ML21180A058: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:From: | {{#Wiki_filter:From: | ||
McCarver, Sammy To: | |||
Bower, Fred; Snyder, Amy Cc: | |||
Hussar, Kenneth; Caron, Dana; Rey, Jeremiah; Dimitriadis, Anthony; Ordoyne, Mike; Eck, Tom | |||
==Subject:== | ==Subject:== | ||
Pilgrim ISFSI-II Inspection Date: | Pilgrim ISFSI-II Inspection Date: | ||
Inspection activities included a review of the access authorization program for the ISFSI-II; verification and assessment of the licensees testing and maintenance program to assure the functionality and reliability of security equipment, verification that a rapid, capable response to safeguards contingency events had been appropriately developed and effectively implemented, conducting interviews with responsible security personnel and plant employees, and performing walk-downs of | Thursday, June 17, 2021 12:00:40 PM OnJune17,2021, Region I physical security inspectors completeda security inspection of the ISFSI-II at Pilgrimusing IP 81311, Physical Security Requirements for Independent Spent Fuel Storage Installations. On-site inspection activities were conducted March 1-3, and June 14-17, 2021. The inspection coveredthelicenseesphysical security plan,Revisions 19A and 20,and NRC OrderEA 132,AdditionalSecurityMeasures,datedJuly 23, 2013. | ||
Inspection activities included a review of the access authorization program for the ISFSI-II; verification and assessment of the licensees testing and maintenance program to assure the functionality and reliability of security equipment, verification that a rapid, capable response to safeguards contingency events had been appropriately developed and effectively implemented, conducting interviews with responsible security personnel and plant employees, and performing walk-downs of theISFSI-II. | |||
Based on inspection activities conducted, the regional inspectors concluded Holtec Decommissioning International, LLC (HDI) demonstrated compliance with Order EA-13-132 for Pilgrim ISFSI-II. | Based on inspection activities conducted, the regional inspectors concluded Holtec Decommissioning International, LLC (HDI) demonstrated compliance with Order EA-13-132 for Pilgrim ISFSI-II. | ||
More information will be documented in inspection report 07201044/2021401, to be issued within 30 days of todays date. | More information will be documented in inspection report 07201044/2021401, to be issued within 30 days of todays date. | ||
Sam McCarver, PE Physical Security Inspector NRC Region I Suite 100 2100 Renaissance Blvd King of Prussia, PA 19406 610-337-5382 Sammy.mccarver@nrc.gov}} | Sam McCarver, PE Physical Security Inspector NRC Region I Suite 100 2100 Renaissance Blvd King of Prussia, PA 19406 610-337-5382 Sammy.mccarver@nrc.gov}} | ||
Latest revision as of 08:18, 29 November 2024
| ML21180A058 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 06/17/2021 |
| From: | Sammy Mccarver NRC Region 1 |
| To: | Fred Bower, Amy Snyder Reactor Decommissioning Branch, Decommissioning, ISFSI, and Reactor Health Physics Branch |
| Snyder A | |
| References | |
| Download: ML21180A058 (1) | |
Text
From:
McCarver, Sammy To:
Bower, Fred; Snyder, Amy Cc:
Hussar, Kenneth; Caron, Dana; Rey, Jeremiah; Dimitriadis, Anthony; Ordoyne, Mike; Eck, Tom
Subject:
Pilgrim ISFSI-II Inspection Date:
Thursday, June 17, 2021 12:00:40 PM OnJune17,2021, Region I physical security inspectors completeda security inspection of the ISFSI-II at Pilgrimusing IP 81311, Physical Security Requirements for Independent Spent Fuel Storage Installations. On-site inspection activities were conducted March 1-3, and June 14-17, 2021. The inspection coveredthelicenseesphysical security plan,Revisions 19A and 20,and NRC OrderEA 132,AdditionalSecurityMeasures,datedJuly 23, 2013.
Inspection activities included a review of the access authorization program for the ISFSI-II; verification and assessment of the licensees testing and maintenance program to assure the functionality and reliability of security equipment, verification that a rapid, capable response to safeguards contingency events had been appropriately developed and effectively implemented, conducting interviews with responsible security personnel and plant employees, and performing walk-downs of theISFSI-II.
Based on inspection activities conducted, the regional inspectors concluded Holtec Decommissioning International, LLC (HDI) demonstrated compliance with Order EA-13-132 for Pilgrim ISFSI-II.
More information will be documented in inspection report 07201044/2021401, to be issued within 30 days of todays date.
Sam McCarver, PE Physical Security Inspector NRC Region I Suite 100 2100 Renaissance Blvd King of Prussia, PA 19406 610-337-5382 Sammy.mccarver@nrc.gov