{{#Wiki_filter:CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C CoC Condition/TS Identifier: ___C-1.1_______ | {{#Wiki_filter:CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 1 of 40 CoC Condition/TS Identifier: ___C-1.1_______ | ||
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | * All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | ||
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | ||
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ||
Requirement | Requirement Appendix C Section 1.1: Definitions CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D. | ||
Technical Specifications Section 1 Definitions, Use and Application Yes Section 2 Approved Contents (Selection Criteria) | |||
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)* | |||
and Surveillance Requirements (SRs) | |||
(Selection Criteria) | (Selection Criteria) | ||
Section 4 Administrative | L1 No L2 No L3 No Section 4 Administrative Controls No Risk Insight**: | ||
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR? | |||
A Significant reduction in | N/A The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR? | ||
Evaluation Summary | N/A A Significant reduction in the margin of safety for ISFSI or cask operation? | ||
N/A Evaluation Summary Move to Appendix D Section 1 as it meets the criterion for inclusion in the new TS format (Use and Application). | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C CoC Condition/TS Identifier: ___C-1.2_______ | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 2 of 40 CoC Condition/TS Identifier: ___C-1.2_______ | ||
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | * All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | ||
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | ||
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ||
Requirement | Requirement Appendix C Section 1.2: Logical Connectors: The purpose of this section is to explain the meaning of logical connectors. | ||
CoC Body | CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D. | ||
Technical Specifications Section 1 Definitions, Use and Application Yes Section 2 Approved Contents (Selection Criteria) | |||
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)* | |||
and Surveillance Requirements (SRs) | |||
(Selection Criteria) | (Selection Criteria) | ||
Section 4 Administrative | L1 No L2 No L3 No Section 4 Administrative Controls No Risk Insight**: | ||
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR? | |||
A Significant reduction in | N/A The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR? | ||
Evaluation Summary | N/A A Significant reduction in the margin of safety for ISFSI or cask operation? | ||
N/A Evaluation Summary Move to Appendix D Section 1 as it meets the criterion for inclusion in the new TS format (Use and Application). | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C No change to text as the existing Purpose, Background, and Examples are helpful to understand the use and application of Logical Connectors. | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 3 of 40 No change to text as the existing Purpose, Background, and Examples are helpful to understand the use and application of Logical Connectors. | ||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C CoC Condition/TS Identifier: ___C-1.3_______ | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 4 of 40 CoC Condition/TS Identifier: ___C-1.3_______ | ||
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | * All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | ||
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | ||
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ||
Requirement | Requirement Appendix C Section 1.3: Completion Times: The purpose of this section is to establish the Completion Time convention and to provide guidance for its use. | ||
CoC Body | CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D. | ||
Technical Specifications Section 1 Definitions, Use and Application Yes Section 2 Approved Contents (Selection Criteria) | |||
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)* | |||
and Surveillance Requirements (SRs) | |||
(Selection Criteria) | (Selection Criteria) | ||
Section 4 Administrative | L1 No L2 No L3 No Section 4 Administrative Controls No Risk Insight**: | ||
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR? | |||
A Significant reduction in | N/A The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR? | ||
Evaluation Summary | N/A A Significant reduction in the margin of safety for ISFSI or cask operation? | ||
N/A Evaluation Summary Move to Appendix D Section 1 as it meets the criterion for inclusion in the new TS format (Use and Application). | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C No change to text as the existing Purpose, Background, Description, Examples, and Immediate Completion Time are helpful to provide guidance on the use and application of Completion Times. | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 5 of 40 No change to text as the existing Purpose, Background, Description, Examples, and Immediate Completion Time are helpful to provide guidance on the use and application of Completion Times. | ||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C CoC Condition/TS Identifier: ___C-1.4_______ | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 6 of 40 CoC Condition/TS Identifier: ___C-1.4_______ | ||
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | * All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | ||
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | ||
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ||
Requirement | Requirement Appendix C Section 1.4: Frequency: The purpose of this section is to define the proper use and application of Frequency requirements. | ||
CoC Body | CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D. | ||
Technical Specifications Section 1 Definitions, Use and Application Yes Section 2 Approved Contents (Selection Criteria) | |||
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)* | |||
and Surveillance Requirements (SRs) | |||
(Selection Criteria) | (Selection Criteria) | ||
Section 4 Administrative | L1 No L2 No L3 No Section 4 Administrative Controls No Risk Insight**: | ||
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR? | |||
A Significant reduction in | N/A The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR? | ||
Evaluation Summary | N/A A Significant reduction in the margin of safety for ISFSI or cask operation? | ||
N/A Evaluation Summary Move to Appendix D Section 1 as it meets the criterion for inclusion in the new TS format (Use and Application). | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C No change to text as the existing Purpose, Description, and Examples are helpful to understand the use and application of Frequency. | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 7 of 40 No change to text as the existing Purpose, Description, and Examples are helpful to understand the use and application of Frequency. | ||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C CoC Condition/TS Identifier: ___C-3.0______ | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 8 of 40 CoC Condition/TS Identifier: ___C-3.0______ | ||
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | * All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | ||
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | ||
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ||
Requirement | Requirement Appendix C Section 3.0: LCO and SR Applicability CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D. | ||
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria) | |||
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)* | |||
and Surveillance Requirements (SRs) | |||
(Selection Criteria) | (Selection Criteria) | ||
Section 4 Administrative | L1 Yes L2 Yes L3 Yes Section 4 Administrative Controls No Risk Insight**: | ||
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR? | |||
Yes These LCO and SR applicability requirements are necessary to ensure that safety functions are maintained as described in the individual LCOs and SRs. | |||
A Significant reduction in | The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR? | ||
Evaluation Summary | No A Significant reduction in the margin of safety for ISFSI or cask operation? | ||
Yes These LCO and SR applicability requirements are necessary to ensure that safety functions are maintained as described in the individual LCOs and SRs. | |||
Evaluation Summary Move to Appendix D Section 3.0. Applies generically to all three criteria (L1, L2, L3). | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C CoC Condition/TS Identifier: ___C-3.1.1_______ | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 9 of 40 CoC Condition/TS Identifier: ___C-3.1.1_______ | ||
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | * All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | ||
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | ||
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ||
Requirement | Requirement Appendix C LCO 3.1.1: Multi-Purpose Canister (MPC) | ||
The MPC shall be dry and helium filled. | The MPC shall be dry and helium filled. | ||
Table 3-1 provides decay heat and burnup limits for forced helium dehydration (FHD) and vacuum drying. | Table 3-1 provides decay heat and burnup limits for forced helium dehydration (FHD) and vacuum drying. | ||
FHD is not subject to time limits. Vacuum drying of MPCs may be subject to time limits, from the end of bulk water removal until the start of helium backfill, as shown in Table 3-1. | FHD is not subject to time limits. Vacuum drying of MPCs may be subject to time limits, from the end of bulk water removal until the start of helium backfill, as shown in Table 3-1. | ||
CoC Body | CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D. | ||
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria) | |||
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)* | |||
and Surveillance Requirements (SRs) | |||
(Selection Criteria) | (Selection Criteria) | ||
Section 4 Administrative | L1 No L2 Yes L3 No Section 4 Administrative Controls No Risk Insight**: | ||
consequences of an | Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR? | ||
No The possibility of a new or different kind of accident being created compared No | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C to those previously evaluated in the FSAR? | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 10 of 40 to those previously evaluated in the FSAR? | ||
A Significant reduction in | A Significant reduction in the margin of safety for ISFSI or cask operation? | ||
Evaluation Summary | Yes This LCO ensures an inert atmosphere around the fuel cladding, and that oxidation of the fuel cladding does not occur, preserving the integrity of the fuel cladding fission product barrier. Its removal would reduce the margin of safety for confinement. | ||
Evaluation Summary Move to Appendix D Section 3 as this LCO ensures an inert atmosphere around the fuel cladding and that oxidation of the fuel cladding does not occur, preserving the integrity of the fuel cladding fission product barrier. (Criterion L2) | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C CoC Condition/TS Identifier: __C-3.1.2________ | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 11 of 40 CoC Condition/TS Identifier: __C-3.1.2________ | ||
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | * All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | ||
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | ||
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ||
Requirement | Requirement Appendix C LCO 3.1.2: HI-STORM 100S VERSION E SFSC Heat Removal System The HI-STORM 100S VERSION E SFSC Heat Removal System shall be operable Note: The SFSC Heat Removal System is operable when 50% or more of the inlet and outlet vent areas are unblocked and available for flow or when air temperature requirements are met. This LCO does not apply to the HI-STORM 100 UVH overpack, which does not include an SFSC heat removal system. | ||
CoC Body | CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D. | ||
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria) | |||
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)* | |||
and Surveillance Requirements (SRs) | |||
(Selection Criteria) | (Selection Criteria) | ||
Section 4 Administrative | L1 No L2 Yes L3 No Section 4 Administrative Controls No Risk Insight**: | ||
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR? | |||
No The possibility of a new or different kind of accident No | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C being created compared to those previously evaluated in the FSAR? | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 12 of 40 being created compared to those previously evaluated in the FSAR? | ||
A Significant reduction in | A Significant reduction in the margin of safety for ISFSI or cask operation? | ||
Evaluation Summary | Yes This LCO ensures fuel cladding temperatures remain below the limit for normal storage operations, preserving the integrity of the fuel cladding fission product barrier. Its removal would reduce the margin of safety for confinement. | ||
Evaluation Summary Move to Appendix D Section 3 as this LCO ensures fuel cladding temperatures remain below the limit for normal storage operations, preserving the integrity of the fuel cladding fission product barrier. (Criterion L2) | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C CoC Condition/TS Identifier: __C-3.1.3________ | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 13 of 40 CoC Condition/TS Identifier: __C-3.1.3________ | ||
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | * All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | ||
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | ||
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ||
Requirement | Requirement Appendix C LCO 3.1.3: MPC Cavity Reflooding The MPC cavity pressure shall be: | ||
< 110 psig (MPC-32M/32 Version 1/68 Version 1), or | |||
< 100 psig for (MPC-24/24E/24EF/32/32F/68/68F/68FF/68M) | |||
CoC Body | CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D. | ||
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria) | |||
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)* | |||
and Surveillance Requirements (SRs) | |||
(Selection Criteria) | (Selection Criteria) | ||
Section 4 Administrative | L1 No L2 Yes L3 No Section 4 Administrative Controls No Risk Insight**: | ||
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR? | |||
A Significant reduction in | No The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR? | ||
No A Significant reduction in the margin of safety for ISFSI or cask operation? | |||
Yes This LCO ensures that the MPC cavity pressure limit is not exceeded during reflooding such that the | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C integrity of the MPC enclosure vessel confinement boundary is compromised. | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 14 of 40 integrity of the MPC enclosure vessel confinement boundary is compromised. | ||
Evaluation Summary | Evaluation Summary Move to Appendix D Section 3 as this LCO ensures that the MPC cavity pressure is below the limit before reflooding operations the MPC is then reflooded with water at a controlled rate and/or the pressure monitored to ensure that the pressure remains below the limit. The integrity of the MPC depends on maintaining the internal cavity pressures within design limits. This is accomplished by introducing water to the cavity in a controlled manner such that there is no sudden formation of large quantities of steam during MPC reflooding, preserving the integrity of the MPC enclosure vessel confinement boundary (fission product barrier). (Criterion L2) | ||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C CoC Condition/TS Identifier: ____ C-3.1.4______ | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 15 of 40 CoC Condition/TS Identifier: ____ C-3.1.4______ | ||
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | * All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | ||
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | ||
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ||
Requirement | Requirement Appendix C LCO 3.1.4: Supplemental Cooling System A supplemental cooling system (SCS) shall be operable. | ||
Note: Upon reaching steady state operation, the SCS may be temporarily disabled for a short duration (< 7 hours) to facilitate necessary operational evolutions, such as movement of the TRANSFER CASK through a door way, or other similar operation. | Note: Upon reaching steady state operation, the SCS may be temporarily disabled for a short duration (< 7 hours) to facilitate necessary operational evolutions, such as movement of the TRANSFER CASK through a door way, or other similar operation. | ||
CoC Body | CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D. | ||
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria) | |||
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)* | |||
and Surveillance Requirements (SRs) | |||
(Selection Criteria) | (Selection Criteria) | ||
Section 4 Administrative | L1 No L2 Yes L3 No Section 4 Administrative Controls No Risk Insight**: | ||
consequences of an | Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR? | ||
No The possibility of a new or different kind of accident being created compared No | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C to those previously evaluated in the FSAR? | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 16 of 40 to those previously evaluated in the FSAR? | ||
A Significant reduction in | A Significant reduction in the margin of safety for ISFSI or cask operation? | ||
Evaluation Summary | Yes This LCO ensures fuel cladding temperatures remain below the limit for normal storage operations, preserving the integrity of the fuel cladding fission product barrier. Its removal would reduce the margin of safety for confinement. | ||
Evaluation Summary Move to Appendix D Section 3 as this LCO ensures fuel cladding temperatures remain below the limit for normal storage operations, preserving the integrity of the fuel cladding fission product barrier. (Criterion L2) | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C CoC Condition/TS Identifier: ___C-3.2.1_______ | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 17 of 40 CoC Condition/TS Identifier: ___C-3.2.1_______ | ||
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | * All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | ||
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | ||
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ||
Requirement | Requirement Appendix C LCO 3.2.1: Transfer Cask Surface Contamination Removable contamination on the exterior surfaces of the TRANSFER CASK and accessible portions of the MPC shall each not exceed: | ||
: a. 1000 dpm/100 cm2 from beta and gamma sources | : a. 1000 dpm/100 cm2 from beta and gamma sources | ||
: b. 20 dpm/100 cm2 from alpha sources. | : b. 20 dpm/100 cm2 from alpha sources. | ||
CoC Body | CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D. | ||
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria) | |||
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)* | |||
and Surveillance Requirements (SRs) | |||
(Selection Criteria) | (Selection Criteria) | ||
Section 4 Administrative | L1 No L2 No L3 Yes Section 4 Administrative Controls No Risk Insight**: | ||
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR? | |||
No increase to the probability of any accident. | |||
Slight increase in consequences due to increased dose from contamination, but not a significant increase. | |||
The possibility of a new or different kind of accident No | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C being created compared to those previously evaluated in the FSAR? | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 18 of 40 being created compared to those previously evaluated in the FSAR? | ||
A Significant reduction in | A Significant reduction in the margin of safety for ISFSI or cask operation? | ||
Evaluation Summary | No Evaluation Summary Move to Appendix D Section 3 as this LCO ensures compliance with contamination limits for normal storage operations when not occurring in Fuel Building. (Criterion L3) | ||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C CoC Condition/TS Identifier: __C-3.3.1________ | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 19 of 40 CoC Condition/TS Identifier: __C-3.3.1________ | ||
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | * All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | ||
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | ||
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ||
Requirement | Requirement Appendix C LCO 3.3.1: Boron Concentration The concentration of boron in the water in the MPC shall meet the following limits for the applicable MPC model and the most limiting fuel assembly array/class and classification to be stored in the MPC: | ||
: a. | : a. | ||
: b. | MPC-32M: Minimum soluble boron concentration as required by the Tables 3-4 through 3-6, per configurations in Appendix D Table 2.4-1. | ||
: b. | |||
MPC-32/32F and MPC-32 Version 1: | |||
Minimum soluble boron concentration as required by Table 3-7 | Minimum soluble boron concentration as required by Table 3-7 | ||
: c. | : c. | ||
: d. | MPC-24 with one or more fuel assemblies having an initial enrichment greater than the value in Appendix B Table 2.1-2 for no soluble boron credit and < 5.0 wt% 235U: > 400 ppmb | ||
: e. | : d. | ||
MPC-24E or MPC-24EF (all INTACT FUEL ASSEMBLIES) with one or more fuel assemblies having an initial enrichment greater than the value in Appendix B Table 2.1-2 for no soluble boron credit and < 5.0 wt% 235U: > 300 ppmb | |||
: e. | |||
MPC-24E or MPC-24EF (one or more DAMAGED FUEL ASSEMBLIES or FUEL DEBRIS) with one or more fuel assemblies having an initial enrichment > 4.0 wt% 235U and | |||
< 5.0 wt% 235U: > 600 ppmb CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D. | |||
Technical Specifications Section 1 Definitions, Use and Application No A1 No | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Section 2 Approved | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 20 of 40 Section 2 Approved Contents (Selection Criteria) | ||
Section 3 Limiting | A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)* | ||
and Surveillance Requirements (SRs) | |||
(Selection Criteria) | (Selection Criteria) | ||
Section 4 Administrative | L1 No L2 Yes L3 No Section 4 Administrative Controls No Risk Insight**: | ||
accident previously | Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR? | ||
Yes The probability of a criticality accident would be increased. | |||
A Significant reduction in | The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR? | ||
Evaluation Summary | No A Significant reduction in the margin of safety for ISFSI or cask operation? | ||
(Criterion L2) | Yes Loss of criticality control would cause a significant reduction in the margin of safety. | ||
Evaluation Summary Move to Appendix D Section 3 as this LCO ensures that a subcritical configuration is maintained. | |||
(Criterion L2) | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C CoC Condition/TS Identifier: __C-Tables 3-1a and 3-1b_______ | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 21 of 40 CoC Condition/TS Identifier: __C-Tables 3-1a and 3-1b_______ | ||
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | * All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | ||
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | ||
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ||
Requirement | Requirement Appendix C Table 3-1a: MPC Cavity Drying Limits for Ventilated Overpack Table 3-1b: MPC-32M Cavity Drying Limits for Unventilated Overpack CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D. | ||
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria) | |||
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)* | |||
and Surveillance Requirements (SRs) | |||
(Selection Criteria) | (Selection Criteria) | ||
Section 4 Administrative | L1 Yes Referenced by LCO 3.1.1 L2 No L3 No Section 4 Administrative Controls No Risk Insight**: | ||
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR? | |||
See evaluation of LCO 3.1.1 above The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR? | |||
See evaluation of LCO 3.1.1 above A Significant reduction in the margin of safety for ISFSI or cask operation? | |||
See evaluation of LCO 3.1.1 above | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Evaluation Summary | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 22 of 40 Evaluation Summary Move to Appendix D Section 3 as these tables provide information needed to complete LCO 3.1.1. (Criterion L1) | ||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C CoC Condition/TS Identifier: ___C-Tables 3-2a and 3-2b_______ | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 23 of 40 CoC Condition/TS Identifier: ___C-Tables 3-2a and 3-2b_______ | ||
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | * All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | ||
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | ||
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ||
Requirement | Requirement Appendix C Table 3-2a: MPC Helium Backfill Limits for Ventilated Overpack Table 3-2b: MPC Helium Backfill Limits for Unventilated Overpack CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D. | ||
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria) | |||
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)* | |||
and Surveillance Requirements (SRs) | |||
(Selection Criteria) | (Selection Criteria) | ||
L1 Yes Referenced by LCO 3.1.1 and 3.1.4 L2 No L3 No Section 4 Administrative Controls No Risk Insight**: | |||
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR? | |||
See evaluation of LCO 3.1.1 and 3.1.4 above The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR? | |||
See evaluation of LCO 3.1.1 and 3.1.4 above A Significant reduction in the margin of safety for ISFSI or cask operation? | |||
See evaluation of LCO 3.1.1 and 3.1.4 above | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Evaluation Summary | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 24 of 40 Evaluation Summary Move to Appendix D Section 3 as these Tables provide information needed to complete LCOs 3.1.1 and 3.1.4. (Criterion L1) | ||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C CoC Condition/TS Identifier: ___C-Table 3-3_______ | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 25 of 40 CoC Condition/TS Identifier: ___C-Table 3-3_______ | ||
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | * All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | ||
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | ||
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ||
Requirement | Requirement Appendix C Table 3-3: Completion Time for Actions to Restore HI-STORM 100S Version E SFSC Heat Removal System to Operable CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D. | ||
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria) | |||
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)* | |||
and Surveillance Requirements (SRs) | |||
(Selection Criteria) | (Selection Criteria) | ||
Section 4 Administrative | L1 No L2 Yes Referenced by LCO 3.1.2 L3 No Section 4 Administrative Controls No Risk Insight**: | ||
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR? | |||
See evaluation of LCOs 3.1.2 above The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR? | |||
Evaluation Summary | See evaluation of LCOs 3.1.2 above A Significant reduction in the margin of safety for ISFSI or cask operation? | ||
See evaluation of LCOs 3.1.2 above Evaluation Summary Move to Appendix D Section 3 as the information in this Table relates to completion times for LCO 3.1.2. | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C CoC Condition/TS Identifier: ___C-Table 3-4_______ | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 26 of 40 CoC Condition/TS Identifier: ___C-Table 3-4_______ | ||
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | * All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | ||
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | ||
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ||
Requirement | Requirement Appendix C Table 3-4: MPC-32M with up to Sixteen DFIs Soluble Boron Requirements CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D. | ||
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria) | |||
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)* | |||
and Surveillance Requirements (SRs) | |||
(Selection Criteria) | (Selection Criteria) | ||
Section 4 Administrative | L1 No L2 Yes Referenced by 3.3.1 L3 No Section 4 Administrative Controls No Risk Insight**: | ||
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR? | |||
See evaluation of LCO 3.3.1 above The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR? | |||
Evaluation Summary | See evaluation of LCO 3.3.1 above A Significant reduction in the margin of safety for ISFSI or cask operation? | ||
CoC Condition/TS Identifier: __C-Table 3-5________ | See evaluation of LCO 3.3.1 above Evaluation Summary Move to Appendix D Section 3 as this Table provides soluble boron requirements related to LCO 3.3.1. | ||
CoC Condition/TS Identifier: __C-Table 3-5________ | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 27 of 40 | ||
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | * All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | ||
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | ||
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ||
Requirement | Requirement Appendix C Table 3-5: MPC-32M with up to Twelve DFCs Soluble Boron Requirements CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D. | ||
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria) | |||
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)* | |||
and Surveillance Requirements (SRs) | |||
(Selection Criteria) | (Selection Criteria) | ||
Section 4 Administrative | L1 No L2 Yes Referenced by LCO 3.3.1 L3 No Section 4 Administrative Controls No Risk Insight**: | ||
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR? | |||
See evaluation of LCO 3.3.1 above The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR? | |||
Evaluation Summary | See evaluation of LCO 3.3.1 above A Significant reduction in the margin of safety for ISFSI or cask operation? | ||
See evaluation of LCO 3.3.1 above Evaluation Summary Move to Appendix D Section 3 as this Table provides soluble boron requirements related to LCO 3.3.1. | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C CoC Condition/TS Identifier: __C-Table 3-6________ | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 28 of 40 CoC Condition/TS Identifier: __C-Table 3-6________ | ||
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | * All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | ||
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | ||
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ||
Requirement | Requirement Appendix C Table 3-6: MPC-32M with Thirteen to Sixteen DFCs/DFIs Soluble Boron Requirements CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D. | ||
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria) | |||
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)* | |||
and Surveillance Requirements (SRs) | |||
(Selection Criteria) | (Selection Criteria) | ||
Section 4 Administrative | L1 No L2 Yes Referenced by LCO 3.3.1 L3 No Section 4 Administrative Controls No Risk Insight**: | ||
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR? | |||
See evaluation of LCO 3.3.1 above The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR? | |||
Evaluation Summary | See evaluation of LCO 3.3.1 above A Significant reduction in the margin of safety for ISFSI or cask operation? | ||
See evaluation of LCO 3.3.1 above Evaluation Summary Move to Appendix D Section 3 as this Table provides soluble boron requirements related to LCO 3.3.1. | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C CoC Condition/TS Identifier: __C-Table 3-7________ | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 29 of 40 CoC Condition/TS Identifier: __C-Table 3-7________ | ||
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | * All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | ||
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | ||
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ||
Requirement | Requirement Appendix C Table 3-7: MPC-32/32F and Version 1 Soluble Boron Requirements CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D. | ||
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria) | |||
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)* | |||
and Surveillance Requirements (SRs) | |||
(Selection Criteria) | (Selection Criteria) | ||
Section 4 Administrative | L1 No L2 Yes Referenced by LCO 3.3.1 L3 No Section 4 Administrative Controls No Risk Insight**: | ||
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR? | |||
See evaluation of LCO 3.3.1 above The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR? | |||
Evaluation Summary | See evaluation of LCO 3.3.1 above A Significant reduction in the margin of safety for ISFSI or cask operation? | ||
See evaluation of LCO 3.3.1 above Evaluation Summary Move to Appendix D Section 3 as this Table provides soluble boron requirements related to LCO 3.3.1. | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C CoC Condition/TS Identifier: ___C-5.1_______ | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 30 of 40 CoC Condition/TS Identifier: ___C-5.1_______ | ||
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | * All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | ||
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | ||
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ||
Requirement | Requirement Appendix C Section 5.1: Radioactive Effluent Control Program for HI-STORM 100S Version E This program implements the requirements of 10 CFR 72.44(d). | ||
: a. The HI-STORM 100 Version E Cask System does not create any radioactive materials or have any radioactive waste treatment systems. Therefore, specific operating procedures for the control of radioactive effluents are not required. Specification 3.1.1, Multi-Purpose Canister (MPC), provides assurance that there are not radioactive effluents from the SFSC. | : a. The HI-STORM 100 Version E Cask System does not create any radioactive materials or have any radioactive waste treatment systems. Therefore, specific operating procedures for the control of radioactive effluents are not required. Specification 3.1.1, Multi-Purpose Canister (MPC), provides assurance that there are not radioactive effluents from the SFSC. | ||
: b. This program includes an environmental monitoring program. Each general license user may incorporate SFSC operations into their environmental monitoring programs for 10 CFR Part 50 operations. | : b. This program includes an environmental monitoring program. Each general license user may incorporate SFSC operations into their environmental monitoring programs for 10 CFR Part 50 operations. | ||
: c. An annual report shall be submitted pursuant to 10 CFR 72.44(d)(3). | : c. An annual report shall be submitted pursuant to 10 CFR 72.44(d)(3). | ||
CoC Body | CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D. | ||
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria) | |||
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)* | |||
and Surveillance Requirements (SRs) | |||
(Selection Criteria) | (Selection Criteria) | ||
L1 No L2 No L3 No | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Section 4 Administrative | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 31 of 40 Section 4 Administrative Controls Yes Risk Insight**: | ||
The possibility of a new or | Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR? | ||
A Significant reduction in | No The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR? | ||
: a. - No | No A Significant reduction in the margin of safety for ISFSI or cask operation? | ||
The first sentence establishes that the HI-STORM | First statement (quoted in Evaluation Summary below) - No | ||
: a. - No The first sentence establishes that the HI-STORM System does not create any radioactive materials or have any radioactive waste treatment systems. The second sentence merely explains that specific operating procedures and reporting is not required based on the first sentence. This is not necessary for safety as implementing the unnecessary procedures and reporting would not decrease any margin to safety for the system. Similarly, the third sentence merely points to an LCO providing additional assurance that the first statement is true. | |||
: b. - Yes Without this environmental monitoring program, radioactive material may not be controlled appropriately. | : b. - Yes Without this environmental monitoring program, radioactive material may not be controlled appropriately. | ||
: c. - No This statement merely specifies a regulatory requirement that must be met. | : c. - No This statement merely specifies a regulatory requirement that must be met. | ||
Evaluation Summary | Evaluation Summary Remove This program implements the requirements of 10 CFR 72.44(d) as this is a regulatory requirement that must be met. Also remove Specification 3.1.1, Multi-Purpose Canister (MPC), | ||
provides assurance that there are not radioactive effluents from the SFSC. from item a as these are not necessary based on the risk insight discussion above. Also remove item c An annual report shall be submitted pursuant to 10 CFR 72.44(d)(3) as this is a regulatory requirement that must be met. | provides assurance that there are not radioactive effluents from the SFSC. from item a as these are not necessary based on the risk insight discussion above. Also remove item c An annual report shall be submitted pursuant to 10 CFR 72.44(d)(3) as this is a regulatory requirement that must be met. | ||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Move the rest of the text to Appendix D Section 4, Administrative Controls. The remaining sentences in item a are not a safety concern but should be kept in the CoC Appendix D as they reduce the regulatory burden on the licensees. Item b should be kept in the CoC Appendix D as this program is necessary to assure that the operations involved in the storage of spent fuel in an ISFSI are performed in a safe manner. | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 32 of 40 Move the rest of the text to Appendix D Section 4, Administrative Controls. The remaining sentences in item a are not a safety concern but should be kept in the CoC Appendix D as they reduce the regulatory burden on the licensees. Item b should be kept in the CoC Appendix D as this program is necessary to assure that the operations involved in the storage of spent fuel in an ISFSI are performed in a safe manner. | ||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C CoC Condition/TS Identifier: ___C-5.2_______ | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 33 of 40 CoC Condition/TS Identifier: ___C-5.2_______ | ||
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | * All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | ||
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | ||
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ||
Requirement | Requirement Appendix C Section 5.2: Cask Transport Evaluation Program | ||
: a. | : a. | ||
: b. | For lifting of the loaded MPC, TRANSFER CASK, or OVERPACK using equipment which is integral to a structure governed by 10 CFR Part 50 regulations, 10 CFR 50 requirements apply. | ||
: c. | : b. | ||
CoC Body | This program is not applicable when the TRANSFER CASK or OVERPACK is in the FUEL BUILDING or is being handled by equipment providing support from underneath (i.e., on a rail car, heavy haul trailer, air pads, etc...). | ||
: c. | |||
The TRANSFER CASK or OVERPACK, when loaded with spent fuel, may be lifted to and carried at any height necessary during TRANSPORT OPERATIONS and MPC TRANSFER, provided the lifting equipment is designed in accordance with items 1, 2, and 3 below. | |||
CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D. | |||
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria) | |||
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)* | |||
and Surveillance Requirements (SRs) | |||
(Selection Criteria) | (Selection Criteria) | ||
Section 4 Administrative | L1 No L2 No L3 No Section 4 Administrative Controls Yes | ||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C A significant increase in | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 34 of 40 Risk Insight**: | ||
FSAR? | Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR? | ||
No The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR? | |||
A Significant reduction in | No A Significant reduction in the margin of safety for ISFSI or cask operation? | ||
Evaluation Summary | Yes A significant reduction in the margin of safety for confinement is possible if there were no restrictions on equipment used for lifting a loaded cask. | ||
Evaluation Summary Move to Appendix D Section 4, Administrative Controls, as this provides restrictions on what equipment can used to transfer the HI-STORM System casks and canisters when they are loaded with fuel. These controls are necessary to assure that the operations involved in the storage of spent fuel in an ISFSI are performed in a safe manner such that the casks will not be dropped which could impact safety functions such as confinement | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C CoC Condition/TS Identifier: __C-5.3________ | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 35 of 40 CoC Condition/TS Identifier: __C-5.3________ | ||
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | * All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | ||
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | ||
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ||
Requirement | Requirement Appendix C Section 5.3: Radiation Protection Program 5.3.1 Each cask user shall ensure that the Part 50 radiation protection program appropriately addresses dry storage cask loading and unloading, as well as ISFSI operations, including transport of the loaded OVERPACK or TRANSFER CASK outside of facilities governed by 10 CFR Part 50. The radiation protection program shall include appropriate controls for direct radiation and contamination, ensuring compliance with applicable regulations, and implementing actions to maintain personnel occupational exposures As Low As Reasonably Achievable (ALARA). The actions and criteria to be included in the program are provided below. | ||
5.3.2 As part of its evaluation pursuant to 10 CFR 72.212(b)(2)(i)(C), the licensee shall perform an analysis to confirm that the dose limits of 10 CFR 72.104(a) will be satisfied under the actual site conditions and ISFSI configuration, considering the planned number of casks to be deployed and the cask contents. | 5.3.2 As part of its evaluation pursuant to 10 CFR 72.212(b)(2)(i)(C), the licensee shall perform an analysis to confirm that the dose limits of 10 CFR 72.104(a) will be satisfied under the actual site conditions and ISFSI configuration, considering the planned number of casks to be deployed and the cask contents. | ||
5.3.3 Based on the analysis performed pursuant to Section 5.3.2, the licensee shall establish individual cask surface dose rate limits for the HI-TRAC TRANSFER CASK and the HI-STORM OVERPACK to be used at the site. Total (neutron plus gamma) dose rate limits shall be established at the following locations: | 5.3.3 Based on the analysis performed pursuant to Section 5.3.2, the licensee shall establish individual cask surface dose rate limits for the HI-TRAC TRANSFER CASK and the HI-STORM OVERPACK to be used at the site. Total (neutron plus gamma) dose rate limits shall be established at the following locations: | ||
: a. | : a. | ||
: b. | The top of the OVERPACK. | ||
: c. | : b. | ||
The side of the TRANSFER CASK and OVERPACK | |||
: c. | |||
The inlet and outlet ducts on the OVERPACK (not applicable for a non-ventilated OVERPACK) | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C (see existing Appendix C for remaining text) | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 36 of 40 (see existing Appendix C for remaining text) | ||
CoC Body | CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D. | ||
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria) | |||
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)* | |||
and Surveillance Requirements (SRs) | |||
(Selection Criteria) | (Selection Criteria) | ||
Section 4 Administrative | L1 No L2 No L3 No Section 4 Administrative Controls Yes Risk Insight**: | ||
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR? | |||
that there is no such area of reduced shielding but | No There would be no increase in the probability of any accident. | ||
There would only be an increase in the consequences of accidents due to increased dose from the Overpack or Transfer Cask if there was an area of reduced shielding. This protection program verifies that there is no such area of reduced shielding but does not include an overt action involving an SSC that provides shielding. | |||
A Significant reduction in | The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR? | ||
Evaluation Summary | No A Significant reduction in the margin of safety for ISFSI or cask operation? | ||
Refer to appropriate Part 72 Section: 72.212(b)(5)(iii) 5.3.3 through 8- Move to Appendix D section 4 . | No There would be a slight reduction in the margin of safety for the shielding function, but only if an area of reduced shielding exists. | ||
These controls are important as they provide dose rate information in assessing worker dose and potentially identifying a misload. | Evaluation Summary 5.3.1 -Move to Appendix D section 4 5.3.2 - Combine main statement with existing Section 5.3.3 as these discussions are currently repetitive. | ||
Refer to appropriate Part 72 Section: 72.212(b)(5)(iii) 5.3.3 through 8-Move to Appendix D section 4. | |||
These controls are important as they provide dose rate information in assessing worker dose and potentially identifying a misload. | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C CoC Condition/TS Identifier: ___C-5.4_______ | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 37 of 40 CoC Condition/TS Identifier: ___C-5.4_______ | ||
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | * All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | ||
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | ||
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ||
Requirement | Requirement Appendix C Section 5.4: Fabrication Helium Leak Test At completion of welding the MPC shell to baseplate, an MPC confinement weld helium leak test shall be performed using a helium mass spectrometer. This test shall include the base metals of the MPC shell and baseplate. A helium leak test shall also be performed on the base metal of the fabricated MPC lid. The confinement boundary leakage rate tests shall be performed in accordance with ANSI N14.5 to leaktight criteria. If a leakage rate exceeding the acceptance criteria is detected, then the area of leakage shall be determined and the area repaired per ASME Code Section III, Subsection NB requirements. Re-testing shall be performed until the leakage rate acceptance criterion is met. | ||
CoC Body | CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D. | ||
Technical Specifications Section 1 Definitions, Use and Application Yes Section 2 Approved Contents (Selection Criteria) | |||
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)* | |||
and Surveillance Requirements (SRs) | |||
(Selection Criteria) | (Selection Criteria) | ||
Section 4 Administrative | L1 No L2 No L3 No Section 4 Administrative Controls No Risk Insight**: | ||
Will removing this requirement A significant increase in the probability or consequences of an accident previously Yes This test confirms the MPC has been manufactured correctly and will provide confinement as designed. | |||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C from the CoC/TS | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 38 of 40 from the CoC/TS result in evaluated in the cask FSAR? | ||
The possibility of a new or | The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR? | ||
A Significant reduction in | No A Significant reduction in the margin of safety for ISFSI or cask operation? | ||
Evaluation Summary | No Evaluation Summary Keep in Appendix C as it describes a test to provide reasonable assurance that an MPC has been manufactured and will operate in conformance with the certified design, and that the confinement safety function will be performed. | ||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C CoC Condition/TS Identifier: ___C-5.5_______ | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 39 of 40 CoC Condition/TS Identifier: ___C-5.5_______ | ||
* All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | * All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s), | ||
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance. | ||
** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ** In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction? | ||
Requirement | Requirement Appendix C Section 5.5: Aging Management Program Each general licensee shall have a program to establish, implement, and maintain written procedures for each AMP described in the FSAR. The program shall include provisions for changing AMP elements, as necessary, and within the limitations of the approved licensing bases to address new information on aging effects based on inspection findings and/or industry operating experience provided to the general licensee during the renewal period. | ||
The general licensee shall establish and implement these written procedures within 365 days after the effective date of the renewal of the CoC or 365 days of the 20th anniversary of the loading of the first dry storage system at its site, whichever is later. | The general licensee shall establish and implement these written procedures within 365 days after the effective date of the renewal of the CoC or 365 days of the 20th anniversary of the loading of the first dry storage system at its site, whichever is later. | ||
Each general licensee shall perform tollgate assessments as described in Chapter 9 of the FSAR. | Each general licensee shall perform tollgate assessments as described in Chapter 9 of the FSAR. | ||
CoC Body | CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D. | ||
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria) | |||
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)* | |||
and Surveillance Requirements (SRs) | |||
(Selection Criteria) | (Selection Criteria) | ||
Section 4 Administrative | L1 No L2 No L3 No Section 4 Administrative Controls Yes | ||
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C A significant increase in | CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 40 of 40 Risk Insight**: | ||
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR? | |||
Yes - Lack of appropriate evaluation of the effects of aging on the dry storage equipment could result in an increase to the consequences of a previously evaluated accident. | |||
A Significant reduction in | The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR? | ||
Evaluation Summary | No A Significant reduction in the margin of safety for ISFSI or cask operation? | ||
Yes - Lack of appropriate evaluation of the effects of aging on the dry storage equipment could result in a significant reduction in safety over time. | |||
Evaluation Summary Move to Appendix D Section 4.}} | |||
Latest revision as of 18:45, 27 November 2024
| ML22028A382 | |
| Person / Time | |
|---|---|
| Site: | Holtec |
| Issue date: | 01/28/2022 |
| From: | Holtec |
| To: | Office of Nuclear Material Safety and Safeguards |
| Shared Package | |
| ML22028A371 | List: |
| References | |
| 5014939 | |
| Download: ML22028A382 (40) | |
Text
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 1 of 40 CoC Condition/TS Identifier: ___C-1.1_______
- All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
- In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement Appendix C Section 1.1: Definitions CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D.
Technical Specifications Section 1 Definitions, Use and Application Yes Section 2 Approved Contents (Selection Criteria)
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)*
and Surveillance Requirements (SRs)
(Selection Criteria)
L1 No L2 No L3 No Section 4 Administrative Controls No Risk Insight**:
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR?
N/A The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR?
N/A A Significant reduction in the margin of safety for ISFSI or cask operation?
N/A Evaluation Summary Move to Appendix D Section 1 as it meets the criterion for inclusion in the new TS format (Use and Application).
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 2 of 40 CoC Condition/TS Identifier: ___C-1.2_______
- All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
- In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement Appendix C Section 1.2: Logical Connectors: The purpose of this section is to explain the meaning of logical connectors.
CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D.
Technical Specifications Section 1 Definitions, Use and Application Yes Section 2 Approved Contents (Selection Criteria)
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)*
and Surveillance Requirements (SRs)
(Selection Criteria)
L1 No L2 No L3 No Section 4 Administrative Controls No Risk Insight**:
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR?
N/A The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR?
N/A A Significant reduction in the margin of safety for ISFSI or cask operation?
N/A Evaluation Summary Move to Appendix D Section 1 as it meets the criterion for inclusion in the new TS format (Use and Application).
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 3 of 40 No change to text as the existing Purpose, Background, and Examples are helpful to understand the use and application of Logical Connectors.
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 4 of 40 CoC Condition/TS Identifier: ___C-1.3_______
- All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
- In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement Appendix C Section 1.3: Completion Times: The purpose of this section is to establish the Completion Time convention and to provide guidance for its use.
CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D.
Technical Specifications Section 1 Definitions, Use and Application Yes Section 2 Approved Contents (Selection Criteria)
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)*
and Surveillance Requirements (SRs)
(Selection Criteria)
L1 No L2 No L3 No Section 4 Administrative Controls No Risk Insight**:
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR?
N/A The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR?
N/A A Significant reduction in the margin of safety for ISFSI or cask operation?
N/A Evaluation Summary Move to Appendix D Section 1 as it meets the criterion for inclusion in the new TS format (Use and Application).
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 5 of 40 No change to text as the existing Purpose, Background, Description, Examples, and Immediate Completion Time are helpful to provide guidance on the use and application of Completion Times.
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 6 of 40 CoC Condition/TS Identifier: ___C-1.4_______
- All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
- In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement Appendix C Section 1.4: Frequency: The purpose of this section is to define the proper use and application of Frequency requirements.
CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D.
Technical Specifications Section 1 Definitions, Use and Application Yes Section 2 Approved Contents (Selection Criteria)
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)*
and Surveillance Requirements (SRs)
(Selection Criteria)
L1 No L2 No L3 No Section 4 Administrative Controls No Risk Insight**:
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR?
N/A The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR?
N/A A Significant reduction in the margin of safety for ISFSI or cask operation?
N/A Evaluation Summary Move to Appendix D Section 1 as it meets the criterion for inclusion in the new TS format (Use and Application).
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 7 of 40 No change to text as the existing Purpose, Description, and Examples are helpful to understand the use and application of Frequency.
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 8 of 40 CoC Condition/TS Identifier: ___C-3.0______
- All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
- In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement Appendix C Section 3.0: LCO and SR Applicability CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D.
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria)
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)*
and Surveillance Requirements (SRs)
(Selection Criteria)
L1 Yes L2 Yes L3 Yes Section 4 Administrative Controls No Risk Insight**:
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR?
Yes These LCO and SR applicability requirements are necessary to ensure that safety functions are maintained as described in the individual LCOs and SRs.
The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR?
No A Significant reduction in the margin of safety for ISFSI or cask operation?
Yes These LCO and SR applicability requirements are necessary to ensure that safety functions are maintained as described in the individual LCOs and SRs.
Evaluation Summary Move to Appendix D Section 3.0. Applies generically to all three criteria (L1, L2, L3).
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 9 of 40 CoC Condition/TS Identifier: ___C-3.1.1_______
- All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
- In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement Appendix C LCO 3.1.1: Multi-Purpose Canister (MPC)
The MPC shall be dry and helium filled.
Table 3-1 provides decay heat and burnup limits for forced helium dehydration (FHD) and vacuum drying.
FHD is not subject to time limits. Vacuum drying of MPCs may be subject to time limits, from the end of bulk water removal until the start of helium backfill, as shown in Table 3-1.
CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D.
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria)
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)*
and Surveillance Requirements (SRs)
(Selection Criteria)
L1 No L2 Yes L3 No Section 4 Administrative Controls No Risk Insight**:
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR?
No The possibility of a new or different kind of accident being created compared No
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 10 of 40 to those previously evaluated in the FSAR?
A Significant reduction in the margin of safety for ISFSI or cask operation?
Yes This LCO ensures an inert atmosphere around the fuel cladding, and that oxidation of the fuel cladding does not occur, preserving the integrity of the fuel cladding fission product barrier. Its removal would reduce the margin of safety for confinement.
Evaluation Summary Move to Appendix D Section 3 as this LCO ensures an inert atmosphere around the fuel cladding and that oxidation of the fuel cladding does not occur, preserving the integrity of the fuel cladding fission product barrier. (Criterion L2)
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 11 of 40 CoC Condition/TS Identifier: __C-3.1.2________
- All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
- In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement Appendix C LCO 3.1.2: HI-STORM 100S VERSION E SFSC Heat Removal System The HI-STORM 100S VERSION E SFSC Heat Removal System shall be operable Note: The SFSC Heat Removal System is operable when 50% or more of the inlet and outlet vent areas are unblocked and available for flow or when air temperature requirements are met. This LCO does not apply to the HI-STORM 100 UVH overpack, which does not include an SFSC heat removal system.
CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D.
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria)
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)*
and Surveillance Requirements (SRs)
(Selection Criteria)
L1 No L2 Yes L3 No Section 4 Administrative Controls No Risk Insight**:
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR?
No The possibility of a new or different kind of accident No
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 12 of 40 being created compared to those previously evaluated in the FSAR?
A Significant reduction in the margin of safety for ISFSI or cask operation?
Yes This LCO ensures fuel cladding temperatures remain below the limit for normal storage operations, preserving the integrity of the fuel cladding fission product barrier. Its removal would reduce the margin of safety for confinement.
Evaluation Summary Move to Appendix D Section 3 as this LCO ensures fuel cladding temperatures remain below the limit for normal storage operations, preserving the integrity of the fuel cladding fission product barrier. (Criterion L2)
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 13 of 40 CoC Condition/TS Identifier: __C-3.1.3________
- All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
- In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement Appendix C LCO 3.1.3: MPC Cavity Reflooding The MPC cavity pressure shall be:
< 110 psig (MPC-32M/32 Version 1/68 Version 1), or
< 100 psig for (MPC-24/24E/24EF/32/32F/68/68F/68FF/68M)
CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D.
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria)
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)*
and Surveillance Requirements (SRs)
(Selection Criteria)
L1 No L2 Yes L3 No Section 4 Administrative Controls No Risk Insight**:
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR?
No The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR?
No A Significant reduction in the margin of safety for ISFSI or cask operation?
Yes This LCO ensures that the MPC cavity pressure limit is not exceeded during reflooding such that the
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 14 of 40 integrity of the MPC enclosure vessel confinement boundary is compromised.
Evaluation Summary Move to Appendix D Section 3 as this LCO ensures that the MPC cavity pressure is below the limit before reflooding operations the MPC is then reflooded with water at a controlled rate and/or the pressure monitored to ensure that the pressure remains below the limit. The integrity of the MPC depends on maintaining the internal cavity pressures within design limits. This is accomplished by introducing water to the cavity in a controlled manner such that there is no sudden formation of large quantities of steam during MPC reflooding, preserving the integrity of the MPC enclosure vessel confinement boundary (fission product barrier). (Criterion L2)
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 15 of 40 CoC Condition/TS Identifier: ____ C-3.1.4______
- All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
- In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement Appendix C LCO 3.1.4: Supplemental Cooling System A supplemental cooling system (SCS) shall be operable.
Note: Upon reaching steady state operation, the SCS may be temporarily disabled for a short duration (< 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />) to facilitate necessary operational evolutions, such as movement of the TRANSFER CASK through a door way, or other similar operation.
CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D.
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria)
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)*
and Surveillance Requirements (SRs)
(Selection Criteria)
L1 No L2 Yes L3 No Section 4 Administrative Controls No Risk Insight**:
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR?
No The possibility of a new or different kind of accident being created compared No
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 16 of 40 to those previously evaluated in the FSAR?
A Significant reduction in the margin of safety for ISFSI or cask operation?
Yes This LCO ensures fuel cladding temperatures remain below the limit for normal storage operations, preserving the integrity of the fuel cladding fission product barrier. Its removal would reduce the margin of safety for confinement.
Evaluation Summary Move to Appendix D Section 3 as this LCO ensures fuel cladding temperatures remain below the limit for normal storage operations, preserving the integrity of the fuel cladding fission product barrier. (Criterion L2)
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 17 of 40 CoC Condition/TS Identifier: ___C-3.2.1_______
- All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
- In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement Appendix C LCO 3.2.1: Transfer Cask Surface Contamination Removable contamination on the exterior surfaces of the TRANSFER CASK and accessible portions of the MPC shall each not exceed:
- a. 1000 dpm/100 cm2 from beta and gamma sources
- b. 20 dpm/100 cm2 from alpha sources.
CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D.
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria)
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)*
and Surveillance Requirements (SRs)
(Selection Criteria)
L1 No L2 No L3 Yes Section 4 Administrative Controls No Risk Insight**:
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR?
No increase to the probability of any accident.
Slight increase in consequences due to increased dose from contamination, but not a significant increase.
The possibility of a new or different kind of accident No
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 18 of 40 being created compared to those previously evaluated in the FSAR?
A Significant reduction in the margin of safety for ISFSI or cask operation?
No Evaluation Summary Move to Appendix D Section 3 as this LCO ensures compliance with contamination limits for normal storage operations when not occurring in Fuel Building. (Criterion L3)
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 19 of 40 CoC Condition/TS Identifier: __C-3.3.1________
- All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
- In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement Appendix C LCO 3.3.1: Boron Concentration The concentration of boron in the water in the MPC shall meet the following limits for the applicable MPC model and the most limiting fuel assembly array/class and classification to be stored in the MPC:
- a.
MPC-32M: Minimum soluble boron concentration as required by the Tables 3-4 through 3-6, per configurations in Appendix D Table 2.4-1.
- b.
MPC-32/32F and MPC-32 Version 1:
Minimum soluble boron concentration as required by Table 3-7
- c.
MPC-24 with one or more fuel assemblies having an initial enrichment greater than the value in Appendix B Table 2.1-2 for no soluble boron credit and < 5.0 wt% 235U: > 400 ppmb
- d.
MPC-24E or MPC-24EF (all INTACT FUEL ASSEMBLIES) with one or more fuel assemblies having an initial enrichment greater than the value in Appendix B Table 2.1-2 for no soluble boron credit and < 5.0 wt% 235U: > 300 ppmb
- e.
MPC-24E or MPC-24EF (one or more DAMAGED FUEL ASSEMBLIES or FUEL DEBRIS) with one or more fuel assemblies having an initial enrichment > 4.0 wt% 235U and
< 5.0 wt% 235U: > 600 ppmb CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D.
Technical Specifications Section 1 Definitions, Use and Application No A1 No
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 20 of 40 Section 2 Approved Contents (Selection Criteria)
A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)*
and Surveillance Requirements (SRs)
(Selection Criteria)
L1 No L2 Yes L3 No Section 4 Administrative Controls No Risk Insight**:
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR?
Yes The probability of a criticality accident would be increased.
The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR?
No A Significant reduction in the margin of safety for ISFSI or cask operation?
Yes Loss of criticality control would cause a significant reduction in the margin of safety.
Evaluation Summary Move to Appendix D Section 3 as this LCO ensures that a subcritical configuration is maintained.
(Criterion L2)
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 21 of 40 CoC Condition/TS Identifier: __C-Tables 3-1a and 3-1b_______
- All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
- In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement Appendix C Table 3-1a: MPC Cavity Drying Limits for Ventilated Overpack Table 3-1b: MPC-32M Cavity Drying Limits for Unventilated Overpack CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D.
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria)
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)*
and Surveillance Requirements (SRs)
(Selection Criteria)
L1 Yes Referenced by LCO 3.1.1 L2 No L3 No Section 4 Administrative Controls No Risk Insight**:
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR?
See evaluation of LCO 3.1.1 above The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR?
See evaluation of LCO 3.1.1 above A Significant reduction in the margin of safety for ISFSI or cask operation?
See evaluation of LCO 3.1.1 above
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 22 of 40 Evaluation Summary Move to Appendix D Section 3 as these tables provide information needed to complete LCO 3.1.1. (Criterion L1)
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 23 of 40 CoC Condition/TS Identifier: ___C-Tables 3-2a and 3-2b_______
- All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
- In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement Appendix C Table 3-2a: MPC Helium Backfill Limits for Ventilated Overpack Table 3-2b: MPC Helium Backfill Limits for Unventilated Overpack CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D.
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria)
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)*
and Surveillance Requirements (SRs)
(Selection Criteria)
L1 Yes Referenced by LCO 3.1.1 and 3.1.4 L2 No L3 No Section 4 Administrative Controls No Risk Insight**:
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR?
See evaluation of LCO 3.1.1 and 3.1.4 above The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR?
See evaluation of LCO 3.1.1 and 3.1.4 above A Significant reduction in the margin of safety for ISFSI or cask operation?
See evaluation of LCO 3.1.1 and 3.1.4 above
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 24 of 40 Evaluation Summary Move to Appendix D Section 3 as these Tables provide information needed to complete LCOs 3.1.1 and 3.1.4. (Criterion L1)
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 25 of 40 CoC Condition/TS Identifier: ___C-Table 3-3_______
- All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
- In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement Appendix C Table 3-3: Completion Time for Actions to Restore HI-STORM 100S Version E SFSC Heat Removal System to Operable CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D.
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria)
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)*
and Surveillance Requirements (SRs)
(Selection Criteria)
L1 No L2 Yes Referenced by LCO 3.1.2 L3 No Section 4 Administrative Controls No Risk Insight**:
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR?
See evaluation of LCOs 3.1.2 above The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR?
See evaluation of LCOs 3.1.2 above A Significant reduction in the margin of safety for ISFSI or cask operation?
See evaluation of LCOs 3.1.2 above Evaluation Summary Move to Appendix D Section 3 as the information in this Table relates to completion times for LCO 3.1.2.
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 26 of 40 CoC Condition/TS Identifier: ___C-Table 3-4_______
- All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
- In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement Appendix C Table 3-4: MPC-32M with up to Sixteen DFIs Soluble Boron Requirements CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D.
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria)
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)*
and Surveillance Requirements (SRs)
(Selection Criteria)
L1 No L2 Yes Referenced by 3.3.1 L3 No Section 4 Administrative Controls No Risk Insight**:
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR?
See evaluation of LCO 3.3.1 above The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR?
See evaluation of LCO 3.3.1 above A Significant reduction in the margin of safety for ISFSI or cask operation?
See evaluation of LCO 3.3.1 above Evaluation Summary Move to Appendix D Section 3 as this Table provides soluble boron requirements related to LCO 3.3.1.
CoC Condition/TS Identifier: __C-Table 3-5________
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 27 of 40
- All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
- In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement Appendix C Table 3-5: MPC-32M with up to Twelve DFCs Soluble Boron Requirements CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D.
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria)
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)*
and Surveillance Requirements (SRs)
(Selection Criteria)
L1 No L2 Yes Referenced by LCO 3.3.1 L3 No Section 4 Administrative Controls No Risk Insight**:
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR?
See evaluation of LCO 3.3.1 above The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR?
See evaluation of LCO 3.3.1 above A Significant reduction in the margin of safety for ISFSI or cask operation?
See evaluation of LCO 3.3.1 above Evaluation Summary Move to Appendix D Section 3 as this Table provides soluble boron requirements related to LCO 3.3.1.
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 28 of 40 CoC Condition/TS Identifier: __C-Table 3-6________
- All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
- In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement Appendix C Table 3-6: MPC-32M with Thirteen to Sixteen DFCs/DFIs Soluble Boron Requirements CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D.
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria)
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)*
and Surveillance Requirements (SRs)
(Selection Criteria)
L1 No L2 Yes Referenced by LCO 3.3.1 L3 No Section 4 Administrative Controls No Risk Insight**:
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR?
See evaluation of LCO 3.3.1 above The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR?
See evaluation of LCO 3.3.1 above A Significant reduction in the margin of safety for ISFSI or cask operation?
See evaluation of LCO 3.3.1 above Evaluation Summary Move to Appendix D Section 3 as this Table provides soluble boron requirements related to LCO 3.3.1.
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 29 of 40 CoC Condition/TS Identifier: __C-Table 3-7________
- All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
- In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement Appendix C Table 3-7: MPC-32/32F and Version 1 Soluble Boron Requirements CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D.
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria)
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)*
and Surveillance Requirements (SRs)
(Selection Criteria)
L1 No L2 Yes Referenced by LCO 3.3.1 L3 No Section 4 Administrative Controls No Risk Insight**:
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR?
See evaluation of LCO 3.3.1 above The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR?
See evaluation of LCO 3.3.1 above A Significant reduction in the margin of safety for ISFSI or cask operation?
See evaluation of LCO 3.3.1 above Evaluation Summary Move to Appendix D Section 3 as this Table provides soluble boron requirements related to LCO 3.3.1.
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 30 of 40 CoC Condition/TS Identifier: ___C-5.1_______
- All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
- In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement Appendix C Section 5.1: Radioactive Effluent Control Program for HI-STORM 100S Version E This program implements the requirements of 10 CFR 72.44(d).
- a. The HI-STORM 100 Version E Cask System does not create any radioactive materials or have any radioactive waste treatment systems. Therefore, specific operating procedures for the control of radioactive effluents are not required. Specification 3.1.1, Multi-Purpose Canister (MPC), provides assurance that there are not radioactive effluents from the SFSC.
- b. This program includes an environmental monitoring program. Each general license user may incorporate SFSC operations into their environmental monitoring programs for 10 CFR Part 50 operations.
- c. An annual report shall be submitted pursuant to 10 CFR 72.44(d)(3).
CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D.
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria)
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)*
and Surveillance Requirements (SRs)
(Selection Criteria)
L1 No L2 No L3 No
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 31 of 40 Section 4 Administrative Controls Yes Risk Insight**:
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR?
No The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR?
No A Significant reduction in the margin of safety for ISFSI or cask operation?
First statement (quoted in Evaluation Summary below) - No
- a. - No The first sentence establishes that the HI-STORM System does not create any radioactive materials or have any radioactive waste treatment systems. The second sentence merely explains that specific operating procedures and reporting is not required based on the first sentence. This is not necessary for safety as implementing the unnecessary procedures and reporting would not decrease any margin to safety for the system. Similarly, the third sentence merely points to an LCO providing additional assurance that the first statement is true.
- b. - Yes Without this environmental monitoring program, radioactive material may not be controlled appropriately.
- c. - No This statement merely specifies a regulatory requirement that must be met.
Evaluation Summary Remove This program implements the requirements of 10 CFR 72.44(d) as this is a regulatory requirement that must be met. Also remove Specification 3.1.1, Multi-Purpose Canister (MPC),
provides assurance that there are not radioactive effluents from the SFSC. from item a as these are not necessary based on the risk insight discussion above. Also remove item c An annual report shall be submitted pursuant to 10 CFR 72.44(d)(3) as this is a regulatory requirement that must be met.
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 32 of 40 Move the rest of the text to Appendix D Section 4, Administrative Controls. The remaining sentences in item a are not a safety concern but should be kept in the CoC Appendix D as they reduce the regulatory burden on the licensees. Item b should be kept in the CoC Appendix D as this program is necessary to assure that the operations involved in the storage of spent fuel in an ISFSI are performed in a safe manner.
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 33 of 40 CoC Condition/TS Identifier: ___C-5.2_______
- All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
- In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement Appendix C Section 5.2: Cask Transport Evaluation Program
- a.
For lifting of the loaded MPC, TRANSFER CASK, or OVERPACK using equipment which is integral to a structure governed by 10 CFR Part 50 regulations, 10 CFR 50 requirements apply.
- b.
This program is not applicable when the TRANSFER CASK or OVERPACK is in the FUEL BUILDING or is being handled by equipment providing support from underneath (i.e., on a rail car, heavy haul trailer, air pads, etc...).
- c.
The TRANSFER CASK or OVERPACK, when loaded with spent fuel, may be lifted to and carried at any height necessary during TRANSPORT OPERATIONS and MPC TRANSFER, provided the lifting equipment is designed in accordance with items 1, 2, and 3 below.
CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D.
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria)
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)*
and Surveillance Requirements (SRs)
(Selection Criteria)
L1 No L2 No L3 No Section 4 Administrative Controls Yes
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 34 of 40 Risk Insight**:
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR?
No The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR?
No A Significant reduction in the margin of safety for ISFSI or cask operation?
Yes A significant reduction in the margin of safety for confinement is possible if there were no restrictions on equipment used for lifting a loaded cask.
Evaluation Summary Move to Appendix D Section 4, Administrative Controls, as this provides restrictions on what equipment can used to transfer the HI-STORM System casks and canisters when they are loaded with fuel. These controls are necessary to assure that the operations involved in the storage of spent fuel in an ISFSI are performed in a safe manner such that the casks will not be dropped which could impact safety functions such as confinement
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 35 of 40 CoC Condition/TS Identifier: __C-5.3________
- All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
- In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement Appendix C Section 5.3: Radiation Protection Program 5.3.1 Each cask user shall ensure that the Part 50 radiation protection program appropriately addresses dry storage cask loading and unloading, as well as ISFSI operations, including transport of the loaded OVERPACK or TRANSFER CASK outside of facilities governed by 10 CFR Part 50. The radiation protection program shall include appropriate controls for direct radiation and contamination, ensuring compliance with applicable regulations, and implementing actions to maintain personnel occupational exposures As Low As Reasonably Achievable (ALARA). The actions and criteria to be included in the program are provided below.
5.3.2 As part of its evaluation pursuant to 10 CFR 72.212(b)(2)(i)(C), the licensee shall perform an analysis to confirm that the dose limits of 10 CFR 72.104(a) will be satisfied under the actual site conditions and ISFSI configuration, considering the planned number of casks to be deployed and the cask contents.
5.3.3 Based on the analysis performed pursuant to Section 5.3.2, the licensee shall establish individual cask surface dose rate limits for the HI-TRAC TRANSFER CASK and the HI-STORM OVERPACK to be used at the site. Total (neutron plus gamma) dose rate limits shall be established at the following locations:
- a.
The top of the OVERPACK.
- b.
The side of the TRANSFER CASK and OVERPACK
- c.
The inlet and outlet ducts on the OVERPACK (not applicable for a non-ventilated OVERPACK)
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 36 of 40 (see existing Appendix C for remaining text)
CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D.
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria)
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)*
and Surveillance Requirements (SRs)
(Selection Criteria)
L1 No L2 No L3 No Section 4 Administrative Controls Yes Risk Insight**:
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR?
No There would be no increase in the probability of any accident.
There would only be an increase in the consequences of accidents due to increased dose from the Overpack or Transfer Cask if there was an area of reduced shielding. This protection program verifies that there is no such area of reduced shielding but does not include an overt action involving an SSC that provides shielding.
The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR?
No A Significant reduction in the margin of safety for ISFSI or cask operation?
No There would be a slight reduction in the margin of safety for the shielding function, but only if an area of reduced shielding exists.
Evaluation Summary 5.3.1 -Move to Appendix D section 4 5.3.2 - Combine main statement with existing Section 5.3.3 as these discussions are currently repetitive.
Refer to appropriate Part 72 Section: 72.212(b)(5)(iii) 5.3.3 through 8-Move to Appendix D section 4.
These controls are important as they provide dose rate information in assessing worker dose and potentially identifying a misload.
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 37 of 40 CoC Condition/TS Identifier: ___C-5.4_______
- All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
- In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement Appendix C Section 5.4: Fabrication Helium Leak Test At completion of welding the MPC shell to baseplate, an MPC confinement weld helium leak test shall be performed using a helium mass spectrometer. This test shall include the base metals of the MPC shell and baseplate. A helium leak test shall also be performed on the base metal of the fabricated MPC lid. The confinement boundary leakage rate tests shall be performed in accordance with ANSI N14.5 to leaktight criteria. If a leakage rate exceeding the acceptance criteria is detected, then the area of leakage shall be determined and the area repaired per ASME Code Section III, Subsection NB requirements. Re-testing shall be performed until the leakage rate acceptance criterion is met.
CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D.
Technical Specifications Section 1 Definitions, Use and Application Yes Section 2 Approved Contents (Selection Criteria)
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)*
and Surveillance Requirements (SRs)
(Selection Criteria)
L1 No L2 No L3 No Section 4 Administrative Controls No Risk Insight**:
Will removing this requirement A significant increase in the probability or consequences of an accident previously Yes This test confirms the MPC has been manufactured correctly and will provide confinement as designed.
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 38 of 40 from the CoC/TS result in evaluated in the cask FSAR?
The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR?
No A Significant reduction in the margin of safety for ISFSI or cask operation?
No Evaluation Summary Keep in Appendix C as it describes a test to provide reasonable assurance that an MPC has been manufactured and will operate in conformance with the certified design, and that the confinement safety function will be performed.
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 39 of 40 CoC Condition/TS Identifier: ___C-5.5_______
- All LCOs also require an Applicability, Condition(s), Required Action(s), Completion Time(s),
Surveillance Requirement(s), and Frequency(ies). Refer to NUREG-1745 for additional guidance.
- In performing the risk insight evaluation above, the evaluator should think about subsequent changes to a relocated CoC requirement. Specifically, ask the question what is the likelihood and worst possible consequences of a future change to this requirement in the less conservative direction?
Requirement Appendix C Section 5.5: Aging Management Program Each general licensee shall have a program to establish, implement, and maintain written procedures for each AMP described in the FSAR. The program shall include provisions for changing AMP elements, as necessary, and within the limitations of the approved licensing bases to address new information on aging effects based on inspection findings and/or industry operating experience provided to the general licensee during the renewal period.
The general licensee shall establish and implement these written procedures within 365 days after the effective date of the renewal of the CoC or 365 days of the 20th anniversary of the loading of the first dry storage system at its site, whichever is later.
Each general licensee shall perform tollgate assessments as described in Chapter 9 of the FSAR.
CoC Body Certified Design Section I. Technology No Section II. Design Features No Appendix C - Inspections, Tests, and Evaluations No Appendix D.
Technical Specifications Section 1 Definitions, Use and Application No Section 2 Approved Contents (Selection Criteria)
A1 No A2 No A3 No Section 3 Limiting Conditions for Operation (LCOs)*
and Surveillance Requirements (SRs)
(Selection Criteria)
L1 No L2 No L3 No Section 4 Administrative Controls Yes
CoC Condition/Technical Specification Evaluation Form - CoC original Appendix C Page 40 of 40 Risk Insight**:
Will removing this requirement from the CoC/TS result in A significant increase in the probability or consequences of an accident previously evaluated in the cask FSAR?
Yes - Lack of appropriate evaluation of the effects of aging on the dry storage equipment could result in an increase to the consequences of a previously evaluated accident.
The possibility of a new or different kind of accident being created compared to those previously evaluated in the FSAR?
No A Significant reduction in the margin of safety for ISFSI or cask operation?
Yes - Lack of appropriate evaluation of the effects of aging on the dry storage equipment could result in a significant reduction in safety over time.
Evaluation Summary Move to Appendix D Section 4.