ML20202G149: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:,               .       .     ~     . . . - . . .   ...-. - -.~...-               . - . - ~ . . . . . . . . . . , . .
{{#Wiki_filter:,
                                                                                                                                    , ,
.
.
~
. . . - . . .
...-. - -.~...-
.
- . - ~ . . . . .
. . . . .
,
.
.
, ,
l.
l.
                . _ ,
*
                      *
. _ ,
              ./^                                                                                                                     ;
./^
            .+
;
t.                            '
t.
      .                                                                                                                               t
.+
                                                                            December 16,1998
'
                        Mr. John F. Franz, Jr.
.
,                        Vice President, Nuclear
t
L                       ! Alliant Tower -                                                                                               :
December 16,1998
Mr. John F. Franz, Jr.
Vice President, Nuclear
,
L
! Alliant Tower -
:
200 First Street SE
j
L
P. O; Box 351
!
' Cedar Rapids, lA 52406-0351
'
;
SUBJECT:
NRC DUANE ARNOLD ENERGY CENTER SECURITY INSPECTION
i
l'
REPORT 50-331/98018(DRS)
l
' Dear Mr. Franz:
!
r
4
L
L
                        200 First Street SE
On December 8,1998, the NRC completed a security inspection of your Duane Amold
                          P. O; Box 351
j
                                                                                                                                      j
Energy Center reactor facility. The onsite inspection effort was conducted between
,
November 16-20,-1998. The enclosed report presents the results of that inspection.
!
!
~ - No violations of NRC requirements were identified during this inspection. Your security .
' equipment testing and maintenance program was a performance strength. The dedication
l
of the maintenance technicians ensured that problems were corrected efficiently and
l
effectively. JThe cooperation between the security department and various other
L
maintenance departments resulted in' low equipment outage times and contributed to
;
L. .
improvements in delay barriers. The security force had an aggressive and effective
;
equipment testing program. We also observed that your security organization implemented
. their duties and responsibilities in an effective manner.
'
'
'
                      ' Cedar Rapids, lA 52406-0351
                                                                                                                                        ;
                        SUBJECT:          NRC DUANE ARNOLD ENERGY CENTER SECURITY INSPECTION                                          i
      l'
                                          REPORT 50-331/98018(DRS)
l                      ' Dear Mr. Franz:
!                                    4                                                                                                  r
L
L
                        On December 8,1998, the NRC completed a security inspection of your Duane Amold
;
j                        Energy Center reactor facility. The onsite inspection effort was conducted between                            ,
.Two' issues were . identified that will require further analysis by us. One issue relates to
                        November 16-20,-1998. The enclosed report presents the results of that inspection.
;
                  ~ - No violations of NRC requirements were identified during this inspection. Your security .
!                      ' equipment testing and maintenance program was a performance strength. The dedication
l                        of the maintenance technicians ensured that problems were corrected efficiently and
l                        effectively. JThe cooperation between the security department and various other
L                        maintenance departments resulted in' low equipment outage times and contributed to                             ;
L. .                    improvements in delay barriers. The security force had an aggressive and effective                            ;
                        equipment testing program. We also observed that your security organization implemented
                                                                                                            '
                                                                                                                                        '
                      . their duties and responsibilities in an effective manner.
L                                                                                                                                      ;
,
,
'
'
                        .Two' issues were . identified that will require further analysis by us. One issue relates to                  ;
.several occasions when the required number of armed response force members were not
                        .several occasions when the required number of armed response force members were not
{
                                                                                                                                        {
g
g                       immediately available, and the reporting requirements for such incidents. The other issue                     :
immediately available, and the reporting requirements for such incidents. The other issue
l                     ' pertains to the unescorted access authorization for a contractor employee. Resolution of                       ,
:
                        these issues will be addressed by separate correspondence,
l
' pertains to the unescorted access authorization for a contractor employee. Resolution of
,
these issues will be addressed by separate correspondence,
o
o
I   e
I
          '
e
                                                                                                                                \
'
L                                                                                                                                 \
\\
L
\\
L
L
.
.!:
!:
040138
                                  040138
:
:
9902050013L981216
!"
!
!
                ,!
,!
                                9902050013L981216                            !"
PDR
ADOCK 05000331
u
u
''
''
                                PDR   ADOCK 05000331
.G
                    -
PDR
                              .G                            PDR
-
                                                                              .
.
                                                                            .-
.-


  .      .  .      _    _            _ _ _ . _            -
                                                                    - . .. __.-        _ _ . _  .
                                                                                                  s
                                                                                                  '
    .
                                                                                                  i
.
.
                                                                                                    l
.
      J. Franz                                         -2-
.
                                                                                                    ]
_
      In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
_
      the enclosure will be placed in the NRC Public Document Room (PDR).
_ _ _ . _
                                              Sincerely,
-
                                              /s/ J. R. Creed
-
                                              James R. Creed, Chief,
.
                                              Plant Support Branch 1
.. __.-
      Docket No.: 50-331
_ _ . _
      License No.: DPR-49
.
      Enclosure:   Inspection Report 50-331/98018(DRS)
s
      cc w/ encl:   E. Protsch, Executive Vice President                                           1
'
                      Energy Delivery Alliant;
.
                                                                                                    ]
i
                      President, IES Utilities, Inc.                                               l
.
                    G. Van Middlesworth, Plant Manager
J. Franz
                    K. Peveler, Manager, Regulatory Performance                                     j
-2-
                    Chairperson, Iowa Utilities Board                                               1
]
                                                                                                    l
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
                                                                                                    l
the enclosure will be placed in the NRC Public Document Room (PDR).
                                                                                                    1
Sincerely,
                                                                                                    l
/s/ J. R. Creed
                                                                                                    i
James R. Creed, Chief,
                                                                                                    I
Plant Support Branch 1
                                                                                                    l
Docket No.: 50-331
                                                                                                    l
License No.: DPR-49
                                                                                                    i
Enclosure:
Inspection Report 50-331/98018(DRS)
cc w/ encl:
E. Protsch, Executive Vice President
1
Energy Delivery Alliant;
]
President, IES Utilities, Inc.
G. Van Middlesworth, Plant Manager
K. Peveler, Manager, Regulatory Performance
j
Chairperson, Iowa Utilities Board
1
l
1
i
l
i


                        .                             ._           -                       .-.
.
    .
._
  *
-
.-.
.
*
i
i
    ~ J. Franz -                                             -2-                                             l
~ J. Franz -
                                                                                                              l
-2-
                                                                                                              I
i
i
l
l
      In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
      'the enclosure will be placed in the NRC Public Document Room (PDR).
'the enclosure will be placed in the NRC Public Document Room (PDR).
                                                    Sincerely,                                               ;
Sincerely,
l
l
                                                                                                              i
James R. Creed, Chief,
                                                    James R. Creed, Chief,                                   i
i
                                                    Plant Support Branch 1
Plant Support Branch 1
i
,
,
                                                                                                              i
Docket No.: 50-331
l      Docket No.: 50-331
l
      License No.: DPR-49
License No.: DPR-49
      Enclosure:         Inspection Report 50-331/98018(DRS)
Enclosure:
      cc w/ encl:       E. Protsch, Executive Vice President
Inspection Report 50-331/98018(DRS)
                            Energy Delivery Alliant;
cc w/ encl:
                            President, IES Utilities, Inc.                                                   !
E. Protsch, Executive Vice President
                          G. Van Middlesworth, Plant Manager                                                 l
Energy Delivery Alliant;
                          K. Peveler, Manager, Regulatory Performance                                         l
President, IES Utilities, Inc.
                          Chairperson, Iowa Utilities Board
G. Van Middlesworth, Plant Manager
      Distribution:
l
      RPC (E-Mail)
K. Peveler, Manager, Regulatory Performance
      Project Mgr., NRR w/enci
Chairperson, Iowa Utilities Board
      J. Caldwell, Rlli w/enci
Distribution:
      C. Pederson, Rlli w/enct
RPC (E-Mail)
      B. Clayton, Rlli w/enct
Project Mgr., NRR w/enci
      SRI Duane Arnold w/enct
J. Caldwell, Rlli w/enci
      DRP w/ encl
C. Pederson, Rlli w/enct
      TSS w/enci
B. Clayton, Rlli w/enct
      DRS (2) w/enci
SRI Duane Arnold w/enct
      Rlll PRR w/enct
DRP w/ encl
      PUBLIC IE-01 w/ enc!
TSS w/enci
      Docket File w/enci
DRS (2) w/enci
    -GREENS
Rlll PRR w/enct
      LEO (E-Mail)
PUBLIC IE-01 w/ enc!
      DOCDESK (E-Mail)
Docket File w/enci
      DOCUMENT NAME: G:DRS\DUA98018.WPD
-GREENS
      To r. . c.p, , a. .,c   oi. in.c in m. i=: e cm unwi en.cnm.nu.ncew. r cm m n on.nu.new.= w No copy
LEO (E-Mail)
        OFFICE       Rlli                       Rill                 Rlli                                 l
DOCDESK (E-Mail)
        NAME         Pirtle:jp                   Lanksbury           Creed
DOCUMENT NAME: G:DRS\\DUA98018.WPD
        DATE         02/ /99                     02/ /99             02/ /99
To r.
. c.p, , a. .,c
oi. in.c
in m. i=: e cm unwi en.cnm.nu.ncew. r cm m n on.nu.new.=
w No copy
OFFICE
Rlli
Rill
Rlli
l
NAME
Pirtle:jp
Lanksbury
Creed
DATE
02/ /99
02/ /99
02/ /99
}}
}}

Latest revision as of 02:38, 8 December 2024

Forwards Insp Rept 50-331/98-18 on 981116-20 Onsite & 1208 NRC Region 3 Ofc.No Violations Noted.Two Issues Were Identified That Will Require Further Analysis by NRC Listed
ML20202G149
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 12/16/1998
From: Creed J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Franz J
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
Shared Package
ML20202G154 List:
References
50-331-98-18, NUDOCS 9902050013
Download: ML20202G149 (3)


See also: IR 05000331/1998018

Text

,

.

.

~

. . . - . . .

...-. - -.~...-

.

- . - ~ . . . . .

. . . . .

,

.

.

, ,

l.

. _ ,

./^

t.

.+

'

.

t

December 16,1998

Mr. John F. Franz, Jr.

Vice President, Nuclear

,

L

! Alliant Tower -

200 First Street SE

j

L

P. O; Box 351

!

' Cedar Rapids, lA 52406-0351

'

SUBJECT:

NRC DUANE ARNOLD ENERGY CENTER SECURITY INSPECTION

i

l'

REPORT 50-331/98018(DRS)

l

' Dear Mr. Franz:

!

r

4

L

On December 8,1998, the NRC completed a security inspection of your Duane Amold

j

Energy Center reactor facility. The onsite inspection effort was conducted between

,

November 16-20,-1998. The enclosed report presents the results of that inspection.

!

~ - No violations of NRC requirements were identified during this inspection. Your security .

' equipment testing and maintenance program was a performance strength. The dedication

l

of the maintenance technicians ensured that problems were corrected efficiently and

l

effectively. JThe cooperation between the security department and various other

L

maintenance departments resulted in' low equipment outage times and contributed to

L. .

improvements in delay barriers. The security force had an aggressive and effective

equipment testing program. We also observed that your security organization implemented

. their duties and responsibilities in an effective manner.

'

'

L

.Two' issues were . identified that will require further analysis by us. One issue relates to

,

'

.several occasions when the required number of armed response force members were not

{

g

immediately available, and the reporting requirements for such incidents. The other issue

l

' pertains to the unescorted access authorization for a contractor employee. Resolution of

,

these issues will be addressed by separate correspondence,

o

I

e

'

\\

L

\\

L

.!:

040138

9902050013L981216

!"

!

,!

PDR

ADOCK 05000331

u

.G

PDR

-

.

.-

.

.

.

_

_

_ _ _ . _

-

-

.

.. __.-

_ _ . _

.

s

'

.

i

.

J. Franz

-2-

]

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and

the enclosure will be placed in the NRC Public Document Room (PDR).

Sincerely,

/s/ J. R. Creed

James R. Creed, Chief,

Plant Support Branch 1

Docket No.: 50-331

License No.: DPR-49

Enclosure:

Inspection Report 50-331/98018(DRS)

cc w/ encl:

E. Protsch, Executive Vice President

1

Energy Delivery Alliant;

]

President, IES Utilities, Inc.

G. Van Middlesworth, Plant Manager

K. Peveler, Manager, Regulatory Performance

j

Chairperson, Iowa Utilities Board

1

l

1

i

l

i

.

._

-

.-.

.

i

~ J. Franz -

-2-

i

l

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and

'the enclosure will be placed in the NRC Public Document Room (PDR).

Sincerely,

l

James R. Creed, Chief,

i

Plant Support Branch 1

i

,

Docket No.: 50-331

l

License No.: DPR-49

Enclosure:

Inspection Report 50-331/98018(DRS)

cc w/ encl:

E. Protsch, Executive Vice President

Energy Delivery Alliant;

President, IES Utilities, Inc.

G. Van Middlesworth, Plant Manager

l

K. Peveler, Manager, Regulatory Performance

Chairperson, Iowa Utilities Board

Distribution:

RPC (E-Mail)

Project Mgr., NRR w/enci

J. Caldwell, Rlli w/enci

C. Pederson, Rlli w/enct

B. Clayton, Rlli w/enct

SRI Duane Arnold w/enct

DRP w/ encl

TSS w/enci

DRS (2) w/enci

Rlll PRR w/enct

PUBLIC IE-01 w/ enc!

Docket File w/enci

-GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

DOCUMENT NAME: G:DRS\\DUA98018.WPD

To r.

. c.p, , a. .,c

oi. in.c

in m. i=: e cm unwi en.cnm.nu.ncew. r cm m n on.nu.new.=

w No copy

OFFICE

Rlli

Rill

Rlli

l

NAME

Pirtle:jp

Lanksbury

Creed

DATE

02/ /99

02/ /99

02/ /99