ML20206S889: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:-             -
{{#Wiki_filter:-.
              -.
-
    ...,
-
                                                      SEP ll N
...,
            In Reply Refer To:
SEP ll N
            Dockets:     50-445/85-16
In Reply Refer To:
                        50-446/85-13
Dockets:
            Texas Utilities Generating Company
50-445/85-16
            ATTN: Mr. W. G. Counsil
50-446/85-13
                      Executive Vice President
Texas Utilities Generating Company
            400 North Olive, L.B. 81
ATTN: Mr. W. G. Counsil
            Dallas, Texas 75201
Executive Vice President
            Gentlemen:
400 North Olive, L.B. 81
                    Thank you for your letters dated June 16, 1986, and September 5, 1986, in
Dallas, Texas 75201
            response to our letters dated April 4,1986, and August 12, 1986. We have no
Gentlemen:
            further questions at this time and will review your corrective action during a
Thank you for your letters dated June 16, 1986, and September 5, 1986, in
            future inspection.
response to our letters dated April 4,1986, and August 12, 1986. We have no
                                                        Sincerely,
further questions at this time and will review your corrective action during a
                                                                    c .inni signed BY.
future inspection.
                                                                      E. H. Johnson.,
Sincerely,
                                                        E. H. Johnson, Director
c .inni signed BY.
                                                        Division of Reactor Safety
E. H. Johnson.,
                                                          and Projects
E. H. Johnson, Director
            cc:
Division of Reactor Safety
,          Texas Utilities Electric. Company
and Projects
l          ATTN:    G. S. Keeley, Manager
cc:
Texas Utilities Electric. Company
,
l
l
                Licensing
ATTN:
G. S. Keeley, Manager
l
Licensing
'
'
            Skyway Tower
Skyway Tower
            400 North Olive Street
400 North Olive Street
            Lock Box 81
Lock Box 81
            Dallas, Texas     75201
Dallas, Texas
            Juanita Ellis
75201
            President - CASE
Juanita Ellis
            1426 South Polk Street
President - CASE
            Dallas, Texas 75224
1426 South Polk Street
            RIV: CPG               RSB                 DRSPTQi
Dallas, Texas 75224
            IBar s:gb              TFWesterman          Johnson
RIV: CPG
            c/// /86               y /ff/86           Epl/p/86
RSB
                                                                                          /EO/
DRSPTQi
          8609230019 860917                                                                           1\
c/// /86
          PDR     ADOCK 05000445
y /ff/86
  _ . . ,
Epl/p/86
          G                    PDR
Johnson
                                                                                      ..   . - . . . - - . . - -
IBar s:gb
TFWesterman
/EO/
8609230019 860917
1\\
PDR
ADOCK 05000445
G
PDR
_ . . ,
..
. - . . .
- - . . - -


                                '
V
  V
'
    .; . .
.; . .
                            Texas Utilities Generating Company                                                         2
Texas Utilities Generating Company
                            Renea Hicks
2
                            Assistant Attorney General
Renea Hicks
                            Environmental Protection Division
Assistant Attorney General
                            P. O. Box 12548
Environmental Protection Division
                            Austin, Texas 78711 - 2548
P. O. Box 12548
                            Administrative Judge Peter Elech
Austin, Texas 78711 - 2548
                            U. S. Nuclear Regulatory Commission
Administrative Judge Peter Elech
                            Washington, D. C. 20555
U. S. Nuclear Regulatory Commission
                            Elizabeth B. Johnson
Washington, D. C.
                            Administrative Judge
20555
                            Oak Ridge National Laboratory
Elizabeth B. Johnson
                            P. 0. Box X, Building 3500
Administrative Judge
                            Oak Ridge. Tennessee 37830
Oak Ridge National Laboratory
                            Dr. Kenneth A. McCollom
P. 0. Box X, Building 3500
                            1107 West Knapp
Oak Ridge. Tennessee 37830
                            Stillwater, Oklahoma 74075
Dr. Kenneth A. McCollom
                            Dr. Walter H. Jordan
1107 West Knapp
                            881 Outer Drive
Stillwater, Oklahoma 74075
                            Oak Ridge, Tennessee 37830
Dr. Walter H. Jordan
                            Anthony Roisman, Esq.
881 Outer Drive
                            Executive Director
Oak Ridge, Tennessee 37830
                            Trial Lawyers for Public Justice
Anthony Roisman, Esq.
                            2000 P. Street, N.W., Suite 611
Executive Director
                            Washington, D. C. 20036
Trial Lawyers for Public Justice
                            Texas Radiation Control Program Director
2000 P. Street, N.W., Suite 611
                            bec to DMB (IE01)
Washington, D. C. 20036
                            bec distrib by RIV:
Texas Radiation Control Program Director
                            *RFB                                                                               * MIS System
bec to DMB (IE01)
                            *RRI-OPS                                                                           *RSTS Operator
bec distrib by RIV:
                            *RRi-CONST                                                                         *R&SPB
*RFB
                            *T. F. Westerman, RSB                                                                 DRSP
* MIS System
                            V. Noonan, NRR                                                                       R. Martin, RA
*RRI-OPS
                            S. Treby, ELD                                                                     *RSB
*RSTS Operator
*RRi-CONST
*R&SPB
*T. F. Westerman, RSB
DRSP
V. Noonan, NRR
R. Martin, RA
S. Treby, ELD
*RSB
.
.
*RIV File
J. Taylor, IE
*D. Weiss,LFMB(AR-2015)
J. Konklin, IE
'
'
                            *RIV File                                                                            J. Taylor, IE
                            *D. Weiss,LFMB(AR-2015)                                                              J. Konklin, IE
i
i
                            *I. Barr.es, CPTG
*I. Barr.es, CPTG
                            *w/766
*w/766
.
.
    _ , _ . - . . . . _ , -             _ _ , _ . _ _ , _ _ , - - . , , . _ _ _ , . . . _ - . , _ , , - _ , . .         - . . _ . - _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ - _ . _ - _ . _ - - . , _ - . _ - - - - _ _ - - -
_ , _ . - . . . . _ , -
_ _ , _ . _ _ , _ _ , - - . , , . _ _ _ , . . . _ - . , _ , , - _ , . .
- . . _ . - _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ - _ . _ - _ . _ - - . , _ - . _ - - - - _ _ - - -


                SEP   5 '86 16:18                   LICENSE TUGCO                                                   PAGE.02
SEP
    . <.                                                                             ,
5 '86 16:18
  i                                                                                           i
LICENSE TUGCO
  0                                                                                               Log # TXX-4992
PAGE.02
                                                                                                      File # 10130
. <.
  o                                                                                                                IR 85-16
,
                                                                                                                      85 13
i
                                      TEXAS UTILITIES GENERATING COMPANY                                                 '7
i
                                EKYW AY TOWER . 400 MoaTN 01JVB STREET. L.B. 91. DAIJ,,AS. TRE.As 7s3o1
0
                                                            September 5, 1986                                 _:-               -
Log # TXX-4992
                                                                                            T m@                   W :W W W
File # 10130
      a===
IR 85-16
                                                                                            '                                       ' * '
o
            Mr. Eric H. Johnson, Director                                                           -
85 13
            Division of Reactor Safety and Projects                                                                 1                  i.
TEXAS UTILITIES GENERATING COMPANY
            U. S. Nuclear Regulatory Commission
7
j           611 Ryan Plaza Drive, Suite 1000
'
EKYW AY TOWER . 400 MoaTN 01JVB STREET. L.B. 91. DAIJ,,AS. TRE.As 7s3o1
September 5, 1986
_:-
-
T m@ W :W W W
a===
*
'
'
'
Mr. Eric H. Johnson, Director
-
Division of Reactor Safety and Projects
i.
1
U. S. Nuclear Regulatory Commission
j
611 Ryan Plaza Drive, Suite 1000
Arlington, TX 76012
'
i
SUBJECT: COMANCHE PEAK S' TEAM ELECTRIC STATION (CPSES)
,
DOCKET NOS. 50-445 AND 50-446
'
'
            Arlington, TX 76012
!
i          SUBJECT: COMANCHE PEAK S' TEAM ELECTRIC STATION (CPSES)                                                      ,
RESPONSE TO NRC NOTICE OF VIOLATION
                                                                                                                                  '
e
                        DOCKET NOS. 50-445 AND 50-446
f
                        RESPONSE TO NRC NOTICE OF VIOLATION                                                                                     e
l
!                                                                                                                                            f
INSPECTION REPORT NOS.: 50-445/85-16 AND 50-446/85-13
l                       INSPECTION REPORT NOS.: 50-445/85-16 AND 50-446/85-13                                                                     ,
,
            Dear Mr. Johnson:
Dear Mr. Johnson:
            We have reviewed your letter of August 12, 1986 and have provided the
We have reviewed your letter of August 12, 1986 and have provided the
            additional information you requested regarding Notice of Violation
additional information you requested regarding Notice of Violation
            445/8516-V-03(ItemA)intheattachmenttothisletter. We requested and
445/8516-V-03(ItemA)intheattachmenttothisletter. We requested and
            received a two week extension in providing this information in a phone
received a two week extension in providing this information in a phone
            discussion with Mr. I. Barnes on September 2, 1986.
discussion with Mr. I. Barnes on September 2, 1986.
            You also requested that we confirm that all references .to training sessions,
You also requested that we confirm that all references .to training sessions,
            meetings, and discussions are appropriately documented and available for
meetings, and discussions are appropriately documented and available for
            audit. Our responses have indicated when these items are formally documented.
audit. Our responses have indicated when these items are formally documented.
            In those cases where we have not indicated formal documentation, such as
In those cases where we have not indicated formal documentation, such as
l           meetings and discussions, key personnel are available to confirm that these
l
            meetings and discussions took place as stated. We consider that training
meetings and discussions, key personnel are available to confirm that these
meetings and discussions took place as stated. We consider that training
sessions should be documented and the confirming documents are available for
'
'
            sessions should be documented and the confirming documents are available for
your review.
            your review.
We believe that our approach is consistent with 20CFR50 Appendix B and meets
            We believe that our approach is consistent with 20CFR50 Appendix B and meets
l
all applicable regulations.
l
l
            all applicable regulations.
Very truly yours,
l                                                                                    Very truly yours,                         -
-
                                                                                                                            .
.
                                                                                    W. G. Counsil
W. G. Counsil
                                                                              '
'
            JWA/amb                                                                           ,
JWA/amb
            Attachments                                               @]j                       .
,
                                                                                                            '
Attachments
            c-NRCRegionIV(0+1 copy)                                   " N ''        'H# E3 7
@]j
                                                                                                                      h              ~
'
                Director, Inspection & Enforcement (15 copies)                                                         '
.
                U. S. Nuclear Regulatory Commission
" N '' 'H# E3 7 h
                Washington, D.C. 20555
c-NRCRegionIV(0+1 copy)
                Mr. V.S. Noonan
~
                Mr. D.L. Kolley
Director, Inspection & Enforcement (15 copies)
                                                                                                          '
U. S. Nuclear Regulatory Commission
                                          a asvraron or ruxaa t/vitriiss mLECTRIC COMPANT
'
[C        /            _____ _.                     .. ._         -.     .. .____.                 - _ _ -                               .   _
Washington, D.C.
20555
Mr. V.S. Noonan
Mr. D.L. Kolley
[C
/
.
.. ._
-.
.. .
.
-
-
.
_
'
a asvraron or ruxaa t/vitriiss mLECTRIC COMPANT
.


  ,
SEP
        SEP    5 '86 16:19     LICENSE TUGCO                       PAGE.03
5 '86 16:19
    ,
LICENSE TUGCO
)                                 Additional Information
PAGE.03
                                            to
,
g                                    NOV 445/8516-V-08
,
      1. RC Concern                                                 -
)
        "
Additional Information
          ... [Y]our response failed to provide any action taken with respect to
to
        the failure of tie design review process to identify the technical
NOV 445/8516-V-08
        inadequacy of Design Change Authorization 13,349."
g
        Response
1.
        A. corrective Action IAkta add Results Achieved
RC Concern
            As stated in our original response, the DCA was re-reviewed and
-
            additional calculations were done to show that the design change was
... [Y]our response failed to provide any action taken with respect to
            acceptable. This re-review of the DCA was performed in accordance with
"
            project procedures which insure that the design change receives the
the failure of tie design review process to identify the technical
            same design control measures as those applicable to the original
inadequacy of Design Change Authorization 13,349."
            design.
Response
        B. Action la Prevent Recurrence
A. corrective Action IAkta add Results Achieved
            As stated in the response to Concern No. 2, we believe the instance
As stated in our original response, the DCA was re-reviewed and
            noted in this Violation is an isolated occurance. However, the
additional calculations were done to show that the design change was
            engineering personnel involved in the review and processing of DCA
acceptable. This re-review of the DCA was performed in accordance with
            13349 will be counseled regarding the applicable design control
project procedures which insure that the design change receives the
            measures.
same design control measures as those applicable to the original
            In the event that the engineering review delineated in Part B of the
design.
            response to Concern No. 2 determines this violation is widespread,
B. Action la Prevent Recurrence
            additional corrective action will be formulated.
As stated in the response to Concern No. 2, we believe the instance
noted in this Violation is an isolated occurance. However, the
engineering personnel involved in the review and processing of DCA
13349 will be counseled regarding the applicable design control
measures.
In the event that the engineering review delineated in Part B of the
response to Concern No. 2 determines this violation is widespread,
additional corrective action will be formulated.


              SEP   S '86 16:19       LICENSE TUGC0                                           ,
, PAG
                                                                                                        , PAG          .  b4                                i                           .
b4
        .s                                                                                                    ~          -
SEP
                                                                                                                                                                                            9
S '86 16:19
                                ,                                                    .
LICENSE TUGC0
                                                                          ,
i
                                                                                                                                            ,
,
                                                                                                                                              ' ' '
.
      l
.
                                  '
.s
                                          Additional Infofwaticn                                  -l                      1
~
                                                                                                                                                                  -
-
                                                                                                                                                                                              5
9
                              s
.
                                'J
,
                                    ! 'a    .' -
,
                                                      to
,
                                              N3V 445/8515-V OS                                .                             i                .,
Additional Infofwaticn
                                                                                                                                                      -
- l
      e                                    ,
' ' '
                                                                    ,
5
                                                                                                                              -                                                 ,
l
                                                                                                                                                          i                      4
'
                                                            '
-
          2. MG Concarn                                                              y                                                s
1
                                                                                                                                                            *
                                                                                                                                                                    3        ;r
                                                                                                                                                                                  '
              "...,[W]edonotconsiderthatreliancesolelyonpersonnIi1 discussion's
              providas and adequate basis for determining that the irientified use cf a
                                                                                                                                                                            '
                                                                                                                                                                                                '
              grouted Richmond Insert was a single case. Accordingly, please describe                                                                                  '
              those actions, planced or t
              made from discussions withperstennel
                                                aken, which
                                                        . "- will        substantiate the ccnclusions
                                                                                                                                                                                                ,
                                                                '                                                                                                                               '
                                                              ,            .
                                                                                                                    ,
              Reseense
                                                                                                                                                                            i
              A. Corrective Action Ighgfl And Besults &c.bfered
                  In our previous response, the cbnclusio.n this issue "is not generic"
                  was based upon extensive discussions with txperienced engineering
                  personnel who have been involved in the structural design of CPSES fc-
                  several years. The calculat8ons noted previously have confirmed the
i
                  installation is acceptable.      '
                                                                  ,
                                                                                                                                                                                          '
                                                                                                                                                                                              '
              8. Action in Frevent Racurranra                    /l     '
                                                                                                                                '
                                                                                                                                                                1 ,
                                                        H                        s>
  '-
                  To provide additional assurance tte int.tance,roted in the Violation was
                  an isolated case, an engineering review will t,e conducted involving all
                                                                      .
                                                                                                                                                                          i
!
!
                  design changes originated within the civil engineering disciplinet ')                                                                                       f
'a
                  This review will provide an assessment of 'the review process, verify *
.'
                  the technical adequacy of information provided by the originator of the                                                                                     ,
to
                  design change, and support our position the instance cited was ,1
-
                  isolated. This review is scheduled for comoletion by Novamber 7,1986.
s
                                                                                                                                                                                  '
'J
l                                                                                                   .
N3V 445/8515-V OS
                                                                                                                                                                s                               ,
.
                                                                                                                                            I                                                  '
i
i                                                                                                                                                              -
-
                                                                                                                                                              '
.,
                                                                                                                                    ,                               ;
e
                                                                                                                                  '
,
                                                                                                                                                        ;
-
                                                                                                                                                                                            $q
,
                                                                                                                                                                s    'g    e
,
                                                                                                                                  #
i
                                                                                                                                                                f
4
                                                                                                                                                                        '
2.
                                                                                                      .
MG Concarn
                                                                                                                                    !
'
                                                                                                                                          +
*
                                                                                                                                                        ,
y
                                                                                                            \
s
                                                                                                                                      +
3
                                                                                                                                                    a
;r
                                                                                b
"...,[W]edonotconsiderthatreliancesolelyonpersonnIi1 discussion's
                                                                                                                '4  ,
'
                                                                                                                                                  }
providas and adequate basis for determining that the irientified use cf a
                                                                                  ,
'
                                                                                        t
'
                                                                                          5
grouted Richmond Insert was a single case. Accordingly, please describe
                                                                                    ?
'
                                                                                                                                                                    '.
made from discussions with aken, which will substantiate the ccnclusions
those actions, planced or t
,
perstennel . "-
'
'
,
.
,
Reseense
i
A. Corrective Action Ighgfl And Besults &c.bfered
In our previous response, the cbnclusio.n this issue "is not generic"
was based upon extensive discussions with txperienced engineering
personnel who have been involved in the structural design of CPSES fc-
several years. The calculat8ons noted previously have confirmed the
i
installation is acceptable.
'
'
,
'
8. Action in Frevent Racurranra
/l
1 ,
H
'
'
s>
To provide additional assurance tte int.tance,roted in the Violation was
'-
an isolated case, an engineering review will t,e conducted involving all
i
.
design changes originated within the civil engineering disciplinet ')
f
!
This review will provide an assessment of 'the review process, verify *
the technical adequacy of information provided by the originator of the
,
design change, and support our position the instance cited was
,1
isolated.
This review is scheduled for comoletion by Novamber 7,1986.
'
l
.
s
,
I
I
i                                                                                           ~
'
                                                                              ._ E .5ba5fAlt Mh                                                                                     ----
i
-'
;
,
'
;
$q
'g
s
e
#
f
'
.
!
+
,
\\
+
a
b
'4
,
}
,
t
5
?
'.
I
i
~
.
E .5ba5fAlt Mh
----
}}
}}

Latest revision as of 18:47, 23 May 2025

Ack Receipt of 860616 & 0905 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-445/85-16 & 50-446/85-13.Corrective Actions Will Be Examined During Future Insp
ML20206S889
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/17/1986
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
References
NUDOCS 8609230019
Download: ML20206S889 (2)


See also: IR 05000445/1985016

Text

-.

-

-

...,

SEP ll N

In Reply Refer To:

Dockets:

50-445/85-16

50-446/85-13

Texas Utilities Generating Company

ATTN: Mr. W. G. Counsil

Executive Vice President

400 North Olive, L.B. 81

Dallas, Texas 75201

Gentlemen:

Thank you for your letters dated June 16, 1986, and September 5, 1986, in

response to our letters dated April 4,1986, and August 12, 1986. We have no

further questions at this time and will review your corrective action during a

future inspection.

Sincerely,

c .inni signed BY.

E. H. Johnson.,

E. H. Johnson, Director

Division of Reactor Safety

and Projects

cc:

Texas Utilities Electric. Company

,

l

ATTN:

G. S. Keeley, Manager

l

Licensing

'

Skyway Tower

400 North Olive Street

Lock Box 81

Dallas, Texas

75201

Juanita Ellis

President - CASE

1426 South Polk Street

Dallas, Texas 75224

RIV: CPG

RSB

DRSPTQi

c/// /86

y /ff/86

Epl/p/86

Johnson

IBar s:gb

TFWesterman

/EO/

8609230019 860917

1\\

PDR

ADOCK 05000445

G

PDR

_ . . ,

..

. - . . .

- - . . - -

V

'

.; . .

Texas Utilities Generating Company

2

Renea Hicks

Assistant Attorney General

Environmental Protection Division

P. O. Box 12548

Austin, Texas 78711 - 2548

Administrative Judge Peter Elech

U. S. Nuclear Regulatory Commission

Washington, D. C.

20555

Elizabeth B. Johnson

Administrative Judge

Oak Ridge National Laboratory

P. 0. Box X, Building 3500

Oak Ridge. Tennessee 37830

Dr. Kenneth A. McCollom

1107 West Knapp

Stillwater, Oklahoma 74075

Dr. Walter H. Jordan

881 Outer Drive

Oak Ridge, Tennessee 37830

Anthony Roisman, Esq.

Executive Director

Trial Lawyers for Public Justice

2000 P. Street, N.W., Suite 611

Washington, D. C. 20036

Texas Radiation Control Program Director

bec to DMB (IE01)

bec distrib by RIV:

  • RFB
  • MIS System
  • RRI-OPS
  • RSTS Operator
  • RRi-CONST
  • R&SPB
  • T. F. Westerman, RSB

DRSP

V. Noonan, NRR

R. Martin, RA

S. Treby, ELD

  • RSB

.

  • RIV File

J. Taylor, IE

  • D. Weiss,LFMB(AR-2015)

J. Konklin, IE

'

i

  • I. Barr.es, CPTG
  • w/766

.

_ , _ . - . . . . _ , -

_ _ , _ . _ _ , _ _ , - - . , , . _ _ _ , . . . _ - . , _ , , - _ , . .

- . . _ . - _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ - _ . _ - _ . _ - - . , _ - . _ - - - - _ _ - - -

SEP

5 '86 16:18

LICENSE TUGCO

PAGE.02

. <.

,

i

i

0

Log # TXX-4992

File # 10130

IR 85-16

o

85 13

TEXAS UTILITIES GENERATING COMPANY

7

'

EKYW AY TOWER . 400 MoaTN 01JVB STREET. L.B. 91. DAIJ,,AS. TRE.As 7s3o1

September 5, 1986

_:-

-

T m@ W :W W W

a===

'

'

'

Mr. Eric H. Johnson, Director

-

Division of Reactor Safety and Projects

i.

1

U. S. Nuclear Regulatory Commission

j

611 Ryan Plaza Drive, Suite 1000

Arlington, TX 76012

'

i

SUBJECT: COMANCHE PEAK S' TEAM ELECTRIC STATION (CPSES)

,

DOCKET NOS. 50-445 AND 50-446

'

!

RESPONSE TO NRC NOTICE OF VIOLATION

e

f

l

INSPECTION REPORT NOS.: 50-445/85-16 AND 50-446/85-13

,

Dear Mr. Johnson:

We have reviewed your letter of August 12, 1986 and have provided the

additional information you requested regarding Notice of Violation

445/8516-V-03(ItemA)intheattachmenttothisletter. We requested and

received a two week extension in providing this information in a phone

discussion with Mr. I. Barnes on September 2, 1986.

You also requested that we confirm that all references .to training sessions,

meetings, and discussions are appropriately documented and available for

audit. Our responses have indicated when these items are formally documented.

In those cases where we have not indicated formal documentation, such as

l

meetings and discussions, key personnel are available to confirm that these

meetings and discussions took place as stated. We consider that training

sessions should be documented and the confirming documents are available for

'

your review.

We believe that our approach is consistent with 20CFR50 Appendix B and meets

l

all applicable regulations.

l

Very truly yours,

-

.

W. G. Counsil

'

JWA/amb

,

Attachments

@]j

'

.

" N 'H# E3 7 h

c-NRCRegionIV(0+1 copy)

~

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission

'

Washington, D.C.

20555

Mr. V.S. Noonan

Mr. D.L. Kolley

[C

/

.

.. ._

-.

.. .

.

-

-

.

_

'

a asvraron or ruxaa t/vitriiss mLECTRIC COMPANT

.

SEP

5 '86 16:19

LICENSE TUGCO

PAGE.03

,

,

)

Additional Information

to

NOV 445/8516-V-08

g

1.

RC Concern

-

... [Y]our response failed to provide any action taken with respect to

"

the failure of tie design review process to identify the technical

inadequacy of Design Change Authorization 13,349."

Response

A. corrective Action IAkta add Results Achieved

As stated in our original response, the DCA was re-reviewed and

additional calculations were done to show that the design change was

acceptable. This re-review of the DCA was performed in accordance with

project procedures which insure that the design change receives the

same design control measures as those applicable to the original

design.

B. Action la Prevent Recurrence

As stated in the response to Concern No. 2, we believe the instance

noted in this Violation is an isolated occurance. However, the

engineering personnel involved in the review and processing of DCA

13349 will be counseled regarding the applicable design control

measures.

In the event that the engineering review delineated in Part B of the

response to Concern No. 2 determines this violation is widespread,

additional corrective action will be formulated.

, PAG

b4

SEP

S '86 16:19

LICENSE TUGC0

i

,

.

.

.s

~

-

9

.

,

,

,

Additional Infofwaticn

- l

' ' '

5

l

'

-

1

!

'a

.'

to

-

s

'J

N3V 445/8515-V OS

.

i

-

.,

e

,

-

,

,

i

4

2.

MG Concarn

'

y

s

3

r

"...,[W]edonotconsiderthatreliancesolelyonpersonnIi1 discussion's

'

providas and adequate basis for determining that the irientified use cf a

'

'

grouted Richmond Insert was a single case. Accordingly, please describe

'

made from discussions with aken, which will substantiate the ccnclusions

those actions, planced or t

,

perstennel . "-

'

'

,

.

,

Reseense

i

A. Corrective Action Ighgfl And Besults &c.bfered

In our previous response, the cbnclusio.n this issue "is not generic"

was based upon extensive discussions with txperienced engineering

personnel who have been involved in the structural design of CPSES fc-

several years. The calculat8ons noted previously have confirmed the

i

installation is acceptable.

'

'

,

'

8. Action in Frevent Racurranra

/l

1 ,

H

'

'

s>

To provide additional assurance tte int.tance,roted in the Violation was

'-

an isolated case, an engineering review will t,e conducted involving all

i

.

design changes originated within the civil engineering disciplinet ')

f

!

This review will provide an assessment of 'the review process, verify *

the technical adequacy of information provided by the originator of the

,

design change, and support our position the instance cited was

,1

isolated.

This review is scheduled for comoletion by Novamber 7,1986.

'

l

.

s

,

I

'

i

-'

,

'

$q

'g

s

e

f

'

.

!

+

,

\\

+

a

b

'4

,

}

,

t

5

?

'.

I

i

~

.

E .5ba5fAlt Mh