'Af M | |||
T.iephon. 9:2) m4ooo Nucl.u Group January 29, 1988 l | |||
InSppYd,' ort.PA 15077 0004 2NRC-8-002 U. | |||
S. Nuclear Regulatory Commission Attn: | |||
Document Control Desk Washington, DC 20555 | |||
==Reference:== | ==Reference:== | ||
Bcavor Valley Power Station Unit No. 2 BV-2 Docket No. 50-412, License No. NPF-73 BVPS-2 FSAR Chapter 14, Test Change Status Report Gentiomen: | Bcavor Valley Power Station Unit No. 2 BV-2 Docket No. 50-412, License No. NPF-73 BVPS-2 FSAR Chapter 14, Test Change Status Report Gentiomen: | ||
Forwarded | Forwarded to NRC is the seventh status report identifying changes to the Initial Test Program as described in Chapter 14, of the FSAR. | ||
These | These changes are made in accordance with the provisions of 10 CFR 50.59 and reported to NRC in accordance with 50.59(b) within one month of initiating changes per BVPS-2 Facility Operating License condition C.(3). | ||
l l | l l | ||
i 8002050162 | Ve y truly yours, h | ||
i | |||
. Carey Senior Vice President i | |||
Nuclear Group 1 | |||
Attachment cc: | |||
Mr. J. Beall, Sr. Resident Inspector (Unit 2) | |||
Mr. | |||
W. | |||
T. Russell, NRC Region I Administrator Mr. | |||
P. Tam, Project Manager INPO Records Conter i | |||
8002050162 890129 i | |||
PDR ADOCK OS000412, | |||
1 P | |||
PDR t | |||
fW | |||
.1 | |||
n e | n e | ||
BVPS-2 FSAR CHAPTER 14 TEST CHANGE STATUS REPORT | BVPS-2 FSAR CHAPTER 14 TEST CHANGE STATUS REPORT l | ||
==References:== | ==References:== | ||
(a) | (a) | ||
Sieber to U. S. Nuclear Regulatory Commission | DLC Letter 2NRC-7-205 dated September 30, 1987, Mr. | ||
FSAR SECTION | J. | ||
J. | |||
Reference | Carcy to U. | ||
service by the scheduled date. | S. Nuclear Regulatory Commission (b): DLC Letter dated December 31, | ||
supply system is expected to be completed by January 31, 1988. | : 1987, Mr.-J. D. | ||
Sieber to U. S. Nuclear Regulatory Commission FSAR SECTION TITLE 1) 14.2.12.48.01 Main Plant Carbon Dioxide Protection System (SOV-2.33A.01) | |||
This test was completed prior to commercial Operations, but high vibration and flow rate readings for the Process Air Filtration | Test (SOV) | ||
Exhaust Fan did not meet the acceptance criteria. Evaluation of the deficiencies resulted in rework of the fan and recalibration of the flow indicator. These items have since been resolved. | Reference (a) identified this testing was deferred until December 31, 1987 due to the inability to complete modifications on time. | ||
b | Compensatory measures were provided until the primary Carbon Dioxide System was successfully tested and placed in service by the scheduled date. | ||
Reference (b) indicated the backup CO2 storage tank which provides adequate reserve capacity has been installed. | |||
Final tecting for this backup supply system is expected to be completed by January 31, 1988. | |||
2) 14.2.12.70.01 Condensate Polishing Building Heating (SOV-2.44G.01) | |||
Ventilation and Air-Conditioning System Test (SOV) | |||
This test was completed prior to commercial Operations, but high vibration and flow rate readings for the Process Air Filtration Exhaust Fan did not meet the acceptance criteria. | |||
Evaluation of the deficiencies resulted in rework of the fan and recalibration of the flow indicator. | |||
These items have since been resolved. | |||
b 3) 14.2.12.61.02 Effluent Radiation Monitor Test (IST) | |||
(IST-2.43.01) | (IST-2.43.01) | ||
This test was completed prior to Commercial Operations except for obtaining a representative grab sample from the Gaseous Waste | This test was completed prior to Commercial Operations except for obtaining a | ||
Surge | representative grab sample from the Gaseous Waste Surge Tank Transfer Monitor to enable grab sample analysis / monitor readout comparisons. | ||
obtained with satisfactory results. | The grab sampic has been obtained with satisfactory results. | ||
0}} | |||
Latest revision as of 17:34, 10 December 2024
| ML20196A791 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 01/29/1988 |
| From: | Carey J DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| 2NRC-8-002, 2NRC-8-2, TAC-63534, NUDOCS 8802050162 | |
| Download: ML20196A791 (2) | |
Text
i
'Af M
T.iephon. 9:2) m4ooo Nucl.u Group January 29, 1988 l
InSppYd,' ort.PA 15077 0004 2NRC-8-002 U.
S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
Reference:
Bcavor Valley Power Station Unit No. 2 BV-2 Docket No. 50-412, License No. NPF-73 BVPS-2 FSAR Chapter 14, Test Change Status Report Gentiomen:
Forwarded to NRC is the seventh status report identifying changes to the Initial Test Program as described in Chapter 14, of the FSAR.
These changes are made in accordance with the provisions of 10 CFR 50.59 and reported to NRC in accordance with 50.59(b) within one month of initiating changes per BVPS-2 Facility Operating License condition C.(3).
l l
Ve y truly yours, h
i
. Carey Senior Vice President i
Nuclear Group 1
Attachment cc:
Mr. J. Beall, Sr. Resident Inspector (Unit 2)
Mr.
W.
T. Russell, NRC Region I Administrator Mr.
P. Tam, Project Manager INPO Records Conter i
8002050162 890129 i
PDR ADOCK OS000412,
1 P
PDR t
fW
.1
n e
BVPS-2 FSAR CHAPTER 14 TEST CHANGE STATUS REPORT l
References:
(a)
DLC Letter 2NRC-7-205 dated September 30, 1987, Mr.
J.
J.
Carcy to U.
S. Nuclear Regulatory Commission (b): DLC Letter dated December 31,
- 1987, Mr.-J. D.
Sieber to U. S. Nuclear Regulatory Commission FSAR SECTION TITLE 1) 14.2.12.48.01 Main Plant Carbon Dioxide Protection System (SOV-2.33A.01)
Test (SOV)
Reference (a) identified this testing was deferred until December 31, 1987 due to the inability to complete modifications on time.
Compensatory measures were provided until the primary Carbon Dioxide System was successfully tested and placed in service by the scheduled date.
Reference (b) indicated the backup CO2 storage tank which provides adequate reserve capacity has been installed.
Final tecting for this backup supply system is expected to be completed by January 31, 1988.
2) 14.2.12.70.01 Condensate Polishing Building Heating (SOV-2.44G.01)
Ventilation and Air-Conditioning System Test (SOV)
This test was completed prior to commercial Operations, but high vibration and flow rate readings for the Process Air Filtration Exhaust Fan did not meet the acceptance criteria.
Evaluation of the deficiencies resulted in rework of the fan and recalibration of the flow indicator.
These items have since been resolved.
b 3) 14.2.12.61.02 Effluent Radiation Monitor Test (IST)
(IST-2.43.01)
This test was completed prior to Commercial Operations except for obtaining a
representative grab sample from the Gaseous Waste Surge Tank Transfer Monitor to enable grab sample analysis / monitor readout comparisons.
The grab sampic has been obtained with satisfactory results.
0