{{#Wiki_filter:October 30, 2020 Mr. Linwood Faulk Director, Nuclear Plant Security Duke Energy Progress, LLC.
{{#Wiki_filter:October 30, 2020


Shearon Harris Nuclear Plant, Unit 1 5413 Shearon Harris Road New Hill, NC 27562-9300 SUBJECT: SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - SECURITY BASELINE INSPECTION REPORT 05000400/2020403
==SUBJECT:==
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - SECURITY BASELINE INSPECTION REPORT 05000400/2020403


==Dear Mr. Faulk:==
==Dear Mr. Faulk:==
Line 30: Line 31:


Sincerely,
Sincerely,
/RA/
/RA/  
James C. Shehee, Chief Plant Support Branch Div of Reactor Safety Docket No. 05000400 License No. NPF-63
 
James C. Shehee, Chief Plant Support Branch Div of Reactor Safety  
 
Docket No. 05000400 License No. NPF-63  


===Enclosure:===
===Enclosure:===
As stated,
As stated,  


==Inspection Report==
==Inspection Report==
Docket Number: 05000400 License Number: NPF-63 Report Number: 05000400/2020403 Enterprise Identifier: I-2020-403-0015 Licensee: Duke Energy Progress, LLC.
Docket Number:
05000400  


Facility: Shearon Harris Nuclear Power Plant, Unit 1 Location: New Hill, NC Inspection Dates: May 18, 2020 - May 20, 2020 (Remote)
License Number:
October 07, 2020 to October 08, 2020 (Onsite)
NPF-63
Inspectors: J. Justice, Physical Security Inspector Approved By: James C. Shehee, Chief Plant Support Branch Div of Reactor Safety Enclosure
 
Report Number:
05000400/2020403
 
Enterprise Identifier: I-2020-403-0015
 
Licensee:
Duke Energy Progress, LLC.
 
Facility:
Shearon Harris Nuclear Power Plant, Unit 1  
 
Location:
New Hill, NC  
 
Inspection Dates:
May 18, 2020 - May 20, 2020 (Remote)  
 
October 07, 2020 to October 08, 2020 (Onsite)  
 
Inspectors:
J. Justice, Physical Security Inspector  
 
Approved By:
James C. Shehee, Chief
Plant Support Branch
Div of Reactor Safety  


=SUMMARY=
=SUMMARY=
Line 47: Line 78:


===List of Findings and Violations===
===List of Findings and Violations===
No findings or violations of more than minor significance were identified.
No findings or violations of more than minor significance were identified.


Line 62: Line 92:
==SAFEGUARDS==
==SAFEGUARDS==
==71130.02 - Access Control==
==71130.02 - Access Control==
The inspectors evaluated the access control program through completion of the following


The inspectors evaluated the access control program through completion of the following
===inspection elements:
 
Access Control===
===inspection elements: Access Control===
{{IP sample|IP=IP 71130.02|count=1}}
{{IP sample|IP=IP 71130.02|count=1}}


    (1)
(1)
* Tier I: All Requirements
* Tier I: All Requirements
* Tier II: 02.06 (b,c), 02.08(a,b,e,f,g,h)
* Tier II: 02.06 (b,c), 02.08(a,b,e,f,g,h)
Line 74: Line 104:


==OTHER ACTIVITIES - BASELINE==
==OTHER ACTIVITIES - BASELINE==
71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
71151 - Performance Indicator Verification  
 
The inspectors verified licensee performance indicators submittals listed below:  
 
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)
: (1) April 2019 through March
: (1) April 2019 through March
Line 87: Line 120:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type             Designation   Description or Title                                 Revision or
Inspection
Procedure                                                                                        Date
Procedure
71130.02   Corrective Action 2320934
Type
Documents         2351933
Designation
Miscellaneous                   Various Key and Lock Control Records
Description or Title
Procedures       AD-SY-ALL-0100 Protection of Information Related to Nuclear Security 6
Revision or
AD-SY-ALL-0210 Site Access Controls                                 6
Date
AD-SY-ALL-0215 Security Search and Entry Processing                 5
71130.02
AD-SY-ALL-0240 Security Key and Lock Controls                       1
Corrective Action
OMM-002       Shift Turnover Package                               69
Documents
SP-013         Administrative/Support Key and Lock Control           14
20934
Self-Assessments                 Nuclear Oversight Performance Review                 02/06/2020
 
71151     Procedures       AD-PI-ALL-0700 Performance Indicators                               4
2351933  
5
 
Miscellaneous
Various Key and Lock Control Records
Procedures
AD-SY-ALL-0100
Protection of Information Related to Nuclear Security
AD-SY-ALL-0210
Site Access Controls
AD-SY-ALL-0215
Security Search and Entry Processing
AD-SY-ALL-0240
Security Key and Lock Controls
OMM-002
Shift Turnover Package
SP-013
Administrative/Support Key and Lock Control
Self-Assessments
Nuclear Oversight Performance Review
2/06/2020
71151
Procedures
AD-PI-ALL-0700
Performance Indicators
4
}}
}}

Latest revision as of 14:28, 29 November 2024

Security Baseline Inspection Report 05000400/2020403
ML20304A469
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/30/2020
From: James Shehee
NRC/RGN-II
To: Faulk L
Duke Energy Progress
References
IR 2020403
Download: ML20304A469 (8)


Text

October 30, 2020

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - SECURITY BASELINE INSPECTION REPORT 05000400/2020403

Dear Mr. Faulk:

On October 8, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Shearon Harris Nuclear Power Plant, Unit 1 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

James C. Shehee, Chief Plant Support Branch Div of Reactor Safety

Docket No. 05000400 License No. NPF-63

Enclosure:

As stated,

Inspection Report

Docket Number:

05000400

License Number:

NPF-63

Report Number:

05000400/2020403

Enterprise Identifier: I-2020-403-0015

Licensee:

Duke Energy Progress, LLC.

Facility:

Shearon Harris Nuclear Power Plant, Unit 1

Location:

New Hill, NC

Inspection Dates:

May 18, 2020 - May 20, 2020 (Remote)

October 07, 2020 to October 08, 2020 (Onsite)

Inspectors:

J. Justice, Physical Security Inspector

Approved By:

James C. Shehee, Chief

Plant Support Branch

Div of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Shearon Harris Nuclear Power Plant, Unit 1, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was completed through a combination of remote and onsite inspection.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1)

  • Tier I: All Requirements
  • Tier II: 02.06 (b,c), 02.08(a,b,e,f,g,h)
  • Tier III:

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) April 2019 through March

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 8, 2020, the inspectors presented the security baseline inspection results to Linwood Faulk and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Corrective Action

Documents

20934

2351933

Miscellaneous

Various Key and Lock Control Records

Procedures

AD-SY-ALL-0100

Protection of Information Related to Nuclear Security

AD-SY-ALL-0210

Site Access Controls

AD-SY-ALL-0215

Security Search and Entry Processing

AD-SY-ALL-0240

Security Key and Lock Controls

OMM-002

Shift Turnover Package

SP-013

Administrative/Support Key and Lock Control

Self-Assessments

Nuclear Oversight Performance Review

2/06/2020

71151

Procedures

AD-PI-ALL-0700

Performance Indicators

4