{{#Wiki_filter: | {{#Wiki_filter:==SUBJECT:== | ||
POINT BEACH NUCLEAR PLANT - INTEGRATED INSPECTION REPORT 05000266/2021003 AND 05000301/2021003 | |||
==Dear Mr. Strope:== | |||
On September 30, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant. On October 5, 2021, the NRC inspectors discussed the results of this inspection with Mr. M. Holzmann, Site Operations Director, and other members of your staff. The results of this inspection are documented in the enclosed report. | |||
One finding of very low safety significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy. | |||
If you contest the violation, or the significance or severity of the violation, documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; and the NRC Resident Inspector at Point Beach Nuclear Plant. | |||
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; and the NRC Resident Inspector at Point Beach Nuclear Plant. | |||
October 20, 2021 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. | |||
Sincerely, Néstor J. Féliz Adorno, Chief Branch 4 Division of Reactor Projects Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27 | |||
===Enclosure:=== | |||
As stated | |||
==Inspection Report== | |||
Docket Numbers: | |||
05000266 and 05000301 | |||
License Numbers: | |||
DPR-24 and DPR-27 | |||
Report Numbers: | |||
05000266/2021003 and 05000301/2021003 | |||
Enterprise Identifier: | |||
I-2021-003-0099 | |||
Licensee: | |||
Nextera Energy Point Beach, LLC | |||
Facility: | |||
Point Beach Nuclear Plant | |||
Location: | |||
Two Rivers, WI | |||
Inspection Dates: | |||
July 01, 2021 to September 30, 2021 | |||
Inspectors: | |||
R. Baker, Senior Operations Engineer | |||
J. Cassidy, Senior Health Physicist | |||
T. Hartman, Senior Resident Inspector | |||
V. Petrella, Resident Inspector | |||
T. Wingfield, Operations Engineer | |||
Approved By: | |||
Néstor J. Féliz Adorno, Chief | |||
Branch 4 | |||
Division of Reactor Projects | |||
=SUMMARY= | |||
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Point Beach Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. | |||
===List of Findings and Violations=== | |||
Inadequate Description of the Amount of Radioactive Material in Shipping Papers Cornerstone Significance Cross-Cutting Aspect Report Section Public Radiation Safety Green NCV 05000266,05000301/2021003-01 Open/Closed | |||
[P.3] - | |||
Resolution 71152 A Self-Revealed Green finding and associated Non-cited Violation (NCV) of 10 CFR 71.5(a)for the failure to provide the correct quantity of radioactive material identified on shipping papers, in accordance with NRC and Department of Transportation requirements. | |||
===Additional Tracking Items=== | |||
None. | |||
=PLANT STATUS= | |||
Unit 1 began the inspection period at rated thermal power. On July 31, 2021, Unit 1 was shut down due to the trip of a main feedwater pump. The unit was restarted on August 1, 2021, and reactor power was raised to approximately 55 percent until the main feedwater pump was repaired. On August 7, 2021, the unit was returned to rated thermal power, and remained at or near full power throughout the remainder of the inspection period. | |||
Unit 2 began the inspection period at rated thermal power. On September 8, 2021, the unit began coastdown for the upcoming refueling outage. The unit was at 86 percent of rated thermal power at the end of the inspection period. | |||
==INSPECTION SCOPES== | |||
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection, unless otherwise noted. Currently approved IPs, with their attached revision histories, are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met, consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. | |||
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the Coronavirus Disease 2019 (COVID-19), resident and regional inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week, increasing the amount of time on site as local COVID-19 conditions permitted. As part of their onsite activities, resident inspectors conducted plant status activities, as described in IMC 2515, Appendix D, observed risk significant activities, and completed on site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all, or a portion, of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP. | |||
==REACTOR SAFETY== | |||
==71111.04 - Equipment Alignment== | |||
===Partial Walkdown Sample (IP Section 03.01) (3 Samples)=== | |||
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains: | |||
: (1) Unit 1 motor-driven auxiliary feedwater pump on August 1, 2021 | |||
: (2) Unit 2 train A emergency diesel generator (G-02) on August 17, 2021 | |||
: (3) Unit 1 train B containment spray on August 26, 2021 | |||
===Complete Walkdown Sample (IP Section 03.02) (1 Sample)=== | |||
: (1) The inspectors evaluated system configurations during a complete walkdown of the Unit 2 safety injection system on July 22, 2021. | |||
==71111.05 - Fire Protection== | |||
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (4 Samples)=== | |||
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas: | |||
(1)fire zones 152, 153, 154, and 155 on August 11, 2021 (2)fire zones 306 and 307 on September 29, 2021 (3)fire zone 308 on September 30, 2021 (4)fire zone 309 on September 30, 2021 | |||
==71111.06 - Flood Protection Measures== | |||
===Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)=== | |||
The inspectors evaluated internal flooding mitigation protections in the: | |||
: (1) circulating water pump and service water pump building | |||
===Cable Degradation (IP Section 03.02) (1 Sample)=== | |||
The inspectors evaluated cable submergence protection in: | |||
: (1) manholes #1 and #2 (Z-65A/B) | |||
==71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance== | |||
===Requalification Examination Results (IP Section 03.03) (1 Sample)=== | |||
: (1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered from August 16, 2021 through September 24, 2021. | |||
==71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance== | |||
===Licensed Operator Requalification Program (IP Section 03.04) (1 Sample)=== | |||
: (1) Biennial Requalification Written Examinations The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered on February 17, 2021. | |||
Annual Requalification Operating Tests The inspectors evaluated the adequacy of the facility licensees annual requalification operating test. | |||
Administration of an Annual Requalification Operating Test The inspectors evaluated the effectiveness of the facility licensee in administering requalification operating tests required by 10 CFR 55.59(a)(2), and that the facility licensee is effectively evaluating their licensed operators for mastery of training objectives. | |||
Requalification Examination Security The inspectors evaluated the ability of the facility licensee to safeguard examination material, such that the examination is not compromised. | |||
Remedial Training and Re-Examinations The inspectors evaluated the effectiveness of remedial training conducted by the licensee, and reviewed the adequacy of re-examinations for licensed operators who did not pass a required requalification examination. | |||
Operator License Conditions The inspectors evaluated the licensees program for ensuring that licensed operators meet the conditions of their licenses. | |||
Control Room Simulator The inspectors evaluated the adequacy of the facility licensees control room simulator in modeling the actual plant, and for meeting the requirements contained in 10 CFR 55.46. | |||
Problem Identification and Resolution The inspectors evaluated the licensees ability to identify and resolve problems associated with licensed operator performance. | |||
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance== | |||
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample) | |||
: (1) The inspectors observed and evaluated licensed operator performance in the Control Room during Unit 1 reactor startup on August 1, 2021. | |||
===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)=== | |||
: (1) The inspectors observed and evaluated annual operator requalification in the simulator on August 24, 2021. | |||
==71111.12 - Maintenance Effectiveness== | |||
===Quality Control (IP Section 03.02) (1 Sample)=== | |||
The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSC remains capable of performing its intended function: | |||
: (1) The inspectors reviewed six work packages covering a variety of maintenance activities to evaluate whether licensee quality control verifications are properly specified, in accordance with the Quality Assurance Program, and are implemented, as specified. | |||
==71111.13 - Maintenance Risk Assessments and Emergent Work Control== | |||
===Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)=== | |||
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed: | |||
(1)emergent work due to Unit 1 plant trip on August 1, 2021 (2)elevated plant risk due to G-01 emergency diesel generator and G-05 gas turbine out of service with severe weather forecasted on August 10, 2021 (3)elevated plant risk due to the Unit 1 turbine trip testing on July 21, 2021 (4)elevated plant risk due to DY-0A, Red 125V DC / 120V AC Alternate Inverter, maintenance on July 20, 2021 (5)elevated plant risk due to the D-305/D-09 swing station battery and charger maintenance and testing on August 31, 2021 | |||
==71111.15 - Operability Determinations and Functionality Assessments== | |||
===Operability Determination or Functionality Assessment (IP Section 03.01) (3 Samples)=== | |||
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments: | |||
: (1) G-02 emergency diesel generator elevated vibrations | |||
: (2) Unit 1 B steam generator feedwater regulator controller failed to operate in auto | |||
: (3) G-02 emergency diesel generator fuel oil transfer pump did not stop as expected | |||
==71111.19 - Post-Maintenance Testing== | |||
===Post-Maintenance Test Sample (IP Section 03.01) (5 Samples)=== | |||
The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality: | |||
: (1) RMP 9036-1, DY-0A Red Channel Instrument Bus Static Inverter Maintenance Procedure, on July 20, 2021 (2)testing of Unit 1 B main feed water pump after the trip on timed overcurrent on August 7, 2021 (3)testing of the G-01 emergency diesel generator after maintenance on August 19, 2021 (4)testing of G-03 lube oil recirculation pump after replacement on August 31, 2021 (5)testing of Unit 2 B residual heat removal pump after maintenance on September 9, 2021 | |||
==71111.22 - Surveillance Testing== | |||
The inspectors evaluated the following surveillance tests: | |||
===Surveillance Tests (other) (IP Section 03.01)=== | |||
{{IP sample|IP=IP 71111.22|count=2}} | |||
(1)1ICP 02.003A, Reactor Protection System Logic Train A 31 Day Surveillance, on July 15, 2021 | |||
: (2) TS 83, Emergency Diesel Generator G-03 Monthly, on July 25, | |||
==RADIATION SAFETY== | |||
==71124.08 - Radioactive Solid Waste Processing & Radioactive Material Handling, Storage,== | |||
& Transportation | |||
===Radioactive Material Storage (IP Section 03.01)=== | |||
{{IP sample|IP=IP 71124.08|count=1}} | |||
: (1) Inspectors evaluated the licensees performance in controlling, labeling, and securing radioactive materials. | |||
===Radioactive Waste System Walkdown (IP Section 03.02) (1 Sample)=== | |||
: (1) Inspectors walked down accessible portions of the solid radioactive waste systems and evaluated system configuration and functionality. | |||
==OTHER ACTIVITIES - BASELINE== | |||
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below: | |||
MS06: Emergency AC Power Systems (IP Section 02.05)=== | |||
{{IP sample|IP=IP 71151|count=2}} | |||
: (1) Unit 1 July 1, 2020 - June 30, 2021 | |||
: (2) Unit 2 July 1, 2020 - June 30, 2021 | |||
===MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)=== | |||
: (1) Unit 1 July 1, 2020 - June 30, 2021 | |||
: (2) Unit 2 July 1, 2020 - June 30, 2021 | |||
===MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)=== | |||
: (1) Unit 1 July 1, 2020 - June 30, 2021 | |||
: (2) Unit 2 July 1, 2020 - June 30, 2021 BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10) (2 Samples) | |||
: (1) Unit 1 October 1, 2020 - June 30, 2021 | |||
: (2) Unit 2 October 1, 2020 - June 30, 2021 | |||
===OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)=== | |||
: (1) October 1, 2020 - June 30, 2021 PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample (IP Section 02.16) (1 Sample) | |||
: (1) October 1, 2020 - June 30, 2021 | |||
==71152 - Problem Identification and Resolution== | |||
===Semiannual Trend Review (IP Section 02.02) (1 Sample)=== | |||
: (1) The inspectors reviewed the licensees corrective action program from December 2020 to May 2021 for potential adverse trends that might be indicative of a more significant safety issue. | |||
===Annual Follow-Up of Selected Issues (IP Section 02.03) (2 Samples)=== | |||
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues: | |||
(1)gap identified on Unit 1 electrical equipment room fire barrier (2)transportation of radioactive materials | |||
===71153 - Follow-Up of Events and Notices of Enforcement Discretion Event Follow-Up (IP Section 03.01)=== | |||
{{IP sample|IP=IP 71153|count=1}} | |||
: (1) The inspectors evaluated a plant trip as a result of a loss of main feedwater pump and the licensees response on July 31, | |||
==INSPECTION RESULTS== | |||
Inadequate Description of the Amount of Radioactive Material in Shipping Papers Cornerstone Significance Cross-Cutting Aspect Report Section Public Radiation Safety Green NCV 05000266,05000301/2021003-01 Open/Closed | |||
[P.3] - | |||
Resolution 71152 A self-revealed Green finding and associated Non-cited Violation (NCV) of 10 CFR 71.5(a) for the failure to provide the correct quantity of radioactive material identified on shipping papers, in accordance with NRC and Department of Transportation requirements. | |||
=====Description:===== | |||
On December 8, 2020, Radiation Protection personnel performed radiological surveys of spent resin liner number 678141-2 using Work Plan 160A Resin Liner Survey and Liner to Shipping Cask, Revision 3, dated December 5, 2020. The results from this survey were used to calculate the quantity of radioactivity contained in the liner. The licensee transferred the calculated quantity of radioactivity in the liner to the NRC Form 540 Uniform Low-Level Radioactive Waste Manifest, which becomes a key attribute of the shipping papers when the liner was shipped to a vendor for waste processing on January 14, 2021. The inspectors observed that Radiation Protection Work Plan 160A Resin Liner Survey and Liner to Shipping Cask, Revision 3, dated December 5, 2020, had been developed in response to lessons learned from radioactive waste shipment 19-037 and to include corrective actions from CR 02360869, Preliminary White Finding Related to Radwaste Shipment. | |||
On January 15, 2021, the vendor received the shipment and moved the liner to a shielded location for short term storage before processing. In April 2021, the waste processing vendor removed the liner from storage, performed a radiological survey, and identified significantly higher dose rates on the liner (and consequently higher activity of radioactive material within the liner) than had been reported by the licensee. | |||
After an evaluation to reconcile the differences, the licensee determined that its staff had under-reported the activity in the liner. On April 21, 2021, the licensee revised the shipping papers, including the total package activity, and transmitted updated documents to the waste processor. In this case, the licensee determined the liner contained a revised total package activity of 1.07E+07 MBq (or 2.90E+05 mCi). This was 2.5 times the radioactive material reported at the time of the shipment (4.21E+06 MBq (or 1.14E+05 mCi)). | |||
The licensee determined the direct cause of this error was RP Workplan 160A, Resin Liner Survey and Liner to Shipping Cask, did not require an adequate amount of survey points. | |||
Corrective Actions: The corrected shipping papers, with the increased total package activity, were sent to waste processor. Additionally, the licensee revised RP workplan 160A, Resin Liner Survey and Liner to Shipping Cask, to require additional survey points. | |||
Corrective Action References: AR 02389967 | |||
=====Performance Assessment:===== | |||
Performance Deficiency: The licensee did not adequately describe hazardous material in shipping papers as required by regulatory requirements. | |||
On January 14, 2021, the licensee shipped radioactive waste (Shipment 21-001) to a radioactive waste processing facility. The shipment documentation listed a radioactive content of 4.21E+06 MBq. After arriving at the facility, the waste processor identified that the radioactive content was incorrect. Subsequently, the licensee performed an evaluation and revised the shipment documentation to state a radioactive content of 1.07E+07 MBq, which was 254 percent of the radioactive material that was reported at the time of the shipment. | |||
Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Program & Process attribute of the Public Radiation Safety cornerstone, and adversely affected the cornerstone objective to ensure adequate protection of public health and safety from exposure to radioactive materials released into the public domain, as a result of routine civilian nuclear reactor operation. Specifically, the licensee provided shipping papers for radioactive material that contained an error that exceeded 20 percent of the activity of the material (Example 6.l of Inspection Manual 0612, Appendix E). | |||
Significance: The inspectors assessed the significance of the finding using Appendix D, Public Radiation Safety SDP. The inspectors evaluated the finding by applying the radioactive material control branch of the SDP (i.e., transportation or Part 61) and determined that the finding was of very low safety significance (i.e., Green) because: | |||
: (1) package radiation limits were not exceeded, | |||
: (2) there was not a breach of package during transit, (3)there was not a certificate of compliance concern, | |||
: (4) there was not a low level burial ground nonconformance, and | |||
: (5) there was no failure to make notifications or provide emergency response information. | |||
Cross-Cutting Aspect: P.3 - Resolution: The organization takes effective corrective actions to address issues in a timely manner commensurate with their safety significance. | |||
Specifically, the licensee determined the direct cause of this error was RP Workplan 160A, Resin Liner Survey and Liner to Shipping Cask, did not require an adequate amount of survey points. The number and location of survey points described in Workplan 160A had been revised to incorporate lessons learned from radioactive waste shipment 19-037, and to institutionalize some of the corrective actions from CR 02360869, Preliminary White Finding Related to Radwaste Shipment. The revision standardized the survey process for shipments to a reduced number of survey points. Consequently, the corrective action(s) to address potentially unreliable data for use in package characterization and shipment preparation was not effective. | |||
=====Enforcement:===== | |||
Violation: 10 CFR 71.5(a) states that each licensee who transports licensed material outside the site of usage, as specified in the NRC license, or where transport is on public highways, or who delivers licensed material to a carrier for transport, shall comply with the applicable requirements of the DOT regulations in 49 CFR parts 107, 171 through 180, and 390 through 397, appropriate to the mode of transport. | |||
49 CFR 172.200(a) states, with exceptions not applicable here, that each person who offers a hazardous material for transportation shall describe the hazardous material on the shipping paper, in the manner required by subpart C of 49 CFR Part 172. | |||
Pursuant to 49 CFR 172.101, radioactive material is classified as hazardous material. | |||
49 CFR 172.203(d)(3) states, in part, the description for a shipment of a Class 7 (radioactive)material must include the following additional entries as appropriate: the maximum activity of the radioactive contents contained in each package during transport in terms of the appropriate SI units (e.g., Becquerels (Bq), Terabecquerels (TBq)). | |||
Contrary to the above, on January 14, 2021, the licensee delivered licensed material to a carrier for transport, and the description on the shipping paper that accompanied the shipment did not include the correct maximum activity of the radioactive contents. | |||
Specifically, the shipment paper stated a maximum activity of 4.21E+06 MBq. Upon subsequent evaluation, the licensee determined the activity to be 1.07E+07 MBq. | |||
Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy. | |||
Observation: Review of Selected Transportation of Radioactive Materials Issues 71152 In 2019, the licensee offered for transport a radioactive material package, containing spent resin, as Low Specific Activity - II (LSA-II) that did not meet the radiation level limits specified in 49 CFR 173.427 for shipping as LSA. Specifically, licensee staff did not recognize that measured radiation levels were in excess of 10 mSv/ hour (1 Rem/hour) at 3 meters from the unshielded package, exceeding the conditions of transport for LSA material. This shipment is also known as Radwaste Shipment 19-037. (In NRC Inspection Report Nos. | |||
05000266/2020090 and 05000301/2020090, the NRC documented a Green finding and the associated non-cited violations for the noncompliances for the shipment.) | |||
The inspectors reviewed Root Cause Evaluation - AR 02360869, Radwaste Shipping Error Results in Preliminary White Finding, to ensure that the licensee implemented corrective actions, commensurate with the significance of the identified issues. Additionally, the inspectors reviewed AR 02389967, Radiological Survey Differences Identified, that was evaluated for another shipment of spent resin performed in January 2021. | |||
In response to the 2019 shipping issue, the licensee determined that, Radwaste Shipment 19-037 was assigned the incorrect shipping name and therefore did not have the proper Emergency Response Guide included in the shipping documents which resulted in non-compliance with site and regulatory shipping requirements. As corrective actions, the licensee: | |||
Revised radwaste shipping checklist RP-AA-108-1002-F06, and applicable similar checklists, to include documented validation of critical parameters when determining proper shipping names and emergency response guide; | |||
Incorporated a management oversight risk matrix within its procedure to drive observation and oversight of key risk-sensitive elements of the shipping process; | |||
Revised radwaste shipping program documents to require development of an annual projected high or elevated risk radwaste shipment schedule and include a method for periodic review and oversight of the schedule; and | |||
Revised applicable shipping and survey procedures to include the option for use of RADMAN calculated 3-meter dose rates vs. measured 3-meter dose rates, and to include cautions/warnings for use of measured 3-meter values, use of the RADMAN override feature, and the potential impact on Proper Shipping Name/Emergency Response Guide. | |||
The inspectors found that the licensee had completed its implementation of the corrective actions identified. | |||
The inspectors observed that the licensees revisions to its survey procedure (RP Workplan 160A) provided additional uniformity (i.e., distances and locations) to the radiation measurements performed on a package prepared for transport. The inspectors observed that the procedure also reduced the number of measurements routinely taken on a package, which appeared to be based on a package having a reasonably homogeneous mixture of radioactivity throughout the package and having consistent radiation levels from the package. | |||
Reviewing the 2019 shipment survey, the inspectors observed that there were notable gradients of radioactivity within the package, as indicated by the range of radiation levels measured by the licensee. At the time of the shipment, the licensee did not appear to recognize the gradients, and calculated the shipment contents with a computer model that relied on a reasonably homogeneous mixture. In addition, the inspectors noted that the licensees revised survey process did not accurately characterize the radioactivity in the 2021 shipment, providing additional indication that the licensees bases (homogeneous distribution of radioactivity) may not be technically sound. | |||
The inspectors observed that the licensees problem statement may have limited the licensees evaluation and corrective actions, resulting in missing some of the underlying causes. As discussed above, the licensees evaluation did not appear to fully recognize some issues with its survey methods and waste characterizations, which were discussed in NRC Inspection Report Nos. 05000266/2020090 and 05000301/2020090. In the report, the NRC documented that, The NRC staff observed that the material appeared to have some gradients in the radionuclide distribution (radiation levels were not fully uniform across the container), which may have impacted the licensees calculations. The inspectors determined that these shortcomings contributed to the non-cited violation documented above. The licensee was evaluating additional corrective actions to address the radiological survey issues. | |||
Observation: Semi Annual Trend Review 71152 The inspectors reviewed action requests entered into the corrective action program for the following: | |||
complete, accurate, and timely documentation of the issue identified in the corrective action program | |||
evaluation and timely disposition of operability and reportability issues | |||
consideration of extent of condition and cause, generic implications, common cause, and previous occurrences | |||
classification and prioritization of the problems resolution, commensurate with the safety significance | |||
identification of corrective actions that are appropriately focused to correct the problem | |||
completion of corrective actions in a timely manner, commensurate with the safety significance of the issue | |||
identification of negative trends associated with human or equipment performance that can potentially impact nuclear safety | |||
operating experience is adequately evaluated for applicability, and applicable lessons learned are communicated to appropriate organizations, and implemented The inspectors completed the review and did not note any significant trends that weren't already identified and addressed by the licensee. | |||
==EXIT MEETINGS AND DEBRIEFS== | |||
The inspectors verified no proprietary information was retained or documented in this report. | |||
On October 5, 2021, the inspectors presented the integrated inspection results to Mr. M. Holzmann, Site Operations Director, and other members of the licensee staff. | |||
On August 19, 2021, the inspectors presented the radiation protection inspection results to Mr. M. Strope, Site Vice President, and other members of the licensee staff. | |||
On September 2, 2021, the inspectors presented the Biennial Licensed Operator Requalification Program inspection results to Mr. M. Strope, Site Vice President, and other members of the licensee staff. | |||
On September 29, 2021, the inspectors presented the Biennial Licensed Operator Requalification Program Annual Operating Test Results inspection results to Mr. A. Moore, Operations Training Supervisor, and other members of the licensee staff. | |||
=DOCUMENTS REVIEWED= | |||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
Corrective Action | |||
Documents | |||
Resulting from | |||
Inspection | |||
AR 02400605 | |||
Update ISO DWG to Depict Gravity Supports as Restraints | |||
08/09/2021 | |||
110E017 Sheet 2 | |||
Safety Injection System | |||
110E017 Sheet 3 | |||
Safety Injection System | |||
110E035 Sheet 1 | |||
P&ID Safety Injection System | |||
110E035 Sheet 2 | |||
P&ID Safety Injection System | |||
M-202 Sh. 2 | |||
P&ID Feedwater System | |||
M-202 Sh. 3 | |||
P&ID Feedwater System | |||
M-209 Sh. 12 | |||
P&ID Em. Diesel Air Starting Sys. | |||
M-219 Sh. 1 | |||
P&ID Fuel Oil System | |||
M-219 Sh. 2 | |||
P&ID Fuel Oil System - Diesel Generator Building | |||
P-202 | |||
Suction from RWST to SI, CS, RHR Pumps | |||
P-219 | |||
Safety Injection Pump Discharge to Injection | |||
SI-1501R-1 and SI-1501R-3 | |||
Drawings | |||
P-220 | |||
Safety Injection Pump Discharge to Injection Line | |||
SI-1501R-1 and SI-1501R-2 | |||
CL 10D | |||
Fuel Oil Systems | |||
71111.04 | |||
Miscellaneous | |||
CL 11A G-02 | |||
G-02 Diesel Generator Checklist | |||
Corrective Action | |||
Documents | |||
Resulting from | |||
Inspection | |||
AR 2400835 | |||
Plant Housekeeping Issues Identified by NRC | |||
08/11/2021 | |||
PFP-0-CB | |||
Pre-Fire Plan Control Building - Elev 8 ft, 26 ft, 44 ft and 66 | |||
ft | |||
71111.05 | |||
Fire Plans | |||
PFP-0-PAB-8 | |||
Pre-Fire Plan Primary Auxiliary Building Elevations 8' and | |||
Below | |||
2009-0008 | |||
Circulating Water Pump House Internal/External Flooding | |||
Calculations | |||
2014-0007 | |||
Allowable Flood Levels | |||
& 4 | |||
Procedures | |||
NP 8.4.17 | |||
PBNP Flooding Program | |||
34, 35, & 36 | |||
71111.06 | |||
Work Orders | |||
WO 40753341-01 | |||
P-290A, Annual Service / Maintenance | |||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
WO 40753342-01 | |||
P-290B, Annual Service / Maintenance | |||
WO 40756075-01 | |||
Manhole: Electrical Inspections (Yearly - Fall) | |||
71111.11A | |||
Miscellaneous | |||
Requalification | |||
Program Annual | |||
Testing Summary | |||
Results | |||
Licensed Operator Annual Examination Performance | |||
Records for 2021 | |||
09/27/2021 | |||
AR 1911813 | |||
Procedure Variance for AOP-9A (Service Water System | |||
Malfunction) | |||
10/13/2013 | |||
AR 2302377 | |||
EC 292423 Unit 1 Cycle 39 Core Reload Modification | |||
2/18/2019 | |||
AR 2368376 | |||
EC 294656 Unit 1 Cycle 40 Core Reload Modification | |||
09/15/2020 | |||
AR 2373582 | |||
Simulator - U1C40 Core Test Acceptance Criterion Not Met | |||
10/28/2020 | |||
AR 2382181 | |||
Crew Failure During NRC Operational Exam | |||
01/27/2021 | |||
AR 2385859 | |||
NRC Biennial Written Exam Security Issue | |||
03/03/2021 | |||
AR 2388219 | |||
License Termination Letter Not Sent to NRC within 30 Day | |||
Requirement | |||
03/29/2021 | |||
Corrective Action | |||
Documents | |||
AR 2389305 | |||
21Biennial Written Exam Performance | |||
04/08/2021 | |||
Post Event | |||
Testing | |||
Unit 1 Small RCS Leak in Containment Building - Validate | |||
1Re-211 Simulator Response | |||
05/21/2020 | |||
Scenario Based | |||
Testing (SBT) | |||
Checklist | |||
SBT Package for PNB LOC 000 043E Simulator Exercise | |||
Guide (SEG) Rev 5 | |||
06/19/2021 | |||
Scenario Based | |||
Testing Checklist | |||
SBT Package for PNB LOC 000 003E SEG Rev 6 | |||
06/19/2021 | |||
Simulator | |||
Certification Test | |||
6.2.1 | |||
100% Power Steady State Performance Test U1C40 | |||
05/23/2021 | |||
Simulator | |||
Certification Test | |||
6.2.2 | |||
75% Power Steady State Performance Test U1C40 | |||
05/23/2021 | |||
Simulator | |||
Certification Test | |||
6.2.3 | |||
28% Power Steady State Performance Test U1C40 | |||
05/23/2021 | |||
71111.11B | |||
Engineering | |||
Evaluations | |||
Simulator | |||
Certification Test | |||
PORV Open without High Head Safety Injection U1C39/40 | |||
05/15/2021 | |||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
6.5.10 | |||
Simulator | |||
Certification Test | |||
6.5.2 | |||
Simultaneous Trip of Both Main Feed-Water Pumps | |||
U1C39/40 | |||
04/24/2021 | |||
Simulator | |||
Certification Test | |||
6.5.5 | |||
Trip of a Single Reactor Coolant Pump U1C39/40 | |||
05/15/2021 | |||
Simulator | |||
Certification Test | |||
6.5.8 | |||
Loss of Coolant Accident (LOCA) with Loss of Offsite Power | |||
U1C39/40 | |||
05/15/2021 | |||
20 Give 2 | |||
EXAM RO | |||
RO Written Examination | |||
2/17/2021 | |||
20 Give 2 | |||
EXAM SRO | |||
SRO Written Examination | |||
2/17/2021 | |||
Attendance | |||
Records | |||
Licensed Operator Continuous Training Attendance Records | |||
(Various) | |||
2019-2020 | |||
License | |||
Reactivation | |||
Records | |||
License Reactivation Records for 4 Individuals - 04/24/2020 | |||
- 07/21/2020 | |||
08/31/2021 | |||
Medical Records | |||
Licensed Operator Medical Records for 11 Operators | |||
09/01/2021 | |||
PBN JPM | |||
P000.008a.COT | |||
Job Performance Measure | |||
PBN JPM | |||
P000.020a.AOT | |||
Job Performance Measure | |||
PBN JPM | |||
P000.033b.COT | |||
Job Performance Measure | |||
PBN JPM | |||
P000.037.COT | |||
Job Performance Measure | |||
PBN JPM | |||
P000.047b.AOT | |||
Job Performance Measure | |||
PBN JPM | |||
P000.047c.AOT | |||
Job Performance Measure | |||
Miscellaneous | |||
PBN JPM | |||
P002.005c.COT | |||
Job Performance Measure | |||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
PBN JPM | |||
P004.013a.COT | |||
Job Performance Measure | |||
PBN JPM | |||
P004.026.AOT | |||
Job Performance Measure | |||
PBN JPM | |||
P078.006.AOT | |||
Job Performance Measure | |||
PBN SEG LOC | |||
000 003E | |||
Simulator Dynamic Scenario | |||
PBN SEG LOC | |||
000 026E | |||
Simulator Dynamic Scenario | |||
PBN SEG LOC | |||
000 043E | |||
Simulator Dynamic Scenario | |||
PBN SEG LOC | |||
000 068E | |||
Simulator Dynamic Scenario | |||
Remediation | |||
Records | |||
20 Annual Operating Test Failure Remediation Packages | |||
for 3 Individuals | |||
09/01/2021 | |||
Remediation | |||
Records | |||
20 Biennial Written Exam Failures Remediation Packages | |||
for 7 Individuals | |||
09/01/2021 | |||
Simulator Review | |||
Committee (SRC) | |||
Meeting Minutes | |||
SRC Meeting Minutes from January 2021 | |||
01/24/2021 | |||
Simulator Review | |||
Committee (SRC) | |||
Meeting Minutes | |||
SRC Meeting Minutes from June 2021 | |||
06/10/2021 | |||
Simulator Work | |||
Request (SWR) | |||
Listing | |||
List of all Open SWR Items | |||
08/30/2021 | |||
SWR Listing | |||
List of all SWR Items Closed Since Previous Biennial | |||
Requal Inspection | |||
08/30/2021 | |||
Watch Proficiency | |||
Records | |||
eSOMS Credit for Standing Watch 04/01/2021 to | |||
06/28/2021 Reports | |||
08/31/2021 | |||
Desktop Guide | |||
94.0 | |||
Simulator Health Management | |||
Procedures | |||
Desktop Guide | |||
Simulator Work Requests | |||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
94.3 | |||
FL-LOCT-TPD | |||
Licensed Operator Continuing Training Program Description | |||
OP-AA-100-1001 | |||
License Maintenance and Activation | |||
TR-AA-220-1002 | |||
NRC Licensed Operator Exam Security | |||
TR-AA-220-1004 | |||
Licensed Operator Continuing Training Annual Operating | |||
and Biennial Written Exams | |||
TR-AA-221-1000 | |||
Simulator Change Control | |||
TR-AA-230-1007 | |||
Conduct of Simulator Training and Evaluation | |||
TR-AA-230-1007- | |||
F01 | |||
Crew Simulator Evaluation Forms for 2021 Annual | |||
Operating Test - Crew A | |||
TR-AA-230-1007- | |||
F02 | |||
Individual Simulator Evaluation Forms for 2021 Annual | |||
Operating Test - Crew A-All Operators | |||
TR-AA-230-1008 | |||
Simulator Scenario Based Testing and Validation | |||
Simulator Work | |||
Request 2291459 | |||
EC 291769 Fire Detection Upgrade - Phase II | |||
11/20/2018 | |||
Simulator Work | |||
Request 2329323 | |||
Xenon Response During Rapid Load Reduction | |||
09/26/2019 | |||
Work Orders | |||
Simulator Work | |||
Request 2398451 | |||
Add PPCS Failure Malfunctions | |||
07/14/2021 | |||
Miscellaneous | |||
PBN LOC 000 | |||
069E | |||
NRC Annual Operating Exam | |||
OP 1B | |||
Reactor Startup | |||
71111.11Q | |||
Procedures | |||
OP 1B Appendix | |||
A | |||
Estimated Critical Position Calculation | |||
NP 11.1.14 | |||
Inspection Planning | |||
Procedures | |||
NP 11.1.15 | |||
Quality Control Inspections | |||
WO 40178723 11 | |||
G-01-FTS-H/L//Numerous Fuel Oil XTFR Alarms G-01 | |||
08/21/2021 | |||
WO 40720934 10 | |||
U2 RPI/EC-294454 - RPI Replacement | |||
09/09/2021 | |||
WO 40722095 01 | |||
F-222/G-02 SW Inlet Duplex Strainer Not to be Cleaned | |||
09/14/2021 | |||
WO 40739986 02 | |||
2-62/YIC-926B-T, Bench Calibrate Replacement Relay | |||
09/17/2021 | |||
WO 40760281 05 | |||
PI-3719, P-35A Disch. Press. Indicating Low | |||
09/16/2021 | |||
71111.12 | |||
Work Orders | |||
WO 40765372 01 | |||
2P-2A-Z/Cooling Fan Replacement | |||
09/03/2021 | |||
71111.13 | |||
Miscellaneous | |||
Point Beach Elevated Risk Focus Activities for the Turbine | |||
07/21/2021 | |||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
Trip Test Unit 1 Quarterly | |||
PBN Unit 1 and 2 Current Risk Summary Report | |||
08/10/2021 | |||
T-0 Execution Schedule, by Early Start | |||
08/09/2021 | |||
Point Beach Elevated Risk Focus Activities for the | |||
DY-0A Red 125V DC / 120V AC Inverter Maintenance | |||
07/20/2021 | |||
Point Beach Work Activity High Risk List for the D-305/D-09 | |||
Station Battery / Charger Maintenance and Service Test | |||
08/31/2021 | |||
T-0 Execution Schedule, by Early Start | |||
08/01/2021 | |||
Procedures | |||
AOP-13C | |||
Severe Weather Conditions | |||
Work Orders | |||
WO 40730660 01 | |||
TS-3A, Unit 1 Turbine Trip Test | |||
07/21/2021 | |||
AR 02394000 | |||
1CS-476 Failed to Operate in Auto | |||
05/22/2021 | |||
AR 2404583 | |||
G-02 Fuel Oil Transfer Pump Would Not Shut Off Manually | |||
09/19/2021 | |||
Corrective Action | |||
Documents | |||
AR 3404006 | |||
Elevated Vibrations on G-02 EDG During TS 82 | |||
09/13/2021 | |||
883D195 Sheet | |||
Logic Diagram Feedwater Control and Isolation | |||
71111.15 | |||
Drawings | |||
M-202 Sheet 2 | |||
Feedwater System | |||
AR 02400516 | |||
1CS-2187 Suction Relief Valve was Noted to be Dripping | |||
08/07/2021 | |||
Corrective Action | |||
Documents | |||
Resulting from | |||
Inspection | |||
AR 02402759 | |||
DGB Door 107 Not Self Latching | |||
08/31/2021 | |||
Miscellaneous | |||
1P-28B Steam Generator Feed Pump and Motor Monitoring | |||
Plan | |||
OI 169 | |||
Steam Generator Feed Pumps Isolation and Restoration | |||
Mode 1, 2, or 3 Unit 1 | |||
Procedures | |||
OP 1C | |||
Startup to Power Operation Unit 1 | |||
WO 40738003 09 | |||
DY-0A, Maintain and Inspect Inverter | |||
07/20/2021 | |||
WO 40779246 01 | |||
IT 04 Train B Low Head Safety Injection Pumps and Valves | |||
Train B Unit 2 | |||
09/10/2021 | |||
WO 40787760 18 | |||
1P-28B (MFP) Trip on Timed Overcurrent | |||
08/10/2021 | |||
WO 40788643 | |||
TS-81, G-01 Emergency Diesel Generator Operability Test | |||
08/22/2021 | |||
71111.19 | |||
Work Orders | |||
WO 40789102 01 | |||
P-215A G-03 Lube Oil Recirc Pump Noisy | |||
08/31/2021 | |||
71111.22 | |||
Procedures | |||
1ICP 02.003A | |||
Reactor Protection System Logic Train A 31 Day | |||
Surveillance | |||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
Work Orders | |||
WO 40744625 01 | |||
TS-83, G-03 Emergency Diesel Generator Operability | |||
07/25/2021 | |||
Corrective Action | |||
Documents | |||
Resulting from | |||
Inspection | |||
AR 02401599 | |||
Source Leak Check Certificate Mismatch | |||
08/19/2021 | |||
LMS ID NUCRPT | |||
1030 | |||
Lesson Title - 10CFR37 Cat 1 & 2 Material | |||
RP-AA-107-1004- | |||
F02 | |||
Source Leak Test and Inventory | |||
08/12/2021 | |||
Miscellaneous | |||
TRM 3.7.4 | |||
Sealed Radioactive Sources | |||
PCP | |||
Process Control Program | |||
71124.08 | |||
Procedures | |||
RP-AA-107-1004 | |||
Procedure for Radioactive Source Controls and Leak | |||
Testing | |||
MSPI Derivation Reports; High Pressure Injection, | |||
Emergency AC, Cooling Water; Unavailability Index; | |||
Units 1 and 2 | |||
07/01/2020 - | |||
06/30/2021 | |||
MSPI Derivation Reports; High Pressure Injection, | |||
Emergency AC, Cooling Water; Unreliability Index; | |||
Units 1 and 2 | |||
07/01/2020 - | |||
06/30/2021 | |||
MSPI Margin Reports; Units 1 and 2 | |||
07/01/2020 - | |||
06/30/2021 | |||
NP 5.2.16 - | |||
Occupational | |||
Exposure | |||
Effectiveness | |||
B; PI Data Calculation, Review and Approval | |||
October | |||
20 - June | |||
21 | |||
NP 5.2.16 - | |||
ODCM | |||
Radioactive | |||
Effluents | |||
Effectiveness | |||
B; PI Data Calculation, Review and Approval | |||
October | |||
20 - June | |||
21 | |||
Miscellaneous | |||
NP 5.2.16 - RCS | |||
Activity Fuel | |||
Performance | |||
B; PI Data Calculation, Review and Approval | |||
October | |||
20 - June | |||
21 | |||
71151 | |||
Procedures | |||
CAMP 044 | |||
Fuel Integrity Monitoring | |||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
CAMP 410 | |||
Determination of Radioactive Iodine and Iodine 131 | |||
Equivalents in Reactor Coolant | |||
PBN-BFJR-18- | |||
054 | |||
MSPI Basis Document for PBNP | |||
AR 02360869 | |||
Preliminary White Finding Related to Radwaste Shipment | |||
01/13/2021 | |||
Corrective Action | |||
Documents | |||
AR 02389967 | |||
Radiological Survey Differences Identified | |||
04/14/2021 | |||
AR 02401505 | |||
Procedure Change Request to Revise RP-AA-108-1003 | |||
"Radioactive Materials Surveys for Shipment" to add | |||
LSA/SCO Dose Rate Limits for Unshielded Material at | |||
3-meters. | |||
08/18/2021 | |||
AR 02401602 | |||
Highest Contact Reading Discrepancy Identified | |||
08/19/2021 | |||
AR 02401619 | |||
Weight Discrepancy on Shipment 18-058 | |||
08/19/2021 | |||
Corrective Action | |||
Documents | |||
Resulting from | |||
Inspection | |||
AR 2395628 | |||
Small Gap Identified Between FZs 245 and 322 | |||
06/10/2021 | |||
Miscellaneous | |||
Trend ARs 12-01-2020 thru 05-31-2021 | |||
06/09/2021 | |||
RP-AA-108-1002 | |||
Shipment of Radioactive Material | |||
Procedures | |||
RP-AA-108-1003 | |||
Radioactive Materials Surveys for Shipment | |||
E-RS 210406-08 | |||
Container No 678141-2 Incoming Survey | |||
04/06/2021 | |||
Radiation | |||
Surveys | |||
E-RS 210407-06 | |||
Container No 678141-2 Incoming Liner | |||
04/08/2021 | |||
Shipment 21-001 | |||
Primary Resin | |||
01/14/2021 | |||
71152 | |||
Shipping Records | |||
Shipment 21-001 | |||
(Revised) | |||
Primary Resin | |||
04/21/2021 | |||
71153 | |||
Corrective Action | |||
Documents | |||
AR 2399946 | |||
Unit 1 Reactor Trip due to 1P-28B MFP Trip | |||
08/01/2021 | |||
}} | }} | ||
Latest revision as of 21:29, 27 November 2024
| ML21292A276 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 10/20/2021 |
| From: | Nestor Feliz-Adorno Reactor Projects Region 3 Branch 4 |
| To: | Strope M Point Beach |
| References | |
| IR 2021003 | |
| Download: ML21292A276 (24) | |
Text
SUBJECT:
POINT BEACH NUCLEAR PLANT - INTEGRATED INSPECTION REPORT 05000266/2021003 AND 05000301/2021003
Dear Mr. Strope:
On September 30, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant. On October 5, 2021, the NRC inspectors discussed the results of this inspection with Mr. M. Holzmann, Site Operations Director, and other members of your staff. The results of this inspection are documented in the enclosed report.
One finding of very low safety significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.
If you contest the violation, or the significance or severity of the violation, documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; and the NRC Resident Inspector at Point Beach Nuclear Plant.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; and the NRC Resident Inspector at Point Beach Nuclear Plant.
October 20, 2021 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Néstor J. Féliz Adorno, Chief Branch 4 Division of Reactor Projects Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000266 and 05000301
License Numbers:
Report Numbers:
05000266/2021003 and 05000301/2021003
Enterprise Identifier:
I-2021-003-0099
Licensee:
Nextera Energy Point Beach, LLC
Facility:
Point Beach Nuclear Plant
Location:
Two Rivers, WI
Inspection Dates:
July 01, 2021 to September 30, 2021
Inspectors:
R. Baker, Senior Operations Engineer
J. Cassidy, Senior Health Physicist
T. Hartman, Senior Resident Inspector
V. Petrella, Resident Inspector
T. Wingfield, Operations Engineer
Approved By:
Néstor J. Féliz Adorno, Chief
Branch 4
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Point Beach Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
Inadequate Description of the Amount of Radioactive Material in Shipping Papers Cornerstone Significance Cross-Cutting Aspect Report Section Public Radiation Safety Green NCV 05000266,05000301/2021003-01 Open/Closed
[P.3] -
Resolution 71152 A Self-Revealed Green finding and associated Non-cited Violation (NCV) of 10 CFR 71.5(a)for the failure to provide the correct quantity of radioactive material identified on shipping papers, in accordance with NRC and Department of Transportation requirements.
Additional Tracking Items
None.
PLANT STATUS
Unit 1 began the inspection period at rated thermal power. On July 31, 2021, Unit 1 was shut down due to the trip of a main feedwater pump. The unit was restarted on August 1, 2021, and reactor power was raised to approximately 55 percent until the main feedwater pump was repaired. On August 7, 2021, the unit was returned to rated thermal power, and remained at or near full power throughout the remainder of the inspection period.
Unit 2 began the inspection period at rated thermal power. On September 8, 2021, the unit began coastdown for the upcoming refueling outage. The unit was at 86 percent of rated thermal power at the end of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection, unless otherwise noted. Currently approved IPs, with their attached revision histories, are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met, consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the Coronavirus Disease 2019 (COVID-19), resident and regional inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week, increasing the amount of time on site as local COVID-19 conditions permitted. As part of their onsite activities, resident inspectors conducted plant status activities, as described in IMC 2515, Appendix D, observed risk significant activities, and completed on site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all, or a portion, of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.
REACTOR SAFETY
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (3 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 1 motor-driven auxiliary feedwater pump on August 1, 2021
- (2) Unit 2 train A emergency diesel generator (G-02) on August 17, 2021
- (3) Unit 1 train B containment spray on August 26, 2021
Complete Walkdown Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated system configurations during a complete walkdown of the Unit 2 safety injection system on July 22, 2021.
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
(1)fire zones 152, 153, 154, and 155 on August 11, 2021 (2)fire zones 306 and 307 on September 29, 2021 (3)fire zone 308 on September 30, 2021 (4)fire zone 309 on September 30, 2021
71111.06 - Flood Protection Measures
Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)
The inspectors evaluated internal flooding mitigation protections in the:
- (1) circulating water pump and service water pump building
Cable Degradation (IP Section 03.02) (1 Sample)
The inspectors evaluated cable submergence protection in:
- (1) manholes #1 and #2 (Z-65A/B)
71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance
Requalification Examination Results (IP Section 03.03) (1 Sample)
- (1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered from August 16, 2021 through September 24, 2021.
71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Requalification Program (IP Section 03.04) (1 Sample)
- (1) Biennial Requalification Written Examinations The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered on February 17, 2021.
Annual Requalification Operating Tests The inspectors evaluated the adequacy of the facility licensees annual requalification operating test.
Administration of an Annual Requalification Operating Test The inspectors evaluated the effectiveness of the facility licensee in administering requalification operating tests required by 10 CFR 55.59(a)(2), and that the facility licensee is effectively evaluating their licensed operators for mastery of training objectives.
Requalification Examination Security The inspectors evaluated the ability of the facility licensee to safeguard examination material, such that the examination is not compromised.
Remedial Training and Re-Examinations The inspectors evaluated the effectiveness of remedial training conducted by the licensee, and reviewed the adequacy of re-examinations for licensed operators who did not pass a required requalification examination.
Operator License Conditions The inspectors evaluated the licensees program for ensuring that licensed operators meet the conditions of their licenses.
Control Room Simulator The inspectors evaluated the adequacy of the facility licensees control room simulator in modeling the actual plant, and for meeting the requirements contained in 10 CFR 55.46.
Problem Identification and Resolution The inspectors evaluated the licensees ability to identify and resolve problems associated with licensed operator performance.
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator performance in the Control Room during Unit 1 reactor startup on August 1, 2021.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated annual operator requalification in the simulator on August 24, 2021.
71111.12 - Maintenance Effectiveness
Quality Control (IP Section 03.02) (1 Sample)
The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSC remains capable of performing its intended function:
- (1) The inspectors reviewed six work packages covering a variety of maintenance activities to evaluate whether licensee quality control verifications are properly specified, in accordance with the Quality Assurance Program, and are implemented, as specified.
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
(1)emergent work due to Unit 1 plant trip on August 1, 2021 (2)elevated plant risk due to G-01 emergency diesel generator and G-05 gas turbine out of service with severe weather forecasted on August 10, 2021 (3)elevated plant risk due to the Unit 1 turbine trip testing on July 21, 2021 (4)elevated plant risk due to DY-0A, Red 125V DC / 120V AC Alternate Inverter, maintenance on July 20, 2021 (5)elevated plant risk due to the D-305/D-09 swing station battery and charger maintenance and testing on August 31, 2021
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (3 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (1) G-02 emergency diesel generator elevated vibrations
- (2) Unit 1 B steam generator feedwater regulator controller failed to operate in auto
- (3) G-02 emergency diesel generator fuel oil transfer pump did not stop as expected
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:
- (1) RMP 9036-1, DY-0A Red Channel Instrument Bus Static Inverter Maintenance Procedure, on July 20, 2021 (2)testing of Unit 1 B main feed water pump after the trip on timed overcurrent on August 7, 2021 (3)testing of the G-01 emergency diesel generator after maintenance on August 19, 2021 (4)testing of G-03 lube oil recirculation pump after replacement on August 31, 2021 (5)testing of Unit 2 B residual heat removal pump after maintenance on September 9, 2021
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
Surveillance Tests (other) (IP Section 03.01)
(1)1ICP 02.003A, Reactor Protection System Logic Train A 31 Day Surveillance, on July 15, 2021
- (2) TS 83, Emergency Diesel Generator G-03 Monthly, on July 25,
RADIATION SAFETY
71124.08 - Radioactive Solid Waste Processing & Radioactive Material Handling, Storage,
& Transportation
Radioactive Material Storage (IP Section 03.01)
- (1) Inspectors evaluated the licensees performance in controlling, labeling, and securing radioactive materials.
Radioactive Waste System Walkdown (IP Section 03.02) (1 Sample)
- (1) Inspectors walked down accessible portions of the solid radioactive waste systems and evaluated system configuration and functionality.
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
MS06: Emergency AC Power Systems (IP Section 02.05)===
- (1) Unit 1 July 1, 2020 - June 30, 2021
- (2) Unit 2 July 1, 2020 - June 30, 2021
MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)
- (1) Unit 1 July 1, 2020 - June 30, 2021
- (2) Unit 2 July 1, 2020 - June 30, 2021
MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)
- (1) Unit 1 July 1, 2020 - June 30, 2021
- (2) Unit 2 July 1, 2020 - June 30, 2021 BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10) (2 Samples)
- (1) Unit 1 October 1, 2020 - June 30, 2021
- (2) Unit 2 October 1, 2020 - June 30, 2021
OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)
- (1) October 1, 2020 - June 30, 2021 PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample (IP Section 02.16) (1 Sample)
- (1) October 1, 2020 - June 30, 2021
71152 - Problem Identification and Resolution
Semiannual Trend Review (IP Section 02.02) (1 Sample)
- (1) The inspectors reviewed the licensees corrective action program from December 2020 to May 2021 for potential adverse trends that might be indicative of a more significant safety issue.
Annual Follow-Up of Selected Issues (IP Section 02.03) (2 Samples)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
(1)gap identified on Unit 1 electrical equipment room fire barrier (2)transportation of radioactive materials
71153 - Follow-Up of Events and Notices of Enforcement Discretion Event Follow-Up (IP Section 03.01)
- (1) The inspectors evaluated a plant trip as a result of a loss of main feedwater pump and the licensees response on July 31,
INSPECTION RESULTS
Inadequate Description of the Amount of Radioactive Material in Shipping Papers Cornerstone Significance Cross-Cutting Aspect Report Section Public Radiation Safety Green NCV 05000266,05000301/2021003-01 Open/Closed
[P.3] -
Resolution 71152 A self-revealed Green finding and associated Non-cited Violation (NCV) of 10 CFR 71.5(a) for the failure to provide the correct quantity of radioactive material identified on shipping papers, in accordance with NRC and Department of Transportation requirements.
Description:
On December 8, 2020, Radiation Protection personnel performed radiological surveys of spent resin liner number 678141-2 using Work Plan 160A Resin Liner Survey and Liner to Shipping Cask, Revision 3, dated December 5, 2020. The results from this survey were used to calculate the quantity of radioactivity contained in the liner. The licensee transferred the calculated quantity of radioactivity in the liner to the NRC Form 540 Uniform Low-Level Radioactive Waste Manifest, which becomes a key attribute of the shipping papers when the liner was shipped to a vendor for waste processing on January 14, 2021. The inspectors observed that Radiation Protection Work Plan 160A Resin Liner Survey and Liner to Shipping Cask, Revision 3, dated December 5, 2020, had been developed in response to lessons learned from radioactive waste shipment 19-037 and to include corrective actions from CR 02360869, Preliminary White Finding Related to Radwaste Shipment.
On January 15, 2021, the vendor received the shipment and moved the liner to a shielded location for short term storage before processing. In April 2021, the waste processing vendor removed the liner from storage, performed a radiological survey, and identified significantly higher dose rates on the liner (and consequently higher activity of radioactive material within the liner) than had been reported by the licensee.
After an evaluation to reconcile the differences, the licensee determined that its staff had under-reported the activity in the liner. On April 21, 2021, the licensee revised the shipping papers, including the total package activity, and transmitted updated documents to the waste processor. In this case, the licensee determined the liner contained a revised total package activity of 1.07E+07 MBq (or 2.90E+05 mCi). This was 2.5 times the radioactive material reported at the time of the shipment (4.21E+06 MBq (or 1.14E+05 mCi)).
The licensee determined the direct cause of this error was RP Workplan 160A, Resin Liner Survey and Liner to Shipping Cask, did not require an adequate amount of survey points.
Corrective Actions: The corrected shipping papers, with the increased total package activity, were sent to waste processor. Additionally, the licensee revised RP workplan 160A, Resin Liner Survey and Liner to Shipping Cask, to require additional survey points.
Corrective Action References: AR 02389967
Performance Assessment:
Performance Deficiency: The licensee did not adequately describe hazardous material in shipping papers as required by regulatory requirements.
On January 14, 2021, the licensee shipped radioactive waste (Shipment 21-001) to a radioactive waste processing facility. The shipment documentation listed a radioactive content of 4.21E+06 MBq. After arriving at the facility, the waste processor identified that the radioactive content was incorrect. Subsequently, the licensee performed an evaluation and revised the shipment documentation to state a radioactive content of 1.07E+07 MBq, which was 254 percent of the radioactive material that was reported at the time of the shipment.
Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Program & Process attribute of the Public Radiation Safety cornerstone, and adversely affected the cornerstone objective to ensure adequate protection of public health and safety from exposure to radioactive materials released into the public domain, as a result of routine civilian nuclear reactor operation. Specifically, the licensee provided shipping papers for radioactive material that contained an error that exceeded 20 percent of the activity of the material (Example 6.l of Inspection Manual 0612, Appendix E).
Significance: The inspectors assessed the significance of the finding using Appendix D, Public Radiation Safety SDP. The inspectors evaluated the finding by applying the radioactive material control branch of the SDP (i.e., transportation or Part 61) and determined that the finding was of very low safety significance (i.e., Green) because:
- (1) package radiation limits were not exceeded,
- (2) there was not a breach of package during transit, (3)there was not a certificate of compliance concern,
- (4) there was not a low level burial ground nonconformance, and
- (5) there was no failure to make notifications or provide emergency response information.
Cross-Cutting Aspect: P.3 - Resolution: The organization takes effective corrective actions to address issues in a timely manner commensurate with their safety significance.
Specifically, the licensee determined the direct cause of this error was RP Workplan 160A, Resin Liner Survey and Liner to Shipping Cask, did not require an adequate amount of survey points. The number and location of survey points described in Workplan 160A had been revised to incorporate lessons learned from radioactive waste shipment 19-037, and to institutionalize some of the corrective actions from CR 02360869, Preliminary White Finding Related to Radwaste Shipment. The revision standardized the survey process for shipments to a reduced number of survey points. Consequently, the corrective action(s) to address potentially unreliable data for use in package characterization and shipment preparation was not effective.
Enforcement:
Violation: 10 CFR 71.5(a) states that each licensee who transports licensed material outside the site of usage, as specified in the NRC license, or where transport is on public highways, or who delivers licensed material to a carrier for transport, shall comply with the applicable requirements of the DOT regulations in 49 CFR parts 107, 171 through 180, and 390 through 397, appropriate to the mode of transport.
49 CFR 172.200(a) states, with exceptions not applicable here, that each person who offers a hazardous material for transportation shall describe the hazardous material on the shipping paper, in the manner required by subpart C of 49 CFR Part 172.
Pursuant to 49 CFR 172.101, radioactive material is classified as hazardous material.
49 CFR 172.203(d)(3) states, in part, the description for a shipment of a Class 7 (radioactive)material must include the following additional entries as appropriate: the maximum activity of the radioactive contents contained in each package during transport in terms of the appropriate SI units (e.g., Becquerels (Bq), Terabecquerels (TBq)).
Contrary to the above, on January 14, 2021, the licensee delivered licensed material to a carrier for transport, and the description on the shipping paper that accompanied the shipment did not include the correct maximum activity of the radioactive contents.
Specifically, the shipment paper stated a maximum activity of 4.21E+06 MBq. Upon subsequent evaluation, the licensee determined the activity to be 1.07E+07 MBq.
Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.
Observation: Review of Selected Transportation of Radioactive Materials Issues 71152 In 2019, the licensee offered for transport a radioactive material package, containing spent resin, as Low Specific Activity - II (LSA-II) that did not meet the radiation level limits specified in 49 CFR 173.427 for shipping as LSA. Specifically, licensee staff did not recognize that measured radiation levels were in excess of 10 mSv/ hour (1 Rem/hour) at 3 meters from the unshielded package, exceeding the conditions of transport for LSA material. This shipment is also known as Radwaste Shipment 19-037. (In NRC Inspection Report Nos.
05000266/2020090 and 05000301/2020090, the NRC documented a Green finding and the associated non-cited violations for the noncompliances for the shipment.)
The inspectors reviewed Root Cause Evaluation - AR 02360869, Radwaste Shipping Error Results in Preliminary White Finding, to ensure that the licensee implemented corrective actions, commensurate with the significance of the identified issues. Additionally, the inspectors reviewed AR 02389967, Radiological Survey Differences Identified, that was evaluated for another shipment of spent resin performed in January 2021.
In response to the 2019 shipping issue, the licensee determined that, Radwaste Shipment 19-037 was assigned the incorrect shipping name and therefore did not have the proper Emergency Response Guide included in the shipping documents which resulted in non-compliance with site and regulatory shipping requirements. As corrective actions, the licensee:
Revised radwaste shipping checklist RP-AA-108-1002-F06, and applicable similar checklists, to include documented validation of critical parameters when determining proper shipping names and emergency response guide;
Incorporated a management oversight risk matrix within its procedure to drive observation and oversight of key risk-sensitive elements of the shipping process;
Revised radwaste shipping program documents to require development of an annual projected high or elevated risk radwaste shipment schedule and include a method for periodic review and oversight of the schedule; and
Revised applicable shipping and survey procedures to include the option for use of RADMAN calculated 3-meter dose rates vs. measured 3-meter dose rates, and to include cautions/warnings for use of measured 3-meter values, use of the RADMAN override feature, and the potential impact on Proper Shipping Name/Emergency Response Guide.
The inspectors found that the licensee had completed its implementation of the corrective actions identified.
The inspectors observed that the licensees revisions to its survey procedure (RP Workplan 160A) provided additional uniformity (i.e., distances and locations) to the radiation measurements performed on a package prepared for transport. The inspectors observed that the procedure also reduced the number of measurements routinely taken on a package, which appeared to be based on a package having a reasonably homogeneous mixture of radioactivity throughout the package and having consistent radiation levels from the package.
Reviewing the 2019 shipment survey, the inspectors observed that there were notable gradients of radioactivity within the package, as indicated by the range of radiation levels measured by the licensee. At the time of the shipment, the licensee did not appear to recognize the gradients, and calculated the shipment contents with a computer model that relied on a reasonably homogeneous mixture. In addition, the inspectors noted that the licensees revised survey process did not accurately characterize the radioactivity in the 2021 shipment, providing additional indication that the licensees bases (homogeneous distribution of radioactivity) may not be technically sound.
The inspectors observed that the licensees problem statement may have limited the licensees evaluation and corrective actions, resulting in missing some of the underlying causes. As discussed above, the licensees evaluation did not appear to fully recognize some issues with its survey methods and waste characterizations, which were discussed in NRC Inspection Report Nos. 05000266/2020090 and 05000301/2020090. In the report, the NRC documented that, The NRC staff observed that the material appeared to have some gradients in the radionuclide distribution (radiation levels were not fully uniform across the container), which may have impacted the licensees calculations. The inspectors determined that these shortcomings contributed to the non-cited violation documented above. The licensee was evaluating additional corrective actions to address the radiological survey issues.
Observation: Semi Annual Trend Review 71152 The inspectors reviewed action requests entered into the corrective action program for the following:
complete, accurate, and timely documentation of the issue identified in the corrective action program
evaluation and timely disposition of operability and reportability issues
consideration of extent of condition and cause, generic implications, common cause, and previous occurrences
classification and prioritization of the problems resolution, commensurate with the safety significance
identification of corrective actions that are appropriately focused to correct the problem
completion of corrective actions in a timely manner, commensurate with the safety significance of the issue
identification of negative trends associated with human or equipment performance that can potentially impact nuclear safety
operating experience is adequately evaluated for applicability, and applicable lessons learned are communicated to appropriate organizations, and implemented The inspectors completed the review and did not note any significant trends that weren't already identified and addressed by the licensee.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On October 5, 2021, the inspectors presented the integrated inspection results to Mr. M. Holzmann, Site Operations Director, and other members of the licensee staff.
On August 19, 2021, the inspectors presented the radiation protection inspection results to Mr. M. Strope, Site Vice President, and other members of the licensee staff.
On September 2, 2021, the inspectors presented the Biennial Licensed Operator Requalification Program inspection results to Mr. M. Strope, Site Vice President, and other members of the licensee staff.
On September 29, 2021, the inspectors presented the Biennial Licensed Operator Requalification Program Annual Operating Test Results inspection results to Mr. A. Moore, Operations Training Supervisor, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
Resulting from
Inspection
Update ISO DWG to Depict Gravity Supports as Restraints
08/09/2021
110E017 Sheet 2
Safety Injection System
110E017 Sheet 3
Safety Injection System
110E035 Sheet 1
P&ID Safety Injection System
110E035 Sheet 2
P&ID Safety Injection System
M-202 Sh. 2
M-202 Sh. 3
M-209 Sh. 12
P&ID Em. Diesel Air Starting Sys.
M-219 Sh. 1
P&ID Fuel Oil System
M-219 Sh. 2
P&ID Fuel Oil System - Diesel Generator Building
P-202
Suction from RWST to SI, CS, RHR Pumps
P-219
Safety Injection Pump Discharge to Injection
SI-1501R-1 and SI-1501R-3
Drawings
P-220
Safety Injection Pump Discharge to Injection Line
SI-1501R-1 and SI-1501R-2
CL 10D
Fuel Oil Systems
Miscellaneous
CL 11A G-02
G-02 Diesel Generator Checklist
Corrective Action
Documents
Resulting from
Inspection
Plant Housekeeping Issues Identified by NRC
08/11/2021
Pre-Fire Plan Control Building - Elev 8 ft, 26 ft, 44 ft and 66
ft
Fire Plans
PFP-0-PAB-8
Pre-Fire Plan Primary Auxiliary Building Elevations 8' and
Below
2009-0008
Circulating Water Pump House Internal/External Flooding
Calculations
2014-0007
Allowable Flood Levels
& 4
Procedures
NP 8.4.17
PBNP Flooding Program
34, 35, & 36
Work Orders
P-290A, Annual Service / Maintenance
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
P-290B, Annual Service / Maintenance
Manhole: Electrical Inspections (Yearly - Fall)
Miscellaneous
Requalification
Program Annual
Testing Summary
Results
Licensed Operator Annual Examination Performance
Records for 2021
09/27/2021
Procedure Variance for AOP-9A (Service Water System
Malfunction)
10/13/2013
EC 292423 Unit 1 Cycle 39 Core Reload Modification
2/18/2019
EC 294656 Unit 1 Cycle 40 Core Reload Modification
09/15/2020
Simulator - U1C40 Core Test Acceptance Criterion Not Met
10/28/2020
Crew Failure During NRC Operational Exam
01/27/2021
NRC Biennial Written Exam Security Issue
03/03/2021
License Termination Letter Not Sent to NRC within 30 Day
Requirement
03/29/2021
Corrective Action
Documents
21Biennial Written Exam Performance
04/08/2021
Post Event
Testing
Unit 1 Small RCS Leak in Containment Building - Validate
1Re-211 Simulator Response
05/21/2020
Scenario Based
Testing (SBT)
Checklist
SBT Package for PNB LOC 000 043E Simulator Exercise
Guide (SEG) Rev 5
06/19/2021
Scenario Based
Testing Checklist
SBT Package for PNB LOC 000 003E SEG Rev 6
06/19/2021
Simulator
Certification Test
6.2.1
100% Power Steady State Performance Test U1C40
05/23/2021
Simulator
Certification Test
6.2.2
75% Power Steady State Performance Test U1C40
05/23/2021
Simulator
Certification Test
6.2.3
28% Power Steady State Performance Test U1C40
05/23/2021
Engineering
Evaluations
Simulator
Certification Test
PORV Open without High Head Safety Injection U1C39/40
05/15/2021
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
6.5.10
Simulator
Certification Test
6.5.2
Simultaneous Trip of Both Main Feed-Water Pumps
U1C39/40
04/24/2021
Simulator
Certification Test
6.5.5
Trip of a Single Reactor Coolant Pump U1C39/40
05/15/2021
Simulator
Certification Test
6.5.8
Loss of Coolant Accident (LOCA) with Loss of Offsite Power
U1C39/40
05/15/2021
20 Give 2
EXAM RO
RO Written Examination
2/17/2021
20 Give 2
EXAM SRO
SRO Written Examination
2/17/2021
Attendance
Records
Licensed Operator Continuous Training Attendance Records
(Various)
2019-2020
License
Reactivation
Records
License Reactivation Records for 4 Individuals - 04/24/2020
- 07/21/2020
08/31/2021
Medical Records
Licensed Operator Medical Records for 11 Operators
09/01/2021
PBN JPM
P000.008a.COT
PBN JPM
P000.020a.AOT
PBN JPM
P000.033b.COT
PBN JPM
P000.037.COT
PBN JPM
P000.047b.AOT
PBN JPM
P000.047c.AOT
Miscellaneous
PBN JPM
P002.005c.COT
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
PBN JPM
P004.013a.COT
PBN JPM
P004.026.AOT
PBN JPM
P078.006.AOT
PBN SEG LOC
000 003E
Simulator Dynamic Scenario
PBN SEG LOC
000 026E
Simulator Dynamic Scenario
PBN SEG LOC
000 043E
Simulator Dynamic Scenario
PBN SEG LOC
000 068E
Simulator Dynamic Scenario
Remediation
Records
20 Annual Operating Test Failure Remediation Packages
for 3 Individuals
09/01/2021
Remediation
Records
20 Biennial Written Exam Failures Remediation Packages
for 7 Individuals
09/01/2021
Simulator Review
Committee (SRC)
Meeting Minutes
SRC Meeting Minutes from January 2021
01/24/2021
Simulator Review
Committee (SRC)
Meeting Minutes
SRC Meeting Minutes from June 2021
06/10/2021
Simulator Work
Request (SWR)
Listing
List of all Open SWR Items
08/30/2021
SWR Listing
List of all SWR Items Closed Since Previous Biennial
Requal Inspection
08/30/2021
Watch Proficiency
Records
eSOMS Credit for Standing Watch 04/01/2021 to
06/28/2021 Reports
08/31/2021
Desktop Guide
94.0
Simulator Health Management
Procedures
Desktop Guide
Simulator Work Requests
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
94.3
FL-LOCT-TPD
Licensed Operator Continuing Training Program Description
License Maintenance and Activation
NRC Licensed Operator Exam Security
Licensed Operator Continuing Training Annual Operating
and Biennial Written Exams
Simulator Change Control
Conduct of Simulator Training and Evaluation
TR-AA-230-1007-
F01
Crew Simulator Evaluation Forms for 2021 Annual
Operating Test - Crew A
TR-AA-230-1007-
F02
Individual Simulator Evaluation Forms for 2021 Annual
Operating Test - Crew A-All Operators
Simulator Scenario Based Testing and Validation
Simulator Work Request 2291459
EC 291769 Fire Detection Upgrade - Phase II
11/20/2018
Simulator Work Request 2329323
Xenon Response During Rapid Load Reduction
09/26/2019
Work Orders
Simulator Work Request 2398451
Add PPCS Failure Malfunctions
07/14/2021
Miscellaneous
PBN LOC 000
069E
NRC Annual Operating Exam
Reactor Startup
Procedures
OP 1B Appendix
A
Estimated Critical Position Calculation
NP 11.1.14
Inspection Planning
Procedures
NP 11.1.15
Quality Control Inspections
WO 40178723 11
G-01-FTS-H/L//Numerous Fuel Oil XTFR Alarms G-01
08/21/2021
WO 40720934 10
U2 RPI/EC-294454 - RPI Replacement
09/09/2021
WO 40722095 01
F-222/G-02 SW Inlet Duplex Strainer Not to be Cleaned
09/14/2021
WO 40739986 02
2-62/YIC-926B-T, Bench Calibrate Replacement Relay
09/17/2021
WO 40760281 05
PI-3719, P-35A Disch. Press. Indicating Low
09/16/2021
Work Orders
WO 40765372 01
2P-2A-Z/Cooling Fan Replacement
09/03/2021
Miscellaneous
Point Beach Elevated Risk Focus Activities for the Turbine
07/21/2021
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Trip Test Unit 1 Quarterly
PBN Unit 1 and 2 Current Risk Summary Report
08/10/2021
T-0 Execution Schedule, by Early Start
08/09/2021
Point Beach Elevated Risk Focus Activities for the
DY-0A Red 125V DC / 120V AC Inverter Maintenance
07/20/2021
Point Beach Work Activity High Risk List for the D-305/D-09
Station Battery / Charger Maintenance and Service Test
08/31/2021
T-0 Execution Schedule, by Early Start
08/01/2021
Procedures
Severe Weather Conditions
Work Orders
WO 40730660 01
TS-3A, Unit 1 Turbine Trip Test
07/21/2021
1CS-476 Failed to Operate in Auto
05/22/2021
G-02 Fuel Oil Transfer Pump Would Not Shut Off Manually
09/19/2021
Corrective Action
Documents
Elevated Vibrations on G-02 EDG During TS 82
09/13/2021
883D195 Sheet
Logic Diagram Feedwater Control and Isolation
Drawings
M-202 Sheet 2
Feedwater System
1CS-2187 Suction Relief Valve was Noted to be Dripping
08/07/2021
Corrective Action
Documents
Resulting from
Inspection
DGB Door 107 Not Self Latching
08/31/2021
Miscellaneous
1P-28B Steam Generator Feed Pump and Motor Monitoring
Plan
OI 169
Steam Generator Feed Pumps Isolation and Restoration
Mode 1, 2, or 3 Unit 1
Procedures
Startup to Power Operation Unit 1
WO 40738003 09
DY-0A, Maintain and Inspect Inverter
07/20/2021
WO 40779246 01
IT 04 Train B Low Head Safety Injection Pumps and Valves
Train B Unit 2
09/10/2021
WO 40787760 18
1P-28B (MFP) Trip on Timed Overcurrent
08/10/2021
TS-81, G-01 Emergency Diesel Generator Operability Test
08/22/2021
Work Orders
WO 40789102 01
P-215A G-03 Lube Oil Recirc Pump Noisy
08/31/2021
Procedures
1ICP 02.003A
Reactor Protection System Logic Train A 31 Day
Surveillance
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Work Orders
WO 40744625 01
TS-83, G-03 Emergency Diesel Generator Operability
07/25/2021
Corrective Action
Documents
Resulting from
Inspection
Source Leak Check Certificate Mismatch
08/19/2021
LMS ID NUCRPT
1030
Lesson Title - 10CFR37 Cat 1 & 2 Material
RP-AA-107-1004-
F02
Source Leak Test and Inventory
08/12/2021
Miscellaneous
TRM 3.7.4
Sealed Radioactive Sources
Procedures
Procedure for Radioactive Source Controls and Leak
Testing
MSPI Derivation Reports; High Pressure Injection,
Emergency AC, Cooling Water; Unavailability Index;
Units 1 and 2
07/01/2020 -
06/30/2021
MSPI Derivation Reports; High Pressure Injection,
Emergency AC, Cooling Water; Unreliability Index;
Units 1 and 2
07/01/2020 -
06/30/2021
MSPI Margin Reports; Units 1 and 2
07/01/2020 -
06/30/2021
NP 5.2.16 -
Occupational
Exposure
Effectiveness
B; PI Data Calculation, Review and Approval
October
20 - June
21
NP 5.2.16 -
Radioactive
Effluents
Effectiveness
B; PI Data Calculation, Review and Approval
October
20 - June
21
Miscellaneous
NP 5.2.16 - RCS
Activity Fuel
Performance
B; PI Data Calculation, Review and Approval
October
20 - June
21
71151
Procedures
CAMP 044
Fuel Integrity Monitoring
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
CAMP 410
Determination of Radioactive Iodine and Iodine 131
Equivalents in Reactor Coolant
PBN-BFJR-18-
054
MSPI Basis Document for PBNP
Preliminary White Finding Related to Radwaste Shipment
01/13/2021
Corrective Action
Documents
Radiological Survey Differences Identified
04/14/2021
Procedure Change Request to Revise RP-AA-108-1003
"Radioactive Materials Surveys for Shipment" to add
LSA/SCO Dose Rate Limits for Unshielded Material at
3-meters.
08/18/2021
Highest Contact Reading Discrepancy Identified
08/19/2021
Weight Discrepancy on Shipment 18-058
08/19/2021
Corrective Action
Documents
Resulting from
Inspection
Small Gap Identified Between FZs 245 and 322
06/10/2021
Miscellaneous
Trend ARs 12-01-2020 thru 05-31-2021
06/09/2021
Shipment of Radioactive Material
Procedures
Radioactive Materials Surveys for Shipment
E-RS 210406-08
Container No 678141-2 Incoming Survey
04/06/2021
Radiation
Surveys
E-RS 210407-06
Container No 678141-2 Incoming Liner
04/08/2021
Shipment 21-001
Primary Resin
01/14/2021
Shipping Records
Shipment 21-001
(Revised)
Primary Resin
04/21/2021
Corrective Action
Documents
Unit 1 Reactor Trip due to 1P-28B MFP Trip
08/01/2021