B16800, Requests Approval to Utilize Code Case N-522, Pressure Testing of Containment Penetration Piping,Section XI, Div 1, for Unit 2 Third 10-yr Interval ISI Program Plan. Commitments Encl: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:* | {{#Wiki_filter:* | ||
hOrdwa#( | hOrdwa#( | ||
lbp l~ err, thi (lloute 1$6). Wcterford, Ur Otaas | |||
'U N Millstone Nudcat Poser beation Nt I rah Nudear I.ncrgy G.ropany Waterford, LT 0(an5 0128 (8te0) 447 1791 l'as (B(C) 444 4277 | |||
'nw Northea t Utilitice Systein OCT 3 l 1937 Docket No. 50-336 B16800 Re: 10 CFR 50.55af a)(3)fil) | |||
U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit No. 2 Reauest to Use an Attemative to ASME Code Section XI The purpose of this letter is for Northeast Nuclear Energy Company (NNECO) to request the use of an alternative to the ASME Boller and Pressure Vessel Code, Section XI, Edition and Addenda, pursuant to the provisions of 10 CFR 50.55a(a)(3)(il). | U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit No. 2 Reauest to Use an Attemative to ASME Code Section XI The purpose of this letter is for Northeast Nuclear Energy Company (NNECO) to request the use of an alternative to the ASME Boller and Pressure Vessel Code, Section XI, Edition and Addenda, pursuant to the provisions of 10 CFR 50.55a(a)(3)(il). | ||
Specifically, NNECO requests approval to utilize Code Case N 522, ' Pressure Testing of Containment Penetration Piping, Section XI, Division 1," for the Millstone Unit No. 2 Third 10-Year Interval ISI Program Plan. | Specifically, NNECO requests approval to utilize Code Case N 522, ' Pressure Testing of Containment Penetration Piping, Section XI, Division 1," for the Millstone Unit No. 2 Third 10-Year Interval ISI Program Plan. | ||
Code Case N-522 directs the testing for pressure retaining piping that penetrates a containment vessel to be performed in accordance with 10 CFR 50, Appendix J, when the piping and isolation valves that are part of the containment system are Class 2 but the balance of the piping is cutside the scope of Section XI. | Code Case N-522 directs the testing for pressure retaining piping that penetrates a containment vessel to be performed in accordance with 10 CFR 50, Appendix J, when the piping and isolation valves that are part of the containment system are Class 2 but the balance of the piping is cutside the scope of Section XI. | ||
The perforr,1ance of the hydrostatic and functional tests, as currently required by Section XI, would result in a substantial hardship to the plant in the form of additional expenditures of funds to perform the tests and additional radiation exposure to the individuals involved in the tests without reailzing a commensurate gain in safety. | The perforr,1ance of the hydrostatic and functional tests, as currently required by Section XI, would result in a substantial hardship to the plant in the form of additional expenditures of funds to perform the tests and additional radiation exposure to the individuals involved in the tests without reailzing a commensurate gain in safety. | ||
During the Third 10-Year Interval, NNECO plans to use Code Case N 522, subject to NRC approval, until such a time this Code Case is incorporated into a future revision of | During the Third 10-Year Interval, NNECO plans to use Code Case N 522, subject to NRC approval, until such a time this Code Case is incorporated into a future revision of Regulatory Guide 1.147. Upon issuance of the Regulatory Guide, NNECO will follow all provisions in Code Case N 522, with any exceptions or limitations as would be discussed in the Regulatory Guide. | ||
Also, NNECO will comply with the condition as stated in the regulatory position of Draft Regulatory Guide DG-1050, " Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1': | |||
Also, NNECO will comply with the condition as stated in the regulatory position of Draft Regulatory Guide DG-1050, " Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1': | |||
[Dk.!/ | [Dk.!/ | ||
l%> | JW IB8R Mh8$$n l%> | ||
l%NME]\\\\tltllIl | |||
U.S. Nuclear Regul: tory Commission | U.S. Nuclear Regul: tory Commission i | ||
j | |||
,816600/Page 2 l | |||
i | i | ||
' Code Case N 522 is acceptable subject to the following condition in addition to those specified in the Code Case. The test should be conducted at the peak calculated containment pressure and the test procedure should permit the i | |||
l | i detection and location of through-wall leakage in containment isolation valves l | ||
(ClVs) and pipe segments between CIVs.' | |||
Regulatory commitments made in this letter are contained in Attachment 1. | |||
A copy of Code Case N 522 is contained in Attachment 2. | |||
W. D. Lanning, Deputy Director of Inspections, Special Projects Office i | j | ||
) | |||
5 Should you have any questions on the information provided, please contact Mr. R. G. | |||
Joshi at (860) 440 2080. | |||
4 Very truly yours, 1 | |||
NORTHEAST NUCLEAR ENERGY COMPANY i | |||
Martin L. Bowling,,lr d' | |||
i Millstone Unit No. 2 Recovery Officer i | |||
i cc: | |||
H. J. Miller, Region i Administrate.- | |||
l D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2 D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 l | |||
W. D. Travers, Ph.D., Director, Special Projects Office P. F. McKee, Deputy Director of Licensing, Special Projects Office W. D. Lanning, Deputy Director of Inspections, Special Projects Office i | |||
i i | i i | ||
I l | |||
l | l | ||
Docket No. 50-336 B16800 | Docket No. 50-336 B16800 Millstone Nuclear Power Station, Unit No. 2 Northeast Nuclear Energy Company's (NNECO's) | ||
Commitments Associated With Reauest to Use an Alternative to ASME Code Section XI October 1997 | Commitments Associated With Reauest to Use an Alternative to ASME Code Section XI October 1997 | ||
U.S. Nuclear Regul: tory Commission | U.S. Nuclear Regul: tory Commission B16800/ Attachment 1\\Page 1 l | ||
List of Regulatory Commitments | List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. | ||
Any other actions discussed in the submittal represent intended or planned actions by NNECO. They 'are described to the NRC for the NRC's information and are not regulatory commitments. The Manager - Regulatory Compliance at Millstone Nuclear Power Station Unit No. 2 should be notified of any questions regarding this document or any associated regulatory commitments. | |||
Any other actions discussed in the submittal represent intended or planned actions by | Number Commitment Due B16800 01 NNECO plans to use Code Case N 522, During the Third subject to NRC approval, until such a time 10-Year ISI Interval that this Code Case is incorporated into a future revision of Regulatory Guide 1.147. | ||
Number | |||
At the' time, NNECO will follow all provisions in Code Case N 522, with any exceptions or limitations as would be discussed in the Regulatory Guide. | At the' time, NNECO will follow all provisions in Code Case N 522, with any exceptions or limitations as would be discussed in the Regulatory Guide. | ||
B16800-02 | B16800-02 The applicable containment penetration During the Third testing will be conducted at the peak 10-Year ISI Interval calculated containment pressure and the test procedure will permit the detection and location of through wallleakage in containment isolation valves (CIVs) and pipe segments between CIVs. | ||
Docket No. 50 336 | Docket No. 50 336 B16800 l | ||
Millstone Nuclear Power Station, Unit No. 2 Code Case N-522 Pressure Testina of Containment Penetration Ploina. Section XI. Division 1 | |||
( | ( | ||
October 1997 | October 1997 | ||
/ | / | ||
CASE | |||
~ | |||
N-522 CASES OFASME BOILER AND PRES $t'RE VESSEL CODE Approval Date: Dooomber 9,1993 See Numerketindes for espiration end eny reaffirmetton dates. | |||
Case N 522 Pressure Testing of Containment Penetration Piping Section XI, Divialon 1 Inquiry: What alternative to the #91es of Table IWC-25001. Category C H may be used for pressure testing piping that penetrates a containment vessel, when the piping and isolation valves that are part of the contain-ment system are Class 2 but the balance of the piping system is outside the scope of Section XI? | Case N 522 Pressure Testing of Containment Penetration Piping Section XI, Divialon 1 Inquiry: What alternative to the #91es of Table IWC-25001. Category C H may be used for pressure testing piping that penetrates a containment vessel, when the piping and isolation valves that are part of the contain-ment system are Class 2 but the balance of the piping system is outside the scope of Section XI? | ||
Reply It is the opinion of the Committee that 10 CFR 50, Appendix J, may be used as an alternative to the rules in Table IWC 2500-1, Category C H, for pressure testing piping that penetrates a containment vessel, when the piping and isolation valves that are part of the con. | Reply It is the opinion of the Committee that 10 CFR 50, Appendix J, may be used as an alternative to the rules in Table IWC 2500-1, Category C H, for pressure testing piping that penetrates a containment vessel, when the piping and isolation valves that are part of the con. | ||
tainment system are Class 2 but the balance of the pip-ing system is outside the scope of Section XI? | tainment system are Class 2 but the balance of the pip-ing system is outside the scope of Section XI? | ||
4-SUPP, 7 - NC | 4-SUPP, 7 - NC d | ||
-}} | |||
Latest revision as of 09:41, 10 December 2024
| ML20198P000 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 10/31/1997 |
| From: | Bowling M NORTHEAST NUCLEAR ENERGY CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| B16800, NUDOCS 9711060239 | |
| Download: ML20198P000 (6) | |
Text
hOrdwa#(
lbp l~ err, thi (lloute 1$6). Wcterford, Ur Otaas
'U N Millstone Nudcat Poser beation Nt I rah Nudear I.ncrgy G.ropany Waterford, LT 0(an5 0128 (8te0) 447 1791 l'as (B(C) 444 4277
'nw Northea t Utilitice Systein OCT 3 l 1937 Docket No. 50-336 B16800 Re: 10 CFR 50.55af a)(3)fil)
U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit No. 2 Reauest to Use an Attemative to ASME Code Section XI The purpose of this letter is for Northeast Nuclear Energy Company (NNECO) to request the use of an alternative to the ASME Boller and Pressure Vessel Code,Section XI, Edition and Addenda, pursuant to the provisions of 10 CFR 50.55a(a)(3)(il).
Specifically, NNECO requests approval to utilize Code Case N 522, ' Pressure Testing of Containment Penetration Piping,Section XI, Division 1," for the Millstone Unit No. 2 Third 10-Year Interval ISI Program Plan.
Code Case N-522 directs the testing for pressure retaining piping that penetrates a containment vessel to be performed in accordance with 10 CFR 50, Appendix J, when the piping and isolation valves that are part of the containment system are Class 2 but the balance of the piping is cutside the scope of Section XI.
The perforr,1ance of the hydrostatic and functional tests, as currently required by Section XI, would result in a substantial hardship to the plant in the form of additional expenditures of funds to perform the tests and additional radiation exposure to the individuals involved in the tests without reailzing a commensurate gain in safety.
During the Third 10-Year Interval, NNECO plans to use Code Case N 522, subject to NRC approval, until such a time this Code Case is incorporated into a future revision of Regulatory Guide 1.147. Upon issuance of the Regulatory Guide, NNECO will follow all provisions in Code Case N 522, with any exceptions or limitations as would be discussed in the Regulatory Guide.
Also, NNECO will comply with the condition as stated in the regulatory position of Draft Regulatory Guide DG-1050, " Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1':
[Dk.!/
JW IB8R Mh8$$n l%>
l%NME]\\\\tltllIl
U.S. Nuclear Regul: tory Commission i
j
,816600/Page 2 l
i
' Code Case N 522 is acceptable subject to the following condition in addition to those specified in the Code Case. The test should be conducted at the peak calculated containment pressure and the test procedure should permit the i
i detection and location of through-wall leakage in containment isolation valves l
(ClVs) and pipe segments between CIVs.'
Regulatory commitments made in this letter are contained in Attachment 1.
A copy of Code Case N 522 is contained in Attachment 2.
j
)
5 Should you have any questions on the information provided, please contact Mr. R. G.
Joshi at (860) 440 2080.
4 Very truly yours, 1
NORTHEAST NUCLEAR ENERGY COMPANY i
Martin L. Bowling,,lr d'
i Millstone Unit No. 2 Recovery Officer i
i cc:
H. J. Miller, Region i Administrate.-
l D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2 D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 l
W. D. Travers, Ph.D., Director, Special Projects Office P. F. McKee, Deputy Director of Licensing, Special Projects Office W. D. Lanning, Deputy Director of Inspections, Special Projects Office i
i i
I l
l
Docket No. 50-336 B16800 Millstone Nuclear Power Station, Unit No. 2 Northeast Nuclear Energy Company's (NNECO's)
Commitments Associated With Reauest to Use an Alternative to ASME Code Section XI October 1997
U.S. Nuclear Regul: tory Commission B16800/ Attachment 1\\Page 1 l
List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.
Any other actions discussed in the submittal represent intended or planned actions by NNECO. They 'are described to the NRC for the NRC's information and are not regulatory commitments. The Manager - Regulatory Compliance at Millstone Nuclear Power Station Unit No. 2 should be notified of any questions regarding this document or any associated regulatory commitments.
Number Commitment Due B16800 01 NNECO plans to use Code Case N 522, During the Third subject to NRC approval, until such a time 10-Year ISI Interval that this Code Case is incorporated into a future revision of Regulatory Guide 1.147.
At the' time, NNECO will follow all provisions in Code Case N 522, with any exceptions or limitations as would be discussed in the Regulatory Guide.
B16800-02 The applicable containment penetration During the Third testing will be conducted at the peak 10-Year ISI Interval calculated containment pressure and the test procedure will permit the detection and location of through wallleakage in containment isolation valves (CIVs) and pipe segments between CIVs.
Docket No. 50 336 B16800 l
Millstone Nuclear Power Station, Unit No. 2 Code Case N-522 Pressure Testina of Containment Penetration Ploina.Section XI. Division 1
(
October 1997
/
CASE
~
N-522 CASES OFASME BOILER AND PRES $t'RE VESSEL CODE Approval Date: Dooomber 9,1993 See Numerketindes for espiration end eny reaffirmetton dates.
Case N 522 Pressure Testing of Containment Penetration Piping Section XI, Divialon 1 Inquiry: What alternative to the #91es of Table IWC-25001. Category C H may be used for pressure testing piping that penetrates a containment vessel, when the piping and isolation valves that are part of the contain-ment system are Class 2 but the balance of the piping system is outside the scope of Section XI?
Reply It is the opinion of the Committee that 10 CFR 50, Appendix J, may be used as an alternative to the rules in Table IWC 2500-1, Category C H, for pressure testing piping that penetrates a containment vessel, when the piping and isolation valves that are part of the con.
tainment system are Class 2 but the balance of the pip-ing system is outside the scope of Section XI?
4-SUPP, 7 - NC d
-