{{#Wiki_filter:. | {{#Wiki_filter:. 1 to Document Control Desk Letter January 6, 1988 Page 1 of 7 6.0 ADMINISTRATIVE CONTROLS | ||
__.= | __.= | ||
6.1 | 6.1 RESPONSIBILITY 6.1.1 The Director, Nuclear Plant Operations shall be responsible for overall unit operation and shall delegate ir, writing the succession to this responsi-bility during his absence. | ||
6.1. 2 The Shift Suoervisor shall be responsible for unit operations. A management directise to this effect, signed by the Vice Presideat, Nuclear Operations, shall be reissued to all station personnel on an annual basis. | The title Director, Nuclear Plant Operations, is j8 synonymous to the titles Manager, Virgil C. Summer Nuclear Station, Station Manager or Plant Manager. | ||
6.1. 2 The Shift Suoervisor shall be responsible for unit operations. | |||
A management directise to this effect, signed by the Vice Presideat, Nuclear Operations, shall be reissued to all station personnel on an annual basis. | |||
6.2 ORGANIZATION n e e e -- | 6.2 ORGANIZATION n e e e -- | ||
V6 | V6 i.A aw Mcbol 6.2.1 The off;it; organization for unit management and technical support shall be as shown on Figure 6.2-1 and: | ||
6.2.1 The off;it; organization for unit management and technical support shall be as shown on Figure 6.2-1 and: | '' NIT "TAri 5.2.2 The unit organi ;ti;n shall bc :: sh,en en Figure S. 2-2 and: ' | ||
t Each on-duty shift shall be composed of at least the minimum shift a. | |||
crew composition shown in Table 6.2-1. | |||
b. | |||
At least one licensed Reactor Operator shall be in the control room when fuel is in the reactor. | |||
In addition, while the unit is in MODE 1, 2, 3 or 4, at least one Lic'ensed Senior Reactor Operator shall be in the Control Room. | |||
All CORE ALTERATIONS shall be observed and directly supervised by | A health physics tecnnician# shall be on site when fuel is in the c. | ||
o reactor. | |||
8o | .cbb o | ||
o-d. | |||
All CORE ALTERATIONS shall be observed and directly supervised by either a licensed Senior Reactor Operator or Senior Reactor Operator o | |||
The health physics technician and Fire Brigade composition may be less than | , $o Limited to Fuel Handling who has no other concurrent responsibilities during this operation. | ||
8o e. | |||
SUMMER - UNIT 1 | A site Fire Bpigade of at least 5 members shall be maintained onsite | ||
*/ | |||
at all times. | |||
Tne Fire Brigade shall not include the Shift Supervisor and the other 2 members of the minimum shift crew necessary for safe shutcown of the unit and any personnel required for other essential functions during a fire emergency. | |||
The health physics technician and Fire Brigade composition may be less than the minimum recuirements for a period of time not to exceed 2 hours in order to accommodate unexpected absence provided immediate action is taken to fill the required positions. | |||
SUMMER - UNIT 1 6-1 Amendment No.18 | |||
~ | |||
a PRESIDENT AND CHIEF | a PRESIDENT AND CHIEF OPERATING OFFICER i | ||
OPERATING OFFICER | I uo> | ||
cu m c+ | cu m c+ | ||
EMCUTIVE VICE PRESIDENT | EMCUTIVE VICE PRESIDENT | ||
OPERATIONS | @ g. | ||
I | OPERATIONS g 5 % ;- | ||
8 I | |||
DIRECTOR | *M o | ||
l' | VICE PRESIDENT 5 | ||
l | NUCLEAR OPERATIONS e-a - ' | ||
STATION OPERATIONS | $*Et l | ||
8' n | |||
DIRECTOR 5 | |||
[- | NUCLEAR PLANT OPERATIONS l' | ||
o O | |||
l l | |||
A,' | |||
STATION OPERATIONS STATION SUPDORT NUCLEAR SERVICES ENGINEERING SERVICES NUCLEAR SAFETY ' | |||
CONTROL ROOM | b o' | ||
MODIFICATIONS & | ~ | ||
l l | |||
Virgil C. Summer Nudear Station, Station Manager, or Plant Manager. | l | ||
[- | |||
l l | |||
m, | |||
w, e | |||
g' l DESIGN ENGINEERING l L | |||
OPERATIONS | |||
' CHEMISTRY & | |||
NUCLEAR LICENSING TECKNICAL OVERSIGHT SRO HEALTH PHYSICS l | |||
g; fD | |||
-1 SHIFT SUPERVISO..S FACILITIES & | |||
OPERATIONS TRAINING SYSTEMS & TEST CORPORATE HEALTH SRO ADMINISTRATION PHYSICS I | |||
CONTROL ROOM SECURITY & | |||
TECHNICAL TRAINING NL' CLEAR FUELS QUALITY SYSTEMS SUPERVISORS EMERGENCY SRO PREPAREDNESS I | |||
MATERIALS & | |||
PROJECT CONTROLS REACTO9 OPERATORS PROCUREMENT g | |||
FIGURE 6 2-1 RO SOUTH CAROLINA ELECTR4C & GAS COMPANY VtRGit C. SUMMER NUCLE AR STATION MAINTENANCE - | |||
FUNCTIONAL ORGANtZATION SERVICES NOYE: Health Phys Supervision has dkett auess to the Director, Nuctear Plant Operations in matters concerning ar*y phase of radiological protectk n. | |||
MODIFICATIONS & | |||
NOTE: The titic Dwector, Nudear Plant Operattons. is synnnymous with tne title Manager 09TAGES Virgil C. Summer Nudear Station, Station Manager, or Plant Manager. | |||
g | g DELET E il* | ||
il* | D:3ECTOR, NUCLEAR | ||
,cenot, E | |||
:1 I | |||
E | e e | ||
:1 | OMRAI AND REGULATORY IICH AND MAaNTE E | ||
COMPtRANCE 5 | |||
7 SE RYsCE S | |||
\\ | |||
N | / | ||
OPEAATIONS | N I | ||
/ | |||
I OPEAATIONS i[98ANCE TECHNICAL 5ECURelY SUPPORT SER'VICli l | |||
SnO (8CE 5'N | |||
/ | |||
SaO | i s | ||
CHEemsvay Suitt sunnyt50a5 MEOSANsCAL SaO Ma m t ngAtin enysics e | |||
(OosiaOt mOOM | / | ||
(OosiaOt mOOM ELECT 1 | |||
u c., | M NCE Surt Ave 5045 M | ||
weSinuestser Asso | L ADMsNt51RAleON j | ||
u c., | |||
m ,o ,ona ,,ons | N weSinuestser Asso EF% | ||
m,o,ona,,ons | |||
/ | |||
COAT e M a50aNet S | |||
"'Q y n | |||
'TES N%- | |||
{ | { | ||
VIRGIL C. SUMMER NUCLEAd STATION | |||
$@~ | |||
m | FIGURE 6 2-2 m | ||
3 FUNCTIONAL ORGANIZATION o | |||
h | S D | ||
h SRO - 5erwor eactor Operator License c | |||
3 o | |||
Health Physics supervision has direct auess to the Dire,(tor, Nu<icar Plant Operations in matters ton <erning any phase of | RO - A tor Operator License u | ||
o N | |||
Health Physics supervision has direct auess to the Dire,(tor, Nu<icar Plant Operations in matters ton <erning any phase of radiological prone o | |||
ion S | |||
v. | |||
NOTE. The title Director, Nu(leat Plant Operations is synonymous with the title Manager, Virgil C. Summer Nuclear Station. Station Manager or Plant o | |||
Manager. | |||
. 1 to Document Control Desk Letter January 6, 1988 Page 4 of 7 ADMINISTRATIVE CONTROLS 2 | |||
6.2.g INDEPENDENT SAFETY ENGINEERING GROUP (ISEG) | 6.2.g INDEPENDENT SAFETY ENGINEERING GROUP (ISEG) | ||
FUNCTION | FUNCTION | ||
: 6. 2.I.1 The ISEG shall function to examine plant operating characteristics, NRC issuances, industry advisories, Licensee Event Reports and other sources of plant design and operating experience information, including plants of similar design, which may indicate areas for improving plant safety. | : 6. 2.I.1 The ISEG shall function to examine plant operating characteristics, NRC issuances, industry advisories, Licensee Event Reports and other sources of plant design and operating experience information, including plants of similar design, which may indicate areas for improving plant safety. | ||
COMPOSITION | COMPOSITION | ||
: 6. 2.#f.2 The ISEG shall be composed of a multi-disciplined dedicated onsite group with a minimum assigned complement of five engineers or appropriate | : 6. 2.#f.2 The ISEG shall be composed of a multi-disciplined dedicated onsite group with a minimum assigned complement of five engineers or appropriate specialists. | ||
RE6PONSIBILITIES | RE6PONSIBILITIES | ||
: 6. 2.#f.3 The ISEG shall be responsible for maintaining surveillance of plant | : 6. 2.#f.3 The ISEG shall be responsible for maintaining surveillance of plant | ||
{ | |||
activities to provida independent verification | activities to provida independent verification | ||
* that these activities are performed correctly and that human errors are reduced as much as practical. | * that these activities are performed correctly and that human errors are reduced as much as practical. | ||
6.2.)'SHIFTTECHNICALADVISOR | AUTHORITY 6.2.#g'4 The ISEG shall make detailed recommendations for procedure revisions, equipment modifications, maintenance activities, operations activities or other means of improving plant safety to the Cr:up Manager,-Testmkal Scr"ices. | ||
The Shift Technical Advisor shall provide technical support to the Shift Supervisor in the areas of, thermal hydraulics, reactor engineering and plant | 6.2.)'SHIFTTECHNICALADVISOR The Shift Technical Advisor shall provide technical support to the Shift Supervisor in the areas of, thermal hydraulics, reactor engineering and plant analysis with regard to the safe operation of the unit. | ||
6.3 UNIT STAFF QUALIFICATIONS 6.3.1 Each member of the unit staff shall meet or exceed the minimum qualifica- | 6.3 UNIT STAFF QUALIFICATIONS 6.3.1 Each member of the unit staff shall meet or exceed the minimum qualifica-i tions of ANSI N18.1-1971 for comparable positions and the supplemental require-ments specified in Sections A and C of Enclosure 1 of the {{letter dated|date=March 28, 1980|text=March 28, 1980 letter}} to all licensees as clarified in NUREG-0737, Section I. A.2.1, except for the l | ||
Regulatory Guide 1.8, September 1975, the Shift Technical Advisor who shall meet or exceed the qualifications referred to in Section 2.2.1.b of Enclosure I of the October 30, 1979 NRC letter to all operating nuclear power plants, and the members of the Independent Safety Engineering Group, each of whom shall have a Bachelor of Science degree or registered Professional Engineer and at least two years experience in their field. At least one year experience shall t,e in the nuclear field. | Associate Manager, Health Physics who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975, the Shift Technical Advisor who shall meet or exceed the qualifications referred to in Section 2.2.1.b of Enclosure I of the October 30, 1979 NRC letter to all operating nuclear power plants, and the members of the Independent Safety Engineering Group, each of whom shall have a Bachelor of Science degree or registered Professional Engineer and at least two years experience in their field. | ||
At least one year experience shall t,e in the nuclear field. | |||
SUMMER - UNIT 1 | 6.4 TRAINING 6.4.1 A retraining and replacement training program for the unit staff shall be maintained and shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI N18.1-1971 and Appendix "A" of 10 CFR Part SE and the su9plemental requirements specified in Sections A and C of Enclosure 1 of the March 28, 1980 NRC letter to all licensees, and shall include familiarization vith identified relevant industry operational experience. | ||
*Not responsible for sign-off function. | |||
SUMMER - UNIT 1 6-5 Amendment No. 36 | |||
-=e-a | |||
Attachment II to Document Control Desk Letter January 6, 1988 | Attachment II to Document Control Desk Letter January 6, 1988 Page 5 of 7 ADMINISTRATIVE CONTROLS i | ||
Page 5 of 7 | 6.5 REVIEW AND AUDIT 6.5.1 PLANT SAFETY REVIEW COMMITTEE (PSRC), | ||
j FUNCTION j | |||
6.5 REVIEW AND AUDIT | 6.5.1.1 The PSRC shall function to advise the Director, Nuclear Plant Opera-s i | ||
6.5.1 PLANT SAFETY REVIEW COMMITTEE (PSRC), | tions on all matters related to nuclear safety. | ||
l | l COMPOSITION | ||
COMPOSITION | ' " 1.2 The P1:nt S:fety Revier Cc-itte :hel' be :: p:::d Of th:: | ||
) | |||
Cha Director, Nuclear Plar,t Operat | |||
Cha Director, Nuclear Plar,t Operat | \\ | ||
A7MC//4b Member: | l Deputy Director, 0 s and Maintenance IB 'l g | ||
Member: | Member: | ||
Member- | Manager Oper j | ||
A7MC//4b Member: | |||
MEETING FRE0VENCY 6.5.1.4 The PSRC shall meet at least once per calendar month and as convened | a chnical Support Member: | ||
anager Mal e Services Member: | |||
Group Manager, Techn Support Services Member-Associate Manager, Health l | |||
Health Physics Supervisor ALTERNATES 6.5.1.3 All alternate members shall be appointed in writing by the PSRC i | |||
Chairman to serve on a temporary basis; however, no more than two alternates including the Chairman's alternate, if applicable, shall participate as voting 1 | |||
members in PSRC activities at any one time. | |||
MEETING FRE0VENCY 6.5.1.4 The PSRC shall meet at least once per calendar month and as convened by the PSRC Chairman or his designated alternate. | |||
QUORUM | QUORUM | ||
'6. 5.1. 5 The minimum quorum of the PSRC necessary %r the perfoniance of the PSRC responsibility and authority provisiens of these Technical D ecifications shall consist of the Chair 1 nan or his designated alternate ant %ree members including alternates. | |||
shall consist of the Chair 1 nan or his designated alternate ant %ree members | RESPONSIBILITIE_S 6.5.1.5 The Plant Safety Review Comittee shall review: | ||
including alternates. | a. | ||
RESPONSIBILITIE_S 6.5.1.5 The Plant Safety Review Comittee shall review: | Station administrative procedures and changes thereto, b. | ||
The safety evaluations for 1) procedurs:, 2) changes to procedures, equipment or systems, and 3) T.ests or expe-iments completed under the provision of Section 50.59, 10 CFR, to ve rify that such actions did not constitute an unreviewed safety question and all programs required by Specification 6.8 and changes thereto. | |||
c. | |||
required by Specification 6.8 and changes thereto. | Proposed procedures and changes to pro:edures, equipment or systems which may involve an unreviewed safety question as defined in Section 50.59, 10 CFR. | ||
d. | |||
Proposed tests or experiments which may involvs an enreviewed safety g | |||
question as defined in Section 50.59, 10 CFR. | |||
SUMMER - UNIl 1 | P"c'osed changes to Techn? al Specifications or the Operating License. | ||
e. | |||
SUMMER - UNIl 1 6-6 Amendment No.18 | |||
.. ~, | |||
.~ | |||
Attachment Il to Document Control Desk Letter | |||
~ January.6, 1988 Page 6 cf 7 COMPOSITION 6.5.1.2 The Plant Safety Review Committee shall be composed of the: | |||
Chairman: | Chairman: | ||
Director, Nuclear Plant Operations, or General Manager, Station Operations Member: | |||
General Manager, Station Support Member: | |||
Manager, Operations Member: | |||
Manager, Maintenance Services Member: | |||
Manager, Chemistry and Health Physics Member: | |||
Manager, Core Engineering & Nuclear Computer Services Member: | |||
Manager, Design Engineering 9 | |||
t | t | ||
Attachment II to Document Control Desk letter January 6, 1988 | Attachment II to Document Control Desk letter January 6, 1988 Page 7 of 7 A0dINISTRATIVE CONTROLS j | ||
A0dINISTRATIVE CONTROLS | l RECOR05 6.5.2.10 Records of NSRC activities shall be prepared, approved and distributed f | ||
as indicated below: | |||
RECOR05 6.5.2.10 Records of NSRC activities shall be prepared, approved and distributed | a. | ||
Minutes of ecch NSRC meeting shall be prepared, approved and forwarded to the Vice President, Nuclear Operations within 14 days following each meeting. | |||
b. | |||
Reports of reviews encompassed by Section 6.5.2.7 above, rhall be pre-pared, approved and forwarded to the Vice President, Nucl4ar Opera-tions within 14 days following completion of the review. | |||
6.5.3 T6CHNICAL REVIEW AND CONTROL | c. | ||
Audit summary reports encompassed by Section 6.5.2.8 above, shall be forwarded to the NSRC and to the Vice President, Nuclear Operations. | |||
Full audits shall be forwarded to the management positions responsi-i ble for the areas audited within 30 days after completion of the audit by the auditing organization, 6.5.3 T6CHNICAL REVIEW AND CONTROL ACTIVITIES 6.5.3.1 Activities which affect nuclear safety shall be conducted as follows: | |||
dures which affect plant nuclear safety, and changes thereto, shall | a. | ||
Procedures required by Technical Specification 6.8 and other proce-dures which affect plant nuclear safety, and changes thereto, shall i | |||
structures, systems and components shall be reviewed as designated uy | be prepared, reviewed and approved. | ||
Enynee,;D | Each such procedure or procedure change shall be reviewed by an individual / group other than the individual / group which prepared the procedure or procedure change, but i | ||
by an individual / group other than the individual / group which designed the modification, be. who may be from the same organization as the | who may be from the same organization as the individual /graup which I | ||
modifications to plai .iuclear safety-related structures, systems anc | prepared the procedure or procedure change. | ||
Procedures other than Administrative Procedures will be approved as delineated in writing by the Director, Nuclear Plant Operations. | |||
The Director, Nuclear Plant i | |||
Operations will approve administrative procedures, security implement-ing procedures and emergency plan implementing procedures. | |||
Temporary approval to procedures which clearly do not change the intent of the approved procedures can be made by two members of the plant management staff, at least one of whom holds a Senior Reactor Operator's License. | |||
For changes to procedures which may involve a change in intent of the i | |||
approved procedures, the person authorized above to approve the proce-dure shall approve the change, b. | |||
Proposed changes or modifications to pla:1t nuclear safety-related structures, systems and components shall be reviewed as designated uy Enynee,;D the Director, Nuclear Plant Ogerations. | |||
Each such modification shall be designed as authorized by,,chnicci-Services and shall be reviewed | |||
) | |||
by an individual / group other than the individual / group which designed the modification, be. who may be from the same organization as the individual / group whi. | |||
1esigned the modifications. | |||
Implementation of modifications to plai | |||
.iuclear safety-related structures, systems anc components shall be u ncurred in by the Director, Nuclear Plant Operations. | |||
SUMMER - UNIT 1 6-11 Amendment No. % 49 1}} | |||
Latest revision as of 09:58, 11 December 2024
| ML20149E844 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 01/06/1988 |
| From: | SOUTH CAROLINA ELECTRIC & GAS CO. |
| To: | |
| Shared Package | |
| ML20149E827 | List: |
| References | |
| NUDOCS 8801140029 | |
| Download: ML20149E844 (7) | |
Text
. 1 to Document Control Desk Letter January 6, 1988 Page 1 of 7 6.0 ADMINISTRATIVE CONTROLS
__.=
6.1 RESPONSIBILITY 6.1.1 The Director, Nuclear Plant Operations shall be responsible for overall unit operation and shall delegate ir, writing the succession to this responsi-bility during his absence.
The title Director, Nuclear Plant Operations, is j8 synonymous to the titles Manager, Virgil C. Summer Nuclear Station, Station Manager or Plant Manager.
6.1. 2 The Shift Suoervisor shall be responsible for unit operations.
A management directise to this effect, signed by the Vice Presideat, Nuclear Operations, shall be reissued to all station personnel on an annual basis.
6.2 ORGANIZATION n e e e --
V6 i.A aw Mcbol 6.2.1 The off;it; organization for unit management and technical support shall be as shown on Figure 6.2-1 and:
NIT "TAri 5.2.2 The unit organi ;ti;n shall bc :: sh,en en Figure S. 2-2 and: '
t Each on-duty shift shall be composed of at least the minimum shift a.
crew composition shown in Table 6.2-1.
b.
At least one licensed Reactor Operator shall be in the control room when fuel is in the reactor.
In addition, while the unit is in MODE 1, 2, 3 or 4, at least one Lic'ensed Senior Reactor Operator shall be in the Control Room.
A health physics tecnnician# shall be on site when fuel is in the c.
o reactor.
.cbb o
o-d.
All CORE ALTERATIONS shall be observed and directly supervised by either a licensed Senior Reactor Operator or Senior Reactor Operator o
, $o Limited to Fuel Handling who has no other concurrent responsibilities during this operation.
8o e.
A site Fire Bpigade of at least 5 members shall be maintained onsite
- /
at all times.
Tne Fire Brigade shall not include the Shift Supervisor and the other 2 members of the minimum shift crew necessary for safe shutcown of the unit and any personnel required for other essential functions during a fire emergency.
The health physics technician and Fire Brigade composition may be less than the minimum recuirements for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accommodate unexpected absence provided immediate action is taken to fill the required positions.
SUMMER - UNIT 1 6-1 Amendment No.18
~
a PRESIDENT AND CHIEF OPERATING OFFICER i
I uo>
cu m c+
EMCUTIVE VICE PRESIDENT
@ g.
OPERATIONS g 5 % ;-
8 I
- M o
VICE PRESIDENT 5
NUCLEAR OPERATIONS e-a - '
$*Et l
8' n
DIRECTOR 5
NUCLEAR PLANT OPERATIONS l'
o O
l l
A,'
STATION OPERATIONS STATION SUPDORT NUCLEAR SERVICES ENGINEERING SERVICES NUCLEAR SAFETY '
b o'
~
l l
l
[-
l l
m,
w, e
g' l DESIGN ENGINEERING l L
OPERATIONS
' CHEMISTRY &
NUCLEAR LICENSING TECKNICAL OVERSIGHT SRO HEALTH PHYSICS l
g; fD
-1 SHIFT SUPERVISO..S FACILITIES &
OPERATIONS TRAINING SYSTEMS & TEST CORPORATE HEALTH SRO ADMINISTRATION PHYSICS I
CONTROL ROOM SECURITY &
TECHNICAL TRAINING NL' CLEAR FUELS QUALITY SYSTEMS SUPERVISORS EMERGENCY SRO PREPAREDNESS I
MATERIALS &
PROJECT CONTROLS REACTO9 OPERATORS PROCUREMENT g
FIGURE 6 2-1 RO SOUTH CAROLINA ELECTR4C & GAS COMPANY VtRGit C. SUMMER NUCLE AR STATION MAINTENANCE -
FUNCTIONAL ORGANtZATION SERVICES NOYE: Health Phys Supervision has dkett auess to the Director, Nuctear Plant Operations in matters concerning ar*y phase of radiological protectk n.
MODIFICATIONS &
NOTE: The titic Dwector, Nudear Plant Operattons. is synnnymous with tne title Manager 09TAGES Virgil C. Summer Nudear Station, Station Manager, or Plant Manager.
g DELET E il*
D:3ECTOR, NUCLEAR
,cenot, E
- 1 I
e e
OMRAI AND REGULATORY IICH AND MAaNTE E
COMPtRANCE 5
\\
/
N I
/
I OPEAATIONS i[98ANCE TECHNICAL 5ECURelY SUPPORT SER'VICli l
SnO (8CE 5'N
/
i s
CHEemsvay Suitt sunnyt50a5 MEOSANsCAL SaO Ma m t ngAtin enysics e
/
(OosiaOt mOOM ELECT 1
M NCE Surt Ave 5045 M
L ADMsNt51RAleON j
u c.,
N weSinuestser Asso EF%
m,o,ona,,ons
/
COAT e M a50aNet S
"'Q y n
'TES N%-
{
VIRGIL C. SUMMER NUCLEAd STATION
$@~
FIGURE 6 2-2 m
3 FUNCTIONAL ORGANIZATION o
S D
h SRO - 5erwor eactor Operator License c
3 o
RO - A tor Operator License u
o N
Health Physics supervision has direct auess to the Dire,(tor, Nu<icar Plant Operations in matters ton <erning any phase of radiological prone o
ion S
v.
NOTE. The title Director, Nu(leat Plant Operations is synonymous with the title Manager, Virgil C. Summer Nuclear Station. Station Manager or Plant o
Manager.
. 1 to Document Control Desk Letter January 6, 1988 Page 4 of 7 ADMINISTRATIVE CONTROLS 2
6.2.g INDEPENDENT SAFETY ENGINEERING GROUP (ISEG)
FUNCTION
- 6. 2.I.1 The ISEG shall function to examine plant operating characteristics, NRC issuances, industry advisories, Licensee Event Reports and other sources of plant design and operating experience information, including plants of similar design, which may indicate areas for improving plant safety.
COMPOSITION
- 6. 2.#f.2 The ISEG shall be composed of a multi-disciplined dedicated onsite group with a minimum assigned complement of five engineers or appropriate specialists.
RE6PONSIBILITIES
- 6. 2.#f.3 The ISEG shall be responsible for maintaining surveillance of plant
{
activities to provida independent verification
- that these activities are performed correctly and that human errors are reduced as much as practical.
AUTHORITY 6.2.#g'4 The ISEG shall make detailed recommendations for procedure revisions, equipment modifications, maintenance activities, operations activities or other means of improving plant safety to the Cr:up Manager,-Testmkal Scr"ices.
6.2.)'SHIFTTECHNICALADVISOR The Shift Technical Advisor shall provide technical support to the Shift Supervisor in the areas of, thermal hydraulics, reactor engineering and plant analysis with regard to the safe operation of the unit.
6.3 UNIT STAFF QUALIFICATIONS 6.3.1 Each member of the unit staff shall meet or exceed the minimum qualifica-i tions of ANSI N18.1-1971 for comparable positions and the supplemental require-ments specified in Sections A and C of Enclosure 1 of the March 28, 1980 letter to all licensees as clarified in NUREG-0737,Section I. A.2.1, except for the l
Associate Manager, Health Physics who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975, the Shift Technical Advisor who shall meet or exceed the qualifications referred to in Section 2.2.1.b of Enclosure I of the October 30, 1979 NRC letter to all operating nuclear power plants, and the members of the Independent Safety Engineering Group, each of whom shall have a Bachelor of Science degree or registered Professional Engineer and at least two years experience in their field.
At least one year experience shall t,e in the nuclear field.
6.4 TRAINING 6.4.1 A retraining and replacement training program for the unit staff shall be maintained and shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI N18.1-1971 and Appendix "A" of 10 CFR Part SE and the su9plemental requirements specified in Sections A and C of Enclosure 1 of the March 28, 1980 NRC letter to all licensees, and shall include familiarization vith identified relevant industry operational experience.
- Not responsible for sign-off function.
SUMMER - UNIT 1 6-5 Amendment No. 36
-=e-a
Attachment II to Document Control Desk Letter January 6, 1988 Page 5 of 7 ADMINISTRATIVE CONTROLS i
6.5 REVIEW AND AUDIT 6.5.1 PLANT SAFETY REVIEW COMMITTEE (PSRC),
j FUNCTION j
6.5.1.1 The PSRC shall function to advise the Director, Nuclear Plant Opera-s i
tions on all matters related to nuclear safety.
l COMPOSITION
' " 1.2 The P1:nt S:fety Revier Cc-itte :hel' be :: p:::d Of th::
)
Cha Director, Nuclear Plar,t Operat
\\
l Deputy Director, 0 s and Maintenance IB 'l g
Member:
Manager Oper j
A7MC//4b Member:
a chnical Support Member:
anager Mal e Services Member:
Group Manager, Techn Support Services Member-Associate Manager, Health l
Health Physics Supervisor ALTERNATES 6.5.1.3 All alternate members shall be appointed in writing by the PSRC i
Chairman to serve on a temporary basis; however, no more than two alternates including the Chairman's alternate, if applicable, shall participate as voting 1
members in PSRC activities at any one time.
MEETING FRE0VENCY 6.5.1.4 The PSRC shall meet at least once per calendar month and as convened by the PSRC Chairman or his designated alternate.
QUORUM
'6. 5.1. 5 The minimum quorum of the PSRC necessary %r the perfoniance of the PSRC responsibility and authority provisiens of these Technical D ecifications shall consist of the Chair 1 nan or his designated alternate ant %ree members including alternates.
RESPONSIBILITIE_S 6.5.1.5 The Plant Safety Review Comittee shall review:
a.
Station administrative procedures and changes thereto, b.
The safety evaluations for 1) procedurs:, 2) changes to procedures, equipment or systems, and 3) T.ests or expe-iments completed under the provision of Section 50.59, 10 CFR, to ve rify that such actions did not constitute an unreviewed safety question and all programs required by Specification 6.8 and changes thereto.
c.
Proposed procedures and changes to pro:edures, equipment or systems which may involve an unreviewed safety question as defined in Section 50.59, 10 CFR.
d.
Proposed tests or experiments which may involvs an enreviewed safety g
question as defined in Section 50.59, 10 CFR.
P"c'osed changes to Techn? al Specifications or the Operating License.
e.
SUMMER - UNIl 1 6-6 Amendment No.18
.. ~,
.~
Attachment Il to Document Control Desk Letter
~ January.6, 1988 Page 6 cf 7 COMPOSITION 6.5.1.2 The Plant Safety Review Committee shall be composed of the:
Chairman:
Director, Nuclear Plant Operations, or General Manager, Station Operations Member:
General Manager, Station Support Member:
Manager, Operations Member:
Manager, Maintenance Services Member:
Manager, Chemistry and Health Physics Member:
Manager, Core Engineering & Nuclear Computer Services Member:
Manager, Design Engineering 9
t
Attachment II to Document Control Desk letter January 6, 1988 Page 7 of 7 A0dINISTRATIVE CONTROLS j
l RECOR05 6.5.2.10 Records of NSRC activities shall be prepared, approved and distributed f
as indicated below:
a.
Minutes of ecch NSRC meeting shall be prepared, approved and forwarded to the Vice President, Nuclear Operations within 14 days following each meeting.
b.
Reports of reviews encompassed by Section 6.5.2.7 above, rhall be pre-pared, approved and forwarded to the Vice President, Nucl4ar Opera-tions within 14 days following completion of the review.
c.
Audit summary reports encompassed by Section 6.5.2.8 above, shall be forwarded to the NSRC and to the Vice President, Nuclear Operations.
Full audits shall be forwarded to the management positions responsi-i ble for the areas audited within 30 days after completion of the audit by the auditing organization, 6.5.3 T6CHNICAL REVIEW AND CONTROL ACTIVITIES 6.5.3.1 Activities which affect nuclear safety shall be conducted as follows:
a.
Procedures required by Technical Specification 6.8 and other proce-dures which affect plant nuclear safety, and changes thereto, shall i
be prepared, reviewed and approved.
Each such procedure or procedure change shall be reviewed by an individual / group other than the individual / group which prepared the procedure or procedure change, but i
who may be from the same organization as the individual /graup which I
prepared the procedure or procedure change.
Procedures other than Administrative Procedures will be approved as delineated in writing by the Director, Nuclear Plant Operations.
The Director, Nuclear Plant i
Operations will approve administrative procedures, security implement-ing procedures and emergency plan implementing procedures.
Temporary approval to procedures which clearly do not change the intent of the approved procedures can be made by two members of the plant management staff, at least one of whom holds a Senior Reactor Operator's License.
For changes to procedures which may involve a change in intent of the i
approved procedures, the person authorized above to approve the proce-dure shall approve the change, b.
Proposed changes or modifications to pla:1t nuclear safety-related structures, systems and components shall be reviewed as designated uy Enynee,;D the Director, Nuclear Plant Ogerations.
Each such modification shall be designed as authorized by,,chnicci-Services and shall be reviewed
)
by an individual / group other than the individual / group which designed the modification, be. who may be from the same organization as the individual / group whi.
1esigned the modifications.
Implementation of modifications to plai
.iuclear safety-related structures, systems anc components shall be u ncurred in by the Director, Nuclear Plant Operations.
SUMMER - UNIT 1 6-11 Amendment No. % 49 1