JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE SUPNARY OF OPERATIONS -
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE SUPNARY OF OPERATIONS -
Line 23: Line 23:
During the month of October, there were no unit shutdowns or significant power reductions.
During the month of October, there were no unit shutdowns or significant power reductions.
The following major safety-related maintenance was performed in the month of October:
The following major safety-related maintenance was performed in the month of October:
: 1. Miscellaneous 1 corrective and preventive maintenance was performed on diese.1 generators.
1.
                                                  "~
Miscellaneous 1 corrective and preventive maintenance was performed on diese.1 generators.
8701290442 861031 PDR   ADOCK 05000364 R                 PDR B&H Y-
"~
                                                                                                          /
8701290442 861031 PDR ADOCK 05000364 R
                                                                                                            --  -)
PDR B&HY-
/
-)


DOCKET NO. 50-364 i
DOCKET NO.
50-364 i
UNIT 2 DATE 11/4/86 COMPLETED BY J. D. Woodard TELEPHONE (205)899-5156
UNIT 2 DATE 11/4/86 COMPLETED BY J. D. Woodard TELEPHONE (205)899-5156
      !Cmi       October DAY   AVERAGE DAILY POWER LEVEL                     DAY                                 AVERAGE DAILY POWER LEVEL (19fe-Net)                                                                                           (P97e-Net) 1                 818                             17                                                                 839 2                 817                             18                                                                 837 3                 818                             19                                                                 840 4                 817                             20                                                                 841 5                 814                             21                                                                 842 6                 822                             22                                                                 840 7                 830                             23                                                                 833 8                 825                             24                                                                 827 9                 823                           ' 25                                                                 826 10                 824                             26                                                                 833 11                 829                             27                                                                 834 12                 827                             28                                                                 836 13                 823                             29                                                                 835 14                 828                             30                                                                 834 15                 777                             31                                                                 833 16                 839 INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
!Cmi October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (19fe-Net)
(P97e-Net) 1 818 17 839 2
817 18 837 3
818 19 840 4
817 20 841 5
814 21 842 6
822 22 840 7
830 23 833 8
825 24 827 9
823
' 25 826 10 824 26 833 11 829 27 834 12 827 28 836 13 823 29 835 14 828 30 834 15 777 31 833 16 839 INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Form 13/20 i
Form 13/20 i


    -- -.                    -                              . :.- :. : . 22 ::.2 ::
. :.- :. :. 22 ::.2 ::
OPERATING DATA REPORT DOCKET NO. 50-364
OPERATING DATA REPORT DOCKET NO. 50-364 DATE 11/4/86 COMPLETED BY L D. Woodard TELEPHONE (?nsmoo-5156 OPERATING STATUS Notes
                                                    .                                                                                DATE 11/4/86 COMPLETED BY L D. Woodard             l
                '                                                                                                                TELEPHONE (?nsmoo-5156 OPERATING STATUS Joseph M. Farley - Unit 2                                            Notes
: 1. Unit Name:-
: 1. Unit Name:-
: 2. Reporting Period:                       October. 1986                                   1")     Cdmulative data since 76s2                                          7/30/81, date'~of
Joseph M. Farley - Unit 2
: 2. Reporting Period:
October. 1986 1")
Cdmulative data since
: 3. L4" Thermal Power (MWt):
: 3. L4" Thermal Power (MWt):
860                                           commerMal operatio.n.
76s2 7/30/81, date'~of 860 commerMal operatio.n.
: 4. Nameplate Rating (Gross MWe):
: 4. Nameplate Rating (Gross MWe):
: 5. Demsn Electncal Rating (Net MWe):                       829
829
: 6. Maximum Dependable Capacity (Gross MWe):                         872.2
: 5. Demsn Electncal Rating (Net MWe):
872.2
: 6. Maximum Dependable Capacity (Gross MWe):
829.2
: 7. Maximum Dependable Capacity (Net MWe):
: 7. Maximum Dependable Capacity (Net MWe):
829.2
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A N/A
: 9. Power Level To Wluch Restncted,If Any (Net MWe):
N/A
N/A
: 9. Power Level To Wluch Restncted,If Any (Net MWe):                                N/A
: 10. Reasons For Restrictions. If Any:
: 10. Reasons For Restrictions. If Any:                         N/A O                                                                                                 -
O V
, V                                                         -
s This Month Yr.-to.Dete Cuinulative 745 7,296 46,081
s This Month               Yr.-to.Dete               Cuinulative 745                   7,296                       46,081
!!. Hours In Reportmg Period
            !!. Hours In Reportmg Period                                                                                                               _
: 12. Number Of Hours Reactor Was Critical 745 6.085.6 44.892.2 0.0 0.0 138.0
: 12. Number Of Hours Reactor Was Critical                                 745                   6.085.6                     44.892.2
: 13. Reactor Reserve Shutdown Hours
: 13. Reactor Reserve Shutdown Hours 0.0                    0.0                        138.0 745                   5,994.4                     39,386.8
: 14. Hours Generator On-Line 745 5,994.4 39,386.8
: 14. Hours Generator On-Line
: 15. Unit Reserve Shutdown Hours 0.0 0.0 -
: 15. Unit Reserve Shutdown Hours                                         0.0                   0.0 -                       0.0
0.0
: 16. Gross Thermal Energy Generated (MWH)                                 1,966,262-             15,207,791                 99,442,341 l           17. Gross Electrical Energy Generated (MWH)                             646.982                 5.007,782                 32.730.470
: 16. Gross Thermal Energy Generated (MWH) 1,966,262-15,207,791 99,442,341 l
: 18. Net Electrical Energy Generated (MWH)                               616,728               4,740,874                   31,030,114
: 17. Gross Electrical Energy Generated (MWH) 646.982 5.007,782 32.730.470
[           19. Unit Service Factor                                                 100.0                 82.2                       85.5
: 18. Net Electrical Energy Generated (MWH) 616,728 4,740,874 31,030,114
: 20. Unit Availability Factor                                             100.0                 82.2                       85.5
[
: 21. Unit Capacity Factor (Using MDC Net)                                 99.8                    78.4                       82.8
: 19. Unit Service Factor 100.0 82.2 85.5
: 22. Unit Capacity Factor (Using DER Net)                                 99.9                    78.4                       81.2 l           23. Unit Forced Outage Rate                                               0.0                    3.0                        4.5
: 20. Unit Availability Factor 100.0 82.2 85.5 99.8 78.4 82.8
: 21. Unit Capacity Factor (Using MDC Net) 99.9 78.4 81.2
: 22. Unit Capacity Factor (Using DER Net) 0.0 3.0 4.5 l
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration.of Ench):
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration.of Ench):
N/A
N/A
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:                               N/A
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                                             Forecast                 Achieved INITIAL CRITICALITY                                                   05/06/81                   05/08/81 INITIAL ELECTRICITY                                                     05/24/81                   05/25/81 COMMERCIAL OPERATION                                                   08/01/81                   07/30/81 (W7n
N/A
                      . - - _ _ _ ~ _ _ __ _ .,- -- _ _ .                  _ - - -_.          -    _        __        _ _ _ - _            __ _
: 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 (W7n
~


o                                                                 O O       -
o O
DOCKET NO.              50-364            ' **
O UNIT Silu1 DOWNS AND POWER REDUC 110NS DOCKET NO.
UNIT Silu1 DOWNS AND POWER REDUC 110NS UNIT NAME         J.M. Farley - Unit 2 DATE November 4, 1956 COMPLEYED ay J.D. Woodard REPORT MONTil October TELEPHONE (205)899-5156 i
50-364 UNIT NAME J.M. Farley - Unit 2 DATE November 4, 1956 REPORT MONTil October COMPLEYED ay J.D. Woodard TELEPHONE (205)899-5156 i
e.
e.
u   E No.               Date g
E u
5E 3g
Licensec Ev, f q, 5 E
                                                      };;    } Yj
}
                                                              ,ye Licensec    Ev,        f q,        Cause & Coneceive Event       g          o3                 Acti m to
} Yj Cause & Coneceive No.
                                                        $                               uiu?
Date g
1 6      g3 $              ,U d g d
3g
Repius # _
,ye Event uiu?
[u           p,,,,,,gecogene, I
o3 Acti m to g
THEI E WERE NO UN: T SHI TDOWNS C R SIGl lIFICAN1 POWER REDUCTI< INS DUR ENG THE MO: TH OF OCTOBER.
g3 $
,U d g Repius #
[u 6
1 p,,,,,,gecogene, d
I THEI E WERE NO UN: T SHI TDOWNS C R SIGl lIFICAN1 POWER REDUCTI< INS DUR ENG THE MO: TH OF OCTOBER.
1 4
1 4
1 l
1 l
1 i
1 i
l l                         2                                                 3 4
l l
F: Fo ced                 Reason:                                             Method:
2 3
S: Stheduled                                                                                           Exhibit G Insisuctions        '
4 F: Fo ced Reason:
A Equipmens Failure (Explain)                       1 -Manual                 for Preparation of Data                         .
Method:
Il Maintenance of Test                             2-Manual Scram.           Entry Sliccis for I.iccusec 0 Refuchug                                         3 Automatic Scram.       Event Report li.ER) File (NUREG-D Regulatiny Rest:iction                           4 Oshes (Eaplain)       0161)
Exhibit G Insisuctions S: Stheduled A Equipmens Failure (Explain) 1 -Manual for Preparation of Data Il Maintenance of Test 2-Manual Scram.
E Operator Training & t.icense Examination F-Administrative                                                         5 G Ope ational Enror (Expl.iin)                                       ,      Exhibis 1 - Same Sousee i
Entry Sliccis for I.iccusec 0 Refuchug 3 Automatic Scram.
(9/77)                       11 Olhe: (Expl.iin)
Event Report li.ER) File (NUREG-D Regulatiny Rest:iction 4 Oshes (Eaplain) 0161)
E Operator Training & t.icense Examination F-Administrative 5
G Ope ational Enror (Expl.iin)
Exhibis 1 - Same Sousee (9/77) 11 Olhe: (Expl.iin) i


i .* :l   .      . -
i.* :l
        ..' ' * . Mamng Address
' *. Mamng Address Alibim1 Power CompIny
    **              Alibim1 Power CompIny
~ 600 North 18th Strett Post Office Box 2641
                ~ 600 North 18th Strett Post Office Box 2641
' Birmingham Alabama 35291 Telephone 205 783-G090 R. P. Mcdonald Senior Wce President Flintridge Building AlabamaPower tne sovrem eec:?-C si s?e" November 7, 1986 Docket No. 50-364 -
                  ' Birmingham Alabama 35291 Telephone 205 783-G090 R. P. Mcdonald Senior Wce President Flintridge Building                                                 AlabamaPower tne sovrem eec:?-C si s?e" November 7, 1986 Docket No. 50-364 -
Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.
Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.           20555
20555


==Dear Sir:==
==Dear Sir:==
RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the October 1986 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifications.
RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the October 1986 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
If you have any questions, please advise.
Yours very   uly ,
Yours very uly,
G n-R. P. Mcdonald RPM /BCE:amh/F-2                                                                                       1 Enclosures xc: Director, IE (10 copies)
G n-R. P. Mcdonald RPM /BCE:amh/F-2 1
Director, RII       (1 copy) 7
Enclosures xc: Director, IE (10 copies)
                                                                                                                    # i(i}}
Director, RII (1 copy) 7
# i(i}}

Latest revision as of 05:26, 4 December 2024

Monthly Operating Rept for Oct 1986
ML20212L941
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/31/1986
From: Mcdonald R, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8701290442
Download: ML20212L941 (6)


Text

__

.~

e:

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE SUPNARY OF OPERATIONS -

October, 1986 L

During the month of October, there were no unit shutdowns or significant power reductions.

The following major safety-related maintenance was performed in the month of October:

1.

Miscellaneous 1 corrective and preventive maintenance was performed on diese.1 generators.

"~

8701290442 861031 PDR ADOCK 05000364 R

PDR B&HY-

/

-)

DOCKET NO.

50-364 i

UNIT 2 DATE 11/4/86 COMPLETED BY J. D. Woodard TELEPHONE (205)899-5156

!Cmi October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (19fe-Net)

(P97e-Net) 1 818 17 839 2

817 18 837 3

818 19 840 4

817 20 841 5

814 21 842 6

822 22 840 7

830 23 833 8

825 24 827 9

823

' 25 826 10 824 26 833 11 829 27 834 12 827 28 836 13 823 29 835 14 828 30 834 15 777 31 833 16 839 INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Form 13/20 i

. :.- :. :. 22 ::.2 ::

OPERATING DATA REPORT DOCKET NO. 50-364 DATE 11/4/86 COMPLETED BY L D. Woodard TELEPHONE (?nsmoo-5156 OPERATING STATUS Notes

1. Unit Name:-

Joseph M. Farley - Unit 2

2. Reporting Period:

October. 1986 1")

Cdmulative data since

3. L4" Thermal Power (MWt):

76s2 7/30/81, date'~of 860 commerMal operatio.n.

4. Nameplate Rating (Gross MWe):

829

5. Demsn Electncal Rating (Net MWe):

872.2

6. Maximum Dependable Capacity (Gross MWe):

829.2

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A N/A

9. Power Level To Wluch Restncted,If Any (Net MWe):

N/A

10. Reasons For Restrictions. If Any:

O V

s This Month Yr.-to.Dete Cuinulative 745 7,296 46,081

!!. Hours In Reportmg Period

12. Number Of Hours Reactor Was Critical 745 6.085.6 44.892.2 0.0 0.0 138.0
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 745 5,994.4 39,386.8
15. Unit Reserve Shutdown Hours 0.0 0.0 -

0.0

16. Gross Thermal Energy Generated (MWH) 1,966,262-15,207,791 99,442,341 l
17. Gross Electrical Energy Generated (MWH) 646.982 5.007,782 32.730.470
18. Net Electrical Energy Generated (MWH) 616,728 4,740,874 31,030,114

[

19. Unit Service Factor 100.0 82.2 85.5
20. Unit Availability Factor 100.0 82.2 85.5 99.8 78.4 82.8
21. Unit Capacity Factor (Using MDC Net) 99.9 78.4 81.2
22. Unit Capacity Factor (Using DER Net) 0.0 3.0 4.5 l
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration.of Ench):

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 (W7n

~

o O

O UNIT Silu1 DOWNS AND POWER REDUC 110NS DOCKET NO.

50-364 UNIT NAME J.M. Farley - Unit 2 DATE November 4, 1956 REPORT MONTil October COMPLEYED ay J.D. Woodard TELEPHONE (205)899-5156 i

e.

E u

Licensec Ev, f q, 5 E

}

} Yj Cause & Coneceive No.

Date g

3g

,ye Event uiu?

o3 Acti m to g

g3 $

,U d g Repius #

[u 6

1 p,,,,,,gecogene, d

I THEI E WERE NO UN: T SHI TDOWNS C R SIGl lIFICAN1 POWER REDUCTI< INS DUR ENG THE MO: TH OF OCTOBER.

1 4

1 l

1 i

l l

2 3

4 F: Fo ced Reason:

Method:

Exhibit G Insisuctions S: Stheduled A Equipmens Failure (Explain) 1 -Manual for Preparation of Data Il Maintenance of Test 2-Manual Scram.

Entry Sliccis for I.iccusec 0 Refuchug 3 Automatic Scram.

Event Report li.ER) File (NUREG-D Regulatiny Rest:iction 4 Oshes (Eaplain) 0161)

E Operator Training & t.icense Examination F-Administrative 5

G Ope ational Enror (Expl.iin)

Exhibis 1 - Same Sousee (9/77) 11 Olhe: (Expl.iin) i

i.* :l

' *. Mamng Address Alibim1 Power CompIny

~ 600 North 18th Strett Post Office Box 2641

' Birmingham Alabama 35291 Telephone 205 783-G090 R. P. Mcdonald Senior Wce President Flintridge Building AlabamaPower tne sovrem eec:?-C si s?e" November 7, 1986 Docket No. 50-364 -

Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the October 1986 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Yours very uly,

G n-R. P. Mcdonald RPM /BCE:amh/F-2 1

Enclosures xc: Director, IE (10 copies)

Director, RII (1 copy) 7

  1. i(i