| title = Responds to 970811 Ltr Addressed to Chairman Jackson Re Concerns of Radiological Control Violations at Plant,As Addressed in CAL 1-97-07,dtd 970304 & Insp Repts 50-213/96-12,50-213/97-01 & 50-213/97-02
| title = Responds to Addressed to Chairman Jackson Re Concerns of Radiological Control Violations at Plant,As Addressed in CAL 1-97-07,dtd 970304 & Insp Repts 50-213/96-12,50-213/97-01 & 50-213/97-02
| author name = Collins S
| author name = Collins S
| author affiliation = NRC (Affiliation Not Assigned)
| author affiliation = NRC (Affiliation Not Assigned)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = 50-213-96-12, 50-213-97-01, 50-213-97-02, 50-213-97-1, 50-213-97-2, CAL-1-97-07, CAL-1-97-7, NUDOCS 9711040205
| document report number = 50-213-96-12, 50-213-97-01, 50-213-97-02, 50-213-97-1, 50-213-97-2, CAL-1-97-07, CAL-1-97-7, NUDOCS 9711040205
| title reference date = 08-11-1997
| package number = ML20212F188
| package number = ML20212F188
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
Line 18: Line 19:


=Text=
=Text=
{{#Wiki_filter:-             --             ~   ~
{{#Wiki_filter:a
    a
-
        g ea *80g
--
  *
~
      g*                                             UNITED STATES
~
                      j             NUCLEAR REGULATORY COMMISSION
ea *80g
                                                WASHINGTON, o.C. soteHopt                                           i
g
      ".
UNITED STATES
          ,,,,,*                                   October 23, 1997
*
                                                                                                                    1
g*
            Mr. Douglas G. Farber
j
            Citizens Awarenens Network
NUCLEAR REGULATORY COMMISSION
            54 Old Tumpike Road
i
            Haddam, Connecticut 06438
".
            Dear Mr. Farber.
WASHINGTON, o.C. soteHopt
            Your letter of August 11,1997, addressed to Chairman Jacksnn, has been referred to me for a
October 23, 1997
          reply. Your letter voices concems about severalissues.
, , , , , *
          Your first concem is that the Nuclear Regulatory Commission (NRC)is unwilling to penalize the
1
          Connecticut Yankee Atomic Power Company (CYAPCo) for radiation control violations. We
Mr. Douglas G. Farber
          disagree with your statement; in fact, the NRC has taken very strong regulatory action issuing a
Citizens Awarenens Network
          Confirmatory Action Letter (CAL No. 197 007) dated March 4,1997, to the licensee as a result
54 Old Tumpike Road
          of NRC identified radiological work control violations. The violations prompting the CAL were
Haddam, Connecticut 06438
          principally associated with a November 2,1996, rt actor cavity airbome radioactivity event and
Dear Mr. Farber.
          events concoming control and monitoring of radioactive materials identified in February 1997.
Your letter of August 11,1997, addressed to Chairman Jacksnn, has been referred to me for a
          (Reference NRC inspection Report Nos. 50 213/9612,97 01, and 97 02.) The CAL effective!v
reply. Your letter voices concems about severalissues.
          restrains the licensee from performing any significant radiological work, including
Your first concem is that the Nuclear Regulatory Commission (NRC)is unwilling to penalize the
          decommissioning activities, until radiological control program improvement is realized and
Connecticut Yankee Atomic Power Company (CYAPCo) for radiation control violations. We
          venfied by the NRC. In addition, the NRC issued a Notice of Violation to the licensee on
disagree with your statement; in fact, the NRC has taken very strong regulatory action issuing a
          August 12,1997, as a result of radiological controls violations idantified during inspections             ,
Confirmatory Action Letter (CAL No. 197 007) dated March 4,1997, to the licensee as a result
          conducted in June and July 1997 (Ref. NRC Inspection Report No. 50-213/97 06.)
of NRC identified radiological work control violations. The violations prompting the CAL were
          NRC is aware of assertionu by the Connecticut Public Utikties Commission (CPUC) involving
principally associated with a November 2,1996, rt actor cavity airbome radioactivity event and
          radioactive soil contamination and potential environmentalimpact from previous radioactive spills
events concoming control and monitoring of radioactive materials identified in February 1997.
          and events at Haddam Neck (HN). In response, NRC has expanded its ongoing inspections to
(Reference NRC inspection Report Nos. 50 213/9612,97 01, and 97 02.) The CAL effective!v
          include a comprehensive reevaluation of Connecticut Yankee's historical record to determine               i
restrains the licensee from performing any significant radiological work, including
                                                                                                                      '
decommissioning activities, until radiological control program improvement is realized and
          what effect, if any. Connecticut Yankee's actions may have had on public health and safety. The
venfied by the NRC. In addition, the NRC issued a Notice of Violation to the licensee on
          reevaluation includes independent radiological surveys and sample analysis by both NRC and
August 12,1997, as a result of radiological controls violations idantified during inspections
          Connecticut Department of Environmental Protection Personnel. Although NRC's review to date
,
          indicates there is no health and safety concem to the public or licensee employees, our
conducted in June and July 1997 (Ref. NRC Inspection Report No. 50-213/97 06.)
          evaluation is continuing.
NRC is aware of assertionu by the Connecticut Public Utikties Commission (CPUC) involving
          Due to issues identified in the CAL, and information from the ongoing inspection efforts, NRC is           ,
radioactive soil contamination and potential environmentalimpact from previous radioactive spills
                                                                                                                      '
and events at Haddam Neck (HN). In response, NRC has expanded its ongoing inspections to
          currently considering additional enforcement action in regard to the radiation control program at
include a comprehensive reevaluation of Connecticut Yankee's historical record to determine
          the Haddam Neck plant, in addition to the CAL on radiation control violations, on May 12,1997,             !
i
          the NRC proposed a $650,000 civil penalty against CYAPCo (F.A 96-001 et al.) for other
'
          violations found during inspections conducted by he NRC between November 21,1995, and                 g ;
what effect, if any. Connecticut Yankee's actions may have had on public health and safety. The
          November 22,1996; the licensee paid the civil penalty on June 11,1997.                               y\
reevaluation includes independent radiological surveys and sample analysis by both NRC and
                                                                                                              t
Connecticut Department of Environmental Protection Personnel. Although NRC's review to date
                                                    b       ,
indicates there is no health and safety concem to the public or licensee employees, our
                                                                                                            I
evaluation is continuing.
    H
Due to issues identified in the CAL, and information from the ongoing inspection efforts, NRC is
                      hMh13 pm                                         ,
,
                                                                          ,
'
                                                                                                                      <
currently considering additional enforcement action in regard to the radiation control program at
                                                                                                                      i
the Haddam Neck plant, in addition to the CAL on radiation control violations, on May 12,1997,
l                                                                    ,
the NRC proposed a $650,000 civil penalty against CYAPCo (F.A 96-001 et al.) for other
                                                                                                                    a
violations found during inspections conducted by he NRC between November 21,1995, and
g
;
November 22,1996; the licensee paid the civil penalty on June 11,1997.
y\\
t
b
I
,
hMh13
<
i
H
pm
,
,
l
,
a


    ,._._ _
,._._ _
        -                  _.     _     _       _ _ _         _ _ . .   _   __           ___           _     .
_.
_
_
_ _ _
_ _ . .
_
__
___
_
.
-
.
.
.
.
  .
Mr. Douglas Fart >er
  .
2
            Mr. Douglas Fart >er                             2
Because your second concem involves a rate caso presently before the Federal Energy
            Because your second concem involves a rate caso presently before the Federal Energy
Regulatory Commission (FERC), the NRC will not comment at this time on the specific issues in
            Regulatory Commission (FERC), the NRC will not comment at this time on the specific issues in
this haaring. However, the NRC continues to believe that 10 CFR 50.75 prescribes acceptable
            this haaring. However, the NRC continues to believe that 10 CFR 50.75 prescribes acceptable
methods to assure and to maintain reasonable assurance for decommissioning funding. Prior to
            methods to assure and to maintain reasonable assurance for decommissioning funding. Prior to
permanent cessation of operations, CYAPCo had provided reasonable assurance that funds
            permanent cessation of operations, CYAPCo had provided reasonable assurance that funds
would be available for decommissioning. The information provided in the Post Shutdown
            would be available for decommissioning. The information provided in the Post Shutdown
Decommissioning Activities Report (PSDAR), submitted on August 22,19g7, Indicates that the
            Decommissioning Activities Report (PSDAR), submitted on August 22,19g7, Indicates that the
licensee has ample funds to commence decommissioning activities and to place the facility in a
            licensee has ample funds to commence decommissioning activities and to place the facility in a
SAFSTOR condition should a concem arise that decommissioning funding may become
            SAFSTOR condition should a concem arise that decommissioning funding may become
inadequate. We are aware that issues brought forth in the FERC case currently in progress may
            inadequate. We are aware that issues brought forth in the FERC case currently in progress may
affect the level of financial assurance that CYAPCo can provide in the future. Upon resolution of
            affect the level of financial assurance that CYAPCo can provide in the future. Upon resolution of
the rate case before FERC and after submittel of the site specific decommissioning cost
            the rate case before FERC and after submittel of the site specific decommissioning cost
estimate, which is expected by December 5,1998, the NRC will reassess the adequacy of
            estimate, which is expected by December 5,1998, the NRC will reassess the adequacy of
decommissioning funding for HN. The NRC is holding a public meeting at 6:30 p.m. O,,
            decommissioning funding for HN. The NRC is holding a public meeting at 6:30 p.m. O,,
October 27,1997, in the Haddam Killingsworth High School, Higganum, CT to solicit public
            October 27,1997, in the Haddam Killingsworth High School, Higganum, CT to solicit public
comments on the decommissioning of HN.
            comments on the decommissioning of HN.
Your third concem deals with a presumed insufficiency in our regulations regarding
            Your third concem deals with a presumed insufficiency in our regulations regarding
decommissioning costs. In CAN's judgment, the cost of site remediation and environmental
            decommissioning costs. In CAN's judgment, the cost of site remediation and environmental
impacts at HN were underestimated and NRC employee Richard Conte's remarks at the July 30,
            impacts at HN were underestimated and NRC employee Richard Conte's remarks at the July 30,
1997, Community Decommissioning Advisory Committee (CDAC) meeting would indicate that
            1997, Community Decommissioning Advisory Committee (CDAC) meeting would indicate that
such underestimation is happening at all U.S. nuclear plants. However, examination of the
            such underestimation is happening at all U.S. nuclear plants. However, examination of the
formulas in 10 CFR 50.75(c) indicate that escalation factors are provided for labor, energy, and
          formulas in 10 CFR 50.75(c) indicate that escalation factors are provided for labor, energy, and
burial costs.
          burial costs.
As part of our assessment of the decommissioning cost estimates, the FERC case's resolution,
          As part of our assessment of the decommissioning cost estimates, the FERC case's resolution,
and public comments, as discussed above, the NRC will use the appropriate formula and <W ilo
          and public comments, as discussed above, the NRC will use the appropriate formula and <W ilo
determine compliance with the regulation. This assessment will determine if the overall cost
          determine compliance with the regulation. This assessment will determine if the overall cost
estimate is within the bounds of the regulation. Also, Mr. Conte's comments at the CDAC were
          estimate is within the bounds of the regulation. Also, Mr. Conte's comments at the CDAC were
made in the context of a general statement that it is not totally unexpected to find some soil
          made in the context of a general statement that it is not totally unexpected to find some soil
contamination at a nuclear power plant site, especially at those with outdoor storage tanks that
          contamination at a nuclear power plant site, especially at those with outdoor storage tanks that
hold radioactive fluids. He did not impty, nor did he intend to imply, that the extent of
          hold radioactive fluids. He did not impty, nor did he intend to imply, that the extent of
contamination and the scope of work for remediation was fully known. Detailed site
          contamination and the scope of work for remediation was fully known. Detailed site
characterization is being conducted by the licensee and will be subject to NRC inspection. This
          characterization is being conducted by the licensee and will be subject to NRC inspection. This
information should allow a more precise determination of the scope and extent of contamination
          information should allow a more precise determination of the scope and extent of contamination
levels. In this regard, an NRC staff member, specializing in site cleanup, remediation, and costs,
          levels. In this regard, an NRC staff member, specializing in site cleanup, remediation, and costs,
will attend the October 27 meeting and will be able to provide more information in these areas.
          will attend the October 27 meeting and will be able to provide more information in these areas.
Finally, a rut amendment to NRC regulations,10 CFR 20.1401, Subpart E, addresses
          Finally, a rut amendment to NRC regulations,10 CFR 20.1401, Subpart E, addresses
residual radioactivity after decommissioning and provides for protection to the public, plant
          residual radioactivity after decommissioning and provides for protection to the public, plant
workers, and the environment. This regulation was formulated with extensive public
          workers, and the environment. This regulation was formulated with extensive public
involvement, and was coordinated with other Federal agencies. It provides this protection in a
          involvement, and was coordinated with other Federal agencies. It provides this protection in a
cost effective manner. I have enclosed an NRC press release, dated May 21,1997, that
          cost effective manner. I have enclosed an NRC press release, dated May 21,1997, that
contairm more information about this recently approved regulation.
          contairm more information about this recently approved regulation.
,
                                                                                                          ,
, ,
                              ,                             -
,
                                                                                                      ,       ,---m -- , - , ,
,
-
,
,---m
-- , - , ,


  ~
~
.
.
    Mr. Douglas Farber                               3-                     October 23, 1997
Mr. Douglas Farber
    Should you have any further questions, please contact Mr. Morton Fairtile of my staff at
3-
    (301)415 1442.
October 23, 1997
                                                  Sincerely,
Should you have any further questions, please contact Mr. Morton Fairtile of my staff at
                                                    @sWhy
(301)415 1442.
                                                    BamuelJ.Comns
Sincerely,
                                                  Samuel J. Collins, Director
@sWhy
                                                  Office of Nuclear Reactor Regulation
BamuelJ.Comns
    Docket No. 50 213
Samuel J. Collins, Director
    Enclosure: As stated
Office of Nuclear Reactor Regulation
    cc w/ enclosure: See next page
Docket No. 50 213
    plSTRIBUTION:
Enclosure: As stated
    iContral File (w/ original incoming) , SCollins/FMiraglia           OPA
cc w/ enclosure: See next page
    PUBLIC (w/ incoming)                 RZimmerman                   OCA
plSTRIBUTION:
    EDO# GT97609                         BSheron                       SECY (GT#970844)
iContral File (w/ original incoming) ,
    SCallan                               WTravers                     MClark (GT#970609)
SCollins/FMiraglia
    AThadani                             PDND r/f (w/ incoming)       EHylton (w/ incoming)
OPA
    HThompson                             JRoe                         Region l
PUBLIC (w/ incoming)
    PNorry                               DMatthews                     MBoyle (MLB4) E mail only
RZimmerman
    JBlaha                               SWeiss                       LThonus
OCA
    SBurns                               SBajwa                       ASLBP
EDO# GT97609
    JLieberman                           MFairtile(w/ incoming)       JHickey
BSheron
    HMiller, RI                           OGC                           AMarkley
SECY (GT#970844)
    PHarris                               RDudley                       TFredrichs
SCallan
    MMasnik                               JMinns                       MWebb
WTravers
    KBohrer (012-G18)                     MClark                       Econner (ELC) E-Matt
MClark (GT#970609)
    EDO r/f                               NRR Mall Room (EDO#GT97609 w/ incoming)
AThadani
    *SEE PREVIOUS CONCURRENCE
PDND r/f (w/ incoming)
    PDND:PM                 PDND:LA,'v           PDND:(A)SC           TECH ED.*     OGC*
EHylton (w/ incoming)
    MFairtile               EHylton/f,p         MMasnik               RSanders       MRafky
HThompson
    9/)W97                  9/3097  E           9p7                   9/11/97       9/16/97
JRoe
    PDND.DA                       (A)D                   R             -
Region l
                                                                                        OC
PNorry
    SWeiss   P             -JR                   S ollins '                           SJackson
DMatthews
    _9/JV97
MBoyle (MLB4) E mail only
              #
JBlaha
                            4/g 7               10/     f                   7       9/ /97     -
SWeiss
    OFFICIAL RECORD COPY
LThonus
    DOCUMENT NAME: G:\SECY\ACTN_lTM\G1609
SBurns
                                                            d\I
SBajwa
ASLBP
JLieberman
MFairtile(w/ incoming)
JHickey
HMiller, RI
OGC
AMarkley
PHarris
RDudley
TFredrichs
MMasnik
JMinns
MWebb
KBohrer (012-G18)
MClark
Econner (ELC) E-Matt
EDO r/f
NRR Mall Room (EDO#GT97609 w/ incoming)
*SEE PREVIOUS CONCURRENCE
PDND:PM
PDND:LA,'v
PDND:(A)SC
TECH ED.*
OGC*
MFairtile
EHylton/f,p
MMasnik
RSanders
MRafky
9/ 097
E
9p7
9/11/97
9/16/97
9/)W97
3
PDND.DA
(A)D
R
-
OC
SWeiss P
-JR
S ollins '
SJackson
#
_9/JV97
4/g 7
10/
f
7
9/ /97
-
d\\I
OFFICIAL RECORD COPY
DOCUMENT NAME: G:\\SECY\\ACTN_lTM\\G1609


        -
,
            . . - - - _ . . .     ~           . . - - . - . -. . - . . - - -             _                                                    - - . . .
-
      ,
. . - - - _ .
. .
~
. . - - . - . -. . - . . - - -
- - .
. .
_
.
.
.
                                                                                                                                                            .
.
  .
.
                                                                                                                                                            .
.
  .
Mr. Douglas Farber
                                                                        3-                                                                                   ;
3-
          Mr. Douglas Farber                                                                                                                                ;
;
          Should you have any further questions, please contact Mr. Morton Fairtile of my staff at
;
          (301)415 1442.
Should you have any further questions, please contact Mr. Morton Fairtile of my staff at
                                                                                                                                                            t
(301)415 1442.
                                                                                                                                                            '
t
                                                                  Sincerely,
Sincerely,
                                                                                                                                                            i
'
                                                                      amuel J. Chilins, Director
i
                                                                  Office of Nuclear Reactor Regulation                                                       ;
amuel J. Chilins, Director
                                                                                                                                                            ,
Office of Nuclear Reactor Regulation
          Docket No 50 213
;
                                                                                                                                                            I
,
          Enclosure: As stated
Docket No 50 213
          cc w/ enclosure:- See next page                                                                                                                   ,
I
                                                                                                                                                            .
Enclosure: As stated
                                                                                                                                    .
cc w/ enclosure:- See next page
                                                                                                                                                            A
,
    . -             . . .
.
                          -
.
                              ,_ .   - - . _ , . . - , , , - _ _ . -                           . _ . , _ , _ _ _ . _ , _ _ _ . _ . _ . _ _ . _ -
A
. -
. . .
,_ .
- - .
_ , . . - , , , - _ _ . -
. _ . , _ , _ _ _ . _ , _ _ _ . _ . _ . _ _ . _ -
-


          .- - -                . - ---       . . .         -,                -
,-
    ,-                 _  -
.- - -
_
-
. - ---
.
.
  o
. .
  '
-,
          Connecticut Yankee Atomic Power Co.       Haddam Neck Plant                             ,
-
                                                                                                    '
.
                                                    Docket No. 50 213
o
                                                                                                    r
'
                                                                                                    I
Connecticut Yankee Atomic Power Co.
                                                                                                  ;
Haddam Neck Plant
          CC:
,'
                                                    Resident inspector                           :
Docket No. 50 213
          Lillian M. Cuoco, Esq.                     Haddam Neck Plant                   _
r
                                                                                                    ,
I
          Senior Nuclear Counsel                     clo U.S. Nuclear Regulatory Commission       i
CC:
          Northeast Utilities Service Company       362 injun Hollow Road                         l'
;
          P. O. Box 270                             East Hampton, CT 06424 3099
Resident inspector
          Hartford, CT 06141 0270-
:
                                                    Mr. James S. Robinson
Lillian M. Cuoco, Esq.
          Mr. Kevin T. A. McCarthy, Director         Manager, Nuclear Investments and               i
Haddam Neck Plant
          Monitoring and Radiation Division           Administration
_
          Department of Environmsntal               Now England Power Company
i
          Protection                                 25 Research Drive
,
        - 79 Elm Street                             Westborough, MA 01582
Senior Nuclear Counsel
          Hartford, CT 00106 5127
clo U.S. Nuclear Regulatory Commission
                                                    Mr. G. P. van Noordonnen
Northeast Utilities Service Company
        - Mr. Allan Johanson                       Manager - Nuclear Licensing
362 injun Hollow Road
          Assistant Director                         Northeast Utilities Service Company
l
          Office of Policy and Management           362 Injun Hollow Road
P. O. Box 270
          Policy Development and Planning           East Hampton, CT 06424 3099                   +
East Hampton, CT 06424 3099
          Division
'
          450 Capit-l Avenue MS#52ENR               Regional Administrator                       ,
Hartford, CT 06141 0270-
          P. O. Box 341441                           r;egion i                                     4
Mr. James S. Robinson
          Hartford, CT 06134 1441                   U.S. Nucles- Regulatory Commission
Mr. Kevin T. A. McCarthy, Director
                                                    475 Allendale Road
Manager, Nuclear Investments and
          Mr. F. C. Rothen                           King of Prussia, PA 19406
i
          Vice President Work Services
Monitoring and Radiation Division
          Northeast Utilities Service Company       Board of Selectmen
Administration
          P. O. Box 128                             Town Office Building
Department of Environmsntal
          Waterford, CT 06385                       Haddam, CT 06438
Now England Power Company
          Mr. D. M. Goebel
Protection
          Vice President - Nuclear Oversight
25 Research Drive
          Northeast Utilities Service Company
- 79 Elm Street
          P. O. Box 128
Westborough, MA 01582
          Waterford, CT 06385
Hartford, CT 00106 5127
                                                                                                  i
Mr. G. P. van Noordonnen
          Mr. J. K. Thayer
- Mr. Allan Johanson
          Recovery Officer Nuclear Engineering
Manager - Nuclear Licensing
            and Support                                                                           '
Assistant Director
          Northeast Utilities Service Company
Northeast Utilities Service Company
          P. O. Box 128 '
Office of Policy and Management
        Waterford, CT 06385
362 Injun Hollow Road
                                                                                                  ,
Policy Development and Planning
                                                                                                  e
East Hampton, CT 06424 3099
      a                 n an,                           ,- m- en-e=~m e-ws,   e-w-~ -   v , tr
+
Division
450 Capit-l Avenue MS#52ENR
Regional Administrator
,
P. O. Box 341441
r;egion i
4
Hartford, CT 06134 1441
U.S. Nucles- Regulatory Commission
475 Allendale Road
Mr. F. C. Rothen
King of Prussia, PA 19406
Vice President Work Services
Northeast Utilities Service Company
Board of Selectmen
P. O. Box 128
Town Office Building
Waterford, CT 06385
Haddam, CT 06438
Mr. D. M. Goebel
Vice President - Nuclear Oversight
Northeast Utilities Service Company
P. O. Box 128
Waterford, CT 06385
i
Mr. J. K. Thayer
Recovery Officer Nuclear Engineering
and Support
'
Northeast Utilities Service Company
P. O. Box 128 '
Waterford, CT 06385
,
e
a
n
an,
,-
m-
en-e=~m
e-ws,
e-w-~
-
v
, tr


              -~       - --     ~ - . .           -         _ _ . - .                 . _     - .             - - _ . _ -               .-__.- --               - -
,
      ,
-~
, fWtp1/www.mc gov /OPAlgmo'ntr.rcvi97 08).htm                                                           httpAwww.nre gov OPA:'gmo'nrarevS7 083.htm
- --
i                       . _ _                 ._     _                     ._                     .
~ - . .
                                                                                                                    _ _ . _ _ _ . _ _                         -._
-
          f._
_ _ . - .
                                            Nuclear Regulatory Commission
. _
                                                          Office of Public Affairs
- .
                                                                                                                                                                                l
- - _ . _ -
                                                          Washington DC 20555
.-__.- --
          l                                                                                                                                                                    t
- -
          t
, fWtp1/www.mc gov /OPAlgmo'ntr.rcvi97 08).htm
                                            Telephone: 301/415-8200 - E mail: opaWnre. gov
httpAwww.nre gov OPA:'gmo'nrarevS7 083.htm
          '
i
                                                                                                                                                                                l
. _ _
                                                                                                                                        -.          . . . . .
._
                                                  .      .-           - - - - .           . _ - . .       .-             .
_
                . - . .
._
          No. 97-083
.
          May 21,1997
_ _ . _ _ _ . _ _
                                NRC APPROVES MAXIMUM PERMISSil3LE RADIATION LEVELS
-._
                                                      FOR LICENSE TERMINATION
f._
                                                                                                                                                                                I
Nuclear Regulatory Commission
          The Nuclear Repulatory Commission has approved an amendment to its regulations to establish
Office of Public Affairs
          maximum permissible radiation levels when a nuclear facility permanently shuts down, is released foi
l
          other uses, and the license is tenninated.                                                                                                                           ;
Washington DC 20555
                                                                                                                                                                                ;
t
        -The new rules will require licensees of pennanently shutdown facilities to reduce remaining
t
          radioactivity to sumciently low levels to pennit the license to be terminated safely. Release of the
Telephone: 301/415-8200 - E mail: opaWnre. gov
          property may be either:
'
          Unrestricted, in which case it could be used for any purpose, or
. - . .
          Restricted, so that it could not be used for certain purposes, such as residential housing.
.
        The Commission believes that the new standards are consistent with specific recommendations of both
.-
        national and international bodies tasked with the development of guidance for radistion protection; are
-
        appropriately based on risk, cost benefit, and socio economic standards; provide the needed flexibility to
-
        accommodate site specific conditions; and are sufficiently conservative to ensure protection of public
- - .
        health and safety and the environment.
. _ - . .
        Unrestricted Release
.-
        Under the new regulations, a site may be released for unrestricted use if the radiation dose from
.
        contamination remaining on the property wni be as far below 25 millirems per year as is reasonably
-.
        achievable. (Twenty five millirems may be compared to a dose of about 5 millirems of background
. . . . .
        radiation from one round trip cross-country airline ilight: 50 millirems average per year from medical
No. 97-083
        examinations; and 300 millirems per year average in the United States from natural background
May 21,1997
        radiation.)
NRC APPROVES MAXIMUM PERMISSil3LE RADIATION LEVELS
        Restricted Release
FOR LICENSE TERMINATION
        The new regulations permit release of a site for restricted use provided that the dose from contamination
I
        remaining on site is as low as is reasonably achievable and that legally enforceable institutional controls                                                           1
The Nuclear Repulatory Commission has approved an amendment to its regulations to establish
        (such as deed restrictions) will ensure that the dose does not exceed 25 millirems per year.
maximum permissible radiation levels when a nuclear facility permanently shuts down, is released foi
                                                                                                                                                                                ,
other uses, and the license is tenninated.
        in addition, if a site is released for restricted use, the licensee must provide financial arrangements to
;
        allow an independent third party to assume and carry out responsibilities for any necessary control and
-The new rules will require licensees of pennanently shutdown facilities to reduce remaining
        maintenance of the site.
;
        Further, a licensee that intends to decommission by restricting use of the site must seek advice- from
radioactivity to sumciently low levels to pennit the license to be terminated safely. Release of the
        individuals and institutions in the community who may be affected by the decommissioning--on whether
property may be either:
iof3                                                                                                                    M SURE                            n8'20'9711:245
Unrestricted, in which case it could be used for any purpose, or
                _ _          -
Restricted, so that it could not be used for certain purposes, such as residential housing.
                                          _                                  - _ _ _ .                   ~             _         -               _               - _ . _ .
The Commission believes that the new standards are consistent with specific recommendations of both
national and international bodies tasked with the development of guidance for radistion protection; are
appropriately based on risk, cost benefit, and socio economic standards; provide the needed flexibility to
accommodate site specific conditions; and are sufficiently conservative to ensure protection of public
health and safety and the environment.
Unrestricted Release
Under the new regulations, a site may be released for unrestricted use if the radiation dose from
contamination remaining on the property wni be as far below 25 millirems per year as is reasonably
achievable. (Twenty five millirems may be compared to a dose of about 5 millirems of background
radiation from one round trip cross-country airline ilight: 50 millirems average per year from medical
examinations; and 300 millirems per year average in the United States from natural background
radiation.)
Restricted Release
The new regulations permit release of a site for restricted use provided that the dose from contamination
remaining on site is as low as is reasonably achievable and that legally enforceable institutional controls
1
(such as deed restrictions) will ensure that the dose does not exceed 25 millirems per year.
,
in addition, if a site is released for restricted use, the licensee must provide financial arrangements to
allow an independent third party to assume and carry out responsibilities for any necessary control and
maintenance of the site.
Further, a licensee that intends to decommission by restricting use of the site must seek advice- from
individuals and institutions in the community who may be affected by the decommissioning--on whether
n8'20'9711:245
iof3
M SURE
-
- . -
-
.
~
_
-
_
-
.
.


                                        _   -    _ _ -    .         _   __
_ _ . _ . _ . _ _ _
                                                                                    _ _ . _ . _ . _ _ _
__ _
                                                                                      _                                  __ _         _
_
        ,
,
_
-
_ _ -
.
_
__
_
*
*
  . hap //ww w.ntc. guWOPAlgmo'nrarev/97-083.htm                                                 hupWwww nre gowOPAlgmo'nrcrcwn08).htn
. hap //ww w.ntc. guWOPAlgmo'nrarev/97-083.htm
                                                                                                                                        '
hupWwww nre gowOPAlgmo'nrcrcwn08).htn
  e            individuals and institutions in the community who may be affected by the decommissioning -on whcther
'
                the provisions for institutional controls proposed by the licensee (1) will provide reasonable assurance                 !
individuals and institutions in the community who may be affected by the decommissioning -on whcther
                that the radiation dose from co. taminat on remaining on site will not exceed 25 millirems per year,(2)
e
                will be enforceable, and (3) will not impose undue burdens on the local community or other affected
the provisions for institutional controls proposed by the licensee (1) will provide reasonable assurance
                parties,
!
                in obtaining this advice, the licensee must provide for participation by a broad cross section of
that the radiation dose from co. taminat on remaining on site will not exceed 25 millirems per year,(2)
              community interests, provide an opportunity for a comprehensive discussion on the issues by
will be enforceable, and (3) will not impose undue burdens on the local community or other affected
              participants, and make public a summary of the results of such discussions.
parties,
              The Commission expects that institutional controls will be very effective in keeping doses to levels
in obtaining this advice, the licensee must provide for participation by a broad cross section of
              below 25 millirems per year. Nevertheless the Commission has included an additional level of protection
community interests, provide an opportunity for a comprehensive discussion on the issues by
              in the rule to protect against the situation where the 25 rnillirems per-yea' level could be exceeded by
participants, and make public a summary of the results of such discussions.
              requiring that licensees provide reasonable assurance that, if the institutional controls were no longer in
The Commission expects that institutional controls will be very effective in keeping doses to levels
              efTect, the maximum yearly radiation dose from contamination remaining on site would not exceed 100
below 25 millirems per year. Nevertheless the Commission has included an additional level of protection
              millirems per year, and be as low as is reasonably achievable.
in the rule to protect against the situation where the 25 rnillirems per-yea' level could be exceeded by
              Licensees in rare circumstances could also propose that, in the event i- stitutional controls were no
requiring that licensees provide reasonable assurance that, if the institutional controls were no longer in
              longer in effect, the residual radioactivity could be as high as 500 millirems per year. Ilowever, licensees
efTect, the maximum yearly radiation dose from contamination remaining on site would not exceed 100
              who propose to use the 500 millirem criterion must (1) demonstrate that furt ber reductions in remaining
millirems per year, and be as low as is reasonably achievable.
              radioactivity are not technicJly achievable, would be prohibitively expensive, or would result in net
Licensees in rare circumstances could also propose that, in the event i- stitutional controls were no
              3ublic or environmental harm: (2) make provision for durable institutional controls, such as engineered
longer in effect, the residual radioactivity could be as high as 500 millirems per year. Ilowever, licensees
              3arriers or government control or ownership; and (3) provide sufficient financial resources to enable an
who propose to use the 500 millirem criterion must (1) demonstrate that furt ber reductions in remaining
              independent third parv to carry out periodic rechecks of the site at least every 5 years to make sure that
radioactivity are not technicJly achievable, would be prohibitively expensive, or would result in net
              the institutional controls remain in place, and to assume and carry out responsibilities for any necessary
3ublic or environmental harm: (2) make provision for durable institutional controls, such as engineered
            controls and maintenance of those controls.
3arriers or government control or ownership; and (3) provide sufficient financial resources to enable an
            Altemate Criteria for 1.icense Termination
independent third parv to carry out periodic rechecks of the site at least every 5 years to make sure that
            The Commission expects the vast preponderance oflicensees to reduce residual radioactivity to levels
the institutional controls remain in place, and to assume and carry out responsibilities for any necessary
            that meet the new enteria for unrestricted or restricted release, liowever, the Commission is concemed
controls and maintenance of those controls.
            about the possible presence of certain diflicult sites that could present unique decommissioning
Altemate Criteria for 1.icense Termination
            problems.
The Commission expects the vast preponderance oflicensees to reduce residual radioactivity to levels
            Ilecause it is preferable to have provisions in the rule to deal with these sites cather than have licensees
that meet the new enteria for unrestricted or restricted release, liowever, the Commission is concemed
            seek an exemption process outside the rule, the rule contains provisions under which the Commission
about the possible presence of certain diflicult sites that could present unique decommissioning
            may tenninate a license using allemate criteria, greater than 25 millirems per year, if the licensee
problems.
            provides assurance that public health and safety would continue to be protected, and that it was unlikely
Ilecause it is preferable to have provisions in the rule to deal with these sites cather than have licensees
            that the radiation dose from all potential man made sources combined would be more than 100 Allirems
seek an exemption process outside the rule, the rule contains provisions under which the Commission
            per year. The licensee must also place restrictions on site use to the extent practical and reduce the
may tenninate a license using allemate criteria, greater than 25 millirems per year, if the licensee
            radiation dose to levels that are as low as reasonably achievable.
provides assurance that public health and safety would continue to be protected, and that it was unlikely
            The Commission expects the use of attemate criteria to be contined to rare situations. To ensure that this
that the radiation dose from all potential man made sources combined would be more than 100 Allirems
            is the case, the Commission is requiring that licensees who propose to use alternate criteria must seek
per year. The licensee must also place restrictions on site use to the extent practical and reduce the
            advice or comment from alTected parties and, as in the case where restricted release is sought, provide
radiation dose to levels that are as low as reasonably achievable.
            for participation by representatives of a broad cross section of community interests who may be affected
The Commission expects the use of attemate criteria to be contined to rare situations. To ensure that this
            by the decommissiomng, an o pportunity for a comprehensive, collective discussion on the issues, and a
is the case, the Commission is requiring that licensees who propose to use alternate criteria must seek
            publicly available summary ol the results of all such discussions,
advice or comment from alTected parties and, as in the case where restricted release is sought, provide
            in addition, the use of alternate criteria to terminate a license will require the approval of the
for participation by representatives of a broad cross section of community interests who may be affected
            Commission, aller consideration of NRC staff recommendations that address any comments provided by
by the decommissiomng, an o pportunity for a comprehensive, collective discussion on the issues, and a
          the Environmental Protection Agency and by the public.
publicly available summary ol the results of all such discussions,
            Public input
in addition, the use of alternate criteria to terminate a license will require the approval of the
          To provide ample opportunities for public comment, when the Commission receives a license
Commission, aller consideration of NRC staff recommendations that address any comments provided by
          tennination or decommissioning plan, or a proposal for cestricted release of a site or release using
the Environmental Protection Agency and by the public.
  2 of 3                                                                                                               08009711:24:33
Public input
                                                                                                    -       --   _   -.     -   -
To provide ample opportunities for public comment, when the Commission receives a license
tennination or decommissioning plan, or a proposal for cestricted release of a site or release using
2 of 3
08009711:24:33
.
-
--
_
-.
-
-


    *
*
        ,    hnp://www.nre gov /OPA/gmo nr:rev/97 083.htm                                           http:// nre goviOPAlgmo'nrarn/97 083 hu
hnp://www.nre gov /OPA/gmo nr:rev/97 083.htm
          *
http://
        *
nre goviOPAlgmo'nrarn/97 083 hu
                        alternate criteria, the agency will publish a notice in the Federal Register. In addition, it will provide
,
                        local notincation via a notice in local newspapers, letters to state or local organizations, or other
*
                        appropriate means. It will also notify the Environmental Protection Agency, appropriate local and statc.
alternate criteria, the agency will publish a notice in the Federal Register. In addition, it will provide
                        govemments and Indian Nations and solicit their comments.
*
                        Specific additional requirements for public input are described above for the restricted use and alt rnate
local notincation via a notice in local newspapers, letters to state or local organizations, or other
                      entena cases.
appropriate means. It will also notify the Environmental Protection Agency, appropriate local and statc.
                      Pronosed and Final Rule                                                                                                     >
govemments and Indian Nations and solicit their comments.
                      A proposed rule on this subject was published for public comment on August 22,1994. The full text of                       '
Specific additional requirements for public input are described above for the restricted use and alt rnate
                      the final rule and a description of specific changes made as a result of the comments received on the
entena cases.
                      proposed rule, and additional NRC analysis, will be contained in s Federal Register notice to be
Pronosed and Final Rule
                      published soon.
>
                      The Commission did not adopt a separate groundwater protection standard, as recommended by the
A proposed rule on this subject was published for public comment on August 22,1994. The full text of
                      Environmental Protection Agency. NRC agrees with the need to control exposures from drinking
the final rule and a description of specific changes made as a result of the comments received on the
                      groundwater that is potentially contaminated a..d agrees that the environmental integrity of the nation's
'
                      groundwater needs to be prot <:cted. Ilowever, NRC has concluded that protection of public health and
proposed rule, and additional NRC analysis, will be contained in s Federal Register notice to be
                      safety in the use of this valuable resource is achieved by limiting e- sure to person., from all potential
published soon.
                      pathways of exposure (i.e., radiation from the ground, eating food aom soil or fish from surface water,
The Commission did not adopt a separate groundwater protection standard, as recommended by the
                      inhalation of dust, etc.), including the groundwater pathway, to as far below 25 millirems per year as is
Environmental Protection Agency. NRC agrees with the need to control exposures from drinking
                    reasonably achievable and that imposition of a separate stan(' rd for groundwater would not provide any
groundwater that is potentially contaminated a..d agrees that the environmental integrity of the nation's
                    significant enhancement of public health and safety and is therefore unnecessary.
groundwater needs to be prot <:cted. Ilowever, NRC has concluded that protection of public health and
                    Yesterday Shirley Ann Jackson, Chainnan of the NRC, met with Fred liansen, Deputy Administrator of
safety in the use of this valuable resource is achieved by limiting e-
                    the Environmental Protection Agency (EPA), to discuss the proposed final rule. At that meeting, she
sure to person., from all potential
                    discussed the features of the rule, and NRC's position on the adequacy of the 25-millirems-per year all
pathways of exposure (i.e., radiation from the ground, eating food aom soil or fish from surface water,
                    pathways standard, the concept of"as low as is reasonably achievable" (ALARA) included in the NRC's
inhalation of dust, etc.), including the groundwater pathway, to as far below 25 millirems per year as is
                    rule, and the NRC's position that, in light of the all pathways standard and ALARA, there is no need for
reasonably achievable and that imposition of a separate stan(' rd for groundwater would not provide any
                    a separate groundwater standard. Ilansen expressed EPA's interest in continuing discussions with NRC
significant enhancement of public health and safety and is therefore unnecessary.
                    regarding timely notice to EPA of proposed NRC license termination in some specific categories of
Yesterday Shirley Ann Jackson, Chainnan of the NRC, met with Fred liansen, Deputy Administrator of
                    cases. The Commission has agreed to continue a dialogue with EPA following finalization of the rule.
the Environmental Protection Agency (EPA), to discuss the proposed final rule. At that meeting, she
                    The new cleanup criteria for decommissioning will not a 3 ply to sites already covered by a license
discussed the features of the rule, and NRC's position on the adequacy of the 25-millirems-per year all
                    tennination or decommissioning plan approved previous y by the Commission or approved within 24
pathways standard, the concept of"as low as is reasonably achievable" (ALARA) included in the NRC's
                    months of the clTective date of the rule (w hich will be announced in the Federal Register).
rule, and the NRC's position that, in light of the all pathways standard and ALARA, there is no need for
                    The final rules that the Commission has promulgated wili generally apply to most NRC licensees and to
a separate groundwater standard. Ilansen expressed EPA's interest in continuing discussions with NRC
                    most liccasec.aegu!ated by Agreement States (which are states that have assumed, by mutual
regarding timely notice to EPA of proposed NRC license termination in some specific categories of
                    agreement, part of the NRC's regulatory authority). An Agreement State may implement more stringent
cases. The Commission has agreed to continue a dialogue with EPA following finalization of the rule.
                    standards ifit finds a need to impose such standards for local conditions.
The new cleanup criteria for decommissioning will not a 3 ply to sites already covered by a license
                                                                              ###
tennination or decommissioning plan approved previous y by the Commission or approved within 24
                                                                                                -.     -__             -. .-
months of the clTective date of the rule (w hich will be announced in the Federal Register).
                                                      NRC llome Pag l News and Infornmtica l E-mail
The final rules that the Commission has promulgated wili generally apply to most NRC licensees and to
          3 of 3                                                                                                               08'20/9711:2 8:33 ~
most liccasec.aegu!ated by Agreement States (which are states that have assumed, by mutual
_ _ _ _                      _-                 . _ _ _            __   _ _                 _ _           _ . _ _ .       _ _ . .         --
agreement, part of the NRC's regulatory authority). An Agreement State may implement more stringent
standards ifit finds a need to impose such standards for local conditions.
###
-.
-__
-. .-
NRC llome Pag l News and Infornmtica l E-mail
3 of 3
08'20/9711:2 8:33 ~
_-
.
__
_ _
_ _
.
.
_ _ . .
--


              .     .                         . _._.       __ _ -                                   _
y.
        y.
.
.
. _._.
__ _ -
_
'
y.
..
'
,O:
._ :/
o
AW hh ct.
tuf G
'
'
  ..
.
          y.
.
                          '
o u t-
  ,O:            ._
#c5
  o
8 kN/h
                      :/
[
                                        tuf G AW hh ct.
$
                            '
feeA
                .
b-
                              .
Control
                                o u t-
'
        #c5 8 kN/h                 [ $       feeA                 b-         Control
DO CONTAOL: G970609
                                                                                                                          '
kuC-
                                                                                DO CONTAOL: G970609
DOC DT: 08/11/97
                                            kuC-                                     DOC DT: 08/11/97
FINAL REPLY:
                                                                                FINAL REPLY:
TO:
      TO:                                                                                                 8 ,,2 I 'l -
8 ,,2 I 'l -
            . Chairman Jackson
. Chairman Jackson
      FOR SIGNATURE OF :                                 ** GRN     **             CRC NO: 97-0844
FOR SIGNATURE OF :
            ' Collins
** GRN
      DESC:                                                                         ROUTING:
**
        CITIZENS AWARENESS NETWORK, CAN, CONCERNS RE THE                             Callan
CRC NO: 97-0844
      '  NRC'S UNWILLING % ESS TO PENALIZE THE                                       Thadani
' Collins
        CONNECTICUT-YANREE ATOMIC POWER COMPANY DESPITE                             Thompson
DESC:
        DOCUMENTED RADIOLOGICAL CONTROL VIOLATIONS AT                               Norry
ROUTING:
        HADDAM NECK STATION                                                         Blaha
CITIZENS AWARENESS NETWORK, CAN, CONCERNS RE THE
                                                                                      Burns
Callan
    DATE: 08/21/S7                                                                   Lieberman, OE
NRC'S UNWILLING % ESS TO PENALIZE THE
                                                                                      Miller, RI
Thadani
    ASSIGNED TO:                       CONTACT:
'
                        NRR                 Collins-
CONNECTICUT-YANREE ATOMIC POWER COMPANY DESPITE
    SPECIAL INSTRUCTIONS OR REMARKS:
Thompson
        Put EDO and Chairman on for concurrence.
DOCUMENTED RADIOLOGICAL CONTROL VIOLATIONS AT
        Chairman's office to review response prior
Norry
        .to dispatch.
HADDAM NECK STATION
    NRR RECEIVED:               AUGUST' 21, 1997
Blaha
    NRR ACTTON:                 .ORPM: ROE
Burns
    NRR ROUTING:                 COLLINS'                                             q   ap l sp
DATE: 08/21/S7
                                  MIRAGLIA
Lieberman, OE
                                                                                            Mu   lv,M
Miller, RI
                                                                                                    81
ASSIGNED TO:
                                                                                      ,
CONTACT:
                                  ZIMMERMAN
NRR
                                'SHERON                                f [*g J Q Q R D}R {C J C.R'$ [syr,7,] 3
Collins-
                                  TRAVERS
SPECIAL INSTRUCTIONS OR REMARKS:
                                                                            6Y N _l u,C A               /
Put EDO and Chairman on for concurrence.
                                                                        t
Chairman's office to review response prior
                                                                                                                        .
.to dispatch.
                                                  _ _ . .             .
NRR RECEIVED:
AUGUST' 21, 1997
NRR ACTTON:
.ORPM: ROE
NRR ROUTING:
COLLINS'
q
Mu l lv,M
ap sp
MIRAGLIA
81
,
ZIMMERMAN
f [*g J Q Q R D}R {C J C.R'$ [syr,7,] 3
'SHERON
TRAVERS
6Y N _l u,C A
/
t
.
_ _ . .
.


                                - -                                                   . , . - .- - . .
4
          4                                                              ,
-
                                -
-
                                                      ..    .
..
  , ,                 .
.
              .
,
        1 *
.
    ..                                                                                                       l
, . - .- - . .
      **                                        OFFICE OF THE SECRETARY-
-
                                            CORRESPONDENCE CONTROL TICKET
.
                                                                                                              !
, ,
                ~ PAPER NUMBER:     CRC-97-0244                     LOGGING DATES.:Aug 19-9.7             *
.
                                                                                                          '
1
                ' ACTION OFFICE:     :EDO                                                                     ,
*
                                                                                                              '
l
                'NUTHOR:             DOUGLAS FARBER
..
              = AFFILIATION -       CONNECTICUT                                                             i
OFFICE OF THE SECRETARY-
                -ADDRESSEE:           CHAIRMAN JACKSON
*
              ' LETTER DATE:     .Aug 11 97             FILE CODES.
CORRESPONDENCE CONTROL TICKET
                SUBJECT:             CITIZENS AWARENESS NETWORK,'CAN,-CONCERNS REGARDING
*
                                    THE NRC'S UNWILLINGNESS TC PENALIZE THE CONNECTICVT
!
                                    YANKEE-ATOMIC POWER COMPANY-DESPITE DOCUMENTED
~ PAPER NUMBER:
                                    RADNLOGICAL CONTROL VIOLATIONS AT HADDAM NECK STA
CRC-97-0244
                ACTION:             ($gpa;                     hth         k
LOGGING DATES.:Aug 19-9.7
                DISTRIBUTION:       CHAIRMAN, RF
*
                SPECIAL HANDLING: SECY.TO ACK
'
            -CONSTITUENT:
' ACTION OFFICE:
              NOTES'                    dtyg,C             M                     i
:EDO
            :DATE DUE -           Sep     5 97
,
              SIGNATURE:                                             DATE SIGNED:
'NUTHOR:
,            AFFILIATION:
DOUGLAS FARBER
                                                  .
'
                                                                                      4
= AFFILIATION -
                    -
CONNECTICUT
                                                                                EDO -- G970609             '
i
                                                                                                            .
-ADDRESSEE:
                                      vr
CHAIRMAN JACKSON
' LETTER DATE:
.Aug 11 97
FILE CODES.
SUBJECT:
CITIZENS AWARENESS NETWORK,'CAN,-CONCERNS REGARDING
THE NRC'S UNWILLINGNESS TC PENALIZE THE CONNECTICVT
YANKEE-ATOMIC POWER COMPANY-DESPITE DOCUMENTED
RADNLOGICAL CONTROL VIOLATIONS AT HADDAM NECK STA
ACTION:
($gpa;
hth
k
DISTRIBUTION:
CHAIRMAN, RF
SPECIAL HANDLING: SECY.TO ACK
-CONSTITUENT:
dtyg,C
M
i
NOTES'
:DATE DUE -
Sep
5 97
SIGNATURE:
DATE SIGNED:
AFFILIATION:
,
.
4
EDO -- G970609
'
-
.
vr
}}
}}

Latest revision as of 06:20, 4 December 2024

Responds to Addressed to Chairman Jackson Re Concerns of Radiological Control Violations at Plant,As Addressed in CAL 1-97-07,dtd 970304 & Insp Repts 50-213/96-12,50-213/97-01 & 50-213/97-02
ML20212F183
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 10/23/1997
From: Collins S
NRC (Affiliation Not Assigned)
To: Farber D
CITIZENS AWARENESS NETWORK
Shared Package
ML20212F188 List:
References
50-213-96-12, 50-213-97-01, 50-213-97-02, 50-213-97-1, 50-213-97-2, CAL-1-97-07, CAL-1-97-7, NUDOCS 9711040205
Download: ML20212F183 (10)


See also: IR 05000213/1996012

Text

a

-

--

~

~

ea *80g

g

UNITED STATES

g*

j

NUCLEAR REGULATORY COMMISSION

i

".

WASHINGTON, o.C. soteHopt

October 23, 1997

, , , , , *

1

Mr. Douglas G. Farber

Citizens Awarenens Network

54 Old Tumpike Road

Haddam, Connecticut 06438

Dear Mr. Farber.

Your letter of August 11,1997, addressed to Chairman Jacksnn, has been referred to me for a

reply. Your letter voices concems about severalissues.

Your first concem is that the Nuclear Regulatory Commission (NRC)is unwilling to penalize the

Connecticut Yankee Atomic Power Company (CYAPCo) for radiation control violations. We

disagree with your statement; in fact, the NRC has taken very strong regulatory action issuing a

Confirmatory Action Letter (CAL No. 197 007) dated March 4,1997, to the licensee as a result

of NRC identified radiological work control violations. The violations prompting the CAL were

principally associated with a November 2,1996, rt actor cavity airbome radioactivity event and

events concoming control and monitoring of radioactive materials identified in February 1997.

(Reference NRC inspection Report Nos. 50 213/9612,97 01, and 97 02.) The CAL effective!v

restrains the licensee from performing any significant radiological work, including

decommissioning activities, until radiological control program improvement is realized and

venfied by the NRC. In addition, the NRC issued a Notice of Violation to the licensee on

August 12,1997, as a result of radiological controls violations idantified during inspections

,

conducted in June and July 1997 (Ref. NRC Inspection Report No. 50-213/97 06.)

NRC is aware of assertionu by the Connecticut Public Utikties Commission (CPUC) involving

radioactive soil contamination and potential environmentalimpact from previous radioactive spills

and events at Haddam Neck (HN). In response, NRC has expanded its ongoing inspections to

include a comprehensive reevaluation of Connecticut Yankee's historical record to determine

i

'

what effect, if any. Connecticut Yankee's actions may have had on public health and safety. The

reevaluation includes independent radiological surveys and sample analysis by both NRC and

Connecticut Department of Environmental Protection Personnel. Although NRC's review to date

indicates there is no health and safety concem to the public or licensee employees, our

evaluation is continuing.

Due to issues identified in the CAL, and information from the ongoing inspection efforts, NRC is

,

'

currently considering additional enforcement action in regard to the radiation control program at

the Haddam Neck plant, in addition to the CAL on radiation control violations, on May 12,1997,

the NRC proposed a $650,000 civil penalty against CYAPCo (F.A 96-001 et al.) for other

violations found during inspections conducted by he NRC between November 21,1995, and

g

November 22,1996; the licensee paid the civil penalty on June 11,1997.

y\\

t

b

I

,

hMh13

<

i

H

pm

,

,

l

,

a

,._._ _

_.

_

_

_ _ _

_ _ . .

_

__

___

_

.

-

.

.

.

Mr. Douglas Fart >er

2

Because your second concem involves a rate caso presently before the Federal Energy

Regulatory Commission (FERC), the NRC will not comment at this time on the specific issues in

this haaring. However, the NRC continues to believe that 10 CFR 50.75 prescribes acceptable

methods to assure and to maintain reasonable assurance for decommissioning funding. Prior to

permanent cessation of operations, CYAPCo had provided reasonable assurance that funds

would be available for decommissioning. The information provided in the Post Shutdown

Decommissioning Activities Report (PSDAR), submitted on August 22,19g7, Indicates that the

licensee has ample funds to commence decommissioning activities and to place the facility in a

SAFSTOR condition should a concem arise that decommissioning funding may become

inadequate. We are aware that issues brought forth in the FERC case currently in progress may

affect the level of financial assurance that CYAPCo can provide in the future. Upon resolution of

the rate case before FERC and after submittel of the site specific decommissioning cost

estimate, which is expected by December 5,1998, the NRC will reassess the adequacy of

decommissioning funding for HN. The NRC is holding a public meeting at 6:30 p.m. O,,

October 27,1997, in the Haddam Killingsworth High School, Higganum, CT to solicit public

comments on the decommissioning of HN.

Your third concem deals with a presumed insufficiency in our regulations regarding

decommissioning costs. In CAN's judgment, the cost of site remediation and environmental

impacts at HN were underestimated and NRC employee Richard Conte's remarks at the July 30,

1997, Community Decommissioning Advisory Committee (CDAC) meeting would indicate that

such underestimation is happening at all U.S. nuclear plants. However, examination of the

formulas in 10 CFR 50.75(c) indicate that escalation factors are provided for labor, energy, and

burial costs.

As part of our assessment of the decommissioning cost estimates, the FERC case's resolution,

and public comments, as discussed above, the NRC will use the appropriate formula and <W ilo

determine compliance with the regulation. This assessment will determine if the overall cost

estimate is within the bounds of the regulation. Also, Mr. Conte's comments at the CDAC were

made in the context of a general statement that it is not totally unexpected to find some soil

contamination at a nuclear power plant site, especially at those with outdoor storage tanks that

hold radioactive fluids. He did not impty, nor did he intend to imply, that the extent of

contamination and the scope of work for remediation was fully known. Detailed site

characterization is being conducted by the licensee and will be subject to NRC inspection. This

information should allow a more precise determination of the scope and extent of contamination

levels. In this regard, an NRC staff member, specializing in site cleanup, remediation, and costs,

will attend the October 27 meeting and will be able to provide more information in these areas.

Finally, a rut amendment to NRC regulations,10 CFR 20.1401, Subpart E, addresses

residual radioactivity after decommissioning and provides for protection to the public, plant

workers, and the environment. This regulation was formulated with extensive public

involvement, and was coordinated with other Federal agencies. It provides this protection in a

cost effective manner. I have enclosed an NRC press release, dated May 21,1997, that

contairm more information about this recently approved regulation.

,

, ,

,

,

-

,

,---m

-- , - , ,

~

.

Mr. Douglas Farber

3-

October 23, 1997

Should you have any further questions, please contact Mr. Morton Fairtile of my staff at

(301)415 1442.

Sincerely,

@sWhy

BamuelJ.Comns

Samuel J. Collins, Director

Office of Nuclear Reactor Regulation

Docket No. 50 213

Enclosure: As stated

cc w/ enclosure: See next page

plSTRIBUTION:

iContral File (w/ original incoming) ,

SCollins/FMiraglia

OPA

PUBLIC (w/ incoming)

RZimmerman

OCA

EDO# GT97609

BSheron

SECY (GT#970844)

SCallan

WTravers

MClark (GT#970609)

AThadani

PDND r/f (w/ incoming)

EHylton (w/ incoming)

HThompson

JRoe

Region l

PNorry

DMatthews

MBoyle (MLB4) E mail only

JBlaha

SWeiss

LThonus

SBurns

SBajwa

ASLBP

JLieberman

MFairtile(w/ incoming)

JHickey

HMiller, RI

OGC

AMarkley

PHarris

RDudley

TFredrichs

MMasnik

JMinns

MWebb

KBohrer (012-G18)

MClark

Econner (ELC) E-Matt

EDO r/f

NRR Mall Room (EDO#GT97609 w/ incoming)

  • SEE PREVIOUS CONCURRENCE

PDND:PM

PDND:LA,'v

PDND:(A)SC

TECH ED.*

OGC*

MFairtile

EHylton/f,p

MMasnik

RSanders

MRafky

9/ 097

E

9p7

9/11/97

9/16/97

9/)W97

3

PDND.DA

(A)D

R

-

OC

SWeiss P

-JR

S ollins '

SJackson

_9/JV97

4/g 7

10/

f

7

9/ /97

-

d\\I

OFFICIAL RECORD COPY

DOCUMENT NAME: G:\\SECY\\ACTN_lTM\\G1609

,

-

. . - - - _ .

. .

~

. . - - . - . -. . - . . - - -

- - .

. .

_

.

.

.

.

.

Mr. Douglas Farber

3-

Should you have any further questions, please contact Mr. Morton Fairtile of my staff at

(301)415 1442.

t

Sincerely,

'

i

amuel J. Chilins, Director

Office of Nuclear Reactor Regulation

,

Docket No 50 213

I

Enclosure: As stated

cc w/ enclosure:- See next page

,

.

.

A

. -

. . .

,_ .

- - .

_ , . . - , , , - _ _ . -

. _ . , _ , _ _ _ . _ , _ _ _ . _ . _ . _ _ . _ -

-

,-

.- - -

_

-

. - ---

.

. .

-,

-

.

o

'

Connecticut Yankee Atomic Power Co.

Haddam Neck Plant

,'

Docket No. 50 213

r

I

CC:

Resident inspector

Lillian M. Cuoco, Esq.

Haddam Neck Plant

_

i

,

Senior Nuclear Counsel

clo U.S. Nuclear Regulatory Commission

Northeast Utilities Service Company

362 injun Hollow Road

l

P. O. Box 270

East Hampton, CT 06424 3099

'

Hartford, CT 06141 0270-

Mr. James S. Robinson

Mr. Kevin T. A. McCarthy, Director

Manager, Nuclear Investments and

i

Monitoring and Radiation Division

Administration

Department of Environmsntal

Now England Power Company

Protection

25 Research Drive

- 79 Elm Street

Westborough, MA 01582

Hartford, CT 00106 5127

Mr. G. P. van Noordonnen

- Mr. Allan Johanson

Manager - Nuclear Licensing

Assistant Director

Northeast Utilities Service Company

Office of Policy and Management

362 Injun Hollow Road

Policy Development and Planning

East Hampton, CT 06424 3099

+

Division

450 Capit-l Avenue MS#52ENR

Regional Administrator

,

P. O. Box 341441

r;egion i

4

Hartford, CT 06134 1441

U.S. Nucles- Regulatory Commission

475 Allendale Road

Mr. F. C. Rothen

King of Prussia, PA 19406

Vice President Work Services

Northeast Utilities Service Company

Board of Selectmen

P. O. Box 128

Town Office Building

Waterford, CT 06385

Haddam, CT 06438

Mr. D. M. Goebel

Vice President - Nuclear Oversight

Northeast Utilities Service Company

P. O. Box 128

Waterford, CT 06385

i

Mr. J. K. Thayer

Recovery Officer Nuclear Engineering

and Support

'

Northeast Utilities Service Company

P. O. Box 128 '

Waterford, CT 06385

,

e

a

n

an,

,-

m-

en-e=~m

e-ws,

e-w-~

-

v

, tr

,

-~

- --

~ - . .

-

_ _ . - .

. _

- .

- - _ . _ -

.-__.- --

- -

, fWtp1/www.mc gov /OPAlgmo'ntr.rcvi97 08).htm

httpAwww.nre gov OPA:'gmo'nrarevS7 083.htm

i

. _ _

._

_

._

.

_ _ . _ _ _ . _ _

-._

f._

Nuclear Regulatory Commission

Office of Public Affairs

l

Washington DC 20555

t

t

Telephone: 301/415-8200 - E mail: opaWnre. gov

'

. - . .

.

.-

-

-

- - .

. _ - . .

.-

.

-.

. . . . .

No.97-083

May 21,1997

NRC APPROVES MAXIMUM PERMISSil3LE RADIATION LEVELS

FOR LICENSE TERMINATION

I

The Nuclear Repulatory Commission has approved an amendment to its regulations to establish

maximum permissible radiation levels when a nuclear facility permanently shuts down, is released foi

other uses, and the license is tenninated.

-The new rules will require licensees of pennanently shutdown facilities to reduce remaining

radioactivity to sumciently low levels to pennit the license to be terminated safely. Release of the

property may be either:

Unrestricted, in which case it could be used for any purpose, or

Restricted, so that it could not be used for certain purposes, such as residential housing.

The Commission believes that the new standards are consistent with specific recommendations of both

national and international bodies tasked with the development of guidance for radistion protection; are

appropriately based on risk, cost benefit, and socio economic standards; provide the needed flexibility to

accommodate site specific conditions; and are sufficiently conservative to ensure protection of public

health and safety and the environment.

Unrestricted Release

Under the new regulations, a site may be released for unrestricted use if the radiation dose from

contamination remaining on the property wni be as far below 25 millirems per year as is reasonably

achievable. (Twenty five millirems may be compared to a dose of about 5 millirems of background

radiation from one round trip cross-country airline ilight: 50 millirems average per year from medical

examinations; and 300 millirems per year average in the United States from natural background

radiation.)

Restricted Release

The new regulations permit release of a site for restricted use provided that the dose from contamination

remaining on site is as low as is reasonably achievable and that legally enforceable institutional controls

1

(such as deed restrictions) will ensure that the dose does not exceed 25 millirems per year.

,

in addition, if a site is released for restricted use, the licensee must provide financial arrangements to

allow an independent third party to assume and carry out responsibilities for any necessary control and

maintenance of the site.

Further, a licensee that intends to decommission by restricting use of the site must seek advice- from

individuals and institutions in the community who may be affected by the decommissioning--on whether

n8'20'9711:245

iof3

M SURE

-

- . -

-

.

~

_

-

_

-

.

.

_ _ . _ . _ . _ _ _

__ _

_

,

_

-

_ _ -

.

_

__

_

. hap //ww w.ntc. guWOPAlgmo'nrarev/97-083.htm

hupWwww nre gowOPAlgmo'nrcrcwn08).htn

'

individuals and institutions in the community who may be affected by the decommissioning -on whcther

e

the provisions for institutional controls proposed by the licensee (1) will provide reasonable assurance

!

that the radiation dose from co. taminat on remaining on site will not exceed 25 millirems per year,(2)

will be enforceable, and (3) will not impose undue burdens on the local community or other affected

parties,

in obtaining this advice, the licensee must provide for participation by a broad cross section of

community interests, provide an opportunity for a comprehensive discussion on the issues by

participants, and make public a summary of the results of such discussions.

The Commission expects that institutional controls will be very effective in keeping doses to levels

below 25 millirems per year. Nevertheless the Commission has included an additional level of protection

in the rule to protect against the situation where the 25 rnillirems per-yea' level could be exceeded by

requiring that licensees provide reasonable assurance that, if the institutional controls were no longer in

efTect, the maximum yearly radiation dose from contamination remaining on site would not exceed 100

millirems per year, and be as low as is reasonably achievable.

Licensees in rare circumstances could also propose that, in the event i- stitutional controls were no

longer in effect, the residual radioactivity could be as high as 500 millirems per year. Ilowever, licensees

who propose to use the 500 millirem criterion must (1) demonstrate that furt ber reductions in remaining

radioactivity are not technicJly achievable, would be prohibitively expensive, or would result in net

3ublic or environmental harm: (2) make provision for durable institutional controls, such as engineered

3arriers or government control or ownership; and (3) provide sufficient financial resources to enable an

independent third parv to carry out periodic rechecks of the site at least every 5 years to make sure that

the institutional controls remain in place, and to assume and carry out responsibilities for any necessary

controls and maintenance of those controls.

Altemate Criteria for 1.icense Termination

The Commission expects the vast preponderance oflicensees to reduce residual radioactivity to levels

that meet the new enteria for unrestricted or restricted release, liowever, the Commission is concemed

about the possible presence of certain diflicult sites that could present unique decommissioning

problems.

Ilecause it is preferable to have provisions in the rule to deal with these sites cather than have licensees

seek an exemption process outside the rule, the rule contains provisions under which the Commission

may tenninate a license using allemate criteria, greater than 25 millirems per year, if the licensee

provides assurance that public health and safety would continue to be protected, and that it was unlikely

that the radiation dose from all potential man made sources combined would be more than 100 Allirems

per year. The licensee must also place restrictions on site use to the extent practical and reduce the

radiation dose to levels that are as low as reasonably achievable.

The Commission expects the use of attemate criteria to be contined to rare situations. To ensure that this

is the case, the Commission is requiring that licensees who propose to use alternate criteria must seek

advice or comment from alTected parties and, as in the case where restricted release is sought, provide

for participation by representatives of a broad cross section of community interests who may be affected

by the decommissiomng, an o pportunity for a comprehensive, collective discussion on the issues, and a

publicly available summary ol the results of all such discussions,

in addition, the use of alternate criteria to terminate a license will require the approval of the

Commission, aller consideration of NRC staff recommendations that address any comments provided by

the Environmental Protection Agency and by the public.

Public input

To provide ample opportunities for public comment, when the Commission receives a license

tennination or decommissioning plan, or a proposal for cestricted release of a site or release using

2 of 3

08009711:24:33

.

-

--

_

-.

-

-

hnp://www.nre gov /OPA/gmo nr:rev/97 083.htm

http://

nre goviOPAlgmo'nrarn/97 083 hu

,

alternate criteria, the agency will publish a notice in the Federal Register. In addition, it will provide

local notincation via a notice in local newspapers, letters to state or local organizations, or other

appropriate means. It will also notify the Environmental Protection Agency, appropriate local and statc.

govemments and Indian Nations and solicit their comments.

Specific additional requirements for public input are described above for the restricted use and alt rnate

entena cases.

Pronosed and Final Rule

>

A proposed rule on this subject was published for public comment on August 22,1994. The full text of

the final rule and a description of specific changes made as a result of the comments received on the

'

proposed rule, and additional NRC analysis, will be contained in s Federal Register notice to be

published soon.

The Commission did not adopt a separate groundwater protection standard, as recommended by the

Environmental Protection Agency. NRC agrees with the need to control exposures from drinking

groundwater that is potentially contaminated a..d agrees that the environmental integrity of the nation's

groundwater needs to be prot <:cted. Ilowever, NRC has concluded that protection of public health and

safety in the use of this valuable resource is achieved by limiting e-

sure to person., from all potential

pathways of exposure (i.e., radiation from the ground, eating food aom soil or fish from surface water,

inhalation of dust, etc.), including the groundwater pathway, to as far below 25 millirems per year as is

reasonably achievable and that imposition of a separate stan(' rd for groundwater would not provide any

significant enhancement of public health and safety and is therefore unnecessary.

Yesterday Shirley Ann Jackson, Chainnan of the NRC, met with Fred liansen, Deputy Administrator of

the Environmental Protection Agency (EPA), to discuss the proposed final rule. At that meeting, she

discussed the features of the rule, and NRC's position on the adequacy of the 25-millirems-per year all

pathways standard, the concept of"as low as is reasonably achievable" (ALARA) included in the NRC's

rule, and the NRC's position that, in light of the all pathways standard and ALARA, there is no need for

a separate groundwater standard. Ilansen expressed EPA's interest in continuing discussions with NRC

regarding timely notice to EPA of proposed NRC license termination in some specific categories of

cases. The Commission has agreed to continue a dialogue with EPA following finalization of the rule.

The new cleanup criteria for decommissioning will not a 3 ply to sites already covered by a license

tennination or decommissioning plan approved previous y by the Commission or approved within 24

months of the clTective date of the rule (w hich will be announced in the Federal Register).

The final rules that the Commission has promulgated wili generally apply to most NRC licensees and to

most liccasec.aegu!ated by Agreement States (which are states that have assumed, by mutual

agreement, part of the NRC's regulatory authority). An Agreement State may implement more stringent

standards ifit finds a need to impose such standards for local conditions.

-.

-__

-. .-

NRC llome Pag l News and Infornmtica l E-mail

3 of 3

08'20/9711:2 8:33 ~

_-

.

__

_ _

_ _

.

.

_ _ . .

--

y.

.

.

. _._.

__ _ -

_

'

y.

..

'

,O:

._ :/

o

AW hh ct.

tuf G

'

.

.

o u t-

  1. c5

8 kN/h

[

$

feeA

b-

Control

'

DO CONTAOL: G970609

kuC-

DOC DT: 08/11/97

FINAL REPLY:

TO:

8 ,,2 I 'l -

. Chairman Jackson

FOR SIGNATURE OF :

    • GRN

CRC NO: 97-0844

' Collins

DESC:

ROUTING:

CITIZENS AWARENESS NETWORK, CAN, CONCERNS RE THE

Callan

NRC'S UNWILLING % ESS TO PENALIZE THE

Thadani

'

CONNECTICUT-YANREE ATOMIC POWER COMPANY DESPITE

Thompson

DOCUMENTED RADIOLOGICAL CONTROL VIOLATIONS AT

Norry

HADDAM NECK STATION

Blaha

Burns

DATE: 08/21/S7

Lieberman, OE

Miller, RI

ASSIGNED TO:

CONTACT:

NRR

Collins-

SPECIAL INSTRUCTIONS OR REMARKS:

Put EDO and Chairman on for concurrence.

Chairman's office to review response prior

.to dispatch.

NRR RECEIVED:

AUGUST' 21, 1997

NRR ACTTON:

.ORPM: ROE

NRR ROUTING:

COLLINS'

q

Mu l lv,M

ap sp

MIRAGLIA

81

,

ZIMMERMAN

f [*g J Q Q R D}R {C J C.R'$ [syr,7,] 3

'SHERON

TRAVERS

6Y N _l u,C A

/

t

.

_ _ . .

.

4

-

-

..

.

,

.

, . - .- - . .

-

.

, ,

.

1

l

..

OFFICE OF THE SECRETARY-

CORRESPONDENCE CONTROL TICKET

!

~ PAPER NUMBER:

CRC-97-0244

LOGGING DATES.:Aug 19-9.7

'

' ACTION OFFICE:

EDO

,

'NUTHOR:

DOUGLAS FARBER

'

= AFFILIATION -

CONNECTICUT

i

-ADDRESSEE:

CHAIRMAN JACKSON

' LETTER DATE:

.Aug 11 97

FILE CODES.

SUBJECT:

CITIZENS AWARENESS NETWORK,'CAN,-CONCERNS REGARDING

THE NRC'S UNWILLINGNESS TC PENALIZE THE CONNECTICVT

YANKEE-ATOMIC POWER COMPANY-DESPITE DOCUMENTED

RADNLOGICAL CONTROL VIOLATIONS AT HADDAM NECK STA

ACTION:

($gpa;

hth

k

DISTRIBUTION:

CHAIRMAN, RF

SPECIAL HANDLING: SECY.TO ACK

-CONSTITUENT:

dtyg,C

M

i

NOTES'