==Dear Mr. Sullivan:== | ==Dear Mr. Sullivan:== | ||
This letter is in response to your correspondence of September 22,1998 and BECo Ltr. | This letter is in response to your correspondence of September 22,1998 and BECo Ltr. | ||
2.99.064, regarding changes to the Pilgrim Nuclear Power Station Physical Security Plan identified as issue 2, Revision 14 and Revision 14, Addendum 1, respectively, submitted under the provisions of 10 CFR 50.54(p). | 2.99.064, regarding changes to the Pilgrim Nuclear Power Station Physical Security Plan identified as issue 2, Revision 14 and Revision 14, Addendum 1, respectively, submitted under the provisions of 10 CFR 50.54(p). | ||
| Line 33: | Line 32: | ||
Sincerely, ORIGINAL SIGNED BY: | Sincerely, ORIGINAL SIGNED BY: | ||
John R. White, Chief Radiation Safety and Safeguards Branch Division of Reactor Safety Docket No. 50-293 | John R. White, Chief Radiation Safety and Safeguards Branch Division of Reactor Safety Docket No. 50-293 | ||
\\ D 9907230019 990714 PDR ADOCK 05000293 p | |||
D 9907230019 990714 PDR | PDR RC,0 | ||
V | V Mr. T. Sullivan cc: | ||
Mr. T. Sullivan | R. Ledgett, Executive Vice President - Operations J. Alexander, Nuclear Assessment Group Manager J | ||
R. Ledgett, Executive Vice President - Operations | J | ||
J. Alexander, Nuclear Assessment Group Manager | - D. Tarantino, Nuclear information Manager S. Brennion, Regulatory Affairs Department Manager J. Fulton, Assistant General Counsel R. Hallisey, Department of Public Health, Commonwealth of Massachusetts The Honorable Therese Murray | ||
.The Honorable Vincent DiMacedo T. MacGregor, Mass. Dept. of Public Comm. & Energy Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Chairman, Nuclear Matters Committee Plymouth Civil Defense Director P. Gromer, Massachusetts Secretary of Energy Resources J. Miller, Senior issues Manager A. Nogee, MASSPIRG Office of the Commissioner, Massachusetts Department of Environmental Quality Engineering Office of the Attomey General. Commonwealth of Massachusetts J Perlov, Secretary of Public Safety for the Commonwealth of Massachusetts Chairman, Citizens Urging Responsible Energy Commonwealth of Massachusetts, SLO Designee 1 | |||
l I; | l I; | ||
r | r Mr.T. Sullivan DISTRIBUTION: | ||
Mr.T. Sullivan | |||
R. Rosano, NRR/PSGB (OWFN 12 E11) | R. Rosano, NRR/PSGB (OWFN 12 E11) | ||
Document Control Desk, Official Record Copy - RID RG01 Region I Docket Room w/ concurrence (w/o SGI) | Document Control Desk, Official Record Copy - RID RG01 Region I Docket Room w/ concurrence (w/o SGI) | ||
| Line 53: | Line 48: | ||
Region I Safeguards Licensing Serial File C. Anderson, Chief, RPB-5, Rl/DRP (w/o SGI) | Region I Safeguards Licensing Serial File C. Anderson, Chief, RPB-5, Rl/DRP (w/o SGI) | ||
NRC Resident inspector PUBLIC Nuclear Safety information Center (NSIC) | NRC Resident inspector PUBLIC Nuclear Safety information Center (NSIC) | ||
DOCUMENT NAME: S:\SR CELS | DOCUMENT NAME: S:\\SR CELS SP141.WPD To receive a copy of this document,in in x: "C" = Copy without attachment / enclosure "E" = Copy with attachrnent/ enclosure "N" = No copy OFFICE DRS/RI l WW DRS/81 _- | ||
l l | |||
G h \\th JWhitV NAME CMiskey O/Ahk 0 | |||
DATE 07/14/99 0 $ 99 G17/Ff/99 07/ /99 07/ /99 OFFICIAL' RECORD COPY 1 | |||
. r.. ', y,e}} | |||
Latest revision as of 17:09, 6 December 2024
| ML20210A944 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 07/14/1999 |
| From: | Jason White NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Ted Sullivan CENTERIOR ENERGY |
| References | |
| NUDOCS 9907230019 | |
| Download: ML20210A944 (3) | |
Text
'
July 14, 1999 Mr. Theodore A. Sullivan Vice President - Nuclear and Station Director Entergy Nuclear incorporated Pilgrim Nuclear Power Station P ymou h M sach setts 02360-5599
SUBJECT:
10 CFR 50.54(p) SUBMITTAL FOR PILGRIM NUCLEAR POWER STATION
Dear Mr. Sullivan:
This letter is in response to your correspondence of September 22,1998 and BECo Ltr.
2.99.064, regarding changes to the Pilgrim Nuclear Power Station Physical Security Plan identified as issue 2, Revision 14 and Revision 14, Addendum 1, respectively, submitted under the provisions of 10 CFR 50.54(p).
Based on your determination that the changes do not decrease the overall effectiveness of your security plan and after limited review of the changes, no NRC approval is required, in accordance with 50.54(p). Implemsntation of these changes will be subject to inspection to confirm that the changes have not decreased the overall effectiveness of your security plan.
The enclosures to your letters contained Safeguards Information of a type specified in 10 CFR 73.21 and will be withheld from public disclosure.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC Public Document Room.
Mr. Gregory Smith was the reviewer for this matter. Should there be any questions, he can be contacted at (610) 337-5263.
Sincerely, ORIGINAL SIGNED BY:
John R. White, Chief Radiation Safety and Safeguards Branch Division of Reactor Safety Docket No. 50-293
\\ D 9907230019 990714 PDR ADOCK 05000293 p
PDR RC,0
V Mr. T. Sullivan cc:
R. Ledgett, Executive Vice President - Operations J. Alexander, Nuclear Assessment Group Manager J
J
- D. Tarantino, Nuclear information Manager S. Brennion, Regulatory Affairs Department Manager J. Fulton, Assistant General Counsel R. Hallisey, Department of Public Health, Commonwealth of Massachusetts The Honorable Therese Murray
.The Honorable Vincent DiMacedo T. MacGregor, Mass. Dept. of Public Comm. & Energy Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Chairman, Nuclear Matters Committee Plymouth Civil Defense Director P. Gromer, Massachusetts Secretary of Energy Resources J. Miller, Senior issues Manager A. Nogee, MASSPIRG Office of the Commissioner, Massachusetts Department of Environmental Quality Engineering Office of the Attomey General. Commonwealth of Massachusetts J Perlov, Secretary of Public Safety for the Commonwealth of Massachusetts Chairman, Citizens Urging Responsible Energy Commonwealth of Massachusetts, SLO Designee 1
l I;
r Mr.T. Sullivan DISTRIBUTION:
R. Rosano, NRR/PSGB (OWFN 12 E11)
Document Control Desk, Official Record Copy - RID RG01 Region I Docket Room w/ concurrence (w/o SGI)
Region i Safeguards Licensing File (TACS UO1320 and UO1370)
Region I Safeguards Licensing Serial File C. Anderson, Chief, RPB-5, Rl/DRP (w/o SGI)
NRC Resident inspector PUBLIC Nuclear Safety information Center (NSIC)
DOCUMENT NAME: S:\\SR CELS SP141.WPD To receive a copy of this document,in in x: "C" = Copy without attachment / enclosure "E" = Copy with attachrnent/ enclosure "N" = No copy OFFICE DRS/RI l WW DRS/81 _-
l l
G h \\th JWhitV NAME CMiskey O/Ahk 0
DATE 07/14/99 0 $ 99 G17/Ff/99 07/ /99 07/ /99 OFFICIAL' RECORD COPY 1