ML20215C186: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:"
{{#Wiki_filter:;7
          ;7
"
          x
x
                  *
.
  .
*
                                          DEC 05W
DEC 05W
      Docket _Nos. 50-325;50-324
Docket _Nos. 50-325;50-324
      License Nos. DPR-71, DPR-62
License Nos. DPR-71, DPR-62
      Carolina Power.and Light Company
Carolina Power.and Light Company
    WITN: Mr. E. E. Utley
WITN: Mr. E. E. Utley
                        ..
..
              Senior Executive Vice President
Senior Executive Vice President
              Power Supply and Engineering
Power Supply and Engineering
                and-Construction                           -
and-Construction
      P. O. Box 1551
-
      Raleigh, NC 27602
P. O. Box 1551
      Gentlemen:
Raleigh, NC 27602
      SUBJECT: NRC INSPECTION REPORT NOS. 50-325/86-31 AND 50-324/86-32
Gentlemen:
      This ' refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
SUBJECT: NRC INSPECTION REPORT NOS. 50-325/86-31 AND 50-324/86-32
      J. E. Menning on November 3-7, 1986. The inspection included a review of
This ' refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
      activities authorized for your Brunswick facility. At the conclusion of the
J. E. Menning on November 3-7, 1986.
      inspection, the findings were discussed with those members of your staff
The inspection included a review of
      identified in the enclosed inspection report.
activities authorized for your Brunswick facility.
      Areas examined during the inspection are identified in the report. Within these
At the conclusion of the
      areas, the inspection consisted of selective examinations of procedures -and
inspection, the findings were discussed with those members of your staff
      representative records,- interviews with personnel, and observation of activities
identified in the enclosed inspection report.
    .in progress.
Areas examined during the inspection are identified in the report. Within these
      Within the scope of the inspection, no violations or deviations were identified.
areas, the inspection consisted of selective examinations of procedures -and
      In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2
representative records,- interviews with personnel, and observation of activities
      Title .10, Code of Federal Regulations, a copy of this letter and its enclosure
.in progress.
      will be placed in the NRC Public Document Room.
Within the scope of the inspection, no violations or deviations were identified.
l     Should you have any questions concerning this letter, please contact us.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2
                                                Sincerely,
Title .10, Code of Federal Regulations, a copy of this letter and its enclosure
                                                    /a
will be placed in the NRC Public Document Room.
                                                David M. Verrelli, Chief
l
Should you have any questions concerning this letter, please contact us.
Sincerely,
/a
David M. Verrelli, Chief
,
,
                                                Reactor Projects Branch 2
l
l
l                                              Division of Reactor Projects
Reactor Projects Branch 2
      Enclosure:
Division of Reactor Projects
      NRC Inspection Report
l
      cc w/ enc 1:
Enclosure:
    LM W. Howe, Vice President
NRC Inspection Report
i       Byunswick Nuclear Project
cc w/ enc 1:
l'   V. R. Dietz, Plant General Manager
LM W. Howe, Vice President
      bec w/ enc 1: See page 2
i
                            g2]go$                                                 I
Byunswick Nuclear Project
                            G                                                   1
l'
                                                                                      l JEo/
V. R. Dietz, Plant General Manager
bec w/ enc 1: See page 2
g2]go$
I
G
1
l
JEo/


                -.
_
      _
-.
's
's
  ..
j[
      j[
..
        : Carolina Power and Light: Company.- 2
: Carolina Power and Light: Company.-
                                                        DEC 0 51996
2
                                                "'
DEC 0 51996
          bcp w/ encl:.     .
"'
        dHIC Resident Inspector
bcp w/ encl:.
        -Document Control-Desk'
.
          State of North Carolina
dHIC Resident Inspector
          RII                 R             RI                   )
-Document Control-Desk'
          JE   ning:er           Blake       ARHerdt Qc )EFredrickson
State of North Carolina
          11/4/86                 p/86       IS/S/86     4/L//86
RII
R
RI
)
JE
ning:er
Blake
ARHerdt
Qc
)EFredrickson
11/4/86
p/86
IS/S/86
4/L//86
}}
}}

Latest revision as of 23:08, 3 December 2024

Forwards Insp Repts 50-324/86-32 & 50-325/86-31 on 861103-07.No Violations or Deviations Noted
ML20215C186
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 12/05/1986
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20215C190 List:
References
NUDOCS 8612150055
Download: ML20215C186 (2)


See also: IR 05000324/1986032

Text

7

"

x

.

DEC 05W

Docket _Nos. 50-325;50-324

License Nos. DPR-71, DPR-62

Carolina Power.and Light Company

WITN: Mr. E. E. Utley

..

Senior Executive Vice President

Power Supply and Engineering

and-Construction

-

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-325/86-31 AND 50-324/86-32

This ' refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

J. E. Menning on November 3-7, 1986.

The inspection included a review of

activities authorized for your Brunswick facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures -and

representative records,- interviews with personnel, and observation of activities

.in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2

Title .10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

l

Should you have any questions concerning this letter, please contact us.

Sincerely,

/a

David M. Verrelli, Chief

,

l

Reactor Projects Branch 2

Division of Reactor Projects

l

Enclosure:

NRC Inspection Report

cc w/ enc 1:

LM W. Howe, Vice President

i

Byunswick Nuclear Project

l'

V. R. Dietz, Plant General Manager

bec w/ enc 1: See page 2

g2]go$

I

G

1

l

JEo/

_

-.

's

j[

..

Carolina Power and Light: Company.-

2

DEC 0 51996

"'

bcp w/ encl:.

.

dHIC Resident Inspector

-Document Control-Desk'

State of North Carolina

RII

R

RI

)

JE

ning:er

Blake

ARHerdt

Qc

)EFredrickson

11/4/86

p/86

IS/S/86

4/L//86