ML21111A077: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:TENNESSEE VALLEY AUTHORITY Sequoyah Nuclear     Post Plant, Office Box2000,Soddy  Daisy,         37384 Tennessee April20,2021 10CFR50.4 ATTN:Document         Control Desk U.S. Nuclear     Regulatory Commission Washington,       D.C.20555-0001 Sequoyah   Nuclear Plant, Units 1and      2 Renewed    Facility Operating     License Nos. DPR-77      andDPR-79 NRCDocket     Nos. 50-327     and 50-328
{{#Wiki_filter:TENNESSEE VALLEY AUTHORITY Sequoyah Nuclear
: Plant, PostOffice Box2000,SoddyDaisy, Tennessee 37384 April 20,2021 10CFR50.4 ATTN:Document Control Desk U.S.Nuclear Regulatory Commission Washington, D.C.
20555-0001 Sequoyah Nuclear
: Plant, Units 1and2 RenewedFacility Operating License Nos.DPR-77andDPR-79 NRCDocket Nos.50-327 and 50-328


==Subject:==
==Subject:==
Response               toNRCRegulatoryIssue           Summary       2021-01, Preparation     and Scheduling     ofOperator     Licensing   Examinations
===Response===
toNRCRegulatoryIssue Summary 2021-01, Preparation and Scheduling ofOperator Licensing Examinations


==References:==
==References:==
1 NRCRegulatory       Issue   Summary   2021-01,   "Preparation     and Scheduling     ofOperator     Licensing Examinations,"     dated    March  24,2021 2.TVAletter     toNRC,"Response         toNRCRegulatory       Issue   Summary2020-01, Preparation   andScheduling       ofOperator   Licensing   Examinations,"     dated May12,2020 TheNuclear       Regulatory Commission's     (NRC)     Regulatory Issue   Summary     (RIS) 2021-01 (Reference     1) requested specific information     regarding Sequoyah     Nuclear   Plant's (SQN) projected   operator   licensing   examination   schedules   andtheestimated       number     ofapplicants.
1 NRCRegulatory Issue Summary 2021-01, "Preparation and Scheduling ofOperator Licensing Examinations,"
Theenclosure       tothisletter  provides theinformation     toaddress     theNRC's    request  and provides anestimate       oftheexamination     requirements     forSQNonNRCForm536,"Operator                 Licensing Examination     Data." Theinformation     provided     inthisenclosure      updates theinformation previously   provided inReference     2.
datedMarch24,2021 2.TVAletter toNRC,"Response toNRCRegulatory Issue Summary2020-01, Preparation andScheduling ofOperator Licensing Examinations,"
There  arenocommitments          contained   inthis   submittal. Should   yourequire     additional   information regarding   this   matter,please   contact Mr.Jeffrey     Sowa, SQNLicensing         Manager     at (423) 843-8129.
dated May12,2020 TheNuclear Regulatory Commission's (NRC)
Sincerely, Marshall, E'sYfgned     byMarshall, Thomas  B.       Po"Jo?o2to+2on:no ThomasMarshall Site Vice  President Sequoyah     Nuclear Plant
Regulatory Issue Summary (RIS) 2021-01 (Reference 1)requested specific information regarding Sequoyah Nuclear Plant's (SQN) projected operator licensing examination schedules andtheestimated number ofapplicants.
Theenclosure tothis letter provides theinformation toaddress theNRC'srequest and provides anestimate oftheexamination requirements forSQNonNRCForm536,"Operator Licensing Examination Data."
Theinformation provided inthis enclosure updates theinformation previously provided inReference 2.
Therearenocommitments contained inthis submittal.
Should yourequire additional information regarding this
: matter, please contact Mr.Jeffrey Sowa,SQNLicensing Manager at (423) 843-8129.
Sincerely, Marshall, E'sYfgned byMarshall, ThomasB.
Po"Jo?o2to+2on:no ThomasMarshall Site VicePresident Sequoyah Nuclear Plant


==Enclosure:==
==Enclosure:==
NRCForm536,       Operator   Licensing   Examination     Data
NRCForm536,Operator Licensing Examination Data


U.S. Nuclear Regulatory Commission Page   2 April 20, 2021 cc(Enclosure)
U.S.
NRC Regional   Administrator Region ATTN:Operations II,          Branch NRC Senior   ResidentInspector-Nuclear Sequoyah    Plant
Nuclear RegulatoryCommission Page 2 April 20, 2021 cc(Enclosure)
NRC Regional Administrator
- Region II, ATTN:Operations Branch NRC Senior ResidentInspector
- Sequoyah Nuclear Plant


ENCLOSURE NRCForm536 OperatorLicensing   Examination Data Tennessee   Valley Authority Sequoyah   Nuclear Plant NRC Docket   Nos.50-327 and50-328
ENCLOSURE NRCForm536 OperatorLicensing Examination Data Tennessee Valley Authority Sequoyah Nuclear Plant NRC Docket Nos.50-327 and50-328


NRC FORM536                    U.S.NUCLEAR REGULATORY  COMMISSIONAPPROVED   BY OMB: NO.3150-0131               EXPIRES: 01/31/2024 (01-2021)                                                           Estimated burden per response      with tocomply  this   information voluntary    collection 45minutes.
NRCFORM536 U.S.NUCLEARREGULATORY COMMISSIONAPPROVED BYOMB:NO.3150-0131 EXPIRES:
request:
01/31/2024 (01-2021)
p       g E
Estimated burden perresponse tocomply with this voluntary information collection request:
s~           )*t 2
45minutes.
OPERATOR        LICENSING This information A10M),
p g
collection regarding comments U.S.
s~ )*tOPERATORLICENSING comments regarding burden estimate totheFOlA,
isused burden Nuclear toplan estimate Regulatory tothe and budgets FOlA, Commission, Library, for resources andInformation DC 20555-0001, Washington, Send examinations.
: Library, andInformation Collections Branch (T-6 This information collection isused toplan budgets andresources for operator examinations.
operator Collections  (T-6 Branch orbye-mail to g n,g        /         EXAMINATION       DATA                                   OMB infocoitects.Resource@nrc.gov, andthe            OMB reviewer at:   Office ofInformation andRegulatory
Send E
            *
2 A10M),
* Affairs, (3150-0131),
U.S.Nuclear Regulatory Commission, Washington, DC 20555-0001, orbye-mail to g
Attn:Desk01ficerthe for  Nuclear    Commission, Regulatory      72517th   NW, Street DC 20503; Washington,     e-mail:oira                 TheNRCmaynot submission@ombsp.gov.           conduct or anda person sponsor,       isnotrequired torespond acollection to,     ofinformation unlessthedocument orrequiring requesting    thecollection displays       OMB acurrently valid control number.
/
FACILITY                                                                                         NRCREGION Sequoyah       Unit      1and Unit 2                                                             Region   II A. PROPOSED                 EXAMINATION       PREPARATION   SCHEDULE PROPOSED     NUMBER               Cy     23             CY 24                       CY 25                     CY 26 ESTIMATED   NUMBEROF LICENSEE-PREPARED                       0                   1                             0                         1 EXAMINATIONS ESTIMATED   NUMBER      OF NRC-PREPARED                         0                 0                             0                         0 EXAMINATIONS B.INITIAL         OPERATOR            LICENSE      EXAMINATIONS PROPOSEDNUMBER                   CY 23               CY 24                     CY 25                       CY 26 NUMBEROFREACTOR                           g OPERATORS                                            [g                             g                       1g NUMBEROFSENIOR              REACTOR OPERATORSINSTANT 0                   6                             0                         5 NUMBER    OFSENIORREACTOR OPERATORSUPGRADE 0                   5                             0                       4 NUMBEROFSENIOR              REACTOR            g                 g                             g                         g OPERATORSLIMITED -
EXAMINATION DATA infocoitects.Resource@nrc.gov, andtheOMBreviewer at:OMBOffice ofInformation andRegulatory
PROPOSED       DATES PRIMARYDATE                       N/A               May2024                         N/A                   May2026 ALTERNATE      DATE              N/A               June 2024                      N/A                   June  2026 NRCFORM536(01-2021)}}
* n,g
: Affairs, (3150-0131),
Attn:
Desk01ficer fortheNuclear Regulatory Commission, 72517th Street NW, Washington, DC20503; e-mail:
oira submission@ombsp.gov.
TheNRCmaynotconduct or
: sponsor, andaperson isnotrequired torespond to,acollection ofinformation unless thedocument requesting orrequiring thecollection displays acurrently valid OMBcontrol number.
FACILITY NRCREGION Sequoyah Unit1and Unit 2 Region II A.PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 23 CY 24 CY 25 CY 26 ESTIMATED NUMBEROF LICENSEE-PREPARED 0
1 0
1 EXAMINATIONS ESTIMATED NUMBEROF NRC-PREPARED 0
0 0
0 EXAMINATIONS B.INITIAL OPERATORLICENSEEXAMINATIONS PROPOSEDNUMBER CY 23 CY 24 CY 25 CY 26 NUMBEROFREACTOR g
[g g
1g OPERATORS NUMBEROFSENIORREACTOR 0
6 0
5 OPERATORS
- INSTANT NUMBEROFSENIORREACTOR 0
5 0
4 OPERATORS
- UPGRADE NUMBEROFSENIORREACTOR g
g g
g OPERATORS
- LIMITED PROPOSED DATES PRIMARYDATE N/A May2024 N/A May2026 ALTERNATEDATE N/A June2024 N/A June2026 NRCFORM536(01-2021)}}

Latest revision as of 09:40, 29 November 2024

Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations
ML21111A077
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/20/2021
From: Marshall T
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS 2021-01
Download: ML21111A077 (4)


Text

TENNESSEE VALLEY AUTHORITY Sequoyah Nuclear

Plant, PostOffice Box2000,SoddyDaisy, Tennessee 37384 April 20,2021 10CFR50.4 ATTN:Document Control Desk U.S.Nuclear Regulatory Commission Washington, D.C.

20555-0001 Sequoyah Nuclear

Plant, Units 1and2 RenewedFacility Operating License Nos.DPR-77andDPR-79 NRCDocket Nos.50-327 and 50-328

Subject:

Response

toNRCRegulatoryIssue Summary 2021-01, Preparation and Scheduling ofOperator Licensing Examinations

References:

1 NRCRegulatory Issue Summary 2021-01, "Preparation and Scheduling ofOperator Licensing Examinations,"

datedMarch24,2021 2.TVAletter toNRC,"Response toNRCRegulatory Issue Summary2020-01, Preparation andScheduling ofOperator Licensing Examinations,"

dated May12,2020 TheNuclear Regulatory Commission's (NRC)

Regulatory Issue Summary (RIS) 2021-01 (Reference 1)requested specific information regarding Sequoyah Nuclear Plant's (SQN) projected operator licensing examination schedules andtheestimated number ofapplicants.

Theenclosure tothis letter provides theinformation toaddress theNRC'srequest and provides anestimate oftheexamination requirements forSQNonNRCForm536,"Operator Licensing Examination Data."

Theinformation provided inthis enclosure updates theinformation previously provided inReference 2.

Therearenocommitments contained inthis submittal.

Should yourequire additional information regarding this

matter, please contact Mr.Jeffrey Sowa,SQNLicensing Manager at (423) 843-8129.

Sincerely, Marshall, E'sYfgned byMarshall, ThomasB.

Po"Jo?o2to+2on:no ThomasMarshall Site VicePresident Sequoyah Nuclear Plant

Enclosure:

NRCForm536,Operator Licensing Examination Data

U.S.

Nuclear RegulatoryCommission Page 2 April 20, 2021 cc(Enclosure)

NRC Regional Administrator

- Region II, ATTN:Operations Branch NRC Senior ResidentInspector

- Sequoyah Nuclear Plant

ENCLOSURE NRCForm536 OperatorLicensing Examination Data Tennessee Valley Authority Sequoyah Nuclear Plant NRC Docket Nos.50-327 and50-328

NRCFORM536 U.S.NUCLEARREGULATORY COMMISSIONAPPROVED BYOMB:NO.3150-0131 EXPIRES:

01/31/2024 (01-2021)

Estimated burden perresponse tocomply with this voluntary information collection request:

45minutes.

p g

s~ )*tOPERATORLICENSING comments regarding burden estimate totheFOlA,

Library, andInformation Collections Branch (T-6 This information collection isused toplan budgets andresources for operator examinations.

Send E

2 A10M),

U.S.Nuclear Regulatory Commission, Washington, DC 20555-0001, orbye-mail to g

/

EXAMINATION DATA infocoitects.Resource@nrc.gov, andtheOMBreviewer at:OMBOffice ofInformation andRegulatory

  • n,g
Affairs, (3150-0131),

Attn:

Desk01ficer fortheNuclear Regulatory Commission, 72517th Street NW, Washington, DC20503; e-mail:

oira submission@ombsp.gov.

TheNRCmaynotconduct or

sponsor, andaperson isnotrequired torespond to,acollection ofinformation unless thedocument requesting orrequiring thecollection displays acurrently valid OMBcontrol number.

FACILITY NRCREGION Sequoyah Unit1and Unit 2 Region II A.PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 23 CY 24 CY 25 CY 26 ESTIMATED NUMBEROF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBEROF NRC-PREPARED 0

0 0

0 EXAMINATIONS B.INITIAL OPERATORLICENSEEXAMINATIONS PROPOSEDNUMBER CY 23 CY 24 CY 25 CY 26 NUMBEROFREACTOR g

[g g

1g OPERATORS NUMBEROFSENIORREACTOR 0

6 0

5 OPERATORS

- INSTANT NUMBEROFSENIORREACTOR 0

5 0

4 OPERATORS

- UPGRADE NUMBEROFSENIORREACTOR g

g g

g OPERATORS

- LIMITED PROPOSED DATES PRIMARYDATE N/A May2024 N/A May2026 ALTERNATEDATE N/A June2024 N/A June2026 NRCFORM536(01-2021)