ML20216F018: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:LOIA                   REV 07 (MC)               AP-470 l
{{#Wiki_filter:l LOIA REV 07 (MC)
l
AP-470 l
!O l                                     LOSS OF INSTRUMENT AIR l         1.0   ENTRY CONDITIONS 1E IA PRESS is s 90 psig, INFORMATION l         JREN use this procedure.                       L       ONLY 2.0   IMMEDIATE ACTIONS HOIE There are no imediate actions for this procedure.
!O l
<                                                                                l I
LOSS OF INSTRUMENT AIR l
O                                                                               1 i
1.0 ENTRY CONDITIONS INFORMATION 1E IA PRESS is s 90 psig, ONLY l
l l
JREN use this procedure.
A Approved by NNP0             [e[U/b-Date 04/08/98
L 2.0 IMMEDIATE ACTIONS HOIE There are no imediate actions for this procedure.
                                      '' (SIGNATURE ON FILE)
l I
AP-470                     PAGE 1 of 27                   LOIA l     9804160378 980409 PDR   ADOCK 05000302 P                 PDR
O i
l A
Approved by NNP0
[e[U/b-Date 04/08/98
'' (SIGNATURE ON FILE)
AP-470 PAGE 1 of 27 LOIA l
9804160378 980409 PDR ADOCK 05000302 P
PDR


l l
l l
I O                                             O I
I O
1 i
O i
BLANK PAGE p
BLANK PAGE p
V
('
('
O                                             o AP-470 REV 07 (MC)       PAGE 2 0F 27 LOIA
V O
o AP-470 REV 07 (MC)
PAGE 2 0F 27 LOIA


3.0 FOLLOW-UP ACTIONS r)
3.0 FOLLOW-UP ACTIONS r)
  't /             ACTIONS                               DETAILS 3.1     Ensure in-house air             g g-compressors are running.
't
/
ACTIONS DETAILS 3.1 Ensure in-house air g g-compressors are running.
SAP-1B IAP-1A IAP-1B i
SAP-1B IAP-1A IAP-1B i
1 3.2     Notify personnel of plant
3.2 Notify personnel of plant STA conditions.
* STA                           l conditions.                                                   1
1 Plant operators NSM e
* Plant operators
HP (notify of degraded IA conditions as a precaution for personnel using breathing air) k.)
* NSM e     HP (notify of degraded IA conditions as a precaution for personnel using breathing air)
Announce on PA " Terminate all use of station air".
  !                                                                            1 k.)
* Announce on PA " Terminate all use of station air".         ;
l l
l l
l   ,
i l
i AP-470       REV 07 (MC)       PAGE 3 0F 27             LOIA l
AP-470 REV 07 (MC)
l
PAGE 3 0F 27 LOIA l


l O                                     Oi l
l O
1 I
Oi I
l l
l c-1 l
c-1
1 l
!                                            l 1
l l
l l
l l
l
l
                                              )
)
'O                                       C AP-470 REV 07 (MC) PAGE 4 0F 27 LOIA l
'O C
AP-470 REV 07 (MC)
PAGE 4 0F 27 LOIA l


3.0 FOLLOW-UP ACTIONS (CONT'D)
3.0 FOLLOW-UP ACTIONS (CONT'D)
ACTIONS                                 DETAILS               >
ACTIONS DETAILS 3.3 Notify SP0 to start berm l
l      3.3   _. Notify SP0 to start berm air compressors.               SAP-lC SAP-ID l                                                 SAP-lE                             'I
air compressors.
:                                                                                      1 i
SAP-lC SAP-ID l
I      3.4 __ J1 at any time, DHR is in       1   J1 A DHR Train is in service,       i service,                       M notify PP0 to manually           !
SAP-lE
l                  E IA PRESS < 80 psig,           throttle the following valves     l l                 M establish manual               (75 ft AB A DH Room):
'I 1
control of DHR cooling, l                 M GO TO Step 3.27 in                 DCV-17 "A DH Cooler Bypass
i I
:                  this procedure                       Control" DCV-177 "A DH Cooler Outlet Control" l
3.4 __ J1 at any time, DHR is in 1
l                                             2   JF B DHR Train is in service,
J1 A DHR Train is in service, i
!N                                                 M notify PP0 to manually throttle the following valves l                                                   (75 ft AB B DH Room):
: service, M notify PP0 to manually l
DCV-18 "B DH Cooler Bypass Control"                     :
E IA PRESS < 80 psig, throttle the following valves l
DCV-178 "B DH Cooler Outlet l                                                       Control" 3     GO TO Step 3.27 in this procedure.
l M establish manual (75 ft AB A DH Room):
l 3.5         JF at any time, IA PRESS   1     Depress Rx trip push button is < 80 psig, E any abnormal system     2     CONCURRENTLY PERFORM E0P-2, operation exists,               Vital System Status M trip Rx and                   Verification, beginning with I                 GO TO Step 3.11 in this         Step 2.1 procedure.
control of DHR cooling, l
3     GO TO Step 3.11 in this procedure.
M GO TO Step 3.27 in DCV-17 "A DH Cooler Bypass this procedure Control" DCV-177 "A DH Cooler Outlet Control" l
O AP-470         REV 07 (MC)       PAGE 5 0F 27               LOIA
l 2
JF B DHR Train is in service,
!N M notify PP0 to manually throttle the following valves l
(75 ft AB B DH Room):
DCV-18 "B DH Cooler Bypass Control" DCV-178 "B DH Cooler Outlet l
Control" 3
GO TO Step 3.27 in this procedure.
l 3.5 JF at any time, IA PRESS 1
Depress Rx trip push button is < 80 psig, E any abnormal system 2
CONCURRENTLY PERFORM E0P-2, operation exists, Vital System Status M trip Rx and Verification, beginning with I
GO TO Step 3.11 in this Step 2.1 procedure.
3 GO TO Step 3.11 in this procedure.
O AP-470 REV 07 (MC)
PAGE 5 0F 27 LOIA


i Applicable carry-over steps:
i Applicable carry-over steps:
CN
CN 4, 'j E DHR is in service AND IA PRESS < 80 psig...
'       3.4    E DHR is in service AND IA PRESS < 80 psig...                   :.
3.4
4, 'j
: i. ;. r l
    '                                                                        i.. ;.' .r l 3.5   E lA PRESS is < 80 psig MQ abnormal system operation exists...
3.5 E lA PRESS is < 80 psig MQ abnormal system operation exists...
1 l
1 l
l l
l l
l l
l l
  ,'' ~                                                                         .-
, ' ~
t v                                                                         f l
v f
t l
l l
l l
l l
l l
l l
l l
l t                                                                           i
l t
, v                                                                          t AP-470       REV 07 (MC)         PAGE 6 0F 27             LOIA
i v
\
t AP-470 REV 07 (MC)
PAGE 6 0F 27 LOIA
\\


L4 FOLLOW-UP ACTIONS (CONT'D)
L4 FOLLOW-UP ACTIONS (CONT'D)
O b                  ACTIONS                                 DETAILS 3.6       1E at any time, IA PRESS is > 90 psig, IliEt{ EXIT this procedure.
Ob ACTIONS DETAILS 3.6 1E at any time, IA PRESS is > 90 psig, IliEt{ EXIT this procedure.
3.7       Bypass IA dryers.
3.7 Bypass IA dryers.
* Notify SP0 to open IAV-31 "IADR-1 &   j IADR-2 Bypass Iso" (95 ft TB behind   '
* Notify SP0 to open IAV-31 "IADR-1 &
1ADR-1).
j IADR-2 Bypass Iso" (95 ft TB behind 1ADR-1).
3.8       Place both IA dryer
3.8 Place both IA dryer
* Notify SP0 to ensure all the prefilters and               following valves are open afterfilters in service.     (95 ft TB by IADR-1):
* Notify SP0 to ensure all the prefilters and following valves are open afterfilters in service.
(95 ft TB by IADR-1):
IAV-Il "Prefilter IAFL-2A Inlet Iso" IAV-12 "Prefilter IAFL-2B Inlet
IAV-Il "Prefilter IAFL-2A Inlet Iso" IAV-12 "Prefilter IAFL-2B Inlet
\pj                                               Iso" IAV-14 "Prefilter IAFL-2B Outlet Iso" IAV-544 "Prefilter IAFL-2A Outlet Iso" IAV-18 "Afterfilter IAFL-3B Inlet Iso" IAV-545 "Afterfilter IAFL-3A Inlet Iso" IAV-19 "Afterfilter IAFL-3A Outlet Iso" l
\\pj Iso" IAV-14 "Prefilter IAFL-2B Outlet Iso" IAV-544 "Prefilter IAFL-2A Outlet Iso" IAV-18 "Afterfilter IAFL-3B Inlet Iso" IAV-545 "Afterfilter IAFL-3A Inlet Iso" IAV-19 "Afterfilter IAFL-3A Outlet Iso"
__ IAV-20 "Afterfilter IAFL-3B Outlet Iso" O
__ IAV-20 "Afterfilter IAFL-3B Outlet Iso" O
AP-470         REV 07 (MC)       PAGE 7 0F 27                 LOIA
AP-470 REV 07 (MC)
PAGE 7 0F 27 LOIA


r                                                                                   1 l
r 1
i Applicable carry-over steps:
i Applicable carry-over steps:
I p]
I p]
3.4   [E DHR is in service AND IA PRESS < 80 psig...
3.4
i    3.5  1E 1A PRESS is < 80 psig a.NJ)
[E DHR is in service AND IA PRESS < 80 psig...
abnormal system operation exists...       f 4
1E 1A PRESS is < 80 psig a.NJ) abnormal system operation exists...
1 3.6   1E IA PRESS is > 90 psig THEN, EXIT this procedure.
f i
1 1
3.5 N
1 i
1 4
l O                                                                             -
3.6 1E IA PRESS is > 90 psig THEN, EXIT this procedure.
v                                                                           (, ..
1 O
V                                                                           (''%
v
AP-470         REV 07 (MC)         PAGE 8 0F 27               LOIA
(,
V
(''
AP-470 REV 07 (MC)
PAGE 8 0F 27 LOIA


I 3.0 FOLLOW-UP ACTIONS (CONT'D1 ACTIONS                               DETAILS
I 3.0 FOLLOW-UP ACTIONS (CONT'D1 ACTIONS DETAILS 3.9 jf IA PRESS does NOT e Notify available personnel to i
!    3.9       jf IA PRESS does NOT       e Notify available personnel to i               recover,                     isolate individual air supply root l               Itifh inspect IA and SA     valves on loop headers with leaks:
: recover, isolate individual air supply root l
l'             loops for leaks.
Itifh inspect IA and SA valves on loop headers with leaks:
TB Loop 119 ft TB Loop 95 ft l
l' loops for leaks.
AB Loop 95 ft
TB Loop 119 ft l
;    3.10       WBIE IA PRESS is
TB Loop 95 ft AB Loop 95 ft 3.10 WBIE IA PRESS is
!                > 90 psig,                                                     l THEN EXIT this procedure.
> 90 psig, l
l l
THEN EXIT this procedure.
i                                                                               i l
l i
l 1
i l
O
O
[
[
Line 135: Line 165:
l l
l l
l t
l t
o AP-470         REV 07 (MC)     PAGE 9 0F 27               LOIA l
o AP-470 REV 07 (MC)
PAGE 9 0F 27 LOIA l


O.
O.
i l
i%.,.*
l l.
l l
l.
BLANK PAGE
BLANK PAGE
                                                          . ~ .
. ~.
f w.
fw.
l l                                                                l
l l
?
?
l l
l l
l t
t
1
*i:
                                                      *i:
1 AP-470 REV 07 (MC)
AP-470 REV 07 (MC)       PAGE 10 0F 27 LOIA J
PAGE 10 0F 27 LOIA J


l 3.0 FOLLOW-UP ACTIONS (CONT'D) n l C/                 ACTIONS                                     DETAILS 1
l 3.0 FOLLOW-UP ACTIONS (CONT'D) n 1
l i                                         STATUS 1
l C/
The following conditions exists:
ACTIONS DETAILS l
e Rx is tripped e IA PRESS is :s; 80 psig and any abnormal system operation exists 3.11       Initiate EFIC.                 1   Depress both "EFW INITIATE" push buttons on EFIC channels A and B.
STATUS i
1 The following conditions exists:
e Rx is tripped e IA PRESS is :s; 80 psig and any abnormal system operation exists 3.11 Initiate EFIC.
1 Depress both "EFW INITIATE" push buttons on EFIC channels A and B.
2 Ensure at least one EFWP running:
2 Ensure at least one EFWP running:
EFP-1 EFP-2 O                                             3     Ensure level in available OTSGs !
EFP-1 EFP-2 O
is at or trending toward required level.
3 Ensure level in available OTSGs is at or trending toward required level.
(Rule 3, EFW Control) l l
(Rule 3, EFW Control) l l
l O
l O
AP-470         REV 07 (MC)         PAGE 11 0F 27               LOIA
AP-470 REV 07 (MC)
PAGE 11 0F 27 LOIA


1 1
1 l
l                                                         l l
l l
l 1
l l
l l
l l
1 P
l l
BLANK PAGE Q
l P                    BLANK PAGE Q                                               ,_.
: t...,,
: t. . ., ,
1 1
0 (s
0 (s
AP-470 REV 07 (MC)       PAGE 12 0F 27 LOIA
AP-470 REV 07 (MC)
PAGE 12 0F 27 LOIA


3.0 F0LLOW-UP ACTIONS (CONT'D)
3.0 F0LLOW-UP ACTIONS (CONT'D)
ACTIONS                                     DETAILS 3.12       Initiate MSLI and MFLI. 1           Depress " MAIN STM ISOLATION" push buttons on EFIC channels A and B for both OTSGs.
ACTIONS DETAILS 3.12 Initiate MSLI and MFLI.
1 Depress " MAIN STM ISOLATION" push buttons on EFIC channels A and B for both OTSGs.
2 ___ Depress " MAIN FEED ISOLATION" push buttons on EFIC channels A and B for both OT9Gs.
2 ___ Depress " MAIN FEED ISOLATION" push buttons on EFIC channels A and B for both OT9Gs.
3 Select MBVs to " MAN" and select all FW isolation valves to "CLOSE":
3 Select MBVs to " MAN" and select all FW isolation valves to "CLOSE":
FW valve       A OTSG           B OTSG LLBV                   FWV-31           FWV-32 MBV toggle             " MAN"           " MAN" MBV                     FWV-30           FWV-29 SUBV                   FWV-36           FWV-33 Cross-tie                       FWV-28 Suction                 FWV-14           FWV-15 4 Ensure both MFWPs are tripped:
FW valve A OTSG B OTSG LLBV FWV-31 FWV-32 MBV toggle
A OTSG       B OTSG FWP-2A         FWP-2B 5 Ensure all MSIVs closed:
" MAN"
A OTSG               B OTSG MSV-412             MSV-413 MSV-411             MSV-414 O
" MAN" MBV FWV-30 FWV-29 SUBV FWV-36 FWV-33 Cross-tie FWV-28 Suction FWV-14 FWV-15 4 Ensure both MFWPs are tripped:
AP-470           REV 07 (MC)     PAGE 13 0F 27                         LOIA
A OTSG B OTSG FWP-2A FWP-2B 5 Ensure all MSIVs closed:
A OTSG B OTSG MSV-412 MSV-413 MSV-411 MSV-414 O
AP-470 REV 07 (MC)
PAGE 13 0F 27 LOIA


j l
O j
O i
l i
r l
r l
I l
I l
l 6
l 6
l BLANK PAGE
l BLANK PAGE
                                                  ..e l                                                 s4 /
..e l
s4 /
l l
l l
l i
l i
Line 196: Line 233:
{
{
l l
l l
I                                               .
I t
t s   4 AP-470 REV 07 (MC)       PAGE 14 0F 27 LOIA 1
4 s
                                                            \
AP-470 REV 07 (MC)
PAGE 14 0F 27 LOIA 1
\\
I l
I l


3.0 FOLLOW-UP ACTIONS (CONT'D)
3.0 FOLLOW-UP ACTIONS (CONT'D)
ACTIONS                                 DETAILS
ACTIONS DETAILS
      ? 13       Align backup air supply to e Notify SP0 to open IAV-676 "ADV ADVs.                         Backup Air Supply Iso" (119 ft TB behind FWHE-38).
? 13 Align backup air supply to e Notify SP0 to open IAV-676 "ADV ADVs.
3.14       Isolate letdown.           1     Close MUV-49 2     If MUV-49 will NOT close, IE!i close MUV-567 3.15       Isolate normal makeup. 1     Maintain PZR level > 80 in with MUV-24 2       Close MUV-27                   1 O 3.16       Maintain MUT level
Backup Air Supply Iso" (119 ft TB behind FWHE-38).
* Cycle appropriate BWST to MVP valve 2 55 in,                     to raise MUT level:
3.14 Isolate letdown.
MUV-73 MVV-58 3.17     If at any time, RCP CB0 is lost,                             RCP-1A IE!! trip all RCPs.
1 Close MUV-49 2
If MUV-49 will NOT close, IE!i close MUV-567 3.15 Isolate normal makeup.
1 Maintain PZR level > 80 in with MUV-24 2
Close MUV-27 1
O 3.16 Maintain MUT level
* Cycle appropriate BWST to MVP valve 2 55 in, to raise MUT level:
MUV-73 MVV-58 3.17 If at any time, RCP CB0 is
: lost, RCP-1A IE!! trip all RCPs.
RCP-lC RCP-1B RCP-10 O
RCP-lC RCP-1B RCP-10 O
AP-470         REV 07 (MC)     PAGE 15 0F 27               LOIA
AP-470 REV 07 (MC)
PAGE 15 0F 27 LOIA
}
}


Applicable carry-over steps:
Applicable carry-over steps:
3.17 If RCP CB0 is lost, I!!EH trip All RCPs.
3.17 If RCP CB0 is lost, I!!EH trip All RCPs.
{-
{-
1 l
1 l
Line 218: Line 265:
l i
l i
1 I
1 I
                                                                          ]
]
PAGE 16 0F 27 LOIA        l l           AP-470       REV 07 (MC) l
l AP-470 REV 07 (MC)
PAGE 16 0F 27 LOIA l


l                                     -                                        \
l
L9 FOLLOW-UP ACTIONS (CONT'D) l ACTIONS                                 DETAILS l
\\
        '8     E at any time, SW low                                           i l               flow for an RCP is               RCP-1A
L9 FOLLOW-UP ACTIONS (CONT'D)
!              indicated by either of the ~ollowing:                   RCP-lc "PP SEAL & WTR FLOW"       RCP-1B l                   lamp extinguished on RCP control switch         RCP-1D "RC PUMP CLG WTR FLOW LOW" annunciator alarm is illuminated T!i@ trip affected RCP.
ACTIONS DETAILS
1 3.19     E at any time, all RCPs   e     Ensure level in available OTSGs are tripped,                   is at or trending toward Nat IEW establish Nat Circ.         Circ level.
'8 E at any time, SW low i
l flow for an RCP is RCP-1A indicated by either of the ~ollowing:
RCP-lc "PP SEAL & WTR FLOW" RCP-1B l
lamp extinguished on RCP control switch RCP-1D "RC PUMP CLG WTR FLOW LOW" annunciator alarm is illuminated T!i@ trip affected RCP.
1 3.19 E at any time, all RCPs e
Ensure level in available OTSGs are tripped, is at or trending toward Nat IEW establish Nat Circ.
Circ level.
[ Rule 3, EFW Control]
[ Rule 3, EFW Control]
e     Monitor all 4 Tems for Nat Circ indications.                   I l
e Monitor all 4 Tems for Nat Circ indications.
e Indications of Nat Circ:           !
l e Indications of Nat Circ:
Thet tracking Tinese Tem tracking OTSG Tset AT (That - IcW) stable or lowering l
Thet tracking Tinese Tem tracking OTSG Tset AT (That - IcW) stable or lowering l
  .O AP-470         REV 07 (MC)     PAGE 17 0F 27               LOIA
.O AP-470 REV 07 (MC)
PAGE 17 0F 27 LOIA


Applicable carry-over steps:
Applicable carry-over steps:
3.17   IE RCP CB0 is lost, ItiEH trip all RCPs.
3.17 IE RCP CB0 is lost, ItiEH trip all RCPs.
3.18   lE SW low flow on any RCP, I!!EH trip affected RCP.
3.18 lE SW low flow on any RCP, I!!EH trip affected RCP.
3.19   LE all RCPs are tripped, lHEN establish Nat Circ.
3.19 LE all RCPs are tripped, lHEN establish Nat Circ.
i l
i l
l O                                                                 e AP-470       REV 07 (MC)           PAGE 18 0F 27   LOIA I
l O
e AP-470 REV 07 (MC)
PAGE 18 0F 27 LOIA I


3.0 FOLLOW-UP ACTIONS (CONT'D) i
3.0 FOLLOW-UP ACTIONS (CONT'D) i [
[
l \\
l \                 ACTIONS                               DETAILS l
ACTIONS DETAILS l
3.20       Reduce RCP seal injection e Notify PP0 to perform the following to 2: 3 gpm per pump.       in order (95 ft AB MU valve alley):
3.20 Reduce RCP seal injection e Notify PP0 to perform the following l
l
to 2: 3 gpm per pump.
\
in order (95 ft AB MU valve alley):
\\
Open MUV-34 " Seal Injection Control Bypass Outlet Iso".
Open MUV-34 " Seal Injection Control Bypass Outlet Iso".
Open MUV-35 " Seal Injection Control Bypass Inlet Iso".
Open MUV-35 " Seal Injection Control Bypass Inlet Iso".
Throttle MUV-17 " Seal Injection Control Bypass".
Throttle MUV-17 " Seal Injection Control Bypass".
Close MVV-14 " Seal Infection Control Inlet Iso".
Close MVV-14 " Seal Infection Control Inlet Iso".
1 3.21       Control RCS TEMP using ADVs.
3.21 Control RCS TEMP using ADVs.
oO V
oO V
I I
I lV AP-470 REV 07 (MC)
lV AP-470         REV 07 (MC)     PAGE 19 0F 27               LOIA
PAGE 19 0F 27 LOIA


Applicable carry-over steps:
Applicable carry-over steps:
3.17 3.18 11 RCP CB0 is lost, THEN trip 111 RCPs.
3.17 11 RCP CB0 is lost, THEN trip 111 RCPs.
lE SW low flow on any RCP, IEN trip affected RCP.
{
{
3.19   If all RCPs are tripped, IMH establish Nat Circ.
3.18 lE SW low flow on any RCP, IEN trip affected RCP.
1 O                                                               c-l lO AP-470       REV 07 (MC)           PAGE 20 0F 27   LOIA
3.19 If all RCPs are tripped, IMH establish Nat Circ.
1 O
c-l lO AP-470 REV 07 (MC)
PAGE 20 0F 27 LOIA


{
{
\
\\
3.0 FOLLOW-UP ACTIONS (CONT'D)
3.0 FOLLOW-UP ACTIONS (CONT'D)
ACTIONS                             DETAILS 3.22       Ensure emergency RB   1 At least 1 Emergency SW Pump cooling is in service,   running:
ACTIONS DETAILS 3.22 Ensure emergency RB 1 At least 1 Emergency SW Pump cooling is in service, running:
(Rule 5, EDG Control]             SWP-1A SWP-18 2 At least 1 Emergency SW Raw Water Pump running:
(Rule 5, EDG Control]
SWP-1A SWP-18 2 At least 1 Emergency SW Raw Water Pump running:
RWP-2A RWP-2B 3 Proper RB cooling unit operation:
RWP-2A RWP-2B 3 Proper RB cooling unit operation:
1E ES has NOT actuated, ItiEN ensure both ES selected RB cooling units running in slow speed.
1E ES has NOT actuated, ItiEN ensure both ES selected RB cooling units running in slow speed.
1E c.S has actuated, O                                          ItiEH ensure only 1 ES selected RB cooling unit running in slow speed.
O 1E c.S has actuated, ItiEH ensure only 1 ES selected RB cooling unit running in slow speed.
4 CI valves to RB cooling units closed:
4 CI valves to RB cooling units closed:
SWV-151 SWV-152 SWV-355 5 SW valves to RB cooling units open:
SWV-151 SWV-152 SWV-355 5 SW valves to RB cooling units open:
l                                             SWV-353 SWV-354 l
l SWV-353 SWV-354 l
>O AP-470         REV 07 (MC) PAGE 21 0F 27                 LOIA
>O AP-470 REV 07 (MC)
PAGE 21 0F 27 LOIA


I Applicable carry-over steps:
I Applicable carry-over steps:
r) 3.17   E RCP CB0 is lost, THEN trip all RCPs.
r) 3.17 E RCP CB0 is lost, THEN trip all RCPs.
,(g                                                                   '
,(g 3.18 E SW low flow on any RCP, THEN trip affected RCP.
3.18   E SW low flow on any RCP, THEN trip affected RCP.
3.19 E G RCPs are tripped, J_HG establish Nat Cire.
3.19   E G RCPs are tripped, J_HG establish Nat Cire.
/^s l
  /^s l
l ln
l l
()
l ln()
AP-470 REV 07 (MC)
AP-470       REV 07 (MC)         PAGE 22 0F 27   LOIA
PAGE 22 0F 27 LOIA


3.0 FOLLOW-UP ACTIONS (CONT'D1
3.0 FOLLOW-UP ACTIONS (CONT'D1
                                                                                )
)
O                 ACTIONS                                 DETAILS l
O ACTIONS DETAILS 3.23 IE at any time, PZR level e
3.23     IE at any time, PZR level e       Control cooldown using ADVs. I is > 250 in,                                                     I THW control PZR level by
Control cooldown using ADVs.
* CONCURRENTLY PERFORM E0P 14, i
is > 250 in, THW control PZR level by CONCURRENTLY PERFORM E0P 14, starting an RCS cooldown. 5, E0P Temperature i
starting an RCS cooldown.         Enclosure 15, E0P Temperature I                                               Log.
I Log.
i 3.24       Break condenser vacuum. 1 Select condenser ARPs to
i 3.24 Break condenser vacuum.
                                            " PULL TO LOCK":
1 Select condenser ARPs to
" PULL TO LOCK":
ARP-1A ARP-18 2 Open condenser vacuum Bkrs:
ARP-1A ARP-18 2 Open condenser vacuum Bkrs:
ARV-48 ARV-49 O                                                                             '
ARV-48 ARV-49 O
3.25     Ensure WG compressors are e Notify PPO to select WG compressors stopped.                     to " PULL TO LOCK" (WDCP-3 Radwaste Control Panel):
3.25 Ensure WG compressors are e Notify PPO to select WG compressors stopped.
WDP-1A                         f WDP-1B                       ,
to " PULL TO LOCK" (WDCP-3 Radwaste Control Panel):
3.26       Isolate GW to AS
WDP-1A f
* Notify SP0 to close ASV-53 "GS desuperheater.               DESUPERHEATER OUTLET 150" (119 ft TB
WDP-1B 3.26 Isolate GW to AS
;                                            at AS Hdr).
* Notify SP0 to close ASV-53 "GS desuperheater.
l l
DESUPERHEATER OUTLET 150" (119 ft TB at AS Hdr).
l l
l l
l l
l l
AP-470         REV 07 (HC)     PAGE 23 0F 27                 LOIA
AP-470 REV 07 (HC)
PAGE 23 0F 27 LOIA


i Applicable carry-over steps:
i Applicable carry-over steps:
'()
'()
is' 3.17   E RCP CB0 is lost, THEN trip all RCPs.
is' 3.17 E RCP CB0 is lost, THEN trip all RCPs.
3.18   E SW low flow on any RCP, THEN trip affected RCP.
3.18 E SW low flow on any RCP, THEN trip affected RCP.
3.19   E all RCPs are tripped, THEN establish Nat Circ.
3.19 E all RCPs are tripped, THEN establish Nat Circ.
3.23   E PZR level is > 250 in, THEN control PZR level...
3.23 E PZR level is > 250 in, THEN control PZR level...
i O
i OQ i
Q                                                                  .
l O
l 1
AP-470 REV 07 (MC)
i l
PAGE 24 0F 27 LOIA
l l
O                                                                 < .
AP-470       REV 07 (MC)           PAGE 24 0F 27   LOIA


h l
h l
l     3.0 FOLLOW-UP ACTIONS (CONT'D) l ACTIONS                                   DETAILS 3.27     E at any time, IA valves fail, THEN select failed valves to their failed position.
l 3.0 FOLLOW-UP ACTIONS (CONT'D) l ACTIONS DETAILS 3.27 E at any time, IA valves
See OP-411, Instrument and Station Air, Enclosure 4, Loss of IA Equipment Failure Modes 1
: fail, THEN select failed valves to their failed position.
3.28     E at any time, SC cooling is lost,                              SAP-1A         -
See OP-411, Instrument and Station Air, Enclosure 4, Loss of IA Equipment Failure Modes 3.28 E at any time, SC cooling SAP-1A
                                                                        ' SAP-1B 3
' SAP-1B is lost, 3
THEN stop SC cooled                     p*
THEN stop SC cooled components.
components.                             .                M.P48 (FWP-2A               FWP-2B TFWP-1A               FWPllB
M.P48 p*
                                                    !. CDP-1 A           ' CDP-1B
(FWP-2A FWP-2B TFWP-1A FWPllB
                                                ''J "ARP'2A -
!. CDP-1 A
                                                                  *  #ARP-2B 3.29     E at any time, IA PRESS is > 90 psig, EJE GO TO OP-411, Instrument and Station Air System, Section 4.8, Restoration From AP-470 3.30       Bypass IA dryers.
' CDP-1B
''J "ARP'2A
#ARP-2B 3.29 E at any time, IA PRESS is > 90 psig, EJE GO TO OP-411, Instrument and Station Air System, Section 4.8, Restoration From AP-470 3.30 Bypass IA dryers.
* Notify SP0 to open IAV-31 "IADR-1 &
* Notify SP0 to open IAV-31 "IADR-1 &
IADR-2 Bypass Iso" (95 ft TB behind 1ADR-1).
IADR-2 Bypass Iso" (95 ft TB behind 1ADR-1).
I,a AP-470         REV 07 (MC)     PAGE 25 0F 27                       LOIA j i
I,a AP-470 REV 07 (MC)
PAGE 25 0F 27 LOIA j
i


l l
l l
l Applicable carry over steps:
l Applicable carry over steps:
3.17 E RCP CB0 is lost, M trip all RCPs.                       p
3.17 E RCP CB0 is lost, M trip all RCPs.
                                                                  ...j 1 3.18   E SW low flow on any RCP, THEN trip affected RCP.
p
l 3.19 E All RCPs are tripped, THEN establish Nat Cire.                   l 3.23   E PZR level is > 250 in, THEN control PZR level...
...j 1
3.27   E IA valves fail, M select failed valves to...
3.18 E SW low flow on any RCP, THEN trip affected RCP.
3.28   1E SC cooling is lost, E stop SC cooled components.              .
l 3.19 E All RCPs are tripped, THEN establish Nat Cire.
4 3.29   IE IA PRESS is > 90 psig, THEN GO TO OP-411...
3.23 E PZR level is > 250 in, THEN control PZR level...
3.27 E IA valves fail, M select failed valves to...
3.28 1E SC cooling is lost, E stop SC cooled components.
4 3.29 IE IA PRESS is > 90 psig, THEN GO TO OP-411...
I i
I i
j i
j i
Line 345: Line 413:
f I
f I
l
l
                                                                      .    )
)
!      AP-470       REV 07 (MC)           PAGE 26 0F 27     LOIA
AP-470 REV 07 (MC)
PAGE 26 0F 27 LOIA


3.0 FOLLOW-UP ACTIONS (CONT'D)
3.0 FOLLOW-UP ACTIONS (CONT'D)
O V                  ACTIONS                                     DETAILS 3.31       Place both IA dryer           e Notify SP0 to ensure the following prefilters and                 are open (95 ft TB by IADR-1):
OV ACTIONS DETAILS 3.31 Place both IA dryer e Notify SP0 to ensure the following prefilters and are open (95 ft TB by IADR-1):
afterfilters in service.
afterfilters in service.
IAV-Il "Prefilter IAFL-2A Inlet Iso" I AV-12 "Prefilter I AFL-2B Inlet Iso" IAV-14 "Prefilter IAFL-2B Outlet Iso" IAV-544 "Prefilter IAFL-2A Outlet Iso" IAV-18 "Afterfilter IAFL-3B Inlet Iso" IAV-545 "Afterfilter IAFL-3A Inlet Iso" IAV-19 "Afterfilter IAFL-3A Outlet Iso" IAV-20 "Afterfilter IAFL-3B Outlet Iso" 3.32       JE IA PRESS does NOT         e Notify available personnel to recover,                       isolate individual air supply root 111@ inspect IA and SA         valves on loop headers with leaks:
IAV-Il "Prefilter IAFL-2A Inlet Iso" I AV-12 "Prefilter I AFL-2B Inlet Iso" IAV-14 "Prefilter IAFL-2B Outlet Iso" IAV-544 "Prefilter IAFL-2A Outlet Iso" IAV-18 "Afterfilter IAFL-3B Inlet Iso" IAV-545 "Afterfilter IAFL-3A Inlet Iso" IAV-19 "Afterfilter IAFL-3A Outlet Iso" IAV-20 "Afterfilter IAFL-3B Outlet Iso" 3.32 JE IA PRESS does NOT e Notify available personnel to
: recover, isolate individual air supply root 111@ inspect IA and SA valves on loop headers with leaks:
loops for leaks.
loops for leaks.
TB Loop 119 ft TB Loop 95 ft AB Loop 95 ft 3.33       WH._@ IA PRESS is
TB Loop 119 ft TB Loop 95 ft AB Loop 95 ft 3.33 WH._@ IA PRESS is
_> 90 psig, I11@ GO TO OP-411, Instrument and Station Air System, Section 4.8, O             Restoration From AP-470 AP-470         REV 07 (MC)   PAGE 27 0F 27 (LAST PAGE)           LOIA}}
_> 90 psig, I11@ GO TO OP-411, Instrument and Station Air System, Section 4.8, O
Restoration From AP-470 AP-470 REV 07 (MC)
PAGE 27 0F 27 (LAST PAGE)
LOIA}}

Latest revision as of 10:28, 3 December 2024

Rev 7 to AP-470, Loss of Instrument Air
ML20216F018
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/08/1998
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20216F000 List:
References
AP-470, NUDOCS 9804160378
Download: ML20216F018 (27)


Text

l LOIA REV 07 (MC)

AP-470 l

!O l

LOSS OF INSTRUMENT AIR l

1.0 ENTRY CONDITIONS INFORMATION 1E IA PRESS is s 90 psig, ONLY l

JREN use this procedure.

L 2.0 IMMEDIATE ACTIONS HOIE There are no imediate actions for this procedure.

l I

O i

l A

Approved by NNP0

[e[U/b-Date 04/08/98

(SIGNATURE ON FILE)

AP-470 PAGE 1 of 27 LOIA l

9804160378 980409 PDR ADOCK 05000302 P

PDR

l l

I O

O i

BLANK PAGE p

('

V O

o AP-470 REV 07 (MC)

PAGE 2 0F 27 LOIA

3.0 FOLLOW-UP ACTIONS r)

't

/

ACTIONS DETAILS 3.1 Ensure in-house air g g-compressors are running.

SAP-1B IAP-1A IAP-1B i

3.2 Notify personnel of plant STA conditions.

1 Plant operators NSM e

HP (notify of degraded IA conditions as a precaution for personnel using breathing air) k.)

Announce on PA " Terminate all use of station air".

l l

i l

AP-470 REV 07 (MC)

PAGE 3 0F 27 LOIA l

l O

Oi I

l c-1 l

1 l

l l

l

)

'O C

AP-470 REV 07 (MC)

PAGE 4 0F 27 LOIA l

3.0 FOLLOW-UP ACTIONS (CONT'D)

ACTIONS DETAILS 3.3 Notify SP0 to start berm l

air compressors.

SAP-lC SAP-ID l

SAP-lE

'I 1

i I

3.4 __ J1 at any time, DHR is in 1

J1 A DHR Train is in service, i

service, M notify PP0 to manually l

E IA PRESS < 80 psig, throttle the following valves l

l M establish manual (75 ft AB A DH Room):

control of DHR cooling, l

M GO TO Step 3.27 in DCV-17 "A DH Cooler Bypass this procedure Control" DCV-177 "A DH Cooler Outlet Control" l

l 2

JF B DHR Train is in service,

!N M notify PP0 to manually throttle the following valves l

(75 ft AB B DH Room):

DCV-18 "B DH Cooler Bypass Control" DCV-178 "B DH Cooler Outlet l

Control" 3

GO TO Step 3.27 in this procedure.

l 3.5 JF at any time, IA PRESS 1

Depress Rx trip push button is < 80 psig, E any abnormal system 2

CONCURRENTLY PERFORM E0P-2, operation exists, Vital System Status M trip Rx and Verification, beginning with I

GO TO Step 3.11 in this Step 2.1 procedure.

3 GO TO Step 3.11 in this procedure.

O AP-470 REV 07 (MC)

PAGE 5 0F 27 LOIA

i Applicable carry-over steps:

CN 4, 'j E DHR is in service AND IA PRESS < 80 psig...

3.4

i. ;. r l

3.5 E lA PRESS is < 80 psig MQ abnormal system operation exists...

1 l

l l

l l

, ' ~

v f

t l

l l

l l

l l

l t

i v

t AP-470 REV 07 (MC)

PAGE 6 0F 27 LOIA

\\

L4 FOLLOW-UP ACTIONS (CONT'D)

Ob ACTIONS DETAILS 3.6 1E at any time, IA PRESS is > 90 psig, IliEt{ EXIT this procedure.

3.7 Bypass IA dryers.

  • Notify SP0 to open IAV-31 "IADR-1 &

j IADR-2 Bypass Iso" (95 ft TB behind 1ADR-1).

3.8 Place both IA dryer

  • Notify SP0 to ensure all the prefilters and following valves are open afterfilters in service.

(95 ft TB by IADR-1):

IAV-Il "Prefilter IAFL-2A Inlet Iso" IAV-12 "Prefilter IAFL-2B Inlet

\\pj Iso" IAV-14 "Prefilter IAFL-2B Outlet Iso" IAV-544 "Prefilter IAFL-2A Outlet Iso" IAV-18 "Afterfilter IAFL-3B Inlet Iso" IAV-545 "Afterfilter IAFL-3A Inlet Iso" IAV-19 "Afterfilter IAFL-3A Outlet Iso"

__ IAV-20 "Afterfilter IAFL-3B Outlet Iso" O

AP-470 REV 07 (MC)

PAGE 7 0F 27 LOIA

r 1

i Applicable carry-over steps:

I p]

3.4

[E DHR is in service AND IA PRESS < 80 psig...

1E 1A PRESS is < 80 psig a.NJ) abnormal system operation exists...

f i

3.5 N

1 4

3.6 1E IA PRESS is > 90 psig THEN, EXIT this procedure.

1 O

v

(,

V

(

AP-470 REV 07 (MC)

PAGE 8 0F 27 LOIA

I 3.0 FOLLOW-UP ACTIONS (CONT'D1 ACTIONS DETAILS 3.9 jf IA PRESS does NOT e Notify available personnel to i

recover, isolate individual air supply root l

Itifh inspect IA and SA valves on loop headers with leaks:

l' loops for leaks.

TB Loop 119 ft l

TB Loop 95 ft AB Loop 95 ft 3.10 WBIE IA PRESS is

> 90 psig, l

THEN EXIT this procedure.

l i

i l

O

[

1 l

l l

l l

l t

o AP-470 REV 07 (MC)

PAGE 9 0F 27 LOIA l

O.

i%.,.*

l l

l.

BLANK PAGE

. ~.

fw.

l l

?

l l

t

  • i:

1 AP-470 REV 07 (MC)

PAGE 10 0F 27 LOIA J

l 3.0 FOLLOW-UP ACTIONS (CONT'D) n 1

l C/

ACTIONS DETAILS l

STATUS i

1 The following conditions exists:

e Rx is tripped e IA PRESS is :s; 80 psig and any abnormal system operation exists 3.11 Initiate EFIC.

1 Depress both "EFW INITIATE" push buttons on EFIC channels A and B.

2 Ensure at least one EFWP running:

EFP-1 EFP-2 O

3 Ensure level in available OTSGs is at or trending toward required level.

(Rule 3, EFW Control) l l

l O

AP-470 REV 07 (MC)

PAGE 11 0F 27 LOIA

1 l

l l

1 P

BLANK PAGE Q

t...,,

0 (s

AP-470 REV 07 (MC)

PAGE 12 0F 27 LOIA

3.0 F0LLOW-UP ACTIONS (CONT'D)

ACTIONS DETAILS 3.12 Initiate MSLI and MFLI.

1 Depress " MAIN STM ISOLATION" push buttons on EFIC channels A and B for both OTSGs.

2 ___ Depress " MAIN FEED ISOLATION" push buttons on EFIC channels A and B for both OT9Gs.

3 Select MBVs to " MAN" and select all FW isolation valves to "CLOSE":

FW valve A OTSG B OTSG LLBV FWV-31 FWV-32 MBV toggle

" MAN"

" MAN" MBV FWV-30 FWV-29 SUBV FWV-36 FWV-33 Cross-tie FWV-28 Suction FWV-14 FWV-15 4 Ensure both MFWPs are tripped:

A OTSG B OTSG FWP-2A FWP-2B 5 Ensure all MSIVs closed:

A OTSG B OTSG MSV-412 MSV-413 MSV-411 MSV-414 O

AP-470 REV 07 (MC)

PAGE 13 0F 27 LOIA

O j

l i

r l

I l

l 6

l BLANK PAGE

..e l

s4 /

l l

l i

i

{

l l

I t

4 s

AP-470 REV 07 (MC)

PAGE 14 0F 27 LOIA 1

\\

I l

3.0 FOLLOW-UP ACTIONS (CONT'D)

ACTIONS DETAILS

? 13 Align backup air supply to e Notify SP0 to open IAV-676 "ADV ADVs.

Backup Air Supply Iso" (119 ft TB behind FWHE-38).

3.14 Isolate letdown.

1 Close MUV-49 2

If MUV-49 will NOT close, IE!i close MUV-567 3.15 Isolate normal makeup.

1 Maintain PZR level > 80 in with MUV-24 2

Close MUV-27 1

O 3.16 Maintain MUT level

  • Cycle appropriate BWST to MVP valve 2 55 in, to raise MUT level:

MUV-73 MVV-58 3.17 If at any time, RCP CB0 is

lost, RCP-1A IE!! trip all RCPs.

RCP-lC RCP-1B RCP-10 O

AP-470 REV 07 (MC)

PAGE 15 0F 27 LOIA

}

Applicable carry-over steps:

3.17 If RCP CB0 is lost, I!!EH trip All RCPs.

{-

1 l

i l

l i

1 I

]

l AP-470 REV 07 (MC)

PAGE 16 0F 27 LOIA l

l

\\

L9 FOLLOW-UP ACTIONS (CONT'D)

ACTIONS DETAILS

'8 E at any time, SW low i

l flow for an RCP is RCP-1A indicated by either of the ~ollowing:

RCP-lc "PP SEAL & WTR FLOW" RCP-1B l

lamp extinguished on RCP control switch RCP-1D "RC PUMP CLG WTR FLOW LOW" annunciator alarm is illuminated T!i@ trip affected RCP.

1 3.19 E at any time, all RCPs e

Ensure level in available OTSGs are tripped, is at or trending toward Nat IEW establish Nat Circ.

Circ level.

[ Rule 3, EFW Control]

e Monitor all 4 Tems for Nat Circ indications.

l e Indications of Nat Circ:

Thet tracking Tinese Tem tracking OTSG Tset AT (That - IcW) stable or lowering l

.O AP-470 REV 07 (MC)

PAGE 17 0F 27 LOIA

Applicable carry-over steps:

3.17 IE RCP CB0 is lost, ItiEH trip all RCPs.

3.18 lE SW low flow on any RCP, I!!EH trip affected RCP.

3.19 LE all RCPs are tripped, lHEN establish Nat Circ.

i l

l O

e AP-470 REV 07 (MC)

PAGE 18 0F 27 LOIA I

3.0 FOLLOW-UP ACTIONS (CONT'D) i [

l \\

ACTIONS DETAILS l

3.20 Reduce RCP seal injection e Notify PP0 to perform the following l

to 2: 3 gpm per pump.

in order (95 ft AB MU valve alley):

\\

Open MUV-34 " Seal Injection Control Bypass Outlet Iso".

Open MUV-35 " Seal Injection Control Bypass Inlet Iso".

Throttle MUV-17 " Seal Injection Control Bypass".

Close MVV-14 " Seal Infection Control Inlet Iso".

3.21 Control RCS TEMP using ADVs.

oO V

I lV AP-470 REV 07 (MC)

PAGE 19 0F 27 LOIA

Applicable carry-over steps:

3.17 11 RCP CB0 is lost, THEN trip 111 RCPs.

{

3.18 lE SW low flow on any RCP, IEN trip affected RCP.

3.19 If all RCPs are tripped, IMH establish Nat Circ.

1 O

c-l lO AP-470 REV 07 (MC)

PAGE 20 0F 27 LOIA

{

\\

3.0 FOLLOW-UP ACTIONS (CONT'D)

ACTIONS DETAILS 3.22 Ensure emergency RB 1 At least 1 Emergency SW Pump cooling is in service, running:

(Rule 5, EDG Control]

SWP-1A SWP-18 2 At least 1 Emergency SW Raw Water Pump running:

RWP-2A RWP-2B 3 Proper RB cooling unit operation:

1E ES has NOT actuated, ItiEN ensure both ES selected RB cooling units running in slow speed.

O 1E c.S has actuated, ItiEH ensure only 1 ES selected RB cooling unit running in slow speed.

4 CI valves to RB cooling units closed:

SWV-151 SWV-152 SWV-355 5 SW valves to RB cooling units open:

l SWV-353 SWV-354 l

>O AP-470 REV 07 (MC)

PAGE 21 0F 27 LOIA

I Applicable carry-over steps:

r) 3.17 E RCP CB0 is lost, THEN trip all RCPs.

,(g 3.18 E SW low flow on any RCP, THEN trip affected RCP.

3.19 E G RCPs are tripped, J_HG establish Nat Cire.

/^s l

l ln

()

AP-470 REV 07 (MC)

PAGE 22 0F 27 LOIA

3.0 FOLLOW-UP ACTIONS (CONT'D1

)

O ACTIONS DETAILS 3.23 IE at any time, PZR level e

Control cooldown using ADVs.

is > 250 in, THW control PZR level by CONCURRENTLY PERFORM E0P 14, starting an RCS cooldown. 5, E0P Temperature i

I Log.

i 3.24 Break condenser vacuum.

1 Select condenser ARPs to

" PULL TO LOCK":

ARP-1A ARP-18 2 Open condenser vacuum Bkrs:

ARV-48 ARV-49 O

3.25 Ensure WG compressors are e Notify PPO to select WG compressors stopped.

to " PULL TO LOCK" (WDCP-3 Radwaste Control Panel):

WDP-1A f

WDP-1B 3.26 Isolate GW to AS

  • Notify SP0 to close ASV-53 "GS desuperheater.

DESUPERHEATER OUTLET 150" (119 ft TB at AS Hdr).

l l

l l

AP-470 REV 07 (HC)

PAGE 23 0F 27 LOIA

i Applicable carry-over steps:

'()

is' 3.17 E RCP CB0 is lost, THEN trip all RCPs.

3.18 E SW low flow on any RCP, THEN trip affected RCP.

3.19 E all RCPs are tripped, THEN establish Nat Circ.

3.23 E PZR level is > 250 in, THEN control PZR level...

i OQ i

l O

AP-470 REV 07 (MC)

PAGE 24 0F 27 LOIA

h l

l 3.0 FOLLOW-UP ACTIONS (CONT'D) l ACTIONS DETAILS 3.27 E at any time, IA valves

fail, THEN select failed valves to their failed position.

See OP-411, Instrument and Station Air, Enclosure 4, Loss of IA Equipment Failure Modes 3.28 E at any time, SC cooling SAP-1A

' SAP-1B is lost, 3

THEN stop SC cooled components.

M.P48 p*

(FWP-2A FWP-2B TFWP-1A FWPllB

!. CDP-1 A

' CDP-1B

J "ARP'2A

  1. ARP-2B 3.29 E at any time, IA PRESS is > 90 psig, EJE GO TO OP-411, Instrument and Station Air System, Section 4.8, Restoration From AP-470 3.30 Bypass IA dryers.
  • Notify SP0 to open IAV-31 "IADR-1 &

IADR-2 Bypass Iso" (95 ft TB behind 1ADR-1).

I,a AP-470 REV 07 (MC)

PAGE 25 0F 27 LOIA j

i

l l

l Applicable carry over steps:

3.17 E RCP CB0 is lost, M trip all RCPs.

p

...j 1

3.18 E SW low flow on any RCP, THEN trip affected RCP.

l 3.19 E All RCPs are tripped, THEN establish Nat Cire.

3.23 E PZR level is > 250 in, THEN control PZR level...

3.27 E IA valves fail, M select failed valves to...

3.28 1E SC cooling is lost, E stop SC cooled components.

4 3.29 IE IA PRESS is > 90 psig, THEN GO TO OP-411...

I i

j i

1 i

f I

l

)

AP-470 REV 07 (MC)

PAGE 26 0F 27 LOIA

3.0 FOLLOW-UP ACTIONS (CONT'D)

OV ACTIONS DETAILS 3.31 Place both IA dryer e Notify SP0 to ensure the following prefilters and are open (95 ft TB by IADR-1):

afterfilters in service.

IAV-Il "Prefilter IAFL-2A Inlet Iso" I AV-12 "Prefilter I AFL-2B Inlet Iso" IAV-14 "Prefilter IAFL-2B Outlet Iso" IAV-544 "Prefilter IAFL-2A Outlet Iso" IAV-18 "Afterfilter IAFL-3B Inlet Iso" IAV-545 "Afterfilter IAFL-3A Inlet Iso" IAV-19 "Afterfilter IAFL-3A Outlet Iso" IAV-20 "Afterfilter IAFL-3B Outlet Iso" 3.32 JE IA PRESS does NOT e Notify available personnel to

recover, isolate individual air supply root 111@ inspect IA and SA valves on loop headers with leaks:

loops for leaks.

TB Loop 119 ft TB Loop 95 ft AB Loop 95 ft 3.33 WH._@ IA PRESS is

_> 90 psig, I11@ GO TO OP-411, Instrument and Station Air System, Section 4.8, O

Restoration From AP-470 AP-470 REV 07 (MC)

PAGE 27 0F 27 (LAST PAGE)

LOIA