{{#Wiki_filter:October 30, 2020 | {{#Wiki_filter:October 30, 2020 | ||
==SUBJECT:== | |||
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - SECURITY BASELINE INSPECTION REPORT 05000400/2020403 | |||
==Dear Mr. Faulk:== | ==Dear Mr. Faulk:== | ||
| Line 30: | Line 31: | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
James C. Shehee, Chief Plant Support Branch Div of Reactor Safety Docket No. 05000400 License No. NPF-63 | |||
James C. Shehee, Chief Plant Support Branch Div of Reactor Safety | |||
Docket No. 05000400 License No. NPF-63 | |||
===Enclosure:=== | ===Enclosure:=== | ||
As stated, | As stated, | ||
==Inspection Report== | ==Inspection Report== | ||
Docket Number: 05000400 | Docket Number: | ||
05000400 | |||
Facility: Shearon Harris Nuclear Power Plant, Unit 1 Location: New Hill, NC Inspection Dates: May 18, 2020 - May 20, 2020 (Remote) | License Number: | ||
October 07, 2020 to October 08, 2020 (Onsite) | NPF-63 | ||
Inspectors: J. Justice, Physical Security Inspector Approved By: James C. Shehee, Chief Plant Support Branch Div of Reactor Safety | |||
Report Number: | |||
05000400/2020403 | |||
Enterprise Identifier: I-2020-403-0015 | |||
Licensee: | |||
Duke Energy Progress, LLC. | |||
Facility: | |||
Shearon Harris Nuclear Power Plant, Unit 1 | |||
Location: | |||
New Hill, NC | |||
Inspection Dates: | |||
May 18, 2020 - May 20, 2020 (Remote) | |||
October 07, 2020 to October 08, 2020 (Onsite) | |||
Inspectors: | |||
J. Justice, Physical Security Inspector | |||
Approved By: | |||
James C. Shehee, Chief | |||
Plant Support Branch | |||
Div of Reactor Safety | |||
=SUMMARY= | =SUMMARY= | ||
| Line 47: | Line 78: | ||
===List of Findings and Violations=== | ===List of Findings and Violations=== | ||
No findings or violations of more than minor significance were identified. | No findings or violations of more than minor significance were identified. | ||
| Line 62: | Line 92: | ||
==SAFEGUARDS== | ==SAFEGUARDS== | ||
==71130.02 - Access Control== | ==71130.02 - Access Control== | ||
The inspectors evaluated the access control program through completion of the following | |||
===inspection elements: | |||
Access Control=== | |||
===inspection elements: Access Control=== | |||
{{IP sample|IP=IP 71130.02|count=1}} | {{IP sample|IP=IP 71130.02|count=1}} | ||
(1) | |||
* Tier I: All Requirements | * Tier I: All Requirements | ||
* Tier II: 02.06 (b,c), 02.08(a,b,e,f,g,h) | * Tier II: 02.06 (b,c), 02.08(a,b,e,f,g,h) | ||
| Line 74: | Line 104: | ||
==OTHER ACTIVITIES - BASELINE== | ==OTHER ACTIVITIES - BASELINE== | ||
71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below: | 71151 - Performance Indicator Verification | ||
The inspectors verified licensee performance indicators submittals listed below: | |||
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample) | PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample) | ||
: (1) April 2019 through March | : (1) April 2019 through March | ||
| Line 87: | Line 120: | ||
=DOCUMENTS REVIEWED= | =DOCUMENTS REVIEWED= | ||
Inspection Type | Inspection | ||
Procedure | |||
71130.02 | Type | ||
Documents | Designation | ||
Miscellaneous | Description or Title | ||
Procedures | Revision or | ||
AD-SY-ALL-0210 Site Access Controls | Date | ||
AD-SY-ALL-0215 Security Search and Entry Processing | 71130.02 | ||
AD-SY-ALL-0240 Security Key and Lock Controls | Corrective Action | ||
OMM-002 | Documents | ||
SP-013 | 20934 | ||
Self-Assessments | |||
71151 | 2351933 | ||
Miscellaneous | |||
Various Key and Lock Control Records | |||
Procedures | |||
AD-SY-ALL-0100 | |||
Protection of Information Related to Nuclear Security | |||
AD-SY-ALL-0210 | |||
Site Access Controls | |||
AD-SY-ALL-0215 | |||
Security Search and Entry Processing | |||
AD-SY-ALL-0240 | |||
Security Key and Lock Controls | |||
OMM-002 | |||
Shift Turnover Package | |||
SP-013 | |||
Administrative/Support Key and Lock Control | |||
Self-Assessments | |||
Nuclear Oversight Performance Review | |||
2/06/2020 | |||
71151 | |||
Procedures | |||
AD-PI-ALL-0700 | |||
Performance Indicators | |||
4 | |||
}} | }} | ||
Latest revision as of 14:28, 29 November 2024
| ML20304A469 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 10/30/2020 |
| From: | James Shehee NRC/RGN-II |
| To: | Faulk L Duke Energy Progress |
| References | |
| IR 2020403 | |
| Download: ML20304A469 (8) | |
Text
October 30, 2020
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - SECURITY BASELINE INSPECTION REPORT 05000400/2020403
Dear Mr. Faulk:
On October 8, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Shearon Harris Nuclear Power Plant, Unit 1 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
James C. Shehee, Chief Plant Support Branch Div of Reactor Safety
Docket No. 05000400 License No. NPF-63
Enclosure:
As stated,
Inspection Report
Docket Number:
05000400
License Number:
Report Number:
Enterprise Identifier: I-2020-403-0015
Licensee:
Duke Energy Progress, LLC.
Facility:
Shearon Harris Nuclear Power Plant, Unit 1
Location:
New Hill, NC
Inspection Dates:
May 18, 2020 - May 20, 2020 (Remote)
October 07, 2020 to October 08, 2020 (Onsite)
Inspectors:
J. Justice, Physical Security Inspector
Approved By:
James C. Shehee, Chief
Plant Support Branch
Div of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Shearon Harris Nuclear Power Plant, Unit 1, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was completed through a combination of remote and onsite inspection.
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
===inspection elements:
Access Control===
(1)
- Tier I: All Requirements
- Tier II: 02.06 (b,c), 02.08(a,b,e,f,g,h)
- Tier III:
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)
- (1) April 2019 through March
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On October 8, 2020, the inspectors presented the security baseline inspection results to Linwood Faulk and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
20934
2351933
Miscellaneous
Various Key and Lock Control Records
Procedures
AD-SY-ALL-0100
Protection of Information Related to Nuclear Security
AD-SY-ALL-0210
Site Access Controls
AD-SY-ALL-0215
Security Search and Entry Processing
AD-SY-ALL-0240
Security Key and Lock Controls
OMM-002
Shift Turnover Package
Administrative/Support Key and Lock Control
Self-Assessments
Nuclear Oversight Performance Review
2/06/2020
71151
Procedures
AD-PI-ALL-0700
Performance Indicators
4