{{#Wiki_filter:April 2, 2021 Mr. Bob Franssen, Vice President Entergy Operations, Inc.
{{#Wiki_filter:April 2, 2021 Mr. Bob Franssen, Vice President Entergy Operations, Inc.
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150  


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF PUBLIC MEETING WITH ENTERGY OPERATIONS, INC.
OF PUBLIC MEETING WITH ENTERGY OPERATIONS, INC.  


==Dear Mr. Franssen:==
==Dear Mr. Franssen:==
This refers to the virtual public meeting conducted on March 31, 2021, between the Nuclear Regulatory Commission (NRC) and your staff. Approximately 60 people attended the public meeting, including members of the general public, with representatives from the several state and local government organizations.
This refers to the virtual public meeting conducted on March 31, 2021, between the Nuclear Regulatory Commission (NRC) and your staff. Approximately 60 people attended the public meeting, including members of the general public, with representatives from the several state and local government organizations.
During the meeting, the NRC presented the results of the annual assessment of safety performance at Grand Gulf Nuclear Station for the period of January 1 through December 31, 2020, as documented in NRC Inspection Report 05000416/2020006, issued March 3, 2021, (ADAMS Accession No. ML21055A008). Your staff presented the stations perspective regarding the issues that contributed to the stations performance in the Degraded Performance Column (Column 3) of the NRCs Reactor Oversight Process (ROP) Action Matrix. During the public question-and-answer portion of the meeting, there were questions from the public regarding actions necessary for the station to be re-assessed into Column 1 of the ROP Action Matrix, the stations previous power uprate license amendment, and the testing of plant equipment.
During the meeting, the NRC presented the results of the annual assessment of safety performance at Grand Gulf Nuclear Station for the period of January 1 through December 31, 2020, as documented in NRC Inspection Report 05000416/2020006, issued March 3, 2021, (ADAMS Accession No. ML21055A008). Your staff presented the stations perspective regarding the issues that contributed to the stations performance in the Degraded Performance Column (Column 3) of the NRCs Reactor Oversight Process (ROP) Action Matrix. During the public question-and-answer portion of the meeting, there were questions from the public regarding actions necessary for the station to be re-assessed into Column 1 of the ROP Action Matrix, the stations previous power uprate license amendment, and the testing of plant equipment.
A copy of the NRCs presentation, Entergys presentation, and an attendance list from the meeting are provided as Enclosures to this letter.
A copy of the NRCs presentation, Entergys presentation, and an attendance list from the meeting are provided as Enclosures to this letter.  


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this letter and its enclosures will be made available electronically for public inspection in the NRCs Public Document Room or the NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this letter and its enclosures will be made available electronically for public inspection in the NRCs Public Document Room or the NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
Sincerely,  
                                              /RA/
/RA/
Jason W. Kozal, Chief Project Branch C Division of Reactor Projects Docket No. 50-416 License No. NPF-29
Jason W. Kozal, Chief Project Branch C Division of Reactor Projects Docket No. 50-416 License No. NPF-29  


==Enclosures:==
==Enclosures:==
: 1. NRC Presentation
: 1. NRC Presentation
: 2. Entergy Presentation
: 2. Entergy Presentation
: 3. Attendance List cc: Electronic Distribution for Grand Gulf
: 3. Attendance List cc: Electronic Distribution for Grand Gulf  


ML21092A154 SUNSI Review             ADAMS        Publicly Available      Non-Sensitive Keyword:
ML21092A154 SUNSI Review By: CHY ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword:
By: CHY                     Yes No   Non-Publicly Available Sensitive     NRC-002 OFFICE       SPE:DRP/C     BC:DRP/C NAME         CYoung       JKozal SIGNATURE     CHY         JWK DATE         4/1/21       4/2/21 Welcome!
NRC-002 OFFICE SPE:DRP/C BC:DRP/C NAME CYoung JKozal SIGNATURE CHY JWK DATE 4/1/21 4/2/21 1
The meeting will begin shortly.                           2020 Annual Performance To hear the audio portion of this                                             Assessment presentation, dial 888-790-3252 and enter participant code 5338120#                   Grand Gulf Nuclear Station (GGNS)
Welcome!
Video display - use the Webex "Layout"                     U.S Nuclear Regulatory Commission - Region IV button to select the "side by side" view to                                               March 31, 2021 most easily view the presenter To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120# 1 1                                                  2 Agenda
The meeting will begin shortly.
1 To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#
Video display - use the Webex "Layout" button to select the "side by side" view to most easily view the presenter 2020 Annual Performance Assessment To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120# 1 Grand Gulf Nuclear Station (GGNS)
U.S Nuclear Regulatory Commission - Region IV March 31, 2021 Agenda
* Introductions
* Introductions
* COVID-19 Impacts on NRC Oversight
* COVID-19 Impacts on NRC Oversight
Line 48: Line 49:
* Grand Gulf Performance Assessment
* Grand Gulf Performance Assessment
* Entergy Response
* Entergy Response
* NRC Closing Comments                                                               FACILITATOR Frances Ramirez
* NRC Closing Comments
* Q&A                                                             Senior Reactor Inspector, Region IV To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120# 4 3                                                   4 1
* Q&A 3
FACILITATOR Frances Ramirez Senior Reactor Inspector, Region IV To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#
4 1
2 3
4


NRC Representatives Scott Morris                          Michael Hay                      Jason Kozal Regional                        Deputy Director,                        Chief, PRESENTER                                                                       Administrator,                          Division of                        Projects Matt Thomas                                                                     Region IV                      Reactor Projects                        Branch C Resident Inspector, Grand Gulf Nuclear Station To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#   5   To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120# 6 5                                                                                                          6 NRC Opening Remarks Grand Gulf Nuclear Station
2 PRESENTER Matt Thomas Resident Inspector, Grand Gulf Nuclear Station To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#
5 NRC Representatives To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#
6 Scott Morris Regional Administrator, Region IV Michael Hay Deputy Director, Division of Reactor Projects Jason Kozal
: Chief, Projects Branch C Grand Gulf Nuclear Station


===Introductions===
===Introductions===
Bob Franssen GGNS Site Vice President, Scott Morris Entergy Operations Inc.                                                                                         Regional Administrator, Region IV To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120# 7    To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120# 8 7                                                                                                          8 2
7 Bob Franssen GGNS Site Vice President, Entergy Operations Inc.
To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#
NRC Opening Remarks 8
To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#
Scott Morris Regional Administrator, Region IV 5
6 7
8
 
3 Grand Gulf Nuclear Station To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#
9 2020 Annual Assessment Meeting NRC Mission Statement
* The NRC licenses and regulates the nation's civilian use of radioactive materials to provide reasonable assurance of adequate protection of public health and safety and to promote the common defense and security and to protect the environment To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#
10 NRC Response to COVID-19
* NRC continues to monitor licensee operations and maintains the ability to rapidly respond to safety or security-related events
* Resident Inspectors make less frequent but regular visits to sites
* Residents use remote monitoring when not on site
* Currently deferring very few inspections and plan to complete the baseline by year end To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#
11 NRC Reactor Oversight Process (ROP)
The ROP is implemented in each of the four NRC regions Involves both inspection and assessment Implemented by regional inspectors and onsite resident NRC inspectors Includes performance indicators (PIs) submitted by licensees each quarter which measure the reliability and availability of plant equipment and processes To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#
12 9
10 11 12
 
4 NRC Reactor Oversight Process (ROP)
To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#
13 Licensee


NRC Mission Statement Grand Gulf Nuclear Station
===Response===
* The NRC licenses and regulates the 2020 Annual Assessment Meeting                                                                          nation's civilian use of radioactive materials to provide reasonable assurance of adequate protection of public health and safety and to promote the common defense and security and to protect the environment To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#  9  To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#  10 9                                                                                                          10 NRC Response to COVID-19                                                                              NRC Reactor Oversight Process (ROP)
Regulatory
* NRC continues to monitor licensee operations and maintains the ability to                          The ROP is implemented in each of the four rapidly respond to safety or security-                              NRC regions related events                                                  Involves both inspection and assessment
* Resident Inspectors make less                                      Implemented by regional inspectors and frequent but regular visits to sites                                onsite resident NRC inspectors Includes performance indicators (PIs)
* Residents use remote monitoring submitted by licensees each quarter which when not on site measure the reliability and availability of
* Currently deferring very few                                          plant equipment and processes inspections and plan to complete the baseline by year end To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#  11  To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#  12 11                                                                                                          12 3


NRC Reactor Oversight Process (ROP)                                                                        Resident Inspector Program Column I           Column II         Column III   Column IV         Column V
===Response===
* NRC Resident Inspectors Licensee          Regulatory        Degraded      Multiple /      Unacceptable Response          Response      Performance      Repetitive      Performance                    live in the local communities Degraded Cornerstone                                      and perform inspection activities at all Region IV Nuclear Plants
Degraded Performance Multiple /
* NRC Action Matrix
Repetitive Degraded Cornerstone Unacceptable Performance Column I Column II Column III Column IV Column V NRC Action Matrix Licensee Response column is baseline inspection (issues of very low safety significance)
* Licensee Response column is baseline inspection (issues of very low safety significance)
Increase in number of findings of significance moves licensee to the right in the matrix Moving to the right leads to increased NRC Oversight (Supplemental Inspections, higher level engagement with plant management)
* Increase in number of findings of significance moves licensee to the right in the matrix
Resident Inspector Program
* Moving to the right leads to increased NRC Oversight (Supplemental Inspections, higher level engagement with plant management)
* NRC Resident Inspectors live in the local communities and perform inspection activities at all Region IV Nuclear Plants To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#
To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120# 13  To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120# 14 13                                                                                                        14 Resident Inspector Program                                                                                Resident Inspector Program
14 Resident Inspector Program
* Provide daily oversight of
* Provide daily oversight of plant activities To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#
* Daily visits to Control Room plant activities
15 Resident Inspector Program
* Daily visits to Control Room
* Periodic meetings with plant senior managers
* Periodic meetings with plant senior managers
* Prioritize inspections based on important plant activities To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120# 15  To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120# 16 15                                                                                                         16 4
* Prioritize inspections based on important plant activities To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#
16 13 14 15 16


Region-Based Inspections                                                                     Grand Gulf 2020 Assessment Results
5 Region-Based Inspections
* Personnel in the NRC Region IV office also conduct
* Personnel in the NRC Region IV office also conduct inspections.
* January 1, 2020 - December 31, 2020 inspections.
* Personnel in the Division of Reactor Safety and Division of Nuclear Materials Safety conduct onsite inspections. Including:
* Grand Gulf performance preserved public
- Engineering
* Personnel in the Division of Reactor Safety and                                                                    health and safety Division of Nuclear Materials Safety conduct onsite
- Operator Qualification Examinations
* The plant is safe to continue operating inspections. Including:
- Radiation Protection
- Emergency Planning
- Security
- Independent Spent Fuel Storage Installations To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#
17 Grand Gulf 2020 Assessment Results
* January 1, 2020 - December 31, 2020
* Grand Gulf performance preserved public health and safety
* The plant is safe to continue operating
* Grand Gulf is in the NRCs Column 3
* Grand Gulf is in the NRCs Column 3
                -  Engineering
* The plant is under enhanced NRC oversight due to some performance issues To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#
* The plant is under enhanced NRC oversight
18 Industry-wide Performance 19 0
                -  Operator Qualification Examinations due to some performance issues
10 20 30 40 50 60 70 80 90 100 92 3
                -  Radiation Protection
1 0
                -  Emergency Planning
0 0
                -  Security
Grand Gulf 2020 PIs and Findings
                -  Independent Spent Fuel Storage Installations To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120# 17  To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#  18 17                                                                                                          18 Industry-wide Performance                                                                                   Grand Gulf 2020 PIs and Findings 100 92
* PIs
* PIs 90 80 70
- 16 Green Performance Indicators
                                                                                                                      - 16 Green Performance Indicators 60                                                                                                        - 1 Yellow Performance Indicator 50 40 30
- 1 Yellow Performance Indicator
* Violations 20                                                                                                        - 12 Green inspection findings 3          1          0      0              0 10 0                                                                                                        - 2 Severity Level IV violations
* Violations
                                                                                                                      - 3 Licensee-Identified violations 19                                                                                                          20 19                                                                                                         20 5
- 12 Green inspection findings
- 2 Severity Level IV violations
- 3 Licensee-Identified violations 20 17 18 19 20


2020 Yellow Performance Indicator                                         Key 2020 Completed Inspections
6 2020 Yellow Performance Indicator May 25, 2020 scram - inadvertent turbine overspeed trip August 8, 2020 manual scram - turbine valve malfunction August 24, 2020 scram - reactor feed pump trip November 6, 2020 scram - unexpected low generator cooling flow signal December 11, 2020: scram - improper control of generator cooling water 21 Key 2020 Completed Inspections
* May 25, 2020 scram - inadvertent turbine overspeed trip
* August 8, 2020 manual scram - turbine valve malfunction
* Problem Identification &
* Problem Identification &
* August 24, 2020 scram - reactor feed pump trip
Resolution (PI&R)
* November 6, 2020 scram - unexpected low generator cooling flow signal Resolution (PI&R)
* December 11, 2020: scram - improper control of generator cooling water
* Traditional Enforcement Trend Inspection
* Traditional Enforcement Trend Inspection
* Entergy Confirmatory Order Inspections 21                                                              22 21                                                                        22 Problem Identification & Resolution                                       Traditional Enforcement Inspection
* Entergy Confirmatory Order Inspections 22 Problem Identification & Resolution
* In January 2020, the NRC completed the 71152
* In January 2020, the NRC completed the 71152 Biennial PI&R Inspection at Grand Gulf
* IP 92723 - Follow Up Inspection for Three or Biennial PI&R Inspection at Grand Gulf                                   More Severity Level IV Traditional Enforcement
* Overall, the licensees corrective action program met regulatory requirements for nuclear safety
* Overall, the licensees corrective action program                         Violations in the Same Area in a 12-Month met regulatory requirements for nuclear safety                           Period
- One Green Finding  
      - One Green Finding                                                       - April 2019 inspection unable to be completed due to licensee performance gaps
- Several program deficiencies associated with effectiveness, evaluation, and correction of issues.
      - Several program deficiencies associated with effectiveness, evaluation, and correction of issues.                   - April 2020 inspection successfully completed
* The NRC plans continued inspection and focus on the licensees corrective action program 23 Traditional Enforcement Inspection
* The NRC plans continued inspection and focus
* IP 92723 - Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period
* NRC continues to monitor the licensees on the licensees corrective action program                              corrective action progress in this area 23                                                              24 23                                                                       24 6
- April 2019 inspection unable to be completed due to licensee performance gaps
- April 2020 inspection successfully completed
* NRC continues to monitor the licensees corrective action progress in this area 24 21 22 23 24


Entergy Confirmatory Order                                         Planned Upcoming Inspections
7 Entergy Confirmatory Order
* In November 2017, the NRC issued three
* In November 2017, the NRC issued three apparent violations involving willfulness at GGNS
* IP 95002, Yellow Unplanned apparent violations involving willfulness at GGNS                     Scrams PI Supplemental
* NRC Confirmatory Order issued in March 2018
* NRC Confirmatory Order issued in March 2018                           Inspection
- Contained fleet-wide corrective actions for Entergy to address willful issues at all their sites
      - Contained fleet-wide corrective actions for Entergy to address willful issues at all their sites
* The NRC conducted follow-up inspections under IP 92702 to review Confirmatory Order actions
* IP 92702, Confirmatory Order
- January 2019 and January 2020 inspections
* The NRC conducted follow-up inspections under                         Inspection IP 92702 to review Confirmatory Order actions
- A third inspection is planned for a later date 25 Planned Upcoming Inspections
* IP 71003, Post- Approval Site
* IP 95002, Yellow Unplanned Scrams PI Supplemental Inspection
      - January 2019 and January 2020 inspections                           Inspection for License Renewal
* IP 92702, Confirmatory Order Inspection
      - A third inspection is planned for a later date
* IP 71003, Post-Approval Site Inspection for License Renewal
* IP 71152, Problem Identification and Resolution Inspection 25                                                                                                        26 25                                                                26 NRC Annual Assessment Summary Grand Gulf Nuclear Station                                          The End-of-Cycle letter for 2020 for Grand Gulf Nuclear Station is located at this link:
* IP 71152, Problem Identification and Resolution Inspection 26 Grand Gulf Nuclear Station  
Response                                            Open ADAMS Package (2020 Grand Gulf Annual Assessment Letter)
Bob Franssen GGNS Site Vice President, Entergy Operations Inc.
27  To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#  28 27                                                                28 7


NRC Social Media                                                                                     Contacting the NRC
===Response===
27 Bob Franssen GGNS Site Vice President, Entergy Operations Inc.
NRC Annual Assessment Summary The End-of-Cycle letter for 2020 for Grand Gulf Nuclear Station is located at this link:
OpenADAMSPackage(2020GrandGulfAnnual AssessmentLetter)
To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#
28 25 26 27 28
 
8 NRC Social Media Twitter: https://twitter.com/nrcgov Facebook: https://www.facebook.com/nrcgov YouTube: https://www.youtube.com/user/NRCgov Flickr: https://www.flickr.com/photos/nrcgov/sets LinkedIn: https://www.linkedin.com/company/usnuclearregulatorycommission GovDelivery: https://service.govdelivery.com/accounts/USNRC/subscriber/new To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#
29 Contacting the NRC
* Report an emergency
* Report an emergency
                                                                                                                      - (301) 816-5100 (call collect)
- (301) 816-5100 (call collect)
* Twitter: https://twitter.com/nrcgov
* Report a safety concern  
* Report a safety concern
- (800) 695-7403  
* Facebook: https://www.facebook.com/nrcgov
- Allegation@nrc.gov
* YouTube: https://www.youtube.com/user/NRCgov
                                                                                                                      - (800) 695-7403
* Flickr: https://www.flickr.com/photos/nrcgov/sets                                                            - Allegation@nrc.gov
* LinkedIn: https://www.linkedin.com/company/usnuclearregulatorycommission
* GovDelivery: https://service.govdelivery.com/accounts/USNRC/subscriber/new
* General information or questions
* General information or questions
                                                                                                                      - www.nrc.gov
- www.nrc.gov
                                                                                                                      - Select What We Do for Public Affairs To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120# 29  To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#   30 29                                                                                                          30 Q&A Members of the public are invited to participate in this NRC Closing Remarks                                                                      meeting after the formal presentation. Signal the phone bridge moderator by pressing *1 if you want to ask a question.
- Select What We Do for Public Affairs To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#
If we were not able to answer your question, submit an E-mail to the NRC to Patricia.Vossmar@nrc.gov or Jason.Kozal@nrc.gov .
30 NRC Closing Remarks 31 To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#
Scott Morris Regional Administrator, Region IV To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#
Scott Morris Regional Administrator, Region IV Q & A Members of the public are invited to participate in this meeting after the formal presentation. Signal the phone bridge moderator by pressing *1 if you want to ask a question.
To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120# 31 31                                                                                                         32 8
If we were not able to answer your question, submit an E-mail to the NRC to Patricia.Vossmar@nrc.gov or Jason.Kozal@nrc.gov.
To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#
29 30 31 32


01/04/2021 1                                        2 Gr and Gulf Nuclear Station NRC Annual Assessment Meeting Building the Premier Utility We exist to grow a world-class energy business that creates sustainable value for our four stakeholders - customers, employees, communities and owners.
01/04/2021 Grand Gulf Nuclear Station NRC Annual Assessment M eeti ng Grand Gulf Nuclear Station NRC Annual Assessment M eeti ng B u i l d i n g t h e P r e m i e r U t i l i t y 1
1                                        2 3                                         4 Unplanned Shutdowns Opening                                    Grand Gulf experienced five unplanned shutdowns in 2020. These shutdowns occurred following our Comments                                  Spring, 2020 refueling outage.
We exist to grow a world-class energy business that creates sustainable value for our four stakeholders - customers, employees, communities and owners.
2 O p en i n g Co mmen t s 3
Un p l an n ed Sh u td o w n s Grand Gulf experienced five unplanned shutdowns in 2020. These shutdowns occurred following our Spring, 2020 refueling outage.
The 2020 refueling outage was highlighted by a major modification to the stations Turbine Control System -
The 2020 refueling outage was highlighted by a major modification to the stations Turbine Control System -
intended to bring long-term and improved performance to the site.
intended to bring long-term and improved performance to the site.
3                                         4
4 1
2 3
4
 
01/04/2021


01/04/2021 5                                                                      6 Response                                                               Sustainable Improvements Improvement milestones have been developed featuring Benchmarks Dedicated Entergy leadership                                           Ongoing commitments External resources with relevant experience                             Commitment to safe operation Rigorous oversight structure                                            Commitment to the community Commitment to the environment 5                                                                       6 7
===Response===
Thank you Building the Premier Utility 7
Improvement milestones have been developed featuring Benchmarks Dedicated Entergy leadership External resources with relevant experience Rigorous oversight structure 5
S u s t a i n a b l e I m p r o v e m e n t s 6
Ongoing commitments Commitment to safe operation Commitment to the community Commitment to the environment Thank you Thank you B u i l d i n g t h e P r e m i e r U t i l i t y 7
5 6
7


GG 2020 EOC Meeting Attendance:
GG 2020 EOC Meeting Attendance:
Bill Maier         NRC Bob Franssen       Entergy Cale Young         NRC David Crockett     NRC Frances Ramirez   NRC Jaime Rodriguez   NRC Jason Kozal       NRC Matt Thomas       NRC Mike Hay           NRC Patricia Vossmar   NRC Scott Morris       NRC Victor Dricks     NRC Allison Graves     Entergy Amy Elam           NRC Andrea Jennetta   S&P Global Platts Andrew Sabisch     Entergy Angel Moreno       NRC Bobby Smith       Director of Radiological Health Cliff Acosta       LDEQ Curtis Beckler     Neil David Ortman       FEMA Region Four Dean Tennant       Entergy Doug Dodson       NRC Ed Everett         ANI Eric Carr         PSEG Nuclear Everett Perkins   Certrec Corporation Geoff Miller       NRC Gustin Bryan       NRC J.Brad Edwards     Cooperative Energy James Snyder       Nuclear Energy Institute Jeff Hardy Jessica Walker     LDQ John Giddens       Entergy John Monninger     NRC Kenneth Chermansky Entergy Lloyd Generette   US EPA Mark Lingenfelter Public Mark Sullivan     Entergy Mary Lissel       NRC Michael Bowling   Entergy Nathan Brown       NRC Neil Sheeham       NRC Neil Tay           NRC
Bill Maier NRC Bob Franssen Entergy Cale Young NRC David Crockett NRC Frances Ramirez NRC Jaime Rodriguez NRC Jason Kozal NRC Matt Thomas NRC Mike Hay NRC Patricia Vossmar NRC Scott Morris NRC Victor Dricks NRC Allison Graves Entergy Amy Elam NRC Andrea Jennetta S&P Global Platts Andrew Sabisch Entergy Angel Moreno NRC Bobby Smith Director of Radiological Health Cliff Acosta LDEQ Curtis Beckler Neil David Ortman FEMA Region Four Dean Tennant Entergy Doug Dodson NRC Ed Everett ANI Eric Carr PSEG Nuclear Everett Perkins Certrec Corporation Geoff Miller NRC Gustin Bryan NRC J.Brad Edwards Cooperative Energy James Snyder Nuclear Energy Institute Jeff Hardy Jessica Walker LDQ John Giddens Entergy John Monninger NRC Kenneth Chermansky Entergy Lloyd Generette US EPA Mark Lingenfelter Public Mark Sullivan Entergy Mary Lissel NRC Michael Bowling Entergy Nathan Brown NRC Neil Sheeham NRC Neil Tay NRC  


Paul Williams   Public Paul Zaffuts     Zaffuts Group Law Firm Phil Sharpe     Studsdik Ron Rispoli     Entergy Services Russell Thames   Entergy Shakur Walker   NRC MS Emergency Management Shawn Maley      Agency Solange DeSantis Entergy Steve Hillman   Entergy Tim Bebey       NRC Tim Donovan     Utilities Safety Alliance Timothy Stedham NRC Tom Gardsdale   No Info Tony Nakanishu   NRC Victoria Midland NRC Wesley           Entergy Whitney Hale     Public}}
Paul Williams Public Paul Zaffuts Zaffuts Group Law Firm Phil Sharpe Studsdik Ron Rispoli Entergy Services Russell Thames Entergy Shakur Walker NRC Shawn Maley MS Emergency Management Agency Solange DeSantis Entergy Steve Hillman Entergy Tim Bebey NRC Tim Donovan Utilities Safety Alliance Timothy Stedham NRC Tom Gardsdale No Info Tony Nakanishu NRC Victoria Midland NRC Wesley Entergy Whitney Hale Public}}

Latest revision as of 09:56, 29 November 2024

GG 2020 EOC Public Meeting Summary of Public Meeting with Entergy Operations, Inc
ML21092A154
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/02/2021
From: Jason Kozal
NRC/RGN-IV/DRP
To: Franssen B
Entergy Operations
References
Download: ML21092A154 (15)


Text

April 2, 2021 Mr. Bob Franssen, Vice President Entergy Operations, Inc.

Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150

SUBJECT:

SUMMARY

OF PUBLIC MEETING WITH ENTERGY OPERATIONS, INC.

Dear Mr. Franssen:

This refers to the virtual public meeting conducted on March 31, 2021, between the Nuclear Regulatory Commission (NRC) and your staff. Approximately 60 people attended the public meeting, including members of the general public, with representatives from the several state and local government organizations.

During the meeting, the NRC presented the results of the annual assessment of safety performance at Grand Gulf Nuclear Station for the period of January 1 through December 31, 2020, as documented in NRC Inspection Report 05000416/2020006, issued March 3, 2021, (ADAMS Accession No. ML21055A008). Your staff presented the stations perspective regarding the issues that contributed to the stations performance in the Degraded Performance Column (Column 3) of the NRCs Reactor Oversight Process (ROP) Action Matrix. During the public question-and-answer portion of the meeting, there were questions from the public regarding actions necessary for the station to be re-assessed into Column 1 of the ROP Action Matrix, the stations previous power uprate license amendment, and the testing of plant equipment.

A copy of the NRCs presentation, Entergys presentation, and an attendance list from the meeting are provided as Enclosures to this letter.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this letter and its enclosures will be made available electronically for public inspection in the NRCs Public Document Room or the NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Jason W. Kozal, Chief Project Branch C Division of Reactor Projects Docket No. 50-416 License No. NPF-29

Enclosures:

1. NRC Presentation
2. Entergy Presentation
3. Attendance List cc: Electronic Distribution for Grand Gulf

ML21092A154 SUNSI Review By: CHY ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword:

NRC-002 OFFICE SPE:DRP/C BC:DRP/C NAME CYoung JKozal SIGNATURE CHY JWK DATE 4/1/21 4/2/21 1

Welcome!

The meeting will begin shortly.

1 To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#

Video display - use the Webex "Layout" button to select the "side by side" view to most easily view the presenter 2020 Annual Performance Assessment To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120# 1 Grand Gulf Nuclear Station (GGNS)

U.S Nuclear Regulatory Commission - Region IV March 31, 2021 Agenda

  • Introductions
  • Regulatory Process Overview
  • Grand Gulf Performance Assessment
  • Entergy Response
  • NRC Closing Comments
  • Q&A 3

FACILITATOR Frances Ramirez Senior Reactor Inspector, Region IV To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#

4 1

2 3

4

2 PRESENTER Matt Thomas Resident Inspector, Grand Gulf Nuclear Station To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#

5 NRC Representatives To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#

6 Scott Morris Regional Administrator, Region IV Michael Hay Deputy Director, Division of Reactor Projects Jason Kozal

Chief, Projects Branch C Grand Gulf Nuclear Station

Introductions

7 Bob Franssen GGNS Site Vice President, Entergy Operations Inc.

To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#

NRC Opening Remarks 8

To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#

Scott Morris Regional Administrator, Region IV 5

6 7

8

3 Grand Gulf Nuclear Station To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#

9 2020 Annual Assessment Meeting NRC Mission Statement

  • The NRC licenses and regulates the nation's civilian use of radioactive materials to provide reasonable assurance of adequate protection of public health and safety and to promote the common defense and security and to protect the environment To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#

10 NRC Response to COVID-19

  • NRC continues to monitor licensee operations and maintains the ability to rapidly respond to safety or security-related events
  • Resident Inspectors make less frequent but regular visits to sites
  • Residents use remote monitoring when not on site
  • Currently deferring very few inspections and plan to complete the baseline by year end To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#

11 NRC Reactor Oversight Process (ROP)

The ROP is implemented in each of the four NRC regions Involves both inspection and assessment Implemented by regional inspectors and onsite resident NRC inspectors Includes performance indicators (PIs) submitted by licensees each quarter which measure the reliability and availability of plant equipment and processes To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#

12 9

10 11 12

4 NRC Reactor Oversight Process (ROP)

To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#

13 Licensee

Response

Regulatory

Response

Degraded Performance Multiple /

Repetitive Degraded Cornerstone Unacceptable Performance Column I Column II Column III Column IV Column V NRC Action Matrix Licensee Response column is baseline inspection (issues of very low safety significance)

Increase in number of findings of significance moves licensee to the right in the matrix Moving to the right leads to increased NRC Oversight (Supplemental Inspections, higher level engagement with plant management)

Resident Inspector Program

  • NRC Resident Inspectors live in the local communities and perform inspection activities at all Region IV Nuclear Plants To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#

14 Resident Inspector Program

  • Provide daily oversight of plant activities To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#

15 Resident Inspector Program

  • Daily visits to Control Room
  • Periodic meetings with plant senior managers
  • Prioritize inspections based on important plant activities To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#

16 13 14 15 16

5 Region-Based Inspections

  • Personnel in the NRC Region IV office also conduct inspections.
  • Personnel in the Division of Reactor Safety and Division of Nuclear Materials Safety conduct onsite inspections. Including:

- Engineering

- Operator Qualification Examinations

- Radiation Protection

- Emergency Planning

- Security

- Independent Spent Fuel Storage Installations To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#

17 Grand Gulf 2020 Assessment Results

  • January 1, 2020 - December 31, 2020
  • Grand Gulf performance preserved public health and safety
  • The plant is safe to continue operating
  • Grand Gulf is in the NRCs Column 3
  • The plant is under enhanced NRC oversight due to some performance issues To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#

18 Industry-wide Performance 19 0

10 20 30 40 50 60 70 80 90 100 92 3

1 0

0 0

Grand Gulf 2020 PIs and Findings

- 16 Green Performance Indicators

- 1 Yellow Performance Indicator

  • Violations

- 12 Green inspection findings

- 2 Severity Level IV violations

- 3 Licensee-Identified violations 20 17 18 19 20

6 2020 Yellow Performance Indicator May 25, 2020 scram - inadvertent turbine overspeed trip August 8, 2020 manual scram - turbine valve malfunction August 24, 2020 scram - reactor feed pump trip November 6, 2020 scram - unexpected low generator cooling flow signal December 11, 2020: scram - improper control of generator cooling water 21 Key 2020 Completed Inspections

  • Problem Identification &

Resolution (PI&R)

  • Traditional Enforcement Trend Inspection
  • Entergy Confirmatory Order Inspections 22 Problem Identification & Resolution
  • In January 2020, the NRC completed the 71152 Biennial PI&R Inspection at Grand Gulf
  • Overall, the licensees corrective action program met regulatory requirements for nuclear safety

- One Green Finding

- Several program deficiencies associated with effectiveness, evaluation, and correction of issues.

  • The NRC plans continued inspection and focus on the licensees corrective action program 23 Traditional Enforcement Inspection
  • IP 92723 - Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period

- April 2019 inspection unable to be completed due to licensee performance gaps

- April 2020 inspection successfully completed

  • NRC continues to monitor the licensees corrective action progress in this area 24 21 22 23 24

7 Entergy Confirmatory Order

  • In November 2017, the NRC issued three apparent violations involving willfulness at GGNS
  • NRC Confirmatory Order issued in March 2018

- Contained fleet-wide corrective actions for Entergy to address willful issues at all their sites

  • The NRC conducted follow-up inspections under IP 92702 to review Confirmatory Order actions

- January 2019 and January 2020 inspections

- A third inspection is planned for a later date 25 Planned Upcoming Inspections

  • IP 71152, Problem Identification and Resolution Inspection 26 Grand Gulf Nuclear Station

Response

27 Bob Franssen GGNS Site Vice President, Entergy Operations Inc.

NRC Annual Assessment Summary The End-of-Cycle letter for 2020 for Grand Gulf Nuclear Station is located at this link:

OpenADAMSPackage(2020GrandGulfAnnual AssessmentLetter)

To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#

28 25 26 27 28

8 NRC Social Media Twitter: https://twitter.com/nrcgov Facebook: https://www.facebook.com/nrcgov YouTube: https://www.youtube.com/user/NRCgov Flickr: https://www.flickr.com/photos/nrcgov/sets LinkedIn: https://www.linkedin.com/company/usnuclearregulatorycommission GovDelivery: https://service.govdelivery.com/accounts/USNRC/subscriber/new To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#

29 Contacting the NRC

  • Report an emergency

- (301) 816-5100 (call collect)

  • Report a safety concern

- (800) 695-7403

- Allegation@nrc.gov

  • General information or questions

- www.nrc.gov

- Select What We Do for Public Affairs To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#

30 NRC Closing Remarks 31 To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#

Scott Morris Regional Administrator, Region IV Q & A Members of the public are invited to participate in this meeting after the formal presentation. Signal the phone bridge moderator by pressing *1 if you want to ask a question.

If we were not able to answer your question, submit an E-mail to the NRC to Patricia.Vossmar@nrc.gov or Jason.Kozal@nrc.gov.

To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#

29 30 31 32

01/04/2021 Grand Gulf Nuclear Station NRC Annual Assessment M eeti ng Grand Gulf Nuclear Station NRC Annual Assessment M eeti ng B u i l d i n g t h e P r e m i e r U t i l i t y 1

We exist to grow a world-class energy business that creates sustainable value for our four stakeholders - customers, employees, communities and owners.

2 O p en i n g Co mmen t s 3

Un p l an n ed Sh u td o w n s Grand Gulf experienced five unplanned shutdowns in 2020. These shutdowns occurred following our Spring, 2020 refueling outage.

The 2020 refueling outage was highlighted by a major modification to the stations Turbine Control System -

intended to bring long-term and improved performance to the site.

4 1

2 3

4

01/04/2021

Response

Improvement milestones have been developed featuring Benchmarks Dedicated Entergy leadership External resources with relevant experience Rigorous oversight structure 5

S u s t a i n a b l e I m p r o v e m e n t s 6

Ongoing commitments Commitment to safe operation Commitment to the community Commitment to the environment Thank you Thank you B u i l d i n g t h e P r e m i e r U t i l i t y 7

5 6

7

GG 2020 EOC Meeting Attendance:

Bill Maier NRC Bob Franssen Entergy Cale Young NRC David Crockett NRC Frances Ramirez NRC Jaime Rodriguez NRC Jason Kozal NRC Matt Thomas NRC Mike Hay NRC Patricia Vossmar NRC Scott Morris NRC Victor Dricks NRC Allison Graves Entergy Amy Elam NRC Andrea Jennetta S&P Global Platts Andrew Sabisch Entergy Angel Moreno NRC Bobby Smith Director of Radiological Health Cliff Acosta LDEQ Curtis Beckler Neil David Ortman FEMA Region Four Dean Tennant Entergy Doug Dodson NRC Ed Everett ANI Eric Carr PSEG Nuclear Everett Perkins Certrec Corporation Geoff Miller NRC Gustin Bryan NRC J.Brad Edwards Cooperative Energy James Snyder Nuclear Energy Institute Jeff Hardy Jessica Walker LDQ John Giddens Entergy John Monninger NRC Kenneth Chermansky Entergy Lloyd Generette US EPA Mark Lingenfelter Public Mark Sullivan Entergy Mary Lissel NRC Michael Bowling Entergy Nathan Brown NRC Neil Sheeham NRC Neil Tay NRC

Paul Williams Public Paul Zaffuts Zaffuts Group Law Firm Phil Sharpe Studsdik Ron Rispoli Entergy Services Russell Thames Entergy Shakur Walker NRC Shawn Maley MS Emergency Management Agency Solange DeSantis Entergy Steve Hillman Entergy Tim Bebey NRC Tim Donovan Utilities Safety Alliance Timothy Stedham NRC Tom Gardsdale No Info Tony Nakanishu NRC Victoria Midland NRC Wesley Entergy Whitney Hale Public