      In Reply Refer To:                 SEP - 91907
In Reply Refer To:
      Dockets:   50-445/87-15                                             l
SEP - 91907
                  50-446/87-12
Dockets:
      TU Electric
50-445/87-15
      ATTN: Mr. William   G. Counsil
l
              Executive Vice President
50-446/87-12
      400 North Olive Street, Lock Box 81
TU Electric
      Dallas, Texas 75201
ATTN:
      Gentlemen:
Mr. William G. Counsil
      This refers to the inspection conducted by Mr. H. S. Phillips of
Executive Vice President
      the Comanche Peak Project Division during the period August 5
400 North Olive Street, Lock Box 81
      through September 2, 1987, of activities authorized by NRC
Dallas, Texas
      Construction Permits CPPR-126 and CPPR-127 for the Comanche Peak
75201
      Steam Electric Station, Units 1 and 2, and to the discussions of
Gentlemen:
      our findings with'you Mr. L. D. Nace, Vice President, Engineering
This refers to the inspection conducted by Mr. H. S. Phillips of
      and Construction, and other members of your staff during and at the
the Comanche Peak Project Division during the period August 5
      conclusion of the inspection.
through September 2,
      The enclosed copy of our inspection report identifies areas
1987, of activities authorized by NRC
      examined during the inspection. Within these areas, the inspection
Construction Permits CPPR-126 and CPPR-127 for the Comanche Peak
      consisted of selective examination of procedures and representative
Steam Electric Station, Units 1 and 2, and to the discussions of
      records, interviews with personnel, and observations by the
our findings with'you Mr. L. D. Nace, Vice President, Engineering
      inspector.
and Construction, and other members of your staff during and at the
      Within the scope of the inspection, no violations or deviations
conclusion of the inspection.
      were identified.
The enclosed copy of our inspection report identifies areas
      In accordance with 10 CFR 2.790 of the Commission's regulations, a
examined during the inspection.
      copy of this letter and the enclosed inspection report will be
Within these areas, the inspection
      placed in the NRC Public Document Room.
consisted of selective examination of procedures and representative
      Should you have any questions concerning this inspection, we will
records, interviews with personnel, and observations by the
      be pleased to discuss them with you.
inspector.
                                        Sincerely,
Within the scope of the inspection, no violations or deviations
                                          bRIGINAL SIGNED BY E. F. WUUCT
were identified.
                                        R. F. Warnick, Assistant Director
In accordance with 10 CFR 2.790 of the Commission's regulations, a
                                          for Inspection Programs
copy of this letter and the enclosed inspection report will be
                                        Comanche Peak Project Division
placed in the NRC Public Document Room.
                                        Office of Special Projects
Should you have any questions concerning this inspection, we will
      Enclosure:
be pleased to discuss them with you.
      Inspection Report
Sincerely,
        50-445/87-15; 50-446/87-12
bRIGINAL SIGNED BY E. F. WUUCT
      OSP:CPPD:IP: SRI       AD:IP repg)
R.
      SPhillipsT             RWarn.i.ck
F. Warnick, Assistant Director
      9/9/87   T-           9/ 9 /87
for Inspection Programs
    8709180132 870909
Comanche Peak Project Division
    PDR   ADOCK 05000445
Office of Special Projects
    G                 PDR
Enclosure:
Inspection Report
50-445/87-15; 50-446/87-12
OSP:CPPD:IP: SRI
AD:IP repg)
SPhillipsT
RWarn.i.ck
9/9/87
T-
9/ 9 /87
8709180132 870909
PDR
ADOCK 05000445
G
PDR


  _ _ _ _ _ _ _ - - _ _ - - -
_ _ _ _ _ _ _ - - _ _ - - -
            '
'
                                  ' un
' un
                                  '
'
p             ,
p
                                        'o                     UNITED STATES
'o
UNITED STATES
,
!
!
                                            o          NUCLEAR REGULATORY COMMl:MION
NUCLEAR REGULATORY COMMl:MION
                                            $                 WASHINGTON, D. C. 20655
o
                              ^*g       jf
$
                                .....                                   SEP - 9 ISET
WASHINGTON, D. C. 20655
                                    In Reply' Refer To:
^*g
                                    Dockets:   50-445/87-15
jf
.....
SEP - 9 ISET
In Reply' Refer To:
Dockets:
50-445/87-15
;
;
                                                50-446/87-12
50-446/87-12
                                    TU Electric
TU Electric
                                  -ATTN: Mr. William G. Counsil
-ATTN:
                                              Executive Vice President
Mr. William G. Counsil
                                    400 North-Olive Street, Lock Box 81
Executive Vice President
                                    Dallas, Texas 75201
400 North-Olive Street, Lock Box 81
                                                                                                            ;
Dallas, Texas
                                    Gentlemen:
75201
                                    This refers to the inspection conducted by Mr. H. S. Phillips of
;
                                    the Comanche Peak Project Division during the period August 5
Gentlemen:
                                    through September 2, 1987, of activities authorized by NRC
This refers to the inspection conducted by Mr. H. S. Phillips of
                                    Construction Permits CPPR-126 and CPPR-127 for the Comanche Peak
the Comanche Peak Project Division during the period August 5
                                    Steam Electric Station, Units 1 and 2, and to the discussions of
through September 2, 1987, of activities authorized by NRC
                                    our findings with Mr. L. D. Nace, Vice President, Engineering and
Construction Permits CPPR-126 and CPPR-127 for the Comanche Peak
                                    Construction, and other members of your staff during and at the
Steam Electric Station, Units 1 and 2, and to the discussions of
                                  . conclusion of the inspection.
our findings with Mr. L.
                                    The enclosed copy of our inspection report identifies areas
D. Nace, Vice President, Engineering and
                                    examined during the inspection. Within these areas, the inspection
Construction, and other members of your staff during and at the
                                    consisted of selective examination of procedures and representative
. conclusion of the inspection.
The enclosed copy of our inspection report identifies areas
examined during the inspection.
Within these areas, the inspection
consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the
<
<
                                    records, interviews with personnel, and observations by the
inspector.
                                    inspector.
Within the scope of the inspection, no violations or deviations
                                    Within the scope of the inspection, no violations or deviations
were identified.
                                    were identified.
In accordance with 10 CFR 2.790 of the Commission's regulations, a
                                    In accordance with 10 CFR 2.790 of the Commission's regulations, a
copy of this letter and the enclosed inspection report will be
                                    copy of this letter and the enclosed inspection report will be
placed in the NRC Public Document Room.
                                    placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will
                                    Should you have any questions concerning this inspection, we will
be pleased to discuss them with you.
                                    be pleased to discuss them with you.
Sincerely,
                                                                          Sincerely,
(?Fk)annisk
                                                                          (?Fk)annisk
.
.                                                                         R. F. Warnick, Assistant Director
R.
j                                                                             for Inspection Programs
F. Warnick, Assistant Director
j
for Inspection Programs
'
'
                                                                          Comanche Peak Project Division
Comanche Peak Project Division
                                                                          Office of Special Projects
Office of Special Projects
                                    Enclosure:
Enclosure:
                                    Inspection Report
Inspection Report
i                                     50-445/87-15; 50-446/87-12
i
50-445/87-15; 50-446/87-12


.
.
TU Electric                 2
TU Electric
                                                                    i
2
    cc w/ enclosure:                                               :
.
    TU Electric                       Bureau of Radiation Control
i
    ATTN: G. S. Keeley, Manager       State of Texas
cc w/ enclosure:
            Nuclear Licensing           1100 West 49th Street       l
:
    Skyway Tower                       Austin, Texas 78756       l
TU Electric
    400 North Olive Street, L.B. 81
Bureau of Radiation Control
    Dallas, Texas 75201               Nancy H. Williams
ATTN: G. S. Keeley, Manager
                                        CYGNA Energy Services       ;
State of Texas
                                                                    '
Nuclear Licensing
    Juanita Ellis                     Suite 390
1100 West 49th Street
    President - CASE                   2121 N. California Blvd
l
    1426 South Polk Street             Walnut Creek, CA 94596
Skyway Tower
    Dallas, Texas 75224
Austin, Texas
    Renea Hicks, Esq.
78756
    Assistant Attorney General
l
    Environmental Protection Division                             ,
400 North Olive Street, L.B.
    P.O. Box 12548, Capitol Station                               '
81
    Austin, Texas 78711-2548
Dallas, Texas
    Administrative Judge Peter Bloch                                 ,
75201
    U.S. Nuclear Regulatory Commission                               j
Nancy H. Williams
    Washington, D.C.   20555                                       i
CYGNA Energy Services
                                                                      !
;
    Elizabeth B. Johnson                                           l
Juanita Ellis
    Administrative Judge
Suite 390
    Oak Ridge National Laboratory
'
    Post Office Box X, Building 3500
President - CASE
    Oak Ridge, Tennessee 37830                                     '
2121 N. California Blvd
    Dr. Kenneth A. McCollom                                           j
1426 South Polk Street
    1107 West Knapp                                                   1
Walnut Creek, CA
    Stillwater, Oklahoma   74075                                   f
94596
    Dr. Walter H. Jordan
Dallas, Texas
    Administrative Judge
75224
    881 West Outer Drive
Renea Hicks, Esq.
    Oak Ridge, Tennessee   37830
Assistant Attorney General
                                                                      I
Environmental Protection Division
  . Anthony Z. Roisman, Esq.                                         ;
,
    Suite 600
P.O. Box 12548, Capitol Station
    1401 New York Avenue, N.W.                                         I
'
    Washington, D.C.   20005                                         '
Austin, Texas
    Ms. Billie Pirner Garde, Esq.
78711-2548
    Government Accountability Project                                 l
Administrative Judge Peter Bloch
    Midwest Office                                                   '
,
    104 East Wisconsin Avenue
U.S. Nuclear Regulatory Commission
    Appleton, Wisconsin   54911
j
                                                                      l
Washington, D.C.
                                                                      l
20555
i
Elizabeth B. Johnson
l
Administrative Judge
Oak Ridge National Laboratory
Post Office Box X, Building 3500
Oak Ridge, Tennessee
37830
'
Dr. Kenneth A. McCollom
j
1107 West Knapp
f
Stillwater, Oklahoma
74075
Dr. Walter H. Jordan
Administrative Judge
881 West Outer Drive
Oak Ridge, Tennessee
37830
. Anthony Z. Roisman, Esq.
Suite 600
1401 New York Avenue, N.W.
Washington, D.C.
20005
'
Ms. Billie Pirner Garde, Esq.
Government Accountability Project
Midwest Office
'
104 East Wisconsin Avenue
Appleton, Wisconsin
54911


    , _ - - _ _
, _ - - _ _
                -           .
-
                              .
.
  ,
.
l                                 DISTRIBU" ION:
,
l
DISTRIBU" ION:
i
i
,                               n Docket F;.les.(502445/446)TNRC:'PDR:
,
                                                  D
n Docket F;.les.(502445/446)TNRC:'PDR:
                                                    '~#' ' ""-
D
                                . Local ~ PDR"~'
'~#'
                                  CPPD Reading (HQ)
' ""-
                                  * Site Reading
. Local ~ PDR"~'
                                  *CPRT Group
CPPD Reading (HQ)
                                  * SRI-OPS
* Site Reading
                                  * SRI-CONST
*CPRT Group
                                  * MIS System
* SRI-OPS
  /.                             *RSTS Operator
* SRI-CONST
                                  RPB
* MIS System
                                  RIV File
/.
                                  *DWeiss, RM/ALF
*RSTS Operator
                                JKeppler/JAxelrad
RPB
                                CIGrimes
RIV File
                                PFMcKee
*DWeiss, RM/ALF
                                HSchierling
JKeppler/JAxelrad
                                JLyons
CIGrimes
                                LChandler, OGC
PFMcKee
                                CPPD-LA, OSP
HSchierling
                                *w/766
JLyons
                                                                      l
LChandler, OGC
                                                                      1
CPPD-LA, OSP
                                                                      l
*w/766
                                                                      4
l
                  _ _ _ - _ -       -                                 I
1
l
4
_ _ _ - _ -
-
I
}}
}}

Latest revision as of 07:07, 3 December 2024

Forwards Insp Repts 50-445/87-15 & 50-446/87-12 on 870805-0902.No Violations or Deviations Noted
ML20234A788
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/09/1987
From: Warnick R
NRC OFFICE OF SPECIAL PROJECTS
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20234A790 List:
References
NUDOCS 8709180132
Download: ML20234A788 (4)


See also: IR 05000445/1987015

Text

,

.

.

-4

In Reply Refer To:

SEP - 91907

Dockets:

50-445/87-15

l

50-446/87-12

TU Electric

ATTN:

Mr. William G. Counsil

Executive Vice President

400 North Olive Street, Lock Box 81

Dallas, Texas

75201

Gentlemen:

This refers to the inspection conducted by Mr. H. S. Phillips of

the Comanche Peak Project Division during the period August 5

through September 2,

1987, of activities authorized by NRC

Construction Permits CPPR-126 and CPPR-127 for the Comanche Peak

Steam Electric Station, Units 1 and 2, and to the discussions of

our findings with'you Mr. L. D. Nace, Vice President, Engineering

and Construction, and other members of your staff during and at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection.

Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the

inspector.

Within the scope of the inspection, no violations or deviations

were identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter and the enclosed inspection report will be

placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will

be pleased to discuss them with you.

Sincerely,

bRIGINAL SIGNED BY E. F. WUUCT

R.

F. Warnick, Assistant Director

for Inspection Programs

Comanche Peak Project Division

Office of Special Projects

Enclosure:

Inspection Report

50-445/87-15; 50-446/87-12

OSP:CPPD:IP: SRI

AD:IP repg)

SPhillipsT

RWarn.i.ck

9/9/87

T-

9/ 9 /87

8709180132 870909

PDR

ADOCK 05000445

G

PDR

_ _ _ _ _ _ _ - - _ _ - - -

'

' un

'

p

'o

UNITED STATES

,

!

NUCLEAR REGULATORY COMMl:MION

o

$

WASHINGTON, D. C. 20655

^*g

jf

.....

SEP - 9 ISET

In Reply' Refer To:

Dockets:

50-445/87-15

50-446/87-12

TU Electric

-ATTN:

Mr. William G. Counsil

Executive Vice President

400 North-Olive Street, Lock Box 81

Dallas, Texas

75201

Gentlemen:

This refers to the inspection conducted by Mr. H. S. Phillips of

the Comanche Peak Project Division during the period August 5

through September 2, 1987, of activities authorized by NRC

Construction Permits CPPR-126 and CPPR-127 for the Comanche Peak

Steam Electric Station, Units 1 and 2, and to the discussions of

our findings with Mr. L.

D. Nace, Vice President, Engineering and

Construction, and other members of your staff during and at the

. conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection.

Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the

<

inspector.

Within the scope of the inspection, no violations or deviations

were identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter and the enclosed inspection report will be

placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will

be pleased to discuss them with you.

Sincerely,

(?Fk)annisk

.

R.

F. Warnick, Assistant Director

j

for Inspection Programs

'

Comanche Peak Project Division

Office of Special Projects

Enclosure:

Inspection Report

i

50-445/87-15; 50-446/87-12

.

TU Electric

2

.

i

cc w/ enclosure:

TU Electric

Bureau of Radiation Control

ATTN: G. S. Keeley, Manager

State of Texas

Nuclear Licensing

1100 West 49th Street

l

Skyway Tower

Austin, Texas

78756

l

400 North Olive Street, L.B.

81

Dallas, Texas

75201

Nancy H. Williams

CYGNA Energy Services

Juanita Ellis

Suite 390

'

President - CASE

2121 N. California Blvd

1426 South Polk Street

Walnut Creek, CA

94596

Dallas, Texas

75224

Renea Hicks, Esq.

Assistant Attorney General

Environmental Protection Division

,

P.O. Box 12548, Capitol Station

'

Austin, Texas

78711-2548

Administrative Judge Peter Bloch

,

U.S. Nuclear Regulatory Commission

j

Washington, D.C.

20555

i

Elizabeth B. Johnson

l

Administrative Judge

Oak Ridge National Laboratory

Post Office Box X, Building 3500

Oak Ridge, Tennessee

37830

'

Dr. Kenneth A. McCollom

j

1107 West Knapp

f

Stillwater, Oklahoma

74075

Dr. Walter H. Jordan

Administrative Judge

881 West Outer Drive

Oak Ridge, Tennessee

37830

. Anthony Z. Roisman, Esq.

Suite 600

1401 New York Avenue, N.W.

Washington, D.C.

20005

'

Ms. Billie Pirner Garde, Esq.

Government Accountability Project

Midwest Office

'

104 East Wisconsin Avenue

Appleton, Wisconsin

54911

, _ - - _ _

-

.

.

,

l

DISTRIBU" ION:

i

,

n Docket F;.les.(502445/446)TNRC:'PDR:

D

'~#'

' ""-

. Local ~ PDR"~'

CPPD Reading (HQ)

  • Site Reading
  • CPRT Group
  • SRI-OPS
  • SRI-CONST
  • MIS System

/.

  • RSTS Operator

RPB

RIV File

  • DWeiss, RM/ALF

JKeppler/JAxelrad

CIGrimes

PFMcKee

HSchierling

JLyons

LChandler, OGC

CPPD-LA, OSP

  • w/766

l

1

l

4

_ _ _ - _ -

-

I