ML17252B040: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(9 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 06/04/1974
| issue date = 06/04/1974
| title = Letter Confirming a 05/07/1974 Conversation Concerning Discovery of Excessive Leakage Past Feedwater Check Valves 3-220-58B and 3-220-62B - Dresden Unit 3
| title = Letter Confirming a 05/07/1974 Conversation Concerning Discovery of Excessive Leakage Past Feedwater Check Valves 3-220-58B and 3-220-62B - Dresden Unit 3
| author name = Stephenson B B
| author name = Stephenson B
| author affiliation = Commonwealth Edison Co
| author affiliation = Commonwealth Edison Co
| addressee name = Keppler J G
| addressee name = Keppler J
| addressee affiliation = US Atomic Energy Commission (AEC)
| addressee affiliation = US Atomic Energy Commission (AEC)
| docket = 05000249
| docket = 05000249
Line 12: Line 12:
| document type = Letter, Note to File incl Telcon Record, Verbal Comm
| document type = Letter, Note to File incl Telcon Record, Verbal Comm
| page count = 2
| page count = 2
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:j l
~.
**~: '.
j i
A.
B.
: c.
UNITED STATES ***
ATOMIC ENERGY COMMISSION DIRECTORATE OF* REGULATORY OPERATIONS*
REGION 111 799 ROOSEVELT ROAD GLEN ELLYN, ILLINOIS 60137 TELEPHONE (312) 858-2660 RO Inspection Report No.
Transmittal Date Distribution:.
RO Chief, FS&EB RO:HQ (5)
DR Central riles Regulatory Standards (3)
Licensing (13)
RO Files RO Inquiry Report No.
Transmittal Date Distribution:
RO Chief, FS&EB RO:HQ (5)
DR Central Files Regulatory Standards (3)
Licensing (13)
RO.files Incident Notification From:
Transmittal Date Distribution:
RO Chief, FS&EB RO:HQ (4)
Licensing (4)
DR Central Files RO Files Distribution:
RO Chief, FS&EB RO:HQ (4)
L:D/D for Fuels & Materials DR Central Files RO Files Distribution:
RO Chief, FS&EB RO:HQ DR Central Files RO Files Commonwealth Edison Co. Docket No. 50-249 (Licensee & Docket No. (or License No.)
June 4, 1974 Distribution:
RO Chief, FS&EB RO:HQ (4)
L:D/D for Fuels &*Materials DR Central Files RO-.. F.iles
~,
...... __......_ __________ --**---~
...... - -*-***. "F"'°'Cf>'I
. I
c
(
GLE~ ELLYN ILL 60137 SUBJECT DP R-25 D,RE SDEN NUCLEAR POWER< STAT-ION* UN.I;T 3. THIS WILL CONFIRM OUR CONVERSAT.ION WITH F MAURA OF YOUR OFFICE AT.
--1330 HOURS THIS DATE CONCERNING THE DISCOVERY VIA LOCAL LEAK RATE TESTING OF* EXCESSIVE LEAKAGE PAST FEEDWATER CHECK
. VALVES 3-220-588 AND 3-220-628~ PREPARATION ARE UNDERWAY IO DISASSEMBLE AND REPAIR THE DEFECTIVE VALVE.
FURTHER INFORMATION WILL BE FORWARDED IN THE FORM OF A r
TEN.DAY LETTER IN ACCORDANCE WITH SECTION 6.B.l.A OF THE SF-1201 (R>69) c TECHNICAL SPECIFICATION B B STEPHENSON SUPERINTENDENT DRESDEN NUCLEAR L
STATEION COMMONWEALTH EDISON CO RRl fll)RRIS ILL c
NNNr-r** --
*c c
C.
MAY 8 1974 C*
SF-1201 (RS-69)
POWER I
e
. "}}

Latest revision as of 11:24, 8 January 2025

Letter Confirming a 05/07/1974 Conversation Concerning Discovery of Excessive Leakage Past Feedwater Check Valves 3-220-58B and 3-220-62B - Dresden Unit 3
ML17252B040
Person / Time
Site: Dresden Constellation icon.png
Issue date: 06/04/1974
From: Stephenson B
Commonwealth Edison Co
To: James Keppler
US Atomic Energy Commission (AEC)
References
Download: ML17252B040 (2)


Text

j l

~.

    • ~: '.

j i

A.

B.

c.

UNITED STATES ***

ATOMIC ENERGY COMMISSION DIRECTORATE OF* REGULATORY OPERATIONS*

REGION 111 799 ROOSEVELT ROAD GLEN ELLYN, ILLINOIS 60137 TELEPHONE (312) 858-2660 RO Inspection Report No.

Transmittal Date Distribution:.

RO Chief, FS&EB RO:HQ (5)

DR Central riles Regulatory Standards (3)

Licensing (13)

RO Files RO Inquiry Report No.

Transmittal Date Distribution:

RO Chief, FS&EB RO:HQ (5)

DR Central Files Regulatory Standards (3)

Licensing (13)

RO.files Incident Notification From:

Transmittal Date Distribution:

RO Chief, FS&EB RO:HQ (4)

Licensing (4)

DR Central Files RO Files Distribution:

RO Chief, FS&EB RO:HQ (4)

L:D/D for Fuels & Materials DR Central Files RO Files Distribution:

RO Chief, FS&EB RO:HQ DR Central Files RO Files Commonwealth Edison Co. Docket No. 50-249 (Licensee & Docket No. (or License No.)

June 4, 1974 Distribution:

RO Chief, FS&EB RO:HQ (4)

L:D/D for Fuels &*Materials DR Central Files RO-.. F.iles

~,

...... __......_ __________ --**---~

...... - -*-***. "F"'°'Cf>'I

. I

c

(

GLE~ ELLYN ILL 60137 SUBJECT DP R-25 D,RE SDEN NUCLEAR POWER< STAT-ION* UN.I;T 3. THIS WILL CONFIRM OUR CONVERSAT.ION WITH F MAURA OF YOUR OFFICE AT.

--1330 HOURS THIS DATE CONCERNING THE DISCOVERY VIA LOCAL LEAK RATE TESTING OF* EXCESSIVE LEAKAGE PAST FEEDWATER CHECK

. VALVES 3-220-588 AND 3-220-628~ PREPARATION ARE UNDERWAY IO DISASSEMBLE AND REPAIR THE DEFECTIVE VALVE.

FURTHER INFORMATION WILL BE FORWARDED IN THE FORM OF A r

TEN.DAY LETTER IN ACCORDANCE WITH SECTION 6.B.l.A OF THE SF-1201 (R>69) c TECHNICAL SPECIFICATION B B STEPHENSON SUPERINTENDENT DRESDEN NUCLEAR L

STATEION COMMONWEALTH EDISON CO RRl fll)RRIS ILL c

NNNr-r** --

  • c c

C.

MAY 8 1974 C*

SF-1201 (RS-69)

POWER I

e

. "