.C. 28242 HALH. TUCKER TELEPHONE vna enesmany (704) 373-4531 85 LWNy A89.39lH Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 | ||
==Subject:== | ==Subject:== | ||
| Line 25: | Line 24: | ||
==Dear Sir:== | ==Dear Sir:== | ||
-The subject Inspection Reports were transmitted by J. A. Olshinski through a {{letter dated|date=December 21, 1984|text=December 21, 1984 letter}}, which required a response to the cited items of non-compliance to be submitted by January 18, 1985. However, a response is incomplete at this time. It is expected that a response will be completed, reviewed, and submitted to you no later than February 1, 1985. | |||
Very truly yours, | Very truly yours, | ||
&cd k 4 & | |||
Hal B. Tucker SGG: sib Attachment cc: | Hal B. Tucker SGG: sib Attachment cc: | ||
Mr. J. C. Bryant NRC. Resident Inspector Oconee Nuclear Station 85072go gj@go!69 5" | |||
F "' | |||
IEo / | IEo / | ||
lj}} | lj}} | ||
Latest revision as of 10:31, 12 December 2024
| ML20132A804 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 01/18/1985 |
| From: | Tucker H DUKE POWER CO. |
| To: | Oreilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 8507230258 | |
| Download: ML20132A804 (1) | |
Text
__ - -
DUKE POWER GOMPANY P.O. BOX 33180 CIKARLOTTE, N.C. 28242 HALH. TUCKER TELEPHONE vna enesmany (704) 373-4531 85 LWNy A89.39lH Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323
Subject:
Oconee Nuclear Station IE Inspection Report Nos. 50-269/84-16 50-270/84-15 50-287/84-26
Dear Sir:
-The subject Inspection Reports were transmitted by J. A. Olshinski through a December 21, 1984 letter, which required a response to the cited items of non-compliance to be submitted by January 18, 1985. However, a response is incomplete at this time. It is expected that a response will be completed, reviewed, and submitted to you no later than February 1, 1985.
Very truly yours,
&cd k 4 &
Hal B. Tucker SGG: sib Attachment cc:
Mr. J. C. Bryant NRC. Resident Inspector Oconee Nuclear Station 85072go gj@go!69 5"
F "'
IEo /
lj