{{#Wiki_filter:_                 _          _            ____ _ _ - _____ _ _ _ _ _ _ _ _ __-__ _______ _-______
{{#Wiki_filter:_
  ,    Mr J. E. Cross                                                                                       December 29, 1998 Pr:sid:nt-G:n:r: tion Group Duqu:snm Light Comp:ny Post Office Box 4 Shippingport, PA 15077
Mr J. E. Cross December 29, 1998 Pr:sid:nt-G:n:r: tion Group Duqu:snm Light Comp:ny Post Office Box 4 Shippingport, PA 15077


==SUBJECT:==
==SUBJECT:==
SAFETY EVALUATION OF BEAVER VALLEY POWER STATION, UNIT NO.1                                                                                   .
SAFETY EVALUATION OF BEAVER VALLEY POWER STATION, UNIT NO.1 (BVPS-1), INSERVICE INSPECTION (ISI) RELIEF REQUESTS ASSOCIATED WITH THE THIRD 10-YEAR ISI INTERVAL (TAC NO. M99673)
(BVPS-1), INSERVICE INSPECTION (ISI) RELIEF REQUESTS ASSOCIATED WITH THE THIRD 10-YEAR ISI INTERVAL (TAC NO. M99673)


==Dear Mr. Cross:==
==Dear Mr. Cross:==
 
By {{letter dated|date=September 17, 1997|text=letter dated September 17,1997}}, as supplemented June 18,1998, Duquesne Ught Company (DLC) submitted the third 10-year interval ISI program plan and associated relief requests for BVPS-1. The U.S. Nuclear Regulatory Commission (NRC) staff, with technical assistance from its contractor, the Idaho National Engineering Environmental Laboratory (INEEL), has reviewed and evaluated the relief requests. The applicable edition of Section XI of the American Society of Mechanical Engineers (ASME) Code for BVPS-1 third 10-year ISI interval is the 1989 edition. As described in the enclosed safety evaluation (SE), the NRC staff adopts the INEEL recommendations in the technical evaluation report (TER), which is attached to the SE. The NRC staff has granted relief request Nos.1-TYP-3-83.140-1,1-TYP-3-85.70-1, and 1-TYP-3-RH-E-1-1 pursuant to 10 CFR 50.55a(g)(6)(i) based on a determination that the requirements of the Code are impractical. The alteratives in relief request Nos.1-TYP-3-B-G-1,1-TYP-3-APP-l-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, and 1-TYP-3-N-524 are authorized pursuant to 10 CFR 50.55a(a)(3)(i) in that they provide an acceptable level of quality and safety. The alternatives in relief request Nos.1-TYP-3-B3.120-1 and 1-TYP C6.10-1 are authorized pursuant to 10 CFR 50.55a(a)(3)(ii) si:1ce compliance with the code would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The relief granted is authorized by law and will not endanger the common defense and security and is otherwise in the public interest, giving due consideration to the burden upon the licensee if the Code requirements were imposed on the facility.
By {{letter dated|date=September 17, 1997|text=letter dated September 17,1997}}, as supplemented June 18,1998, Duquesne Ught Company (DLC) submitted the third 10-year interval ISI program plan and associated relief requests for BVPS-1. The U.S. Nuclear Regulatory Commission (NRC) staff, with technical                                                                       '
assistance from its contractor, the Idaho National Engineering Environmental Laboratory (INEEL), has reviewed and evaluated the relief requests. The applicable edition of Section XI of the American Society of Mechanical Engineers (ASME) Code for BVPS-1 third 10-year ISI interval is the 1989 edition. As described in the enclosed safety evaluation (SE), the NRC staff adopts the INEEL recommendations in the technical evaluation report (TER), which is attached to the SE. The NRC staff has granted relief request Nos.1-TYP-3-83.140-1,1-TYP-3-85.70-1, and 1-TYP-3-RH-E-1-1 pursuant to 10 CFR 50.55a(g)(6)(i) based on a determination that the requirements of the Code are impractical. The alteratives in relief request Nos.1-TYP-3-B-G-1,1-TYP-3-APP-l-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, and 1-TYP-3-N-524 are authorized pursuant to 10 CFR 50.55a(a)(3)(i) in that they provide an acceptable level of quality and safety. The alternatives in relief request Nos.1-TYP-3-B3.120-1 and 1-TYP       C6.10-1 are authorized pursuant to 10 CFR 50.55a(a)(3)(ii) si:1ce compliance with the code would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The relief granted is authorized by law and will not endanger the common defense and security and is otherwise in the public interest, giving due consideration to the burden upon the licensee if the Code requirements were imposed on the facility.
Sincerely,
Sincerely,
                                                                                /s/
/s/
Robert A. Capra, Director 9901210340 981229                                         Project Directorate 1-2 PDR     ADOCK 05000334                                   Division of Reactor Projects - t/11 G                     PDR Office of Nuclear Reactor Regulation Docket No. 50-334                                                                                                                                     }
Robert A. Capra, Director 9901210340 981229 Project Directorate 1-2 PDR ADOCK 05000334 Division of Reactor Projects - t/11 G
PDR Office of Nuclear Reactor Regulation Docket No. 50-334
}
l
l


==Enclosure:==
==Enclosure:==
Safety Evaluation cc w/encI: See next page                       . . ,                                                                                                        'A l   DISTRIBUTION                         ;
Safety Evaluation cc w/encI: See next page
d ( '.I (                                                                                                 h1   '
'A l
Docket File             MO'Brien                       PEr;eigh, RGN I PUBLIC                   OGC                           PPatnah.
DISTRIBUTION d ( '.I (
PDI-2 Reading           ACRS                         GBagchi                                                                                     y JZwolinski GHill(2)                                                                           ; .-                                .
h1 Docket File MO'Brien PEr;eigh, RGN I PUBLIC OGC PPatnah.
                                                                                                                                                        -  W RCapra                   GShear                                                                             !
PDI-2 Reading ACRS GBagchi JZwolinski GHill(2) y W
DBrinkman               THarris (E-mail SE)
RCapra GShear DBrinkman THarris (E-mail SE)
OFFICE     PDI-2/PMN A PQl-2/PM                                   PDl[2kb                                               DI-2/D NAME       DBrinkmah:rb                                           Mdikri                               Ma q         RCapra" DATE       n h 9/98           /L/Ti/98                                                                 8 /     /98   IE /M/98 OFFICIAL RECORD COPY                                                                       t'           I DOCUMENT NAME: BV99673.REL
OFFICE PDI-2/PMN A PQl-2/PM PDl[2kb DI-2/D NAME DBrinkmah:rb Mdikri Ma q RCapra" DATE n h 9/98
/L/Ti/98 8
/
/98 IE /M/98 OFFICIAL RECORD COPY t'
I DOCUMENT NAME: BV99673.REL


                                        ~                       -
~
f-c an%
f-c an%
p             1                       UNITED STATES
p 1
      *              }           NUCLEARwasmorow, REGULATORY         COMMISSION
UNITED STATES
      .,"%                                          o.c. meewom December 29, 1998                                               {
}
NUCLEAR REGULATORY COMMISSION wasmorow, o.c. meewom December 29, 1998
{
Mr. J. E. Cross President-Generation Group Duquesne Ught Company Post Omco Box 4 Shippingport, PA 15077
Mr. J. E. Cross President-Generation Group Duquesne Ught Company Post Omco Box 4 Shippingport, PA 15077


==SUBJECT:==
==SUBJECT:==
 
SAFETY EVALUATION OF BEAVER VALLEY POWER STATION, UNIT NO (BVPS-1), INSERVICE INSPECTION (ISI) REUEF REQUESTS ANiOCIATED WITH THE THIRD 10 YEAR ISI INTERVAL (TAC NO. M99673)
SAFETY EVALUATION OF BEAVER VALLEY POWER STATION, UNIT NO.
(BVPS-1), INSERVICE INSPECTION (ISI) REUEF REQUESTS ANiOCIATED WITH THE THIRD 10 YEAR ISI INTERVAL (TAC NO. M99673)


==Dear Mr. Cross:==
==Dear Mr. Cross:==
 
By {{letter dated|date=September 17, 1997|text=letter dated September 17,1997}}, as supplemented June 18,1998, Duquesne Company (DLC) submitted the third 10-year intervsl ISI program plan and associate requests for BVPS-1. The U.S. Nuclear Regulatory Commission (NRC) staff, with techni assistance frora its contractor, the Idaho National Engineering Environmental La (INEEL), has reviewed and eva!uated the relief requests. The applicable edition of of the American Society of Mechanical Engineers (ASME) Code for BVPS 1 thir imenmi!s the 1989 s,dition. As described in the enclosed safety evaluation (SE) t adopta the INEEL recommendations in the technical eva!ustion report (TER), which
By {{letter dated|date=September 17, 1997|text=letter dated September 17,1997}}, as supplemented June 18,1998, Duquesne Company (DLC) submitted the third 10-year intervsl ISI program plan and associate requests for BVPS-1. The U.S. Nuclear Regulatory Commission (NRC) staff, with techni assistance frora its contractor, the Idaho National Engineering Environmental La (INEEL), has reviewed and eva!uated the relief requests. The applicable edition of of the American Society of Mechanical Engineers (ASME) Code for BVPS 1 thir imenmi!s the 1989 s,dition. As described in the enclosed safety evaluation (SE) t
}
>        adopta the INEEL recommendations in the technical eva!ustion report (TER), which to the SE. The NRC staff has granted relief request Nos.1-TYP-3-B3.140-1,1 TYP-3 1 and 1-TYP 3-RH-E 1-1 pursuant to 10 CFR 50.55a(g)(6)(i) based on a determinatio
to the SE. The NRC staff has granted relief request Nos.1-TYP-3-B3.140-1,1 TYP-3 1 and 1-TYP 3-RH-E 1-1 pursuant to 10 CFR 50.55a(g)(6)(i) based on a determinatio
?
?
\          14 requirements o.~l..e Code are impractical. The alteratives in relief                         request Nos 1-T G-1,1 TYP-3 APP-l 1,1 TYP-3-UT-1,1-TYP 3 N 509,1-TYP-3-N-521, and 1-TYP-3 authorized pursuant to 10 CFR 50.55a(a)(3)(i) in that they provide an acceptable level o quality and safety. The altamatives in relief request Nos.1-TYP-3 B3.1201 and 1-TYP 3-C6.101 are authorized pursuant to 10 CFR 50.55a(a)(3)(ii) since compliance with th would rcsult in hardship or unusual difficulty without a compensating -increase                - - =.: in the lev defense and security and is otherw!ss in the public interest Nrder; upon the 'icensee if the Code requirements were imposed on the facility.                         _
14 requirements o.~l..e Code are impractical. The alteratives in relief request Nos 1-T
Sincerely, w a.C W Robert A. Capra, Director
\\
                      -.Z  .----
G-1,1 TYP-3 APP-l 1,1 TYP-3-UT-1,1-TYP 3 N 509,1-TYP-3-N-521, and 1-TYP-3 authorized pursuant to 10 CFR 50.55a(a)(3)(i) in that they provide an acceptable level quality and safety. The altamatives in relief request Nos.1-TYP-3 B3.1201 and 1-TYP 3-C6.101 are authorized pursuant to 10 CFR 50.55a(a)(3)(ii) since compliance with th would rcsult in hardship or unusual difficulty without a compensating increase in the lev
T Project Directorate I2   ~'               ~           _ _ . . _ -
- - - =.:
defense and security and is otherw!ss in the public interes Nrder; upon the 'icensee if the Code requirements were imposed on the facility.
Sincerely, w a.C W
-.Z T
Robert A. Capra, Director Project Directorate I2
~'
~
Division of ReactorProjects-W Omco of Nuclear Reactor Regulation Docket No. 50-334 Er'.csure: U.'ety Evaluation cc w4nc!: See next page
Division of ReactorProjects-W Omco of Nuclear Reactor Regulation Docket No. 50-334 Er'.csure: U.'ety Evaluation cc w4nc!: See next page


                                                                                                                          \
\\
J. E. Cross                                                                                     ;
J. E. Cross Duquesne Ught Company Beaver Valley Power Station, Units 1 & 2 1
Duquesne Ught Company                           Beaver Valley Power Station, Units 1 & 2       1 i
i cc:
cc:
Jay E. Silberg, Esquire Shaw, Pittman, Potts & Trowbridge Bureau of Radiation Protection 2300 N Street, NW.
Jay E. Silberg, Esquire Shaw, Pittman, Potts & Trowbridge               Bureau of Radiation Protection 2300 N Street, NW.                               Pennsylvania Department of Washington, DC 20037                             EnvironmentalResources ATTN: MichaelP. Murphy Director-Safetyand Uconsing   -
Pennsylvania Department of Washington, DC 20037 EnvironmentalResources ATTN: MichaelP. Murphy Director-Safetyand Uconsing Post Office Box 2063 Department (BV-A)
Post Office Box 2063 Department (BV-A)                             Harrisburg, PA 17120 Duquesne Ught Company Beaver Valley Power Station                       Mayor of the Borough of PO Box 4                                           Shippingport Shippingport, PA 15077                           Post Office Box 3 Shippingport, PA 15077 Commissioner Roy M. Smith West Virginia Department of Labor                 Regional Administrator, Region I Building 3, Room 319                             U.S. Nuclear Regulatory Commission 4
Harrisburg, PA 17120 Duquesne Ught Company Beaver Valley Power Station Mayor of the Borough of PO Box 4 Shippingport Shippingport, PA 15077 Post Office Box 3 Shippingport, PA 15077 Commissioner Roy M. Smith West Virginia Department of Labor Regional Administrator, Region I Building 3, Room 319 U.S. Nuclear Regulatory Commission Caphol Complex 475 Allendale Road 4
Caphol Complex                                   475 Allendale Road Charleston, WV 25305                             King of Prussia, PA 19406 Director, Utilities Department                   Resident inspector Public Utilities Commission                       U.S. Nuclear Regulatory Commission 180 East Broad Street                             Post Office Box 298 Columbus, OH 43266-0573                           Shippingport,PA 15077                             1 i '
Charleston, WV 25305 King of Prussia, PA 19406 Director, Utilities Department Resident inspector Public Utilities Commission U.S. Nuclear Regulatory Commission 180 East Broad Street Post Office Box 298 Columbus, OH 43266-0573 Shippingport,PA 15077 1
Director, Pennsylvania Emergency ManagementAgency                               Duquesne Ught Company Post Office Box 3321                             BeaverValley Power Station                         '
i Director, Pennsylvania Emergency ManagementAgency Duquesne Ught Company Post Office Box 3321 BeaverValley Power Station Harrisburg, PA 17105-3321 Shippingport, PA 15077 PO Box 4 Ohio EPA DERR ATTN: S. C. Jain, Senior Vice President ATTN: Zack A. Clayton Nuclear Services (BV A)
Harrisburg, PA 17105-3321       -
Post Office Box 104g Columbus, OH 43266-0149 Mr. J. A. Hultz, Manager Projects & Support Services Dr. Judith Johnsrud First Energy National Energy Committee 76 South Main Street Sierra Club Akron,OH 44308 433 Orlando Avenue State College, PA 16803 Duquesne Ught Company
PO Box 4 Shippingport, PA 15077 Ohio EPA DERR                                     ATTN: S. C. Jain, Senior Vice President ATTN: Zack A. Clayton                             Nuclear Services (BV A)
. : ^
Post Office Box 104g Columbus, OH 43266-0149                         Mr. J. A. Hultz, Manager Projects & Support Services Dr. Judith Johnsrud                               First Energy National Energy Committee                         76 South Main Street Sierra Club                                       Akron,OH 44308 433 Orlando Avenue State College, PA 16803
- = ~ ~ ~
_ _ __        .:^ .    -. :      - = ~ ~ ~                   ~
~
Duquesne Ught Company BeaverValley PowerStation PO Box 4                                                                                               i 1
BeaverValley PowerStation PO Box 4 i
Shippingport, PA 15077 ATTN: Kevin L Ostrowski, Division Vice President, Nuclear Operations Group and Plant Manager (BV SOSB 7)
Shippingport, PA 15077 1
                                                                                                -.                  _.}}
ATTN: Kevin L Ostrowski, Division Vice President, Nuclear Operations Group and Plant Manager (BV SOSB 7)
_.}}

Latest revision as of 07:45, 10 December 2024

Discusses Third 10-year Interval ISI Program Plan & Associated Relief Requests for BVPS-1 Submitted by Dlc on 970917 & 980618.Informs That NRC Has Adopted Ineel Recommendations in TER INEEL-98-00893.Forwards SE & TER
ML20199F510
Person / Time
Site: Beaver Valley
Issue date: 12/29/1998
From: Capra R
NRC (Affiliation Not Assigned)
To: Cross J
DUQUESNE LIGHT CO.
Shared Package
ML20199F517 List:
References
TAC-M99673, NUDOCS 9901210340
Download: ML20199F510 (3)


Text

_

Mr J. E. Cross December 29, 1998 Pr:sid:nt-G:n:r: tion Group Duqu:snm Light Comp:ny Post Office Box 4 Shippingport, PA 15077

SUBJECT:

SAFETY EVALUATION OF BEAVER VALLEY POWER STATION, UNIT NO.1 (BVPS-1), INSERVICE INSPECTION (ISI) RELIEF REQUESTS ASSOCIATED WITH THE THIRD 10-YEAR ISI INTERVAL (TAC NO. M99673)

Dear Mr. Cross:

By letter dated September 17,1997, as supplemented June 18,1998, Duquesne Ught Company (DLC) submitted the third 10-year interval ISI program plan and associated relief requests for BVPS-1. The U.S. Nuclear Regulatory Commission (NRC) staff, with technical assistance from its contractor, the Idaho National Engineering Environmental Laboratory (INEEL), has reviewed and evaluated the relief requests. The applicable edition of Section XI of the American Society of Mechanical Engineers (ASME) Code for BVPS-1 third 10-year ISI interval is the 1989 edition. As described in the enclosed safety evaluation (SE), the NRC staff adopts the INEEL recommendations in the technical evaluation report (TER), which is attached to the SE. The NRC staff has granted relief request Nos.1-TYP-3-83.140-1,1-TYP-3-85.70-1, and 1-TYP-3-RH-E-1-1 pursuant to 10 CFR 50.55a(g)(6)(i) based on a determination that the requirements of the Code are impractical. The alteratives in relief request Nos.1-TYP-3-B-G-1,1-TYP-3-APP-l-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, and 1-TYP-3-N-524 are authorized pursuant to 10 CFR 50.55a(a)(3)(i) in that they provide an acceptable level of quality and safety. The alternatives in relief request Nos.1-TYP-3-B3.120-1 and 1-TYP C6.10-1 are authorized pursuant to 10 CFR 50.55a(a)(3)(ii) si:1ce compliance with the code would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The relief granted is authorized by law and will not endanger the common defense and security and is otherwise in the public interest, giving due consideration to the burden upon the licensee if the Code requirements were imposed on the facility.

Sincerely,

/s/

Robert A. Capra, Director 9901210340 981229 Project Directorate 1-2 PDR ADOCK 05000334 Division of Reactor Projects - t/11 G

PDR Office of Nuclear Reactor Regulation Docket No. 50-334

}

l

Enclosure:

Safety Evaluation cc w/encI: See next page

'A l

DISTRIBUTION d ( '.I (

h1 Docket File MO'Brien PEr;eigh, RGN I PUBLIC OGC PPatnah.

PDI-2 Reading ACRS GBagchi JZwolinski GHill(2) y W

RCapra GShear DBrinkman THarris (E-mail SE)

OFFICE PDI-2/PMN A PQl-2/PM PDl[2kb DI-2/D NAME DBrinkmah:rb Mdikri Ma q RCapra" DATE n h 9/98

/L/Ti/98 8

/

/98 IE /M/98 OFFICIAL RECORD COPY t'

I DOCUMENT NAME: BV99673.REL

~

f-c an%

p 1

UNITED STATES

}

NUCLEAR REGULATORY COMMISSION wasmorow, o.c. meewom December 29, 1998

{

Mr. J. E. Cross President-Generation Group Duquesne Ught Company Post Omco Box 4 Shippingport, PA 15077

SUBJECT:

SAFETY EVALUATION OF BEAVER VALLEY POWER STATION, UNIT NO (BVPS-1), INSERVICE INSPECTION (ISI) REUEF REQUESTS ANiOCIATED WITH THE THIRD 10 YEAR ISI INTERVAL (TAC NO. M99673)

Dear Mr. Cross:

By letter dated September 17,1997, as supplemented June 18,1998, Duquesne Company (DLC) submitted the third 10-year intervsl ISI program plan and associate requests for BVPS-1. The U.S. Nuclear Regulatory Commission (NRC) staff, with techni assistance frora its contractor, the Idaho National Engineering Environmental La (INEEL), has reviewed and eva!uated the relief requests. The applicable edition of of the American Society of Mechanical Engineers (ASME) Code for BVPS 1 thir imenmi!s the 1989 s,dition. As described in the enclosed safety evaluation (SE) t adopta the INEEL recommendations in the technical eva!ustion report (TER), which

}

to the SE. The NRC staff has granted relief request Nos.1-TYP-3-B3.140-1,1 TYP-3 1 and 1-TYP 3-RH-E 1-1 pursuant to 10 CFR 50.55a(g)(6)(i) based on a determinatio

?

14 requirements o.~l..e Code are impractical. The alteratives in relief request Nos 1-T

\\

G-1,1 TYP-3 APP-l 1,1 TYP-3-UT-1,1-TYP 3 N 509,1-TYP-3-N-521, and 1-TYP-3 authorized pursuant to 10 CFR 50.55a(a)(3)(i) in that they provide an acceptable level quality and safety. The altamatives in relief request Nos.1-TYP-3 B3.1201 and 1-TYP 3-C6.101 are authorized pursuant to 10 CFR 50.55a(a)(3)(ii) since compliance with th would rcsult in hardship or unusual difficulty without a compensating increase in the lev

- - - =.:

defense and security and is otherw!ss in the public interes Nrder; upon the 'icensee if the Code requirements were imposed on the facility.

Sincerely, w a.C W

-.Z T

Robert A. Capra, Director Project Directorate I2

~'

~

Division of ReactorProjects-W Omco of Nuclear Reactor Regulation Docket No. 50-334 Er'.csure: U.'ety Evaluation cc w4nc!: See next page

\\

J. E. Cross Duquesne Ught Company Beaver Valley Power Station, Units 1 & 2 1

i cc:

Jay E. Silberg, Esquire Shaw, Pittman, Potts & Trowbridge Bureau of Radiation Protection 2300 N Street, NW.

Pennsylvania Department of Washington, DC 20037 EnvironmentalResources ATTN: MichaelP. Murphy Director-Safetyand Uconsing Post Office Box 2063 Department (BV-A)

Harrisburg, PA 17120 Duquesne Ught Company Beaver Valley Power Station Mayor of the Borough of PO Box 4 Shippingport Shippingport, PA 15077 Post Office Box 3 Shippingport, PA 15077 Commissioner Roy M. Smith West Virginia Department of Labor Regional Administrator, Region I Building 3, Room 319 U.S. Nuclear Regulatory Commission Caphol Complex 475 Allendale Road 4

Charleston, WV 25305 King of Prussia, PA 19406 Director, Utilities Department Resident inspector Public Utilities Commission U.S. Nuclear Regulatory Commission 180 East Broad Street Post Office Box 298 Columbus, OH 43266-0573 Shippingport,PA 15077 1

i Director, Pennsylvania Emergency ManagementAgency Duquesne Ught Company Post Office Box 3321 BeaverValley Power Station Harrisburg, PA 17105-3321 Shippingport, PA 15077 PO Box 4 Ohio EPA DERR ATTN: S. C. Jain, Senior Vice President ATTN: Zack A. Clayton Nuclear Services (BV A)

Post Office Box 104g Columbus, OH 43266-0149 Mr. J. A. Hultz, Manager Projects & Support Services Dr. Judith Johnsrud First Energy National Energy Committee 76 South Main Street Sierra Club Akron,OH 44308 433 Orlando Avenue State College, PA 16803 Duquesne Ught Company

. : ^

- = ~ ~ ~

~

BeaverValley PowerStation PO Box 4 i

Shippingport, PA 15077 1

ATTN: Kevin L Ostrowski, Division Vice President, Nuclear Operations Group and Plant Manager (BV SOSB 7)

_.