ML20202J008: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:(, | {{#Wiki_filter:(, | ||
'/ | |||
As Reg. | As Reg. | ||
UNITE 3 STATES u | |||
j NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 30006 4001 December 2, 1997 | |||
'+,..... # | |||
Leon J. Olivier Vice President - Nuclear Boston Edison Company Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, Massatusetts 02360 5599 | Leon J. Olivier Vice President - Nuclear Boston Edison Company Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, Massatusetts 02360 5599 | ||
| Line 26: | Line 28: | ||
==Dear Mr. Olivier:== | ==Dear Mr. Olivier:== | ||
During 'he time period of January 19 through February 27,1998, we have scheduled an on-site design inspection of your Pilgrim Nuclear Generating Station. Your staff has indicated that there are nu major conflicts with onsite activities during this period. The two mechanical systems selected are the residual heat removal (RHR) and reactor building closed cooling water (RBCCW) systems. In addition, support and interface systems will be reviewed as well as the electrical distribution system. We will contact your staff to request material needed to support the on-site and off-site reviews. The team leader and two team members of the inspection team are scheduled to visit the site between December 22 and 23,1997, to ensure that all requested documentatirm has been provided to facilitate the in-office review and on-site inspection. | |||
During | Recer.t NRC inspections at nuclear power reactor facilities have identified numerous nndings I | ||
where the actual plant configuration or operations were inconsistent with the design basis, licensing basis, or the UFSAR. Thus, the purpose of this inspection is to evaluate the capability l | |||
of the systems to perform efety functions required by their design and licensing bases and to verify consistency of the as 'ouilt configuration with the final safety analysis report. Inspection Procedure (IP) 93801, " Safety System Functional inspection" will be used to perform the design inspection. | |||
Mr. Morris Branch, Team Leader, NRR, will interface with you and your staff regarding all matters related to this inspection. The inspection will be performed by a team of five engineers from Stone and Webster (S&W) Corporation who have been contracted by the NRC for this purpose. | Mr. Morris Branch, Team Leader, NRR, will interface with you and your staff regarding all matters related to this inspection. The inspection will be performed by a team of five engineers from Stone and Webster (S&W) Corporation who have been contracted by the NRC for this purpose. | ||
Mr. Robert Najuch of S&W who is part of the five person team will be the lead contractor engineer. | Mr. Robert Najuch of S&W who is part of the five person team will be the lead contractor engineer. | ||
Df gp I is . . | Df gp 5"p f" OM7 [e**D77V I is.. g i a m., U a u a usa | ||
9712110020 971202 PDR | '-t v | ||
l.li l.isi.ilil.li.ll.ll.l ll T | 9712110020 971202 PDR ADOCK 05000293 G | ||
m* | PM l.li l.isi.ilil.li.ll.ll.l ll T | ||
N m* | |||
Mr. L. J. Olivier | Mr. L. J. Olivier Decette 2,1997 | ||
- We will be in contact with your stan regarding additional details for the inspection. Should you have any questions, please contact Mr. Branch at (301) 415-1279 or myself at (301) 415-3041. | |||
Sincerely, Original signed by | Sincerely, Original signed by i | ||
Ronald B. Eaton, Actin 0 Project Director Project Directorate 1-3 Division Reactor Projects Office of Nuclear Reactor Regulation Docket No. 50-293 i | |||
cc: See next page Distribution: | cc: See next page Distribution: | ||
. DOCKET FILE (50-293) | |||
PUBLIC ' | PUBLIC ' | ||
PECB R/F | PECB R/F | ||
+ | |||
,' NRC Resident inspector i | |||
H. Miller, RA | |||
_..W.~Axelson, DRA | _..W.~Axelson, DRA | ||
'ACRS: | |||
N | |||
[ OGC:. | |||
f P | |||
l}; | l}; | ||
MConner, DRP ~ | MConner, DRP ~ | ||
l.l, | |||
l .l , | EAdensam-JRoe | ||
,~ | |||
. AWang. | |||
4 v | |||
~ | |||
r... | |||
I-- | PD1-3 R/F I - - | ||
MBranch | MBranch | ||
- ? | |||
v | |||
- DNorkin SRichards s. | |||
'~ | |||
DOCUMENT NAME: G:\MXB2\ANNOUNCE.PIL | DOCUMENT NAME: G:\\MXB2\\ANNOUNCE.PIL | ||
*See previous concurrence To receive a copy of this document, indecate in the box: "c" = copy wahout enclosures "E" = Copy with enclosures "N" = No copy OFFICE PM:PD1-3 l PSIB: DISP l | |||
> SIB: DISP l | |||
PSIB:DICP l D9FDNRR NAME AWano he MBranch* | |||
DNorkin* | |||
SRichards* | |||
R8aton DATE 1$/>/97 11/20/97 11/20/97 11/21/97 11f74 7 OFFICIAL RECORD COPY 1 | |||
Mr. Leon J. Olivier Bosten Edison Company | Mr. Leon J. Olivier Bosten Edison Company Pilgrim Nuclear Power Station cc: | ||
Mr. Ron Ledgett Executive Vice President | Mr. Ron Ledgett Executive Vice President Mr. Jeffer;. Keene 800 Boylston Street Licensing Division Manager Boston, MA 02199 Dosion Edison Company 600 Rocky Hill Road Resident Inspectcr Plymouth, MA 02360-5599 U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Ms. Nancy Desmond Post Office Box 867 Manager, Reg. Affairs Dept. | ||
Plymouth, MA 02360-5599 U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station | Plymouth, MA 02360 Pilgrim Nuclear Power Station RFD #1 Rocky Hill Road Chairman, Board of Selectmen Plymouth, MA 02360 11 Lincoln Street Plymouth, MA 02360 Mr. David F. Tarantino Nuclear-Information Manager Chairman, Duxbury Board of Selectmen Pilgrim Nuclear Power Station Town Hall RFD #1, Rocky Hill Road 878 Tremont Street Plymouth, MA 02360 Duxbury, MA 02332 Ms. Kathleen M. O'Toole Office of the Consnissioner Secretary of Public Safety Massachusetts Department of Executive Office of Puolic Safety Environmental Protection One Ashburton Place One Winter Street Boston, MA 02108 Boston, MA 0?l08 Mr. Peter LaPorte, Director Office of the Attorney General Attn: James Muckerheide One Ashburton Place Massachusetts Emergency Management 20th Floor Agency Boston, MA 02108 400 Worcester Road P.O. Box 1496 Mr. Robert M. -Hallisey, Director Framingham, MA 01701-0317 Radiction Control Program Massachusetts Department of Chairman, Citizens Urging Public Health Responsible Energy 305 South Street P.O. Box 2621 Boston, MA 02130 Duxbury, MA 02331 Regional Administrator, Region I Citizens at Risk U. 5. @ clear Regulatory Commission P.O. Box 3803 475 Allendale Road Plymouth, MA 02361 King of Prussia, PA 19406 W.S. Stowe, Esquire Ms. Jane Fleming Boston Edison Company 8 Oceanwood Drive 800 Boylston St., 36th Floor Duxbury, MA 0233 Boston, MA 02199 o | ||
Plymouth, MA 02360 | |||
Environmental Protection | |||
w | w | ||
cc: | |||
(cont.) | |||
Chairman Nuclear Matters Committee Town Hall | Chairman Nuclear Matters Committee Town Hall | ||
-11 Lincoln-Street Plymouth, MA 02360 Mr. William D. Meinert Nuclear Eroineer Massachusetts-Municipal Wholesale Electric Company P.O. Box 426 I | |||
P.O. Box 426 Ludlow, MA 01056-0426 | Ludlow, MA 01056-0426 i | ||
_}} | _}} | ||
Latest revision as of 02:21, 8 December 2024
| ML20202J008 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 12/02/1997 |
| From: | Eaton R NRC (Affiliation Not Assigned) |
| To: | Olivier L BOSTON EDISON CO. |
| References | |
| NUDOCS 9712110020 | |
| Download: ML20202J008 (4) | |
Text
(,
'/
As Reg.
UNITE 3 STATES u
j NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 30006 4001 December 2, 1997
'+,..... #
Leon J. Olivier Vice President - Nuclear Boston Edison Company Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, Massatusetts 02360 5599
SUBJECT:
PILGRIM NUCLEAR POWER STATION DESIGN INSPECTION
Dear Mr. Olivier:
During 'he time period of January 19 through February 27,1998, we have scheduled an on-site design inspection of your Pilgrim Nuclear Generating Station. Your staff has indicated that there are nu major conflicts with onsite activities during this period. The two mechanical systems selected are the residual heat removal (RHR) and reactor building closed cooling water (RBCCW) systems. In addition, support and interface systems will be reviewed as well as the electrical distribution system. We will contact your staff to request material needed to support the on-site and off-site reviews. The team leader and two team members of the inspection team are scheduled to visit the site between December 22 and 23,1997, to ensure that all requested documentatirm has been provided to facilitate the in-office review and on-site inspection.
Recer.t NRC inspections at nuclear power reactor facilities have identified numerous nndings I
where the actual plant configuration or operations were inconsistent with the design basis, licensing basis, or the UFSAR. Thus, the purpose of this inspection is to evaluate the capability l
of the systems to perform efety functions required by their design and licensing bases and to verify consistency of the as 'ouilt configuration with the final safety analysis report. Inspection Procedure (IP) 93801, " Safety System Functional inspection" will be used to perform the design inspection.
Mr. Morris Branch, Team Leader, NRR, will interface with you and your staff regarding all matters related to this inspection. The inspection will be performed by a team of five engineers from Stone and Webster (S&W) Corporation who have been contracted by the NRC for this purpose.
Mr. Robert Najuch of S&W who is part of the five person team will be the lead contractor engineer.
Df gp 5"p f" OM7 [e**D77V I is.. g i a m., U a u a usa
'-t v
9712110020 971202 PDR ADOCK 05000293 G
PM l.li l.isi.ilil.li.ll.ll.l ll T
N m*
Mr. L. J. Olivier Decette 2,1997
- We will be in contact with your stan regarding additional details for the inspection. Should you have any questions, please contact Mr. Branch at (301) 415-1279 or myself at (301) 415-3041.
Sincerely, Original signed by i
Ronald B. Eaton, Actin 0 Project Director Project Directorate 1-3 Division Reactor Projects Office of Nuclear Reactor Regulation Docket No. 50-293 i
cc: See next page Distribution:
. DOCKET FILE (50-293)
PUBLIC '
PECB R/F
+
,' NRC Resident inspector i
H. Miller, RA
_..W.~Axelson, DRA
'ACRS:
N
[ OGC:.
f P
l};
MConner, DRP ~
l.l,
EAdensam-JRoe
,~
. AWang.
4 v
~
r...
PD1-3 R/F I - -
MBranch
- ?
v
- DNorkin SRichards s.
'~
DOCUMENT NAME: G:\\MXB2\\ANNOUNCE.PIL
- See previous concurrence To receive a copy of this document, indecate in the box: "c" = copy wahout enclosures "E" = Copy with enclosures "N" = No copy OFFICE PM:PD1-3 l PSIB: DISP l
> SIB: DISP l
PSIB:DICP l D9FDNRR NAME AWano he MBranch*
DNorkin*
SRichards*
R8aton DATE 1$/>/97 11/20/97 11/20/97 11/21/97 11f74 7 OFFICIAL RECORD COPY 1
Mr. Leon J. Olivier Bosten Edison Company Pilgrim Nuclear Power Station cc:
Mr. Ron Ledgett Executive Vice President Mr. Jeffer;. Keene 800 Boylston Street Licensing Division Manager Boston, MA 02199 Dosion Edison Company 600 Rocky Hill Road Resident Inspectcr Plymouth, MA 02360-5599 U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Ms. Nancy Desmond Post Office Box 867 Manager, Reg. Affairs Dept.
Plymouth, MA 02360 Pilgrim Nuclear Power Station RFD #1 Rocky Hill Road Chairman, Board of Selectmen Plymouth, MA 02360 11 Lincoln Street Plymouth, MA 02360 Mr. David F. Tarantino Nuclear-Information Manager Chairman, Duxbury Board of Selectmen Pilgrim Nuclear Power Station Town Hall RFD #1, Rocky Hill Road 878 Tremont Street Plymouth, MA 02360 Duxbury, MA 02332 Ms. Kathleen M. O'Toole Office of the Consnissioner Secretary of Public Safety Massachusetts Department of Executive Office of Puolic Safety Environmental Protection One Ashburton Place One Winter Street Boston, MA 02108 Boston, MA 0?l08 Mr. Peter LaPorte, Director Office of the Attorney General Attn: James Muckerheide One Ashburton Place Massachusetts Emergency Management 20th Floor Agency Boston, MA 02108 400 Worcester Road P.O. Box 1496 Mr. Robert M. -Hallisey, Director Framingham, MA 01701-0317 Radiction Control Program Massachusetts Department of Chairman, Citizens Urging Public Health Responsible Energy 305 South Street P.O. Box 2621 Boston, MA 02130 Duxbury, MA 02331 Regional Administrator, Region I Citizens at Risk U. 5. @ clear Regulatory Commission P.O. Box 3803 475 Allendale Road Plymouth, MA 02361 King of Prussia, PA 19406 W.S. Stowe, Esquire Ms. Jane Fleming Boston Edison Company 8 Oceanwood Drive 800 Boylston St., 36th Floor Duxbury, MA 0233 Boston, MA 02199 o
w
cc:
(cont.)
Chairman Nuclear Matters Committee Town Hall
-11 Lincoln-Street Plymouth, MA 02360 Mr. William D. Meinert Nuclear Eroineer Massachusetts-Municipal Wholesale Electric Company P.O. Box 426 I
Ludlow, MA 01056-0426 i
_