#REDIRECT [[PY-CEI-NRR-0703, Submits Commitments Re Silicone Sealant to Facilitate Issuance of Ser,Per NRC 870811 Request.Util Will Place Test Specimens in Plant Area Environmentally Approx to ESF Ventilation Sys & Test Specimen to Determine Degradation]]
| number = ML20237H445
| issue date = 08/27/1987
| title = Submits Commitments Re Silicone Sealant to Facilitate Issuance of Ser,Per NRC 870811 Request.Util Will Place Test Specimens in Plant Area Environmentally Approx to ESF Ventilation Sys & Test Specimen to Determine Degradation
| author name = Edelman M
| author affiliation = CLEVELAND ELECTRIC ILLUMINATING CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
| docket = 05000440, 05000441
| license number =
| contact person =
| document report number = PY-CEI-NRR-0703, PY-CEI-NRR-703, NUDOCS 8709030272
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 3
}}
 
=Text=
{{#Wiki_filter:_            --      -          --        _
THE CLEVELAND ELECTRIC ILLUMIN ATING COMP ANY                                                              i P.O. sox 5000    -  CLEVELANo, OHIO 4410t - TELEPHONE (216) 622 9800 - ILLUMINATING OLoG - 55 PUsLICSOUARE  j d
Semng The Best Location in the Nation    1 MURRAY R. EDELMAN sa mcE PRESOfNT NuctAn August 27, 1987 PY-CEI/NRR-0703 L Document Control Desk U.S. Nuclear Regulatory Commission Washington, D. C.            20555 Perry Nuclear Power Plant Docket No. 50-440; 50-441 License Commitment 17, Silicone Sealant
 
==Dear Sir:==
 
By letter dated July 30, 1986 (PY-CEI/NRR-0505 L) the Cleveland Electric Illuminating Company (CSI) notified the NRC that it had completed its qualification testing on silicone sealants. This notification fulfilled License Commitment 17 of FSAR Appendix 1B.
On August 11, 1987 members of the NRC staff met with representatives of CEI and reviewed Perry's final report, which demonstrated that the sealants will perform their intended function under normal and accident conditions for the life of the plant.            In addition, the ESF ventilation systems were inspected to determine representative 1y s. tere the scalants had been used on the systems.
The NRC reviewers found the qualification report acceptable, and agreed that the scalants were qualified for the 40 year life of the plant. The NRC reviewers then requested that CEI commit to some additienal requirements before issuing an SER on this subject.
To f acilite te issuance of the staf f's SER on sealant, CEI commits to the following:
a)    CEI will place the test specimen's in the plant in an area environmentally approximate to the ESF ventilation systems.
During each refueling outage, CEI will leak test these test specimens to determine if any degradation of the silicone has occurred. Since these specimens have already been aged to 40 years, this testing will determine how long past the 40 year qualified life the sealant is goc' for, and to provide a means of recognizing degradation. Since the sealant is already qualified for 40 years, failure of these test specimens during any future testing will not invalidate the results of the qualification report.
870903027g g7oggy DR    ADOCK 05000440 PDR Q1l
                                                                                                              \ \ ()
 
l                                                                  .    .
t
!.                                                      Document Control Desk                                              August 27, ' 1987 PY-CEI/NRR-0703 L b)    CEI will perfora an engineering walkdown of the ESF ventilation systems during each refueling outage. This walkdown will consist'of a visual inspection of.a representative t; tion of exposed ductwork to check for indication of sealant degradation.
c)    .Se results of a) and b) above, will be briefly summarized and reported to the NRC in the Annual Report (Technical Specification 6.9.1.4).
CEI appreciates the NRC's assistance in resolving this issue. If you have any questions, please feel free to call me.
Very truly .aur ,
                                                                                                      &          J Murray R. Edelman Senior Vice President Nuclear Group MRE:nJc cc:        T. Colburn K. Connaughton jgj "?t  'a '-/ 9 Of1