ML20217N301: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_ . _ _ _ _ _ _ _ _ _ _ . _
{{#Wiki_filter:,
1-OM-17.4. Rev. 0
1-OM-17.4. Rev. 0 Page 1 of 3 Millstone Unit One O
  ,                                                                                                    Page 1 of 3 Millstone Unit One O                             ortair10xs minuit SECTION 17.4
ortair10xs minuit SECTION 17.4
                          " UNIT 1 TRANSFORMER YARD CONTROL"                                                       ;
" UNIT 1 TRANSFORMER YARD CONTROL" Sponsor: D.J. Meekhoff Effective Date IABLE OF CONTENTS PAGE NUMBER 1.0 PURPOSE 2
Sponsor: D.J. Meekhoff Effective Date IABLE OF CONTENTS                                                             PAGE NUMBER 1.0   PURPOSE                                                                         2 3 2.0   APPLICABILITY                                                                   2 (G
3 2.0 APPLICABILITY 2
(G


==3.0   REFERENCES==
==3.0 REFERENCES==
2 4.0   RESPONSIBILITIES                                                                 2 5.0 PRECAUTIONS                                                                     2 6.0 INSTRUCTIONS                                                                     3 70   ATTACHMENTS                                                                     3 Approved by:
2 4.0 RESPONSIBILITIES 2
5.0 PRECAUTIONS 2
6.0 INSTRUCTIONS 3
70 ATTACHMENTS 3
Approved by:
G e
G e
1
1 970826011-2: 470819 T/IP1 Operations Manager V" ^*" ****?'a*
                                    '                          T/IP1 Operations Manager 970826011-2: 470819                                  '
V" ^*" ****?'a* ,


1-OM-17.4 Riv. 0
1-OM-17.4 Riv. 0 Page 2 of 3 0
,                                                                                                            Page 2 of 3 0   .1.0 - - PURPOSE -
.1.0 - - PURPOSE -
1.1   To communicate the Standard for controlling access to the Unit 1 Transformer Yard, thereby minimizing the quantity of vehicles and materials stored in the Transformer Yard.
1.1 To communicate the Standard for controlling access to the Unit 1 Transformer Yard, thereby minimizing the quantity of vehicles and materials stored in the Transformer Yard.
2.0 APPLICABILITY 2.1   This procedure applies to all personnel accessing or storing materials or vehicles in the Unit i Transformer Yard.
2.0 APPLICABILITY 2.1 This procedure applies to all personnel accessing or storing materials or vehicles in the Unit i Transformer Yard.


==3.0 REFERENCES==
==3.0 REFERENCES==
 
3.1 MAP 2.38, Attachment 8.1 3.2 ISEG Observation 93-025
3.1     MAP 2.38, Attachment 8.1 3.2     ISEG Observation 93-025
- 3.3
            - 3.3   .OP-240," Conduct of Outages"
.OP-240," Conduct of Outages" 4.0 RESPONSIBILITIES
: f3  4.0 RESPONSIBILITIES Q           4.1-     Director, Unit Operations - Responsible for authorizing the storage of materials in the Unit 1 Transformer Yard.
: f3 Q
1 4.2     Operations Manager _- Responsible for reviewing requests for the storage of materials and for enforcing the requirements of this expectation.
4.1-Director, Unit Operations - Responsible for authorizing the storage of materials in the Unit 1 Transformer Yard.
4.3     Shift Manager - Responsible for authorizing and controlling vehicle access in and out of the Unit 1 Transformer Yard.
1 4.2 Operations Manager _- Responsible for reviewing requests for the storage of materials and for enforcing the requirements of this expectation.
      ~ 5.0 PRECAUTIONS 5.1     Special precautions must be taken while working in the transfctmer yard to protect
4.3 Shift Manager - Responsible for authorizing and controlling vehicle access in and out of the Unit 1 Transformer Yard.
                    . power availability. This may include erecting caution signs or physical barriers near
~ 5.0 PRECAUTIONS 5.1 Special precautions must be taken while working in the transfctmer yard to protect
                    - the work, or pre-job briefings.
. power availability. This may include erecting caution signs or physical barriers near
5.2 . The transformer yard is not to be used as a laydown area. Only material to be used for a specific job in the transformer yard should be stored in the transformer yard.
- the work, or pre-job briefings.
5.3     The transformer yard access gates should be locked at all times except when specific permission has been granted by the Shift Manager to open the gates. The dp                   gates should be maintained closed following entry to or exit from the Transfarmer Yard.
5.2.
The transformer yard is not to be used as a laydown area. Only material to be used for a specific job in the transformer yard should be stored in the transformer yard.
5.3 The transformer yard access gates should be locked at all times except when specific permission has been granted by the Shift Manager to open the gates. The dp gates should be maintained closed following entry to or exit from the Transfarmer Yard.
1
1


oM-17A. Rev. O Page 3 of 3 5.4       The Shift Manger shall be notified of any planned actions involving cranes, mantifts
oM-17A. Rev. O Page 3 of 3 5.4 The Shift Manger shall be notified of any planned actions involving cranes, mantifts
-(                   or other vehicles working on, or in the vicinity of, on-site transmission lines.
-(
5.5     Personnel accessing the transformer yard shall comply with the requirements shown on facility fences for personnel access.
or other vehicles working on, or in the vicinity of, on-site transmission lines.
          - 5.6     The Transformer Yard is critical to shutdown risk assessment and must be maintained free of unnecessary vehicles and equipment.-
5.5 Personnel accessing the transformer yard shall comply with the requirements shown on facility fences for personnel access.
6.0 INSTRUCTIONS 6.1-     Vehicular Access Control 6.1.1 All vehicular traffic in and out of the Transformer Yard must be approved by the Shift Manager and logged on Attachment 1.
- 5.6 The Transformer Yard is critical to shutdown risk assessment and must be maintained free of unnecessary vehicles and equipment.-
6.0 INSTRUCTIONS 6.1-Vehicular Access Control 6.1.1 All vehicular traffic in and out of the Transformer Yard must be approved by the Shift Manager and logged on Attachment 1.
6.1.2 The gates must be maintained locked except when opening or shutting the gates for egress to and from the Transformer Yard.
6.1.2 The gates must be maintained locked except when opening or shutting the gates for egress to and from the Transformer Yard.
6.2     Material Storage g                    6.2.1 Storage of materials and equipment in the Transformer Yard must be
6.2 Material Storage 6.2.1 Storage of materials and equipment in the Transformer Yard must be g-Q reviewed by the Operations Manager and approved by the Directer, Unit.
-Q -
reviewed by the Operations Manager and approved by the Directer, Unit .
Operations PRIOR to such storage occurring.
Operations PRIOR to such storage occurring.
6.2.2 Following Operations Manager review and approval, material storage in the
6.2.2 Following Operations Manager review and approval, material storage in the
                            . Transformer Yard shall be logged on Attachment 2.
. Transformer Yard shall be logged on Attachment 2.
* 7.0 ATTACHMENTS OM-17.4-1   Vehicle Traffic Control
7.0 ATTACHMENTS OM-17.4-1 Vehicle Traffic Control
            .'1-OM-17.4-2     Material and Equipment Control
.'1-OM-17.4-2 Material and Equipment Control
    )
)
h w                                       _ _ _ _ _ _ _ _ . _ _ . _ _ . _ _ . _ . . _ . _
h w


                                                                                      ,-s      .      .
;~')
            ;~')                                 ('
('
            %)                                   %)                                   \v' Attachment 1 UNIT 1 TRANSFORMER YARD CONTROL LOG VEHICLE TRAFFIC CONTROL TIME GATE   TIME GATE TIME                   REASON             SM APPROVAL   OPENED LOCKED CLOSED DATE        REQUESTOR i
,-s
%)
%)
\\v' UNIT 1 TRANSFORMER YARD CONTROL LOG VEHICLE TRAFFIC CONTROL TIME GATE TIME GATE DATE TIME REQUESTOR REASON SM APPROVAL OPENED LOCKED CLOSED i
1-OM-17.4-1, Rev. O Page 1 of 1 l
1-OM-17.4-1, Rev. O Page 1 of 1 l


                                                                                                                                  -m     .      ,
-m
                                                                                        ,--~,
, - - ~,
_7            s._,
_ 7 s._,
l     I                                 '[     }
l I
(\ j) '                                                             \w..)
'[
                                                                                                                                ' xd' Attachment 2 UNIT 1 TRANSFORMER YARD CONTROL LOG MATERIAL AND EQUIPMENT CONTROL DIRECTOR, REASON OPS MANAGER   UNIT OPS         DATE DATE            TIME          REQUESTOR      MATERIA 11 EQUIPMENT
}
                                                            - TO BE STORED                           CONCURRENCE . APPROVAL     REMOVED l
( j) '
\\w..)
' xd'
\\
UNIT 1 TRANSFORMER YARD CONTROL LOG MATERIAL AND EQUIPMENT CONTROL
: DIRECTOR, DATE TIME REQUESTOR MATERIA 11 EQUIPMENT REASON OPS MANAGER UNIT OPS DATE
- TO BE STORED CONCURRENCE
. APPROVAL REMOVED l
l i
l i
l i
l                                                                                                                                                   i l
l 1-OM-17.4-2. Rev. O ry t of t
1-OM-17.4-2. Rev. O ry t of t
.2.
_ _ _  .2. . . . . . . . . . .
.... - -.}}
                                                . .    . .. .        . .. . - - .}}

Latest revision as of 07:57, 3 December 2024

Rev 0 to 1-OM-17.4, Unit 1 Transformer Yard Control
ML20217N301
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/22/1997
From: Meekhoff D
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20217N155 List:
References
1-OM-17.4, NUDOCS 9708260103
Download: ML20217N301 (5)


Text

,

1-OM-17.4. Rev. 0 Page 1 of 3 Millstone Unit One O

ortair10xs minuit SECTION 17.4

" UNIT 1 TRANSFORMER YARD CONTROL" Sponsor: D.J. Meekhoff Effective Date IABLE OF CONTENTS PAGE NUMBER 1.0 PURPOSE 2

3 2.0 APPLICABILITY 2

(G

3.0 REFERENCES

2 4.0 RESPONSIBILITIES 2

5.0 PRECAUTIONS 2

6.0 INSTRUCTIONS 3

70 ATTACHMENTS 3

Approved by:

G e

1 970826011-2: 470819 T/IP1 Operations Manager V" ^*" ****?'a*

1-OM-17.4 Riv. 0 Page 2 of 3 0

.1.0 - - PURPOSE -

1.1 To communicate the Standard for controlling access to the Unit 1 Transformer Yard, thereby minimizing the quantity of vehicles and materials stored in the Transformer Yard.

2.0 APPLICABILITY 2.1 This procedure applies to all personnel accessing or storing materials or vehicles in the Unit i Transformer Yard.

3.0 REFERENCES

3.1 MAP 2.38, Attachment 8.1 3.2 ISEG Observation 93-025

- 3.3

.OP-240," Conduct of Outages" 4.0 RESPONSIBILITIES

f3 Q

4.1-Director, Unit Operations - Responsible for authorizing the storage of materials in the Unit 1 Transformer Yard.

1 4.2 Operations Manager _- Responsible for reviewing requests for the storage of materials and for enforcing the requirements of this expectation.

4.3 Shift Manager - Responsible for authorizing and controlling vehicle access in and out of the Unit 1 Transformer Yard.

~ 5.0 PRECAUTIONS 5.1 Special precautions must be taken while working in the transfctmer yard to protect

. power availability. This may include erecting caution signs or physical barriers near

- the work, or pre-job briefings.

5.2.

The transformer yard is not to be used as a laydown area. Only material to be used for a specific job in the transformer yard should be stored in the transformer yard.

5.3 The transformer yard access gates should be locked at all times except when specific permission has been granted by the Shift Manager to open the gates. The dp gates should be maintained closed following entry to or exit from the Transfarmer Yard.

1

oM-17A. Rev. O Page 3 of 3 5.4 The Shift Manger shall be notified of any planned actions involving cranes, mantifts

-(

or other vehicles working on, or in the vicinity of, on-site transmission lines.

5.5 Personnel accessing the transformer yard shall comply with the requirements shown on facility fences for personnel access.

- 5.6 The Transformer Yard is critical to shutdown risk assessment and must be maintained free of unnecessary vehicles and equipment.-

6.0 INSTRUCTIONS 6.1-Vehicular Access Control 6.1.1 All vehicular traffic in and out of the Transformer Yard must be approved by the Shift Manager and logged on Attachment 1.

6.1.2 The gates must be maintained locked except when opening or shutting the gates for egress to and from the Transformer Yard.

6.2 Material Storage 6.2.1 Storage of materials and equipment in the Transformer Yard must be g-Q reviewed by the Operations Manager and approved by the Directer, Unit.

Operations PRIOR to such storage occurring.

6.2.2 Following Operations Manager review and approval, material storage in the

. Transformer Yard shall be logged on Attachment 2.

7.0 ATTACHMENTS OM-17.4-1 Vehicle Traffic Control

.'1-OM-17.4-2 Material and Equipment Control

)

h w

~')

('

,-s

%)

%)

\\v' UNIT 1 TRANSFORMER YARD CONTROL LOG VEHICLE TRAFFIC CONTROL TIME GATE TIME GATE DATE TIME REQUESTOR REASON SM APPROVAL OPENED LOCKED CLOSED i

1-OM-17.4-1, Rev. O Page 1 of 1 l

-m

, - - ~,

_ 7 s._,

l I

'[

}

( j) '

\\w..)

' xd'

\\

UNIT 1 TRANSFORMER YARD CONTROL LOG MATERIAL AND EQUIPMENT CONTROL

DIRECTOR, DATE TIME REQUESTOR MATERIA 11 EQUIPMENT REASON OPS MANAGER UNIT OPS DATE

- TO BE STORED CONCURRENCE

. APPROVAL REMOVED l

l i

l i

l 1-OM-17.4-2. Rev. O ry t of t

.2.

.... - -.