ML20210T581: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:___ _-___ _ _ .
{{#Wiki_filter:___ _-___ _ _.
e September 11, 1997
e September 11, 1997 Mr. George Rael, Director -
-      ,      Mr. George Rael, Director -
ERD /UMTRA U.S.,De'part, ment of Energy Albuquerque Operations Office P.O. Box S400 Albuquerque, NM 87185-5400
ERD /UMTRA U.S.,De'part, ment of Energy Albuquerque Operations Office P.O. Box S400 Albuquerque, NM 87185-5400


Line 27: Line 26:


==Dear Mr. Rael:==
==Dear Mr. Rael:==
 
)
)              The U.S. Nuclear Regulatory Commission staff has completed its review of the U.S. Department of Energy's (DOE's) Final Completion Report dated February 6,1997, and associated documents for the U*anium Mill Tailings Remedial Action Project site at Gunnison, Colorado. These g            documents !r, dude the final Completion Report page changes transmitted on June 25,1997.
The U.S. Nuclear Regulatory Commission staff has completed its review of the U.S. Department of Energy's (DOE's) Final Completion Report dated February 6,1997, and associated documents for the U*anium Mill Tailings Remedial Action Project site at Gunnison, Colorado. These documents !r, dude the final Completion Report page changes transmitted on June 25,1997.
: 3.                 y NRC staff's re w is documented in Enclosure 1, the final Completion Review Report 9-           WAR). The CRR disesses the staff's evaluation of DOE's completed remedial action against i             the previously approved plxas and specifications. Ba:;ed on its review of the Completion Report, Se NRC stoff co6 curs (nat DOE has performed remedial action at the Gunnison site in accordance with the approved plans and specifications. I have, therefore, signed arid enclosed R             the DOE Certification Summary (Enclosure 2) signifying concurrence in comp tion of the Gunn! son remedial action.
g 3.
_~
y NRC staff's re w is documented in Enclosure 1, the final Completion Review Report 9 -
If you have sny questions conceming this subject letter or the ericlosures, please contact the NRC Project Manager, Harold Lsfevre, at (301! 415-6678.
WAR). The CRR disesses the staff's evaluation of DOE's completed remedial action against i
the previously approved plxas and specifications. Ba:;ed on its review of the Completion Report, Se NRC stoff co6 curs (nat DOE has performed remedial action at the Gunnison site in accordance with the approved plans and specifications. I have, therefore, signed arid enclosed R
the DOE Certification Summary (Enclosure 2) signifying concurrence in comp tion of the Gunn! son remedial action.
If you have sny questions conceming this subject letter or the ericlosures, please contact the
~
NRC Project Manager, Harold Lsfevre, at (301! 415-6678.
Sincerely, (Original signed by)
Sincerely, (Original signed by)
Joseph J. Holonich, Chief Uranium Recovery Branch Division of Waste Management Office of Nuclear Material Safety and Safeguards
Joseph J. Holonich, Chief Uranium Recovery Branch Division of Waste Management Office of Nuclear Material Safety and Safeguards Q{)ki I


==Enclosures:==
==Enclosures:==
As stated cc: S. Arp, DOE Alb Q{)ki      I F. Bosiljevac, DOE Alb E. Artiglia, TAC Alb                                                                                                                                                     bd, )I . g DISTRIBUTION wlEncl.:         : Flie Center                                           PUBLIC                     NMSS r/f                 URB r/f
As stated cc: S. Arp, DOE Alb F. Bosiljevac, DOE Alb bd, )I. g E. Artiglia, TAC Alb DISTRIBUTION wlEncl.:
                                        'CNWRA                                                 ACNW                       CCain                           HLefevre i
: Flie Center PUBLIC NMSS r/f URB r/f
E.g_E0cl; c MFederline                                 CAbrams                                       MLoon DOCUMENT NAME: S:\DWM\ URB \JRT\GUNNISON\CRR.LTR URB         ,            k                                                                     URB ([\/       @
'CNWRA ACNW CCain HLefevre E.g_E0cl; MFederline CAbrams MLoon i
NAME     RTinsley     /k , DGillek                                                                     J                                                   ,
c DOCUMENT NAME: S:\\DWM\\ URB \\JRT\\GUNNISON\\CRR.LTR URB k
DATE      Olg7 h                     9/ /97                         \  OFFICtAL RECORD COPY V97 h f!(!(b f b b                        l[
URB ([\\/
acu                                   _
NAME RTinsley /k, DGillek J
{S}{0S$N                 pog                                                                                          gg                                                       M         l
Olg7 h
___.._____.___.__._____-_m__________._A-________.________-_.____-____-_._m.                     . _ _ _ _ _ _ . _ _ _ _ _ _ _ .}}
\\
V97 DATE 9/ /97 OFFICtAL RECORD COPY h f!(!(b f bb l[
acu
{S}{0S$N gg M
l pog
___.._____.___.__._____-_m__________._A-________.________-_.____-____-_._m.
. _ _ _ _ _ _. _ _ _ _ _ _ _.}}

Latest revision as of 01:04, 6 December 2024

Forwards Final Completion Review Rept for Remedial Action at Gunnison,Co U Mill Tailings Remedial Action Project Site
ML20210T581
Person / Time
Issue date: 09/11/1997
From: Joseph Holonich
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Rael G
ENERGY, DEPT. OF
Shared Package
ML20210T584 List:
References
REF-WM-61 NUDOCS 9709150246
Download: ML20210T581 (1)


Text

___ _-___ _ _.

e September 11, 1997 Mr. George Rael, Director -

ERD /UMTRA U.S.,De'part, ment of Energy Albuquerque Operations Office P.O. Box S400 Albuquerque, NM 87185-5400

SUBJECT:

FINAL COMPLETION REVIEW REPORT FOR THE URANIUM MILL TAILINGS REMEDIAL ACTION PROJECT AT GUNNISON, COLORADO

Dear Mr. Rael:

)

The U.S. Nuclear Regulatory Commission staff has completed its review of the U.S. Department of Energy's (DOE's) Final Completion Report dated February 6,1997, and associated documents for the U*anium Mill Tailings Remedial Action Project site at Gunnison, Colorado. These documents !r, dude the final Completion Report page changes transmitted on June 25,1997.

g 3.

y NRC staff's re w is documented in Enclosure 1, the final Completion Review Report 9 -

WAR). The CRR disesses the staff's evaluation of DOE's completed remedial action against i

the previously approved plxas and specifications. Ba:;ed on its review of the Completion Report, Se NRC stoff co6 curs (nat DOE has performed remedial action at the Gunnison site in accordance with the approved plans and specifications. I have, therefore, signed arid enclosed R

the DOE Certification Summary (Enclosure 2) signifying concurrence in comp tion of the Gunn! son remedial action.

If you have sny questions conceming this subject letter or the ericlosures, please contact the

~

NRC Project Manager, Harold Lsfevre, at (301! 415-6678.

Sincerely, (Original signed by)

Joseph J. Holonich, Chief Uranium Recovery Branch Division of Waste Management Office of Nuclear Material Safety and Safeguards Q{)ki I

Enclosures:

As stated cc: S. Arp, DOE Alb F. Bosiljevac, DOE Alb bd, )I. g E. Artiglia, TAC Alb DISTRIBUTION wlEncl.:

Flie Center PUBLIC NMSS r/f URB r/f

'CNWRA ACNW CCain HLefevre E.g_E0cl; MFederline CAbrams MLoon i

c DOCUMENT NAME: S:\\DWM\\ URB \\JRT\\GUNNISON\\CRR.LTR URB k

URB ([\\/

NAME RTinsley /k, DGillek J

Olg7 h

\\

V97 DATE 9/ /97 OFFICtAL RECORD COPY h f!(!(b f bb l[

acu

{S}{0S$N gg M

l pog

___.._____.___.__._____-_m__________._A-________.________-_.____-____-_._m.

. _ _ _ _ _ _. _ _ _ _ _ _ _.