ML20141F428: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 25: | Line 25: | ||
==Dear Mr. Dostie:== | ==Dear Mr. Dostie:== | ||
I am' responding to your {{letter dated|date=April 15, 1997|text=letter dated April 15, 1997}}, providing the State's objection to and coments on the Maine Yankee Atomic Power Company's proposed Technical Specification No. 200, dated September 13,1996, as supplemented by {{letter dated|date=January 15, 1997|text=letter dated January 15, 1997}}. The staff has reviewed your comments and our responses to your specific comments related to the proposed amendment are contained'in Enclosure 1. | |||
I am' responding to your {{letter dated|date=April 15, 1997|text=letter dated April 15, 1997}}, providing the State's objection to and coments on the Maine Yankee Atomic Power Company's proposed | 4 You provided additional generic comments regarding the implementation of Option B of Appendix J to 10 CFR Part 50. | ||
The staff's_ response to these comments is also provided in Enclosure 1. | |||
4 You provided additional generic comments regarding the implementation of Option B of Appendix J to 10 CFR Part 50. The staff's_ response to these | Based on its review,.the staff concludes the your comments are adequately addressed in the. licensee's. proposed chango. | ||
comments is also provided in Enclosure 1. | Therefore, the staff intends to issue the proposed amendment. | ||
If you have any questions on this matter, please call me at (301) 415-1429. | If you have any questions on this matter, please call me at (301) 415-1429. | ||
Sincerely, (Original Signed By) | Sincerely, (Original Signed By) i Daniel H. Dorman, Project Manager Project Directorate I-3 i | ||
Project Directorate I-3 | Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-309 | ||
==Enclosure:== | ==Enclosure:== | ||
Response to Comments | Response to Comments j | ||
cc w/ encl: | |||
See next page DISTRIBUTION g g QQ(h Docket File R. Clark j | |||
PUBLIC D. Dorman | |||
[ | |||
PDI-3 Rdg. | |||
E. Peyton S. Varga C. Berlinger J. Zwolinski OGC | |||
/ | |||
I | I | ||
. DOCUMENT NAME: | |||
* Copy without attachment / enclosure "E" = Coofiyitty 9thhment/ enclosure | G:\\DORMAN\\MYM96588.SOM To,eceive a copy of thee document,Indcate in the boa: "C" | ||
NAME' | * Copy without attachment / enclosure "E" = Coofiyitty 9thhment/ enclosure "N* = No eqpy 0FFICE PDI 3/PM _, l PDI 3/PM l | ||
0FFICIAL RECORD COPY 9705210308 970519 PDR | PDI-3/LA C\\SCS8 ( | ||
@E DD/DRPE Ml | |||
) | |||
NAME' RClark @ | |||
DDorman h8h EPeyton MiCL CBerlingeI-JZwolinski / | |||
i DATE 05//3 /fT/ | |||
05/13 /97 05/1 3 /97 05//9/97 g | |||
05/ /7 /97 0FFICIAL RECORD COPY 9705210308 970519 PDR ADOCK 05000309 P | |||
PDR | |||
***ou i | |||
y" t | |||
UNITED STATES g | |||
j NUCLEAR RE2ULATCRY COMMISSION WASHINGTON D.C. 30666 0001 | j NUCLEAR RE2ULATCRY COMMISSION WASHINGTON D.C. 30666 0001 | ||
'+.,......,o! | |||
Mr. Patrick J. Dostie | May 19, 1997 Mr. Patrick J. Dostie l | ||
Wiscasset, ME 04578 | State of Maine Nuclear Safety i | ||
Inspector Maine Yankee Atomic Power Station P.O. Box 408 Wiscasset, ME 04578 | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 55: | Line 70: | ||
==Dear Mr. Dostie:== | ==Dear Mr. Dostie:== | ||
I am responding to your {{letter dated|date=April 15, 1997|text=letter dated April 15, 1997}}, providing the State's objection to and coments on the Maine Yankee Atomic Power Company's proposed Technical Specification No. 200, dated September 13, 1996, as supplemented by {{letter dated|date=January 15, 1997|text=letter dated January 15, 1997}}. | |||
I am responding to your {{letter dated|date=April 15, 1997|text=letter dated April 15, 1997}}, providing the State's objection to and coments on the Maine Yankee Atomic Power Company's proposed Technical Specification No. 200, dated September 13, 1996, as supplemented by | The staff has reviewed your coments and our responses to your specific coments related to the proposed amendment are contained in Enclosure 1. | ||
{{letter dated|date=January 15, 1997|text=letter dated January 15, 1997}}. The staff has reviewed your coments and our responses to your specific coments related to the proposed amendment are contained in Enclosure 1. | |||
You provided additional generic comments regarding the implementation of Option 8 of Appendix J to 10 CFR Part 50. The staff's response to these coments is also provided in Enclosure 1. | You provided additional generic comments regarding the implementation of Option 8 of Appendix J to 10 CFR Part 50. The staff's response to these coments is also provided in Enclosure 1. | ||
Based on its review, the staff concludes that your coments are adequately addressed in the licensea's proposed change. Therefore, the staff intends to issue the proposed amendment. | Based on its review, the staff concludes that your coments are adequately addressed in the licensea's proposed change. Therefore, the staff intends to issue the proposed amendment. | ||
| Line 67: | Line 81: | ||
Response to Coments cc w/ encl: See next page a a ~ | Response to Coments cc w/ encl: See next page a a ~ | ||
Mr. Patrick J. Dostie | Mr. Patrick J. Dostie cc w/ enc 1: | ||
Mr. Charles B. Brinkman | Mr. Charles B. Brinkman Mr. Robert W. Blackmore Manager - Washington Nuclear Plant Manager Operations Maine Yankee Atomic Power Station ABB Combustion Engineering P.O. Box 408 12300 Twinbrook Parkway, Suite 330 Wiscasset, ME 04578 Rockville, HD 20852 Mr. Michael J. Meisner Thomas G. Dignan, Jr., Esquire Vice-President Ropes & Gray Licensing and Regulatory Compliance One International Place Maine Yankee Atomic Power Company Boston, MA 02110-2624 329 Bath Road Brunswick, ME 04011 Mr. Uldis Vanags State Nuclear Safety Advisor Mr. Bruce E. Hinkley, Acting State Planning Office Vice-President, Engineering i | ||
State Planning Office | State House Station #38 Maine Yankee Atomic Power Company Augusta, ME 04333 329 Bath Road Brunswick, ME 04011 Mr. P. L. Anderson, Project Manager Yankee Atomic Electric Company Mr. Patrick J. Dostie 580 Main Street State of Maine Nuclear Safety Bolton, MA 01740-1398 Inspector Maine Yankee Atomic Power Station Regional Administrator, Region I P.O. Box 408 U.S. Nuclear Regulatory Commission Wiscasset, ME 04578 475 Allendale Road King of Prussia, PA 19406 Mr. Graham M. Leitch Vice President, Operations First Selectman of Wiscasset Maine Yankee Atomic Power Station Municipal Building P.O. Box 408 U.S. Route 1 Wiscasset, ME 04578 1 | ||
Mr. James R. Hebert, Manager | Wiscasset, ME 04578 Mary Ann Lynch, Esquire Mr. J. T. Yerokun Maine Yankee Atomic Power Company Senior Resident Inspector 329 Bath Road Maine Yankee Atomic Power Station Brunswick, ME 04578 U.S. Nuclaar Regulatory Commission P.O. Box E Mr. Jonathan M. Block Wiscasset, ME 04578 Attorney at Law j | ||
Maine Yankee Atomic Power Company | P.O. Box 566 Mr. James R. Hebert, Manager Putney, VT 05346-0566 Nuclear Engineering and Licensing | ||
Edgecomb, ME 04556 | ~ | ||
Maine Yankee Atomic Power Company Mr. Michael B. Sellman, President 329 Bath Road Maine Yankee Atomic Power Company Brunswick, ME 04011 329 Bath Road Brunswich, ME 04011 Friends of the Coast P.O. Box 98 Edgecomb, ME 04556 j | |||
4 | |||
O RESPONSE TO COMMENTS BY THE STATE OF MAINE MAINE YANKEE PROPOSED TECHNICAL SPECIFICATION NO. 200 | O RESPONSE TO COMMENTS BY THE STATE OF MAINE MAINE YANKEE PROPOSED TECHNICAL SPECIFICATION NO. 200 l | ||
Comment No. I | Comment No. I j | ||
Since December of 1995 Maine Yankee has been reanalyzing its calculated peak | In Section 4.4.1.3 (a) of the proposed change, Maine Yankee appears to be establishing..by default, a calculated peak accident pressure, P, of 50 psig. | ||
has not been published yet, current estimates place it very near to its design pressure of 55 psig. We believe that as written the Tech Specs would | Since December of 1995 Maine Yankee has been reanalyzing its calculated peak i | ||
automatically default in the future to 50 psig instead of any newly calculated | accident pressure as part of an allegation inquiry. Although the final value has not been published yet, current estimates place it very near to its design pressure of 55 psig. | ||
peak accident pressure. This could lead to an interpretation that Type A, B, and C tests performed at 50 psig, instead of the reanalyzed peak accident pressure, would be appropriate, even though they would be in direct conflict with the intent and requirements of Appendix J, Option B. | We believe that as written the Tech Specs would automatically default in the future to 50 psig instead of any newly calculated | ||
pressure for Type A, B and C tests conducted in accordance with this TS shall | ) | ||
peak accident pressure. This could lead to an interpretation that Type A, B, and C tests performed at 50 psig, instead of the reanalyzed peak accident pressure, would be appropriate, even though they would be in direct conflict with the intent and requirements of Appendix J, Option B. | |||
Comment No. 2 In sections 4.4.I.1, 4.4.11.1, 4.4.11.2, and 4.4.II.3 of the proposed change the phrase, "as modified by approved exemptions", appears irrelevant as any exemptions from the rules would require NRC approval prior to implementation. | l NRC Staff Response i | ||
Besides, if Maine Yankee were to endorse another methodology, other than the | The proposed wording of Technical Specification (TS) 4.4.1.3(a) includes the statement that "P will be conservatively assumed to be equal to the containment desig,n pressure (55 psig) for the purposes of containment testing in accordance with this Technical Specification." Therefore, the full test pressure for Type A, B and C tests conducted in accordance with this TS shall i | ||
approval under Appendix J (B) (V-B) prior to implementation. Likewise, if | be 55 psig. Any reduction in the full test pressure below 55 psig would require another amendment to this TS. | ||
be committed to the September 1995 version, unless it wished to adopt the updated revision, in which case NRC approval would probably be required. | The licensee acknowledged this in its September 13, 1996, submittal in which it stated that "a proposed revu'on to the Technical Specifications will be submitted after the containment peak accident pressure is recalculated." | ||
Comment No. 2 In sections 4.4.I.1, 4.4.11.1, 4.4.11.2, and 4.4.II.3 of the proposed change the phrase, "as modified by approved exemptions", appears irrelevant as any exemptions from the rules would require NRC approval prior to implementation. | |||
Besides, if Maine Yankee were to endorse another methodology, other than the one cited in Regulatory Guide 1.163, that methodology would also require NRC approval under Appendix J (B) (V-B) prior to implementation. | |||
Likewise, if there were any future revisions of Reg. Guide 1.163, Maine Yankee would still be committed to the September 1995 version, unless it wished to adopt the updated revision, in which case NRC approval would probably be required. | |||
Moreover, this phrase further implies that exemptions for testing requirements already exist in the FSAR or Tech Specs. We have been unable to uncover any exemptions that are mentioned in either document. | Moreover, this phrase further implies that exemptions for testing requirements already exist in the FSAR or Tech Specs. We have been unable to uncover any exemptions that are mentioned in either document. | ||
NRC Staff Response The State is correct to observe that (1) any exemption pursuant to 10 CFR 50.12 from the requirements of Appendix J would require prior NRC approval; | NRC Staff Response The State is correct to observe that (1) any exemption pursuant to 10 CFR 50.12 from the requirements of Appendix J would require prior NRC approval; | ||
_(2) licensee use of a methodology other than that described in Regulatory | _(2) licensee use of a methodology other than that described in Regulatory | ||
Guide (RG) 1.163 would require prior NRC approval of an amendment to the | ) | ||
Guide (RG) 1.163 would require prior NRC approval of an amendment to the j | |||
---a-----,. | |||
facility TS; and (3). licensee use of a version of.RG 1.163 other than the September 1995 version would require prior NRC approval of an amendment to the | facility TS; and (3). licensee use of a version of.RG 1.163 other than the September 1995 version would require prior NRC approval of an amendment to the facility TS. | ||
The phrase "as modified by approved exemptions" is not intended to imply.that NRC approval would not be required for such exemptions nor that there are j | |||
The phrase "as modified by approved exemptions" is not intended to imply.that | previously approved exemptions. The phrase allows for future NRC approval of exemptions without the undue additional administrative' burden of amending the facility TS. | ||
This is standard wording that is being applied to all amendments related to implementation of Option B of Appendix J to 10 CFR Part 50. | |||
related to implementation of Option B of Appendix J to 10 CFR Part 50. | [gsment No. 3 In 10CFR50, Appendix J (B) (III-A) it stipulates that for a Type A test the i | ||
[gsment No. 3 | allowable leakage rate (L ) with margin must be specified in the Tech Specs. | ||
In 10CFR50, Appendix J (B) (III-A) it stipulates that for a Type A test the | Furthermore it states that the sum of the leakage rates at P,in the Tech for Type B and C i | ||
tests must.be less than L, with margin and also be s'pecified Specs. | |||
Yet except for the Type B air lock test, no margins are designated in L | |||
NRC-Staff Response l | the Tech Specs. | ||
9.2.6 states that | It would seem appropriate that the margins be at least cited-in the basis section of the Tech Specs. | ||
The staff considers the difference between 1.0L, and 0.75L, to be the margin i | NRC-Staff Response l | ||
Maine Yankee Technical Specification 4.4.1.3.b defines L,. | |||
1.0L, and 0.6L, to be the margin required by Appendix J Option B. | NEI 94-01, Section 9.2.6 states that The As-found Type A test leakage rate must be less than the acceptance criterion of 1.0 L, given in the plant Technical Specifications.. Prior to entering a mode where containment integrity is required, the As-left Type A leakage rate shall not exceed 0.75 L,. | ||
In addition to these margins, the Maine Yankee technical specifications Bases | The staff considers the difference between 1.0L, and 0.75L, to be the margin i | ||
point out that the value of L will maintain public exposure well below 10 | required by the Appendix J Option B. | ||
i | Similarly, for the Type B and C tests, NEI 94-01, Section 10.2 defines the i | ||
d l | |||
acceptable leakage rate as 0.6L,. | |||
The staff considers the difference between 1.0L, and 0.6L, to be the margin required by Appendix J Option B. | |||
In addition to these margins, the Maine Yankee technical specifications Bases point out that the value of L will maintain public exposure well below 10 CFR 100 values "under the most adverse design basis accident conditions." | |||
Comment No. 4 The. State is willing to. accept Maine Yankee's position that the last full pressure test conducted in 1988 meets the industry guidance as set forth in Reg. Guide 1.163. | |||
However, the State is very concerned that the NRC considers extrapolations of reduced pressure tests to full pressure tests as i | |||
_.--,,..,--.m__ | |||
__y | |||
i-l' - | i-l' - | ||
l, | l, 3 | ||
unsuccessful and that Maine Yankee has performed only one full pressure test in the last 25-years. To ensure greater confidence in the integrity of the i | |||
containment building, the State proposes that Maine Yankee. commit to the NRC that the next Type A test will be performed at the reanalyzed peak accident | |||
- pressure and within the 10 year testing interval since Maine Yankee's last 4 | |||
' full pressure test in October of 1988. | |||
J NRC Staff Response | J NRC Staff Response The Maine Yankee 1988 Integrated Leak Rate Test (ILRT) was a " Full Pressure Test" conducted at 50 psig, which is the peak accident pressure in the current TSs and in the TSs that were in effect at that time. A partial pressure test was conducted in 1992, as permitted by Appendix J of 10 CFR 50 at that time. | ||
j' Option B permit, the test interval for the ILRT to be extended to 10 years i | |||
j' | ' following two consecutive successful tests, at least one of which must be i | ||
i | |||
i | ' conducted at full pressure. The licensee's 1988 and 1992 tests satisfy this i | ||
the proposed TS, the next test must be conducted at a test pressure of 55 | : requirement. Therefore the test interval may be extended to 10 years. Under the proposed TS, the next test must be conducted at a test pressure of 55 7 | ||
psig, unless the TSs are amended in the future to reference a revised test pressure as a result of the. reanalysis discussed in comment No. 1. | |||
pressure as a result of the. reanalysis discussed in comment | j Comment No. 5 We are very concerned that, if a Type A test fails, the industry guidance cited in Reg.' Guide 1.163 allows up to four years before another retest is administered to ensure adequate performance. We consider this an unreasonable amount of time after a failed test to ensure containment integrity. We believe a timely retest, such as prior to a plant startup, would be more appropriate. | ||
No. 1. | NRC Staff Response Since the technical specifications include the requirement to perform a Type A i | ||
amount of time after a failed test to ensure containment integrity. We believe a timely retest, such as prior to a plant startup, would be more appropriate. | test, if the licensee were to fail a Type A test, the containment would be considered inoperable since a required surveillance test would have been failed. Therefore, the licensee would not be permitted by the technical specifications to resume operation until a successful Type A test had been performed. | ||
NRC Staff Response | Regulatory Guide 1.163 states that, even after performing this successful Type A test, another test is necessary within 4 years. | ||
Comment No. 6 Reg. Guide 1.163 recommends that containment purge valves should be limited to j | |||
Comment No. 6 Reg. Guide 1.163 recommends that containment purge valves should be limited to | a 30 month testing interval. We assume that Maine Yankee will abide by this J | ||
less than exemplary. | recommiendation as the historical performance of their purge valves has been less than exemplary. | ||
] | |||
i | |||
~ | |||
F NRC Staff Response | F NRC Staff Response Maine Yankee technical specification Section 4.4.II.4.b. requires that i | ||
It should be noted that this shorter test interval is not an Appendix J | containment purge supply, exhaust and bypass valves will be leak tested at six-month intervals. | ||
as.a result of a staff study of valves with resilient seals. Regulatory Guide | Since the Maine Yankee licensee has not proposed to change this interval, this requirement remains in effect. | ||
It should be noted that this shorter test interval is not an Appendix J requirement. | |||
Comment No. 7 Although we have not seen any documented evidence that Maine Yankee has | It was included in the technical specifications of many plants as.a result of a staff study of valves with resilient seals. | ||
Regulatory Guide 1.163 restricts the interval to no more than 30 months. | |||
If the technical specifications had not limited the test interval to 6 months, the test interval for the purge, exhaust and bypass valves would have been required to be 30 months since the licensee has included Regulatory Guide 1.163 in the technical specifications. | |||
Comment No. 7 Although we have not seen any documented evidence that Maine Yankee has committed to ANSI /ANS 56.8-1994, we presume they will as both the industry guidance and Reg. Guide 1.163 refer to this standard as a means of demonstrating compliance with Appendix J, Option B. | |||
NRC Staff Resoonse 4 | NRC Staff Resoonse 4 | ||
When the proposed amendment becomes effective, the Maine Yankee technical specifi. cations will require that Appendix J leakage rate testing be performed in accordance with Regulatory Guide 1.163-1995. This regulatory guide references the Nuclear Energy Institute's report NEI 94-01, " Industry Guideline for Implementing Performance-Based Option of 10 CFR 50, Appendix J", | When the proposed amendment becomes effective, the Maine Yankee technical specifi. cations will require that Appendix J leakage rate testing be performed in accordance with Regulatory Guide 1.163-1995. This regulatory guide references the Nuclear Energy Institute's report NEI 94-01, " Industry Guideline for Implementing Performance-Based Option of 10 CFR 50, Appendix J", | ||
dated July 21, 1995. NEI 94-01, in turn, references ANSI /ANS Standard 56.8-1994. Thus, the staff considers this standard to be a technical specification requirement. | dated July 21, 1995. | ||
NEI 94-01, in turn, references ANSI /ANS Standard 56.8-1994. Thus, the staff considers this standard to be a technical specification requirement. | |||
e I | e I | ||
1 i | 1 i | ||
.}} | |||
Latest revision as of 15:16, 11 December 2024
| ML20141F428 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 05/19/1997 |
| From: | Dan Dorman NRC (Affiliation Not Assigned) |
| To: | Dostie P MAINE, STATE OF |
| References | |
| NUDOCS 9705210308 | |
| Download: ML20141F428 (7) | |
Text
.
May 19, 1997 Mr. Patrick J. Dostie State of Maine Nuclear Safety
- Inspector Maine Yankee Atomic Power Station P.O. Box 408 Wiscasset, ME 04578
SUBJECT:
STATE COMMENTS ON MAINE YANKEE PROPOSED CHANGE N0. 200
Dear Mr. Dostie:
I am' responding to your letter dated April 15, 1997, providing the State's objection to and coments on the Maine Yankee Atomic Power Company's proposed Technical Specification No. 200, dated September 13,1996, as supplemented by letter dated January 15, 1997. The staff has reviewed your comments and our responses to your specific comments related to the proposed amendment are contained'in Enclosure 1.
4 You provided additional generic comments regarding the implementation of Option B of Appendix J to 10 CFR Part 50.
The staff's_ response to these comments is also provided in Enclosure 1.
Based on its review,.the staff concludes the your comments are adequately addressed in the. licensee's. proposed chango.
Therefore, the staff intends to issue the proposed amendment.
If you have any questions on this matter, please call me at (301) 415-1429.
Sincerely, (Original Signed By) i Daniel H. Dorman, Project Manager Project Directorate I-3 i
Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-309
Enclosure:
Response to Comments j
cc w/ encl:
See next page DISTRIBUTION g g QQ(h Docket File R. Clark j
PUBLIC D. Dorman
[
PDI-3 Rdg.
E. Peyton S. Varga C. Berlinger J. Zwolinski OGC
/
I
. DOCUMENT NAME:
G:\\DORMAN\\MYM96588.SOM To,eceive a copy of thee document,Indcate in the boa: "C"
- Copy without attachment / enclosure "E" = Coofiyitty 9thhment/ enclosure "N* = No eqpy 0FFICE PDI 3/PM _, l PDI 3/PM l
PDI-3/LA C\\SCS8 (
@E DD/DRPE Ml
)
NAME' RClark @
DDorman h8h EPeyton MiCL CBerlingeI-JZwolinski /
i DATE 05//3 /fT/
05/13 /97 05/1 3 /97 05//9/97 g
05/ /7 /97 0FFICIAL RECORD COPY 9705210308 970519 PDR ADOCK 05000309 P
- ou i
y" t
UNITED STATES g
j NUCLEAR RE2ULATCRY COMMISSION WASHINGTON D.C. 30666 0001
'+.,......,o!
May 19, 1997 Mr. Patrick J. Dostie l
State of Maine Nuclear Safety i
Inspector Maine Yankee Atomic Power Station P.O. Box 408 Wiscasset, ME 04578
SUBJECT:
STATE COMMENTS ON MAINE YANKEE PROPOSED CHANGE NO. 200
Dear Mr. Dostie:
I am responding to your letter dated April 15, 1997, providing the State's objection to and coments on the Maine Yankee Atomic Power Company's proposed Technical Specification No. 200, dated September 13, 1996, as supplemented by letter dated January 15, 1997.
The staff has reviewed your coments and our responses to your specific coments related to the proposed amendment are contained in Enclosure 1.
You provided additional generic comments regarding the implementation of Option 8 of Appendix J to 10 CFR Part 50. The staff's response to these coments is also provided in Enclosure 1.
Based on its review, the staff concludes that your coments are adequately addressed in the licensea's proposed change. Therefore, the staff intends to issue the proposed amendment.
If you have any questions on this matter, please call me at (301) 415-1429.
Sincerely, i
Ch Daniel H. Dorman, Project Manager Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-309
Enclosure:
Response to Coments cc w/ encl: See next page a a ~
Mr. Patrick J. Dostie cc w/ enc 1:
Mr. Charles B. Brinkman Mr. Robert W. Blackmore Manager - Washington Nuclear Plant Manager Operations Maine Yankee Atomic Power Station ABB Combustion Engineering P.O. Box 408 12300 Twinbrook Parkway, Suite 330 Wiscasset, ME 04578 Rockville, HD 20852 Mr. Michael J. Meisner Thomas G. Dignan, Jr., Esquire Vice-President Ropes & Gray Licensing and Regulatory Compliance One International Place Maine Yankee Atomic Power Company Boston, MA 02110-2624 329 Bath Road Brunswick, ME 04011 Mr. Uldis Vanags State Nuclear Safety Advisor Mr. Bruce E. Hinkley, Acting State Planning Office Vice-President, Engineering i
State House Station #38 Maine Yankee Atomic Power Company Augusta, ME 04333 329 Bath Road Brunswick, ME 04011 Mr. P. L. Anderson, Project Manager Yankee Atomic Electric Company Mr. Patrick J. Dostie 580 Main Street State of Maine Nuclear Safety Bolton, MA 01740-1398 Inspector Maine Yankee Atomic Power Station Regional Administrator, Region I P.O. Box 408 U.S. Nuclear Regulatory Commission Wiscasset, ME 04578 475 Allendale Road King of Prussia, PA 19406 Mr. Graham M. Leitch Vice President, Operations First Selectman of Wiscasset Maine Yankee Atomic Power Station Municipal Building P.O. Box 408 U.S. Route 1 Wiscasset, ME 04578 1
Wiscasset, ME 04578 Mary Ann Lynch, Esquire Mr. J. T. Yerokun Maine Yankee Atomic Power Company Senior Resident Inspector 329 Bath Road Maine Yankee Atomic Power Station Brunswick, ME 04578 U.S. Nuclaar Regulatory Commission P.O. Box E Mr. Jonathan M. Block Wiscasset, ME 04578 Attorney at Law j
P.O. Box 566 Mr. James R. Hebert, Manager Putney, VT 05346-0566 Nuclear Engineering and Licensing
~
Maine Yankee Atomic Power Company Mr. Michael B. Sellman, President 329 Bath Road Maine Yankee Atomic Power Company Brunswick, ME 04011 329 Bath Road Brunswich, ME 04011 Friends of the Coast P.O. Box 98 Edgecomb, ME 04556 j
4
O RESPONSE TO COMMENTS BY THE STATE OF MAINE MAINE YANKEE PROPOSED TECHNICAL SPECIFICATION NO. 200 l
Comment No. I j
In Section 4.4.1.3 (a) of the proposed change, Maine Yankee appears to be establishing..by default, a calculated peak accident pressure, P, of 50 psig.
Since December of 1995 Maine Yankee has been reanalyzing its calculated peak i
accident pressure as part of an allegation inquiry. Although the final value has not been published yet, current estimates place it very near to its design pressure of 55 psig.
We believe that as written the Tech Specs would automatically default in the future to 50 psig instead of any newly calculated
)
peak accident pressure. This could lead to an interpretation that Type A, B, and C tests performed at 50 psig, instead of the reanalyzed peak accident pressure, would be appropriate, even though they would be in direct conflict with the intent and requirements of Appendix J, Option B.
l NRC Staff Response i
The proposed wording of Technical Specification (TS) 4.4.1.3(a) includes the statement that "P will be conservatively assumed to be equal to the containment desig,n pressure (55 psig) for the purposes of containment testing in accordance with this Technical Specification." Therefore, the full test pressure for Type A, B and C tests conducted in accordance with this TS shall i
be 55 psig. Any reduction in the full test pressure below 55 psig would require another amendment to this TS.
The licensee acknowledged this in its September 13, 1996, submittal in which it stated that "a proposed revu'on to the Technical Specifications will be submitted after the containment peak accident pressure is recalculated."
Comment No. 2 In sections 4.4.I.1, 4.4.11.1, 4.4.11.2, and 4.4.II.3 of the proposed change the phrase, "as modified by approved exemptions", appears irrelevant as any exemptions from the rules would require NRC approval prior to implementation.
Besides, if Maine Yankee were to endorse another methodology, other than the one cited in Regulatory Guide 1.163, that methodology would also require NRC approval under Appendix J (B) (V-B) prior to implementation.
Likewise, if there were any future revisions of Reg. Guide 1.163, Maine Yankee would still be committed to the September 1995 version, unless it wished to adopt the updated revision, in which case NRC approval would probably be required.
Moreover, this phrase further implies that exemptions for testing requirements already exist in the FSAR or Tech Specs. We have been unable to uncover any exemptions that are mentioned in either document.
NRC Staff Response The State is correct to observe that (1) any exemption pursuant to 10 CFR 50.12 from the requirements of Appendix J would require prior NRC approval;
_(2) licensee use of a methodology other than that described in Regulatory
)
Guide (RG) 1.163 would require prior NRC approval of an amendment to the j
---a-----,.
facility TS; and (3). licensee use of a version of.RG 1.163 other than the September 1995 version would require prior NRC approval of an amendment to the facility TS.
The phrase "as modified by approved exemptions" is not intended to imply.that NRC approval would not be required for such exemptions nor that there are j
previously approved exemptions. The phrase allows for future NRC approval of exemptions without the undue additional administrative' burden of amending the facility TS.
This is standard wording that is being applied to all amendments related to implementation of Option B of Appendix J to 10 CFR Part 50.
[gsment No. 3 In 10CFR50, Appendix J (B) (III-A) it stipulates that for a Type A test the i
allowable leakage rate (L ) with margin must be specified in the Tech Specs.
Furthermore it states that the sum of the leakage rates at P,in the Tech for Type B and C i
tests must.be less than L, with margin and also be s'pecified Specs.
Yet except for the Type B air lock test, no margins are designated in L
the Tech Specs.
It would seem appropriate that the margins be at least cited-in the basis section of the Tech Specs.
NRC-Staff Response l
Maine Yankee Technical Specification 4.4.1.3.b defines L,.
NEI 94-01, Section 9.2.6 states that The As-found Type A test leakage rate must be less than the acceptance criterion of 1.0 L, given in the plant Technical Specifications.. Prior to entering a mode where containment integrity is required, the As-left Type A leakage rate shall not exceed 0.75 L,.
The staff considers the difference between 1.0L, and 0.75L, to be the margin i
required by the Appendix J Option B.
Similarly, for the Type B and C tests, NEI 94-01, Section 10.2 defines the i
d l
acceptable leakage rate as 0.6L,.
The staff considers the difference between 1.0L, and 0.6L, to be the margin required by Appendix J Option B.
In addition to these margins, the Maine Yankee technical specifications Bases point out that the value of L will maintain public exposure well below 10 CFR 100 values "under the most adverse design basis accident conditions."
Comment No. 4 The. State is willing to. accept Maine Yankee's position that the last full pressure test conducted in 1988 meets the industry guidance as set forth in Reg. Guide 1.163.
However, the State is very concerned that the NRC considers extrapolations of reduced pressure tests to full pressure tests as i
_.--,,..,--.m__
__y
i-l' -
l, 3
unsuccessful and that Maine Yankee has performed only one full pressure test in the last 25-years. To ensure greater confidence in the integrity of the i
containment building, the State proposes that Maine Yankee. commit to the NRC that the next Type A test will be performed at the reanalyzed peak accident
- pressure and within the 10 year testing interval since Maine Yankee's last 4
' full pressure test in October of 1988.
J NRC Staff Response The Maine Yankee 1988 Integrated Leak Rate Test (ILRT) was a " Full Pressure Test" conducted at 50 psig, which is the peak accident pressure in the current TSs and in the TSs that were in effect at that time. A partial pressure test was conducted in 1992, as permitted by Appendix J of 10 CFR 50 at that time.
j' Option B permit, the test interval for the ILRT to be extended to 10 years i
' following two consecutive successful tests, at least one of which must be i
i
' conducted at full pressure. The licensee's 1988 and 1992 tests satisfy this i
- requirement. Therefore the test interval may be extended to 10 years. Under the proposed TS, the next test must be conducted at a test pressure of 55 7
psig, unless the TSs are amended in the future to reference a revised test pressure as a result of the. reanalysis discussed in comment No. 1.
j Comment No. 5 We are very concerned that, if a Type A test fails, the industry guidance cited in Reg.' Guide 1.163 allows up to four years before another retest is administered to ensure adequate performance. We consider this an unreasonable amount of time after a failed test to ensure containment integrity. We believe a timely retest, such as prior to a plant startup, would be more appropriate.
NRC Staff Response Since the technical specifications include the requirement to perform a Type A i
test, if the licensee were to fail a Type A test, the containment would be considered inoperable since a required surveillance test would have been failed. Therefore, the licensee would not be permitted by the technical specifications to resume operation until a successful Type A test had been performed.
Regulatory Guide 1.163 states that, even after performing this successful Type A test, another test is necessary within 4 years.
Comment No. 6 Reg. Guide 1.163 recommends that containment purge valves should be limited to j
a 30 month testing interval. We assume that Maine Yankee will abide by this J
recommiendation as the historical performance of their purge valves has been less than exemplary.
]
i
~
F NRC Staff Response Maine Yankee technical specification Section 4.4.II.4.b. requires that i
containment purge supply, exhaust and bypass valves will be leak tested at six-month intervals.
Since the Maine Yankee licensee has not proposed to change this interval, this requirement remains in effect.
It should be noted that this shorter test interval is not an Appendix J requirement.
It was included in the technical specifications of many plants as.a result of a staff study of valves with resilient seals.
Regulatory Guide 1.163 restricts the interval to no more than 30 months.
If the technical specifications had not limited the test interval to 6 months, the test interval for the purge, exhaust and bypass valves would have been required to be 30 months since the licensee has included Regulatory Guide 1.163 in the technical specifications.
Comment No. 7 Although we have not seen any documented evidence that Maine Yankee has committed to ANSI /ANS 56.8-1994, we presume they will as both the industry guidance and Reg. Guide 1.163 refer to this standard as a means of demonstrating compliance with Appendix J, Option B.
NRC Staff Resoonse 4
When the proposed amendment becomes effective, the Maine Yankee technical specifi. cations will require that Appendix J leakage rate testing be performed in accordance with Regulatory Guide 1.163-1995. This regulatory guide references the Nuclear Energy Institute's report NEI 94-01, " Industry Guideline for Implementing Performance-Based Option of 10 CFR 50, Appendix J",
dated July 21, 1995.
NEI 94-01, in turn, references ANSI /ANS Standard 56.8-1994. Thus, the staff considers this standard to be a technical specification requirement.
e I