IR 05000237/2021003: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:November 1, 2021
{{#Wiki_filter:==SUBJECT:==
 
==SUBJECT:==
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - INTEGRATED INSPECTION REPORT 05000237/2021003 AND 05000249/2021003
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - INTEGRATED INSPECTION REPORT 05000237/2021003 AND 05000249/2021003


Line 30: Line 28:
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.


Sincerely, Signed by Riemer, Kenneth on 11/01/21 Kenneth R. Riemer, Chief Branch 1 Division of Reactor Projects Docket Nos. 05000237 and 05000249 License Nos. DPR-19 and DPR-25
Sincerely, Kenneth R. Riemer, Chief Branch 1 Division of Reactor Projects Docket Nos. 05000237 and 05000249 License Nos. DPR-19 and DPR-25


===Enclosure:===
===Enclosure:===
As stated
As stated  


==Inspection Report==
==Inspection Report==
Docket Numbers: 05000237 and 05000249 License Numbers: DPR-19 and DPR-25 Report Numbers: 05000237/2021003 and 05000249/2021003 Enterprise Identifier: I-2021-003-0082 Licensee: Exelon Generation Co., LLC Facility: Dresden Nuclear Power Station, Units 2 and 3 Location: Morris, IL Inspection Dates: July 01, 2021 to September 30, 2021 Inspectors: M. Domke, Resident Inspector G. Edwards, Health Physicist R. Elliott, Acting Senior Resident Inspector A. Nguyen, Senior Resident Inspector M. Porfirio, Illinois Emergency Management Agency Approved By: Kenneth R. Riemer, Chief Branch 1 Division of Reactor Projects Enclosure
Docket Numbers:
05000237 and 05000249
License Numbers:
DPR-19 and DPR-25
Report Numbers:
05000237/2021003 and 05000249/2021003
Enterprise Identifier:
I-2021-003-0082
Licensee:
Exelon Generation Co., LLC
Facility:
Dresden Nuclear Power Station, Units 2 and 3
Location:
Morris, IL
Inspection Dates:
July 01, 2021 to September 30, 2021
Inspectors:
M. Domke, Resident Inspector
G. Edwards, Health Physicist
R. Elliott, Acting Senior Resident Inspector
A. Nguyen, Senior Resident Inspector
M. Porfirio, Illinois Emergency Management Agency
Approved By:
Kenneth R. Riemer, Chief
Branch 1
Division of Reactor Projects


=SUMMARY=
=SUMMARY=
Line 44: Line 67:


===List of Findings and Violations===
===List of Findings and Violations===
No findings or violations of more than minor significance were identified.
No findings or violations of more than minor significance were identified.


Line 64: Line 86:


==REACTOR SAFETY==
==REACTOR SAFETY==
==71111.04 - Equipment Alignment==
==71111.04 - Equipment Alignment==
===Partial Walkdown Sample (IP Section 03.01) (1 Sample)===
===Partial Walkdown Sample (IP Section 03.01) (1 Sample)===
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
Line 75: Line 95:


==71111.05 - Fire Protection==
==71111.05 - Fire Protection==
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (2 Samples)===
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (2 Samples)===
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
Line 85: Line 104:


==71111.06 - Flood Protection Measures==
==71111.06 - Flood Protection Measures==
===Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)===
===Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)===
: (1) Unit 2 cable tunnel east and Unit 3 cable tunnel west, elevation 502' on July 12, 2021
: (1) Unit 2 cable tunnel east and Unit 3 cable tunnel west, elevation 502' on July 12, 2021


==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)===
===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)===
: (1) The inspectors observed and evaluated the crew in dealing with a low-pressure core injection corner room leak, a control rod drift, a feedwater leak in drywell, and an anticipated transient without a scram condition in the simulator on September 16, 2021.
: (1) The inspectors observed and evaluated the crew in dealing with a low-pressure core injection corner room leak, a control rod drift, a feedwater leak in drywell, and an anticipated transient without a scram condition in the simulator on September 16, 2021.


==71111.12 - Maintenance Effectiveness==
==71111.12 - Maintenance Effectiveness==
===Maintenance Effectiveness (IP Section 03.01) (1 Sample)===
===Maintenance Effectiveness (IP Section 03.01) (1 Sample)===
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
Line 102: Line 118:
===Quality Control (IP Section 03.02) (1 Sample)===
===Quality Control (IP Section 03.02) (1 Sample)===
The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSC remains capable of performing its intended function:
The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSC remains capable of performing its intended function:
: (1) Commercially dedicated ball check valve for Unit 3 reactor building exhaust outlet isolation damper per WO 015200503 Commercially dedicated junction box to overhaul Unit 3 hydraulic control unit during refueling outage D3R25 per WO 04946153 Commercially dedicated hoses to replace the pilot bellows sensing line on Unit 3 Target Rock relief and pilot assembly per WO 04890312
: (1) Commercially dedicated ball check valve for Unit 3 reactor building exhaust outlet isolation damper per WO 015200503
 
Commercially dedicated junction box to overhaul Unit 3 hydraulic control unit during refueling outage D3R25 per WO 04946153
 
Commercially dedicated hoses to replace the pilot bellows sensing line on Unit 3 Target Rock relief and pilot assembly per WO 04890312


==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
===Risk Assessment and Management Sample (IP Section 03.01) (2 Samples)===
===Risk Assessment and Management Sample (IP Section 03.01) (2 Samples)===
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
Line 112: Line 131:


==71111.15 - Operability Determinations and Functionality Assessments==
==71111.15 - Operability Determinations and Functionality Assessments==
===Operability Determination or Functionality Assessment (IP Section 03.01) (6 Samples)===
===Operability Determination or Functionality Assessment (IP Section 03.01) (6 Samples)===
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
Line 123: Line 141:


==71111.19 - Post-Maintenance Testing==
==71111.19 - Post-Maintenance Testing==
===Post-Maintenance Test Sample (IP Section 03.01) (2 Samples)===
===Post-Maintenance Test Sample (IP Section 03.01) (2 Samples)===
The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:
The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:
: (1) Repair 'B' control room emergency ventilation valve 2/3-399-332 to 2/3-39248-3" pipe leak on August 5, 2021, Work Order 05175915-01
: (1) Repair 'B' control room emergency ventilation valve 2/3-399-332 to 2/3-39248-3" pipe leak on August 5, 2021, Work Order 05175915-01
: (2) Unit 2 high pressure core injection trip during quarterly surveillance solenoid valves SV8 and SV12 replacements on September 14, 2021, Work Order 05176215-05
: (2) Unit 2 high pressure core injection trip during quarterly surveillance solenoid valves SV8 and SV12 replacements on September 14, 2021, Work Order 05176215-05
==71111.22 - Surveillance Testing==
==71111.22 - Surveillance Testing==
The inspectors evaluated the following surveillance tests:
The inspectors evaluated the following surveillance tests:


Line 140: Line 157:


===Inservice Testing (IP Section 03.01) (1 Sample)===
===Inservice Testing (IP Section 03.01) (1 Sample)===
: (1) Unit 3 quarterly containment cooling service water pump 3B IST surveillance on           September 7, 2021 per work order 05164416
: (1) Unit 3 quarterly containment cooling service water pump 3B IST surveillance on September 7, 2021 per work order 05164416


==71114.04 - Emergency Action Level and Emergency Plan Changes==
==71114.04 - Emergency Action Level and Emergency Plan Changes==
===Inspection Review (IP Section 02.01-02.03) (1 Sample)===
===Inspection Review (IP Section 02.01-02.03) (1 Sample)===
: (1) The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes.
: (1) The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes.


Eval No. 20-74 Emergency Action Levels for Dresden Station, EP-AA-1004, Addendum 3 Eval No. 20-86 Dresden Station Radiological Emergency Plan This evaluation does not constitute NRC approval.
Eval No. 20-74 Emergency Action Levels for Dresden Station, EP-AA-1004, Addendum 3
 
Eval No. 20-86 Dresden Station Radiological Emergency Plan This evaluation does not constitute NRC approval.


==71114.06 - Drill Evaluation==
==71114.06 - Drill Evaluation==
===Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)===
===Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)===
The inspectors evaluated:
The inspectors evaluated:
Line 156: Line 173:


==RADIATION SAFETY==
==RADIATION SAFETY==
==71124.02 - Occupational ALARA Planning and Controls==
==71124.02 - Occupational ALARA Planning and Controls==
===Radiological Work Planning (IP Section 03.01) (3 Samples)===
===Radiological Work Planning (IP Section 03.01) (3 Samples)===
The inspectors evaluated the licensees radiological work planning.
The inspectors evaluated the licensees radiological work planning.
Line 166: Line 181:


==71124.07 - Radiological Environmental Monitoring Program==
==71124.07 - Radiological Environmental Monitoring Program==
===Radiological Environmental Monitoring Program (IP Section 03.02) (1 Sample)===
===Radiological Environmental Monitoring Program (IP Section 03.02) (1 Sample)===
: (1) The inspectors evaluated the implementation of the licensees radiological             environmental monitoring program.
: (1) The inspectors evaluated the implementation of the licensees radiological environmental monitoring program.


===GPI Implementation (IP Section 03.03) (1 Sample)===
===GPI Implementation (IP Section 03.03) (1 Sample)===
: (1) The inspectors evaluated the licensees implementation of the Groundwater             Protection Initiative program to identify incomplete or discontinued program elements.
: (1) The inspectors evaluated the licensees implementation of the Groundwater Protection Initiative program to identify incomplete or discontinued program elements.


==OTHER ACTIVITIES - BASELINE==
==OTHER ACTIVITIES - BASELINE==
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
MS08: Heat Removal Systems (IP Section 02.07) ===
MS08: Heat Removal Systems (IP Section 02.07)===
{{IP sample|IP=IP 71151|count=2}}
{{IP sample|IP=IP 71151|count=2}}
: (1) Unit 2 (July 1, 2020 - June 30, 2021)
: (1) Unit 2 (July 1, 2020 - June 30, 2021)
Line 190: Line 203:


==71152 - Problem Identification and Resolution==
==71152 - Problem Identification and Resolution==
===Annual Follow-Up of Selected Issues (IP Section 02.03) (2 Samples)===
===Annual Follow-Up of Selected Issues (IP Section 02.03) (2 Samples)===
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
Line 197: Line 209:


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Observation: Unit 3 'A' MSL Inboard MSIV Partially Closed                             71152 The inspectors reviewed Action Request 4425857, "U3 'A' MSL Inboard MSIV Partially Closed" as a sample for annual selected issue(s) for follow-up focusing on the following performance attributes of IP 71152:
Observation: Unit 3 'A' MSL Inboard MSIV Partially Closed 71152 The inspectors reviewed Action Request 4425857, "U3 'A' MSL Inboard MSIV Partially Closed" as a sample for annual selected issue(s) for follow-up focusing on the following performance attributes of IP 71152:
complete, accurate, and timely documentation in the corrective action program evaluation and timely disposition of operability and reportability issues consideration of the extent of condition and cause, generic implications, common cause, and previous occurrences evaluation and timely disposition of operability and reportability issues classification and prioritization of the resolution of the problem commensurate with safety significance identification of corrective actions, which were appropriately focused to correct the problem completion of corrective actions in a timely manner commensurate with the safety significance of the issue identification of negative trends associated with human or equipment performance that can potentially impact nuclear safety operating experience is adequately evaluated for applicability and applicable lesson learned are communicated to appropriate organizations and implemented Inspectors notified the licensee of a concern about potential misclassification of activities associated with Unit 3 inboard MSIV "A" closing and subsequent piping replacements due to cracked threads in the MSIV manifold block. Interviews with the licensee determined their actions taken near the MSIV failure date 5/26/2021 were viewed as "rework" in accordance with CC-AA-11. The 1 1/2-inch nominal size pipe had damaged threads that did not conform (cracked) and were not providing pressure boundary required of the pneumatic pipe. The licensee added a new section of threaded pipe and welded this extension using a socket coupling to existing, halved pipe. The licensee added this socket and two welds and an extended threaded 1 1/2 section and determined the activity was rework instead of repair.
 
complete, accurate, and timely documentation in the corrective action program
 
evaluation and timely disposition of operability and reportability issues
 
consideration of the extent of condition and cause, generic implications, common cause, and previous occurrences
 
evaluation and timely disposition of operability and reportability issues
 
classification and prioritization of the resolution of the problem commensurate with safety significance
 
identification of corrective actions, which were appropriately focused to correct the problem
 
completion of corrective actions in a timely manner commensurate with the safety significance of the issue
 
identification of negative trends associated with human or equipment performance that can potentially impact nuclear safety
 
operating experience is adequately evaluated for applicability and applicable lesson learned are communicated to appropriate organizations and implemented Inspectors notified the licensee of a concern about potential misclassification of activities associated with Unit 3 inboard MSIV "A" closing and subsequent piping replacements due to cracked threads in the MSIV manifold block. Interviews with the licensee determined their actions taken near the MSIV failure date 5/26/2021 were viewed as "rework" in accordance with CC-AA-11. The 1 1/2-inch nominal size pipe had damaged threads that did not conform (cracked) and were not providing pressure boundary required of the pneumatic pipe. The licensee added a new section of threaded pipe and welded this extension using a socket coupling to existing, halved pipe. The licensee added this socket and two welds and an extended threaded 1 1/2 section and determined the activity was rework instead of repair.


The "rework" designation allowed the licensee to perform work using its work order processes, whereas a "repair" designation would have required the engineering change process. The licensee documented Inspectors' concerns in action request 4434692.
The "rework" designation allowed the licensee to perform work using its work order processes, whereas a "repair" designation would have required the engineering change process. The licensee documented Inspectors' concerns in action request 4434692.


Observation: Valve Packing Leak on 2-1501-79B                                         71152 The inspectors reviewed Action Request 1546806, "Valve Packing Leak on 2-1501-79B" as a sample for annual selected issue(s) for follow-up focusing on the following performance attributes of IP 71152:
Observation: Valve Packing Leak on 2-1501-79B 71152 The inspectors reviewed Action Request 1546806, "Valve Packing Leak on 2-1501-79B" as a sample for annual selected issue(s) for follow-up focusing on the following performance attributes of IP 71152:
complete, accurate, and timely documentation in the corrective action program evaluation and timely disposition of operability and reportability issues consideration of the extent of condition and cause, generic implications, common cause, and previous occurrences evaluation and timely disposition of operability and reportability issues classification and prioritization of the resolution of the problem commensurate with safety significance identification of corrective actions, which were appropriately focused to correct the problem completion of corrective actions in a timely manner commensurate with the safety significance of the issue identification of negative trends associated with human or equipment performance that can potentially impact nuclear safety operating experience is adequately evaluated for applicability and applicable lesson learned are communicated to appropriate organizations and implemented The licensee identified a class 2 valve packing leak on component 2-1501-79B at a rate of 12 drops per minute (dpm) in 2013. Inspectors observed licensee defined ASME code limitations for class 2 leakage as less than 20 drops per minute, and Inspector walkdowns identified leakage at 2-1501-79B beyond 20 drops per minute.
 
complete, accurate, and timely documentation in the corrective action program
 
evaluation and timely disposition of operability and reportability issues
 
consideration of the extent of condition and cause, generic implications, common cause, and previous occurrences
 
evaluation and timely disposition of operability and reportability issues
 
classification and prioritization of the resolution of the problem commensurate with safety significance
 
identification of corrective actions, which were appropriately focused to correct the problem
 
completion of corrective actions in a timely manner commensurate with the safety significance of the issue identification of negative trends associated with human or equipment performance that can potentially impact nuclear safety
 
operating experience is adequately evaluated for applicability and applicable lesson learned are communicated to appropriate organizations and implemented The licensee identified a class 2 valve packing leak on component 2-1501-79B at a rate of 12 drops per minute (dpm) in 2013. Inspectors observed licensee defined ASME code limitations for class 2 leakage as less than 20 drops per minute, and Inspector walkdowns identified leakage at 2-1501-79B beyond 20 drops per minute.


This a packing leak that would typically worsen but documentation shows either improvement (0dpm) or stagnation (12dpm) while Inspector walkdowns showed exceedance of owner defined ASME acceptance criteria between 40-80 dpm beginning July 2021.
This a packing leak that would typically worsen but documentation shows either improvement (0dpm) or stagnation (12dpm) while Inspector walkdowns showed exceedance of owner defined ASME acceptance criteria between 40-80 dpm beginning July 2021.
Line 222: Line 266:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type              Designation      Description or Title                                      Revision or
Procedure                                                                                              Date
71111.04  Corrective Action 4436081          NRC Inspector Walkdown Items                              07/20/2021
Documents        4436299          NRC Inspector Walkdown Items                              07/21/2021
Resulting from    4436521          NRC Walkdown items                                        07/22/2021
Inspection
Inspection
Procedures        DOP 2300-M1/E1   Unit 3 HPCI System Checklist                             41
Procedure
DOS 1500-M1     Unit 3 LPCI and Containment Cooling Valve Checklist       39
Type
71111.05  Fire Plans        182 U2 Cable     Unit 2 Cable Tunnel East Elevation 502'                  05
Designation
Description or Title
Revision or
Date
4436081
NRC Inspector Walkdown Items
07/20/2021
4436299
NRC Inspector Walkdown Items
07/21/2021
Corrective Action
Documents
Resulting from
Inspection
4436521
NRC Walkdown items
07/22/2021
DOP 2300-M1/E1
Unit 3 HPCI System Checklist
71111.04
Procedures
DOS 1500-M1
Unit 3 LPCI and Containment Cooling Valve Checklist
2 U2 Cable
Tunnel
Tunnel
183 Cable Tunnel FZ 8.2.4 Unit 3 Cable Tunnel West Elevation 502'         05
Unit 2 Cable Tunnel East Elevation 502'
2 U1CH         FZ 11.3 Unit 1 Crib House                                 03
183 Cable Tunnel
Procedures        DFPS 4114-13     Station Blackout Building Fire Equipment Inspection       27
FZ 8.2.4 Unit 3 Cable Tunnel West Elevation 502'
OP-AA-201-003   Fire Drill Performance                                   19
Fire Plans
71111.06   Corrective Action 4434425          Ground Water Intrusion in 2/3 Cable Tunnel                07/11/2021
2 U1CH
FZ 11.3 Unit 1 Crib House
DFPS 4114-13
Station Blackout Building Fire Equipment Inspection
71111.05
Procedures
OP-AA-201-003
Fire Drill Performance
71111.06
Corrective Action
Documents
Documents
71111.11Q Miscellaneous     OBE-21-02A       Dresden Operations LORT Training                         00
4434425
71111.12  Corrective Action 4295671          Butyl Rubber Cables Require Repairs                       11/08/2019
Ground Water Intrusion in 2/3 Cable Tunnel
Documents        4301941         DPIS 3-0261-34C                                           12/06/2019
07/11/2021
28689         Work Order Required for Replacement of Unit 3 CCSW       03/23/2020
71111.11Q
Miscellaneous
OBE-21-02A
Dresden Operations LORT Training
295671
Butyl Rubber Cables Require Repairs
11/08/2019
4301941
DPIS 3-0261-34C
2/06/2019
28689
Work Order Required for Replacement of Unit 3 CCSW
Piping
Piping
4333144         3-1501-2A                                                 04/06/2020
03/23/2020
4362775         D3M20: Grade 3 Stem Grease Found on 3-1501-28A           08/13/2020
4333144
4395352         3A LPCI HX Tube Side Inlet Pressure Gauge Likely Clogged 01/12/2021
3-1501-2A
Corrective Action 4434692          NRC Concern with Disposition of Rework to MSIV Air Piping 07/13/2021
04/06/2020
4362775
D3M20: Grade 3 Stem Grease Found on 3-1501-28A
08/13/2020
Corrective Action
Documents
4395352
3A LPCI HX Tube Side Inlet Pressure Gauge Likely Clogged
01/12/2021
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
Procedures       SM-AA-300-1001   Procurement Engineering Process and Responsibilities     24
4434692
Work Orders      1520503          EWP MM D3 16Y PM REP Ball Checks/Inspect Air             04/26/2021
NRC Concern with Disposition of Rework to MSIV Air Piping
07/13/2021
Procedures
SM-AA-300-1001
Procurement Engineering Process and Responsibilities
20503
EWP MM D3 16Y PM REP Ball Checks/Inspect Air
Hose/Replace VERSA Pilot
Hose/Replace VERSA Pilot
4890312         D3 24M/RFL TS IST RV-Remove/Replace T-Rock Relief and     05/24/2021
04/26/2021
4890312
D3 24M/RFL TS IST RV-Remove/Replace T-Rock Relief and
Pilot Assembly
Pilot Assembly
4946153         D3R25 Overhaul of XX-XX HCU                               08/05/2021
05/24/2021
Inspection Type             Designation     Description or Title                                     Revision or
71111.12
Procedure                                                                                              Date
Work Orders
71111.13  Miscellaneous     L1222 Switching Risk Screening per OP-AA-107-F-01                        09/09/2021
4946153
D3R25 Overhaul of XX-XX HCU
08/05/2021
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
L1222 Switching
9/9/2021 Control
9/9/2021 Control
Room Risk
Room Risk
Screening
Screening
Procedures        DFPS 4123-01     Unit 1 Diesel Fire Pump Operability                       54
Risk Screening per OP-AA-107-F-01
DOP 4400-06     Operation of Unit 1 Screen Wash Pump                     17
09/09/2021
71111.15  Corrective Action 2610638         U3 HPCI Pump in IST Alert Range                           01/11/2016
DFPS 4123-01
Documents        4090732         U3 HPCI Booster Pump Vibes                               01/05/2018
Unit 1 Diesel Fire Pump Operability
4434751         DW Temps TE 3-5741-12A and TE 3-1053-B Above EQ           07/13/2021
71111.13
Procedures
DOP 4400-06
Operation of Unit 1 Screen Wash Pump
2610638
U3 HPCI Pump in IST Alert Range
01/11/2016
4090732
U3 HPCI Booster Pump Vibes
01/05/2018
4434751
DW Temps TE 3-5741-12A and TE 3-1053-B Above EQ
Limits
Limits
4437971         Small Amount of Water Drained from Conduit on 2-0261-35A 07/30/2021
07/13/2021
4438501         Flex Barge A Fuel Replacement                             08/02/2021
4437971
4438968         Unit 2 SBO Secondary Vent Fan Did Not Start               08/04/2021
Small Amount of Water Drained from Conduit on 2-0261-35A
4445418         Unit 3 HPCI Booster Pump Point 10A Vibrations             09/09/2021
07/30/2021
Operability       2610411          U3 HPCI Outboard Booster Pump Bearing                    01/10/2016
4438501
Flex Barge A Fuel Replacement
08/02/2021
4438968
Unit 2 SBO Secondary Vent Fan Did Not Start
08/04/2021
Corrective Action
Documents
4445418
Unit 3 HPCI Booster Pump Point 10A Vibrations
09/09/2021
Operability
Evaluations
Evaluations
Procedures       OP-AA-108-115   Operability Determinations (CM-1)                         24
2610411
71111.19  Work Orders      05175915-01     Repair B CREVS VLV 2/3-3999-332 to 2/3-39248-3" Pipe     08/05/2021
U3 HPCI Outboard Booster Pump Bearing
01/10/2016
71111.15
Procedures
OP-AA-108-115
Operability Determinations (CM-1)
05175915-01
Repair B CREVS VLV 2/3-3999-332 to 2/3-39248-3" Pipe
Leak
Leak
5176215-05       OPS Perform PMT of HPCI Solenoid SV8 & SV12               09/14/2021
08/05/2021
71111.22  Corrective Action 02610409        U3 HPCI Vibration                                         01/10/2016
71111.19
Documents        02610411        U3 HPCI Outboard Booster Pump Bearing                     01/10/2016
Work Orders
2610638         U3 HPCI Pump in IST Alert Range                           01/11/2016
5176215-05
04090732         U3 HPCI Booster Pump Vibes                               01/05/2018
OPS Perform PMT of HPCI Solenoid SV8 & SV12
04445418         U3 HPCI Booster Pump Point 10A Vibrations                 09/09/2021
09/14/2021
Corrective Action 04450385        U3 HPCI Vibration Data from Recent Surveillance          10/03/2021
2610409
U3 HPCI Vibration
01/10/2016
2610411
U3 HPCI Outboard Booster Pump Bearing
01/10/2016
2610638
U3 HPCI Pump in IST Alert Range
01/11/2016
04090732
U3 HPCI Booster Pump Vibes
01/05/2018
Corrective Action
Documents
04445418
U3 HPCI Booster Pump Point 10A Vibrations
09/09/2021
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
Procedures        DOS 1100-04     Standby Liquid Control System Quarterly/Comprehensive     53
04450385
U3 HPCI Vibration Data from Recent Surveillance
10/03/2021
DOS 1100-04
Standby Liquid Control System Quarterly/Comprehensive
Pump Test for the In-Service Testing Program
Pump Test for the In-Service Testing Program
DOS 1400-05     Core Spray System Pump Operability and Quarterly IST Test 56
DOS 1400-05
Core Spray System Pump Operability and Quarterly IST Test
with Torus Available
with Torus Available
DOS 1500-02     Containment Cooling Service Water Pump Test and           95
71111.22
Inspection Type             Designation   Description or Title                                     Revision or
Procedures
Procedure                                                                                            Date
DOS 1500-02
Containment Cooling Service Water Pump Test and  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
In-Service Test
In-Service Test
DOS 2300-03   High Pressure Coolant Injection System Operability and   109
DOS 2300-03
High Pressure Coolant Injection System Operability and
Quarterly IST Verification Test
Quarterly IST Verification Test
DOS 2300-03   High Pressure Coolant Injection System Operability and   118
109
DOS 2300-03
High Pressure Coolant Injection System Operability and
Quarterly IST Verification Test
Quarterly IST Verification Test
DOS 2300-07   High Pressure Coolant Injection Fast Initiation Test     44
118
DOS 2300-08   HPCI Pump Discharge Line Temperature Monitoring         11
DOS 2300-07
DTP 09         Leak Detection Data Sheet                               17
High Pressure Coolant Injection Fast Initiation Test
Work Orders      01873162       D3 QTR TS HPCI Pump Operability Test and IST             11/02/2015
DOS 2300-08
HPCI Pump Discharge Line Temperature Monitoring
DTP 09
Leak Detection Data Sheet
01873162
D3 QTR TS HPCI Pump Operability Test and IST
Surveillance
Surveillance
5149543-01     OP D2 QTR TS CS PMP Test with Torus Avail for IST Data   07/27/2021
11/02/2015
Work Orders
5149543-01
OP D2 QTR TS CS PMP Test with Torus Avail for IST Data
Surveillance
Surveillance
71114.04  Miscellaneous    Eval No. 20-74 Emergency Action Levels for Dresden Station, EP-AA-1004, 08/21/2020
07/27/2021
Eval No. 20-74
Emergency Action Levels for Dresden Station, EP-AA-1004,
Addendum 3
Addendum 3
Eval No. 20-86 Dresden Station Radiological Emergency Plan             09/19/2020
08/21/2020
71124.02  Miscellaneous                   Dresden Station D3R26 RP/ALARA Refuel Outage Report     Spring 2021
71114.04
Miscellaneous
Eval No. 20-86
Dresden Station Radiological Emergency Plan
09/19/2020
Miscellaneous
Dresden Station D3R26 RP/ALARA Refuel Outage Report
Fall 2020
Fall 2020
Radiation Work    DR-03-20-00506 D3R26 Drywell Scaffold Installation/Removal Activities   0
Spring 2021
Permits (RWPs)    DR-03-20-00520 D3R26 Drywell Snubbers                                   0
DR-03-20-00506
DR-03-20-00901 U3R26 Reactor Disassembly/Reassembly Activities         0
D3R26 Drywell Scaffold Installation/Removal Activities
71124.07  Corrective Action 04375666       Air Sampler D-03 Found Without Power                     10/09/2021
DR-03-20-00520
Documents         04409865       2020 REMP Anomalies and ODCM Missed Samples             03/18/2021
D3R26 Drywell Snubbers
Miscellaneous                    Metrological Tower Inspection Report                     04/19/2021
71124.02
Dresden Nuclear Power Station 2020 Annual Radiological   05/06/2021
Radiation Work
Permits (RWPs)
DR-03-20-00901
U3R26 Reactor Disassembly/Reassembly Activities
04375666
Air Sampler D-03 Found Without Power
10/09/2021
Corrective Action
Documents
04409865
20 REMP Anomalies and ODCM Missed Samples
03/18/2021
Metrological Tower Inspection Report
04/19/2021
71124.07
Miscellaneous
Dresden Nuclear Power Station 2020 Annual Radiological
Environmental Operating Report
Environmental Operating Report
71152     Corrective Action 4446281        NRC Question                                            09/14/2021
05/06/2021
71152
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
13
4446281
NRC Question
09/14/2021
}}
}}

Latest revision as of 21:00, 27 November 2024

Integrated Inspection Report 05000237/2021003 and 05000249/2021003
ML21305A053
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 11/01/2021
From: Kenneth Riemer
NRC/RGN-III/DRP/B1
To: Rhoades D
Exelon Generation Co LLC, Exelon Nuclear
References
IR 2021003
Download: ML21305A053 (15)


Text

SUBJECT:

DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - INTEGRATED INSPECTION REPORT 05000237/2021003 AND 05000249/2021003

Dear Mr. Rhoades:

On September 30, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Dresden Nuclear Power Station, Units 2 and 3. On October 7, 2021, the NRC inspectors discussed the results of this inspection with Mr. P. Karaba, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Kenneth R. Riemer, Chief Branch 1 Division of Reactor Projects Docket Nos. 05000237 and 05000249 License Nos. DPR-19 and DPR-25

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000237 and 05000249

License Numbers:

DPR-19 and DPR-25

Report Numbers:

05000237/2021003 and 05000249/2021003

Enterprise Identifier:

I-2021-003-0082

Licensee:

Exelon Generation Co., LLC

Facility:

Dresden Nuclear Power Station, Units 2 and 3

Location:

Morris, IL

Inspection Dates:

July 01, 2021 to September 30, 2021

Inspectors:

M. Domke, Resident Inspector

G. Edwards, Health Physicist

R. Elliott, Acting Senior Resident Inspector

A. Nguyen, Senior Resident Inspector

M. Porfirio, Illinois Emergency Management Agency

Approved By:

Kenneth R. Riemer, Chief

Branch 1

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Dresden Nuclear Power Station, Units 2 and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 2 began the inspection period at rated thermal power. On July 17, 2021, the unit was down powered to 74 percent to perform a quarterly control rod sequence exchange and routine testing. The unit was returned to rated thermal power on July 18, 2021. On August 15, 2021, the unit was down powered to 82 percent to perform an end of cycle control rod sequence exchange. The unit was returned to rated thermal power on August 16, 2021. On September 4, 2021, the unit was down powered to 80 percent to perform an end of cycle control rod sequence exchange. The unit was returned to rated thermal power on September 5, 2021 and remained at or near rated thermal power for the remainder of the inspection period.

Unit 3 began the inspection period at rated thermal power. On September 18, 2021, the unit was down powered to 85 percent to perform a quarterly control rod sequence exchange and conduct control rod drive testing. The unit was returned to rated thermal power on September 19, 2021 and remained at or near rated thermal power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident and regional inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week, increasing the amount of time on-site as local COVID-19 conditions permitted.

As part of their on-site activities, resident inspectors conducted plant status activities as described in IMC 2515, Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution, observed risk significant activities; and completed on-site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on-site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (1 Sample)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 3 high pressure core injection system partial walkdown August 17, 2021

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the Unit 3 low pressure coolant injection and containment cooling systems on July 22, 2021.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) FZ 8.2.4, Unit 2 cable tunnel east and Unit 3 cable tunnel west elevation 502' on July 12, 2021
(2) FZ 11.3 Unit 1 crib house on July 21, 2021

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the onsite fire brigade training and performance during an unannounced fire drill in Unit 3 station black out diesel generator room on September 20, 2021.

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)

(1) Unit 2 cable tunnel east and Unit 3 cable tunnel west, elevation 502' on July 12, 2021

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated the crew in dealing with a low-pressure core injection corner room leak, a control rod drift, a feedwater leak in drywell, and an anticipated transient without a scram condition in the simulator on September 16, 2021.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Containment cooling function to maintain design requirement by closed cooling service water and low-pressure core injection systems on September 28, 2021

Quality Control (IP Section 03.02) (1 Sample)

The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSC remains capable of performing its intended function:

(1) Commercially dedicated ball check valve for Unit 3 reactor building exhaust outlet isolation damper per WO 015200503

Commercially dedicated junction box to overhaul Unit 3 hydraulic control unit during refueling outage D3R25 per WO 04946153

Commercially dedicated hoses to replace the pilot bellows sensing line on Unit 3 Target Rock relief and pilot assembly per WO 04890312

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Unit 2/3 elevated risk due 2/3 diesel fire pump maintenance on July 21, 2021
(2) Line 1222 switching opened circuit breaker 10-11 which temporarily provides only one breaker for Unit 3 main generator output on September 9, 2021 Be

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (6 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Drywall temperatures thermal elements TE 3-5741 and TE 3-1053-B above environmental qualification limits, AR 4434751
(2) A small amount of water was drained from the conduit on 2-0261-35A, AR 4437971
(3) Control room emergency ventilation system refrigerant control unit return pipe through-wall leak at weld connection between 2/3-3999-332 and 2/3-39248-3, AR 4438564
(4) Unit 2 station blackout secondary ventilation fan did not start, AR 4438968
(5) Flex barge 'A' fuel replacement, AR 4437501
(6) Unit 3 high pressure coolant injection pump alert level vibrations on outboard booster pump axial 10A location on September 9, 2021 per WO 5164996-01, AR 4445418

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:

(1) Repair 'B' control room emergency ventilation valve 2/3-399-332 to 2/3-39248-3" pipe leak on August 5, 2021, Work Order 05175915-01
(2) Unit 2 high pressure core injection trip during quarterly surveillance solenoid valves SV8 and SV12 replacements on September 14, 2021, Work Order 05176215-05

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) Unit 3 quarterly high pressure coolant injection system operability on September 8, 2021 per work order 05164996
(2) Common unit quarterly 2/3 diesel generator cooling water IST surveillance on September 27, 2021 per work order 05168530-01
(3) Quarterly core spray pump test with torus available for IST data surveillance on July 27, 2021 per work order 05149543
(4) Unit 3 standby liquid control system quarterly 3B pump test for the in-service testing program on August 19, 2021 per work order 05158064-01

Inservice Testing (IP Section 03.01) (1 Sample)

(1) Unit 3 quarterly containment cooling service water pump 3B IST surveillance on September 7, 2021 per work order 05164416

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1) The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes.

Eval No. 20-74 Emergency Action Levels for Dresden Station, EP-AA-1004, Addendum 3

Eval No. 20-86 Dresden Station Radiological Emergency Plan This evaluation does not constitute NRC approval.

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1) Licensee Operator requalification training held in the training simulator on September 16,

RADIATION SAFETY

71124.02 - Occupational ALARA Planning and Controls

Radiological Work Planning (IP Section 03.01) (3 Samples)

The inspectors evaluated the licensees radiological work planning.

(1) Radiation Work Permit DR-03-20-00901 for Unit 3 Reactor Disassembly/Reassembly Activities during the Fall 2020 Outage (D3R26).
(2) Radiation Work Permit DR-03-20-00506 for Unit 3 Drywell Scaffold Installation/Removal Activities during the Fall 2020 Outage (D3R26).
(3) Radiation Work Permit DR-03-20-00520 for Unit 3 Drywell Snubber Activities during the Fall 2020 Outage (D3R26).

71124.07 - Radiological Environmental Monitoring Program

Radiological Environmental Monitoring Program (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the implementation of the licensees radiological environmental monitoring program.

GPI Implementation (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated the licensees implementation of the Groundwater Protection Initiative program to identify incomplete or discontinued program elements.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS08: Heat Removal Systems (IP Section 02.07)===

(1) Unit 2 (July 1, 2020 - June 30, 2021)
(2) Unit 3 (July 1, 2020 - June 30, 2021)

MS09: Residual Heat Removal Systems (IP Section 02.08) (2 Samples)

(1) Unit 2 (July 1, 2020 - June 30, 2021)
(2) Unit 3 (July 1, 2020 - June 30, 2021)

MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)

(1) Unit 2 (July 1, 2020 - June 30, 2021)
(2) Unit 3 (July 1, 2020 - June 30, 2021)

71152 - Problem Identification and Resolution

Annual Follow-Up of Selected Issues (IP Section 02.03) (2 Samples)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Unit 3 'A' MSL inboard MSIV partially closed, IR 4425857
(2) Unit 2 LCPI "B" suction line vent valve 2-1501-79B packing leak beyond owner established limits per ASME Boiler & Pressure Vessel Code Section XI IWB-3142, IR

INSPECTION RESULTS

Observation: Unit 3 'A' MSL Inboard MSIV Partially Closed 71152 The inspectors reviewed Action Request 4425857, "U3 'A' MSL Inboard MSIV Partially Closed" as a sample for annual selected issue(s) for follow-up focusing on the following performance attributes of IP 71152:

complete, accurate, and timely documentation in the corrective action program

evaluation and timely disposition of operability and reportability issues

consideration of the extent of condition and cause, generic implications, common cause, and previous occurrences

evaluation and timely disposition of operability and reportability issues

classification and prioritization of the resolution of the problem commensurate with safety significance

identification of corrective actions, which were appropriately focused to correct the problem

completion of corrective actions in a timely manner commensurate with the safety significance of the issue

identification of negative trends associated with human or equipment performance that can potentially impact nuclear safety

operating experience is adequately evaluated for applicability and applicable lesson learned are communicated to appropriate organizations and implemented Inspectors notified the licensee of a concern about potential misclassification of activities associated with Unit 3 inboard MSIV "A" closing and subsequent piping replacements due to cracked threads in the MSIV manifold block. Interviews with the licensee determined their actions taken near the MSIV failure date 5/26/2021 were viewed as "rework" in accordance with CC-AA-11. The 1 1/2-inch nominal size pipe had damaged threads that did not conform (cracked) and were not providing pressure boundary required of the pneumatic pipe. The licensee added a new section of threaded pipe and welded this extension using a socket coupling to existing, halved pipe. The licensee added this socket and two welds and an extended threaded 1 1/2 section and determined the activity was rework instead of repair.

The "rework" designation allowed the licensee to perform work using its work order processes, whereas a "repair" designation would have required the engineering change process. The licensee documented Inspectors' concerns in action request 4434692.

Observation: Valve Packing Leak on 2-1501-79B 71152 The inspectors reviewed Action Request 1546806, "Valve Packing Leak on 2-1501-79B" as a sample for annual selected issue(s) for follow-up focusing on the following performance attributes of IP 71152:

complete, accurate, and timely documentation in the corrective action program

evaluation and timely disposition of operability and reportability issues

consideration of the extent of condition and cause, generic implications, common cause, and previous occurrences

evaluation and timely disposition of operability and reportability issues

classification and prioritization of the resolution of the problem commensurate with safety significance

identification of corrective actions, which were appropriately focused to correct the problem

completion of corrective actions in a timely manner commensurate with the safety significance of the issue identification of negative trends associated with human or equipment performance that can potentially impact nuclear safety

operating experience is adequately evaluated for applicability and applicable lesson learned are communicated to appropriate organizations and implemented The licensee identified a class 2 valve packing leak on component 2-1501-79B at a rate of 12 drops per minute (dpm) in 2013. Inspectors observed licensee defined ASME code limitations for class 2 leakage as less than 20 drops per minute, and Inspector walkdowns identified leakage at 2-1501-79B beyond 20 drops per minute.

This a packing leak that would typically worsen but documentation shows either improvement (0dpm) or stagnation (12dpm) while Inspector walkdowns showed exceedance of owner defined ASME acceptance criteria between 40-80 dpm beginning July 2021.

The licensee appears compliant with ASME Section XI and 10CFR50.55a because required examinations were performed at required periodicities even if no leakage was identified.

ASME code interpretation XI-1-92-03 supports this notion of compliance. The licensee is tracking completion of Inspector identified leakage beyond owner defined limits by AR 4446281, "NRC Question."

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On October 7, 2021, the inspectors presented the integrated inspection results to Mr. P. Karaba, Site Vice President, and other members of the licensee staff.

On August 6, 2021, the inspectors presented the radiation protection inspection results to Mr. P. Boyle, Plant Manager, and other members of the licensee staff.

On October 1, 2021, the inspectors presented the EPlan and EAL Change inspection results to Mr. D. Moore, Senior Manager, Emergency Preparedness, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

4436081

NRC Inspector Walkdown Items

07/20/2021

4436299

NRC Inspector Walkdown Items

07/21/2021

Corrective Action

Documents

Resulting from

Inspection

4436521

NRC Walkdown items

07/22/2021

DOP 2300-M1/E1

Unit 3 HPCI System Checklist

71111.04

Procedures

DOS 1500-M1

Unit 3 LPCI and Containment Cooling Valve Checklist

2 U2 Cable

Tunnel

Unit 2 Cable Tunnel East Elevation 502'

183 Cable Tunnel

FZ 8.2.4 Unit 3 Cable Tunnel West Elevation 502'

Fire Plans

2 U1CH

FZ 11.3 Unit 1 Crib House

DFPS 4114-13

Station Blackout Building Fire Equipment Inspection

71111.05

Procedures

OP-AA-201-003

Fire Drill Performance

71111.06

Corrective Action

Documents

4434425

Ground Water Intrusion in 2/3 Cable Tunnel

07/11/2021

71111.11Q

Miscellaneous

OBE-21-02A

Dresden Operations LORT Training

295671

Butyl Rubber Cables Require Repairs

11/08/2019

4301941

DPIS 3-0261-34C

2/06/2019

28689

Work Order Required for Replacement of Unit 3 CCSW

Piping

03/23/2020

4333144

3-1501-2A

04/06/2020

4362775

D3M20: Grade 3 Stem Grease Found on 3-1501-28A

08/13/2020

Corrective Action

Documents

4395352

3A LPCI HX Tube Side Inlet Pressure Gauge Likely Clogged

01/12/2021

Corrective Action

Documents

Resulting from

Inspection

4434692

NRC Concern with Disposition of Rework to MSIV Air Piping

07/13/2021

Procedures

SM-AA-300-1001

Procurement Engineering Process and Responsibilities

20503

EWP MM D3 16Y PM REP Ball Checks/Inspect Air

Hose/Replace VERSA Pilot

04/26/2021

4890312

D3 24M/RFL TS IST RV-Remove/Replace T-Rock Relief and

Pilot Assembly

05/24/2021

71111.12

Work Orders

4946153

D3R25 Overhaul of XX-XX HCU

08/05/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Miscellaneous

L1222 Switching

9/9/2021 Control

Room Risk

Screening

Risk Screening per OP-AA-107-F-01

09/09/2021

DFPS 4123-01

Unit 1 Diesel Fire Pump Operability

71111.13

Procedures

DOP 4400-06

Operation of Unit 1 Screen Wash Pump

2610638

U3 HPCI Pump in IST Alert Range

01/11/2016

4090732

U3 HPCI Booster Pump Vibes

01/05/2018

4434751

DW Temps TE 3-5741-12A and TE 3-1053-B Above EQ

Limits

07/13/2021

4437971

Small Amount of Water Drained from Conduit on 2-0261-35A

07/30/2021

4438501

Flex Barge A Fuel Replacement

08/02/2021

4438968

Unit 2 SBO Secondary Vent Fan Did Not Start

08/04/2021

Corrective Action

Documents

4445418

Unit 3 HPCI Booster Pump Point 10A Vibrations

09/09/2021

Operability

Evaluations

2610411

U3 HPCI Outboard Booster Pump Bearing

01/10/2016

71111.15

Procedures

OP-AA-108-115

Operability Determinations (CM-1)

05175915-01

Repair B CREVS VLV 2/3-3999-332 to 2/3-39248-3" Pipe

Leak

08/05/2021

71111.19

Work Orders

5176215-05

OPS Perform PMT of HPCI Solenoid SV8 & SV12

09/14/2021

2610409

U3 HPCI Vibration

01/10/2016

2610411

U3 HPCI Outboard Booster Pump Bearing

01/10/2016

2610638

U3 HPCI Pump in IST Alert Range

01/11/2016

04090732

U3 HPCI Booster Pump Vibes

01/05/2018

Corrective Action

Documents

04445418

U3 HPCI Booster Pump Point 10A Vibrations

09/09/2021

Corrective Action

Documents

Resulting from

Inspection

04450385

U3 HPCI Vibration Data from Recent Surveillance

10/03/2021

DOS 1100-04

Standby Liquid Control System Quarterly/Comprehensive

Pump Test for the In-Service Testing Program

DOS 1400-05

Core Spray System Pump Operability and Quarterly IST Test

with Torus Available

71111.22

Procedures

DOS 1500-02

Containment Cooling Service Water Pump Test and

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

In-Service Test

DOS 2300-03

High Pressure Coolant Injection System Operability and

Quarterly IST Verification Test

109

DOS 2300-03

High Pressure Coolant Injection System Operability and

Quarterly IST Verification Test

118

DOS 2300-07

High Pressure Coolant Injection Fast Initiation Test

DOS 2300-08

HPCI Pump Discharge Line Temperature Monitoring

DTP 09

Leak Detection Data Sheet

01873162

D3 QTR TS HPCI Pump Operability Test and IST

Surveillance

11/02/2015

Work Orders

5149543-01

OP D2 QTR TS CS PMP Test with Torus Avail for IST Data

Surveillance

07/27/2021

Eval No. 20-74

Emergency Action Levels for Dresden Station, EP-AA-1004,

Addendum 3

08/21/2020

71114.04

Miscellaneous

Eval No. 20-86

Dresden Station Radiological Emergency Plan

09/19/2020

Miscellaneous

Dresden Station D3R26 RP/ALARA Refuel Outage Report

Fall 2020

Spring 2021

DR-03-20-00506

D3R26 Drywell Scaffold Installation/Removal Activities

DR-03-20-00520

D3R26 Drywell Snubbers

71124.02

Radiation Work

Permits (RWPs)

DR-03-20-00901

U3R26 Reactor Disassembly/Reassembly Activities

04375666

Air Sampler D-03 Found Without Power

10/09/2021

Corrective Action

Documents

04409865

20 REMP Anomalies and ODCM Missed Samples

03/18/2021

Metrological Tower Inspection Report

04/19/2021

71124.07

Miscellaneous

Dresden Nuclear Power Station 2020 Annual Radiological

Environmental Operating Report

05/06/2021

71152

Corrective Action

Documents

Resulting from

Inspection

4446281

NRC Question

09/14/2021