ML20203B627: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[B16582, Monthly Operating Rept for Nov 1997 for Mnps,Unit 3]]
| number = ML20203B627
| issue date = 11/30/1997
| title = Monthly Operating Rept for Nov 1997 for Mnps,Unit 3
| author name = Emmons K, Hicks G
| author affiliation = NORTHEAST NUCLEAR ENERGY CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000423
| license number =
| contact person =
| document report number = B16582, NUDOCS 9712150110
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 8
}}
 
=Text=
{{#Wiki_filter:_
  ,          gyg                                                      Rye Ferry Rd. (Route 156), Waterinrd, Cr OME bNbT                                                    hC% tone Nelcar Power Station Nordeut Nuclear F.r,crgy Cornpany P.o. Bos 128 Taterford, CT 06385-0128 (860) 447 1791 Fan (360) 444 4277                              ,
he No. dent Utilitice Systen.
DEC - 91997 Docket No. 50-423 B16582 US Nuclear Regulatory Commission Attentiorn Document Control Desk Washington, D.C. 20555 Millstone Nut: lear Power Station Unit No. 3 Facility Operating License Number NPF-49 Monthlv Operatino Report for November 1997 In accordance with the reporting requirements of Technical Specification 0.9.1.5 for Millstone Unit No. 3, enclosed in Attachment 2 is the Monthly Operating Report for the month of November 1997.
Should you have any questions regarding this submittal, please contact Mr. David Smith at (860) 437 5840.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY Qm U
G/. Hicks Airector - Millstone Unit No. 3 Attachments (2) .
6 d'!        l cc:      H. J. Miller, Region 1 Administrator W. D. Travers, Ph.D, Director Special Projects A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 J. W; Andersen, NRC Project Manager, Millstone Unit No. 3 9712150110 971130
* e            -
 
1 r
i t
t t
                                                                ..                                                                                                                                                                                t t
r Docket No. 50-423 B16582
                                                                                                                                                                                                                                                  ,t 3
i i
t
                                                                                                                                                                                                                                                .I
                                                                                                                                                                                                                                                ..t D
4
;                                                                                                                    Attachment 1 Millstone Nuc! ear Power Station, Unit No. 3                                                                                                                :
i i
NtiECO's Commitments                                                                                                                  ;
E k
                                                                                                                                                                                                                                                  ?
s b.
t i
4 k
E 5
December 1997 f
t
            ,                                                                                                                                                                                                                                    t t
F h
_ . . . . _ _ _... .._. _ . . . . _ . ~ . . _ , _ - . _ . . ,                                    . _ _ _ . _      _  .    . _ . _ . , . _ . . - - - . . . _ .  -
 
U.S. Nuclerr R:gulatory Commission l
816582%ttachment 1\Page 1 e
r Enclosure i
List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this                                            {
document. Please notify the Manager - Regulatory Compliance at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or                                          !
any associated regulatory commitments.                                                                                !
Committed Date or Commitment                                                                Outage NONE                                                                    N/A 1
f
 
i
            -4 i
Docket No. 50-423                                                    i B16582                                        l l
~
t I
Attachment 2 i
Millstone Nuclear Power Station, Unit No. 3                                                                                        ;
Facility Operating License No NPF-49 November 1997 Monthly Operatina Report -                                                                                          ;
i t
(
i-December 1997 9
v.ee-,,--w,-,w,,
r-v,,--+-4~rw-      ,o--      ,  - , , - - - - - - + - ~ - + - - - , w-,-,,e -w-ww,,p-ww--,- ---,~on,n, -- - --
p ~~            ---:n,-~                    e      g
 
      -.- . - _.. _ - . - - - - - .... - -                                                          _. _ _ .-.. _                      ..~ --. - . - . - -- . . - -
f 6
            .                    U S. Nuclear RegufDory Commission                                                                                                              ;
B16582Witachment 2Page 1 -                                                                                                                    [
REFUELING INFORMATION REQUEST                                                                                t November 1997                                                                                !
1.. Name of the facility:            Millstone Unit 3                                                                                    i i
: 2.      Scheduled date for next refueling outage: To be determined                                                                            !
: 3.      Scheduled date for restart following refueling: To be determined
: 4. . Will refueling or resumption of operation thereafter require a technical                                                                l spedfication change or other license amendment?                                                                                      i
;                                          NLL                                                                                                                                  !
F                              = 5.      Scheduled date(s) for submitting licensing action and supporting                                                                      ;
information:                                                                                                                          }
None.                                                                                                                                :
,                                                                                                                                                                                f
: 6.      Important licensing considerations associated with refueling, e.g., new or
!                                          different fuel design or supplier, unreviewed design or performance analysis                                                          ,
methods, significant changes in fuel design, new operating procedures                                                                ,
None.                                                                                                                                !
: 7.      The number of' fuel assemblies (a) in the core and (b) in the spent fuel storage pool:                                                                                                                        r in Core: (a)      193                    in Spent Fuel Pool: (b) 411 l
i
: 8.      The present licensed spent fuel pool storage capacity and the size of any p                                          increase in licensed storage capacity that has been requested or is planned,                                                          i
;                                          in numbar of fuel assemblies:
Etesent storace capacity: 756.                                                                                                        t No increase reauested.
i O                      9.      The projected date of the last refueling that can be discharged to the spent fuel pool assuming present license capacity:
End of Cvele 7,                                                                                                                  ,
1
                                                                                                                                                                                ?
t I
d                                                                                                                                                                            6
[
                                                                                                                                                                    ~
  --, e en , - - , + , . . . , ,            e.... ,,.w,~...    ,e, ,-...,.,+,,-,...,,.--,.;.-,-..n.,              n,.-~ , - , , .,~.e_...--..--.-                    _,.- - -
 
      .          _.___ _ _ _ . . .                            ~      .        .__ _ _ __,_.. . _._ . . ___ _ _ _. _ . _ . . . . _ . _ _ . . _ . . _ _ - . _ _ _ _ . . .
U.S. Nuclear Regulatory Commission                                                                                                                                                                              ,
B16582%ttachmant 2\Page 2                                                                                                                                                                                      l DOCKET NO.: 50-423                                                          j 4
UNIT: Millstone Unit 3                                ;
i                                                                                                                                                                                              DATE: 12/1/97                                          i
;                                                                                                                                                              COMPLETED BY: - K. W. Emmons                                                            :
TELEPHONE:                  (860)447 1791                              !
Ext. 6572                                !
l f
MONTH: Nov 97                                                                                                                                                                                                  :
DAY            AVG. DAILY POWER LEVEL                                                                        DAY                              AVG. DAILY POWER LEVEL (MWo Net)                                                                                                            - (MWe-Net)                                      ,
1                                        0                                                                  17                                                0
.                                              2                                        0                                                                  18                                                0 3                                        0                                                                  19                                                0                                      '
4                                        0                                                                  20                                                0 5                                        0                                                                  21                                                0 6                                        0                                                                  22                                                0 7                                        0                                                                  23                                                0 8                                        0                                                                  24-                                                0 I
!!                                              9                                        0                                                                  25                                                0
^
10                                        0                                                                  26                                                0 11-                                      0                                                                  27                                                0 12                                        0                                                                  28                                                0                                      i 13                                        0                                                                  29                                                0 14                                        0                                                                  30                                                0 15                                        0                                                                  31 16                                        0 INSTRUCTIONS t.
On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
j  -agy  gr-m-ge-G*-gr+y  dt-+-uw  er--  M*+p'"**iwT'  9-
                                                                        %-V- j.p varre-,~  r              yy,,S.i.p4,, -,-,, , ,    ',,_r9,,. w-__a----- Www    ---y%---------+---r-----aeg+          i- -+rg-  -.t-r-e-W-e-=--* - o er .-11-e1tetw-+
 
UD,'Nudoar Regulatory Commission
* B16582%ttachment 2Page 3 UNIT NAME: Millstone Unit 3 DATE: 12/01/97 COMPLETED BY:                  K. W. Emmons TELEPHONE: (8601447 1791 Eat 6572 OPERATING STATUS
: 1. - Docket Number                                                                50 423
: 2. Reporting Period                                                              Nov 97                                            Notes:
    ' 3. Utility Oontact                                                                K. W. Emmons
    - 4. - Licensed Thermal Power (MWt):                                                3411
: 5. Nameplate Rating (Gross MWe):                                                  1253
: 6. Design Electrical Rating (Not MWe):                                            1153.6
: 7. Maximum Dependable Capacity (Gross MWe):                                      1184.20
: 8. Maximum Dependable Capacity (Net MWe): -                                      1137.00
: 9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Olve Reasons:
N/A
: 10. Power Level To Which Restricted, if any (Not MWe):                                                    0
: 11. Reasons For Restrictions. If Any:                NRC Category lli Facility; ffRC Confirmatory Order sequiring im;lementation of an independent corrective action verification program; NRC Order requiring a third-party rev6ew of the employee concerns program at Millstone Stationi design basis verification response pursuant to 10CFR50.54(fl.
This Month                Yr. To Date              Cumulativ6
: 12. Hours in Reporting Period-                                                                                    720.0                            8016.0        101760.0 13 Number Of Hours Reactor Was CrWeal                                                                              0.0                                0.0          67080.1
: 14. Reactor Reserve Shutdown Hours                                                                                  0.0                                0.0          6525.8
: 15. Hours Generator On Line                                                                                        0.0                                0.0          65912.4
: 16. Unit Reserve Shutdown Hours                                                                                    0.0                                0.0              0.0
: 17. Gross Thermal Energy Generated (MWH)                                                                            0.0                                0.0    216937728.1
: 18. Gross Electrical Energy Generated (MWH)                                                                        0.0                                0.0      74905103.1
: 19. Not Electrical Energy Generated (MWH)                                                                      -4686.5                            53495.5      71243224.0 70, Unit Service Factor-                                                                                            0.0                                0.0              64.8 2' Unit Availability Factor                                                                                        0.0                                0.0              64.8
: 22. Unit Capacity Factor (Using MDC Net)                                                                            0.0                                0.0              61.5
: 23. Unit Capacity Factor (Using DER Net)                                                                            0.0                                0.0            .60.7 24.. Unit Forced Outage Rate                                                                                      100.0                              100.0              27.5
: 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Shutdown at time of this report.
: 26. If Unit Shutdown At End Of Report Period. Estimated Date of Startup:                                                    To be determined.
: 27. Units in Test Status (Prior to Commercial Operation):
Forecast              Achieved .
INITIAL CRITICALITY                                                                        N/A              N/A INITIAL ELECTRICITY                                                                          N/A              N/A COMMERCIAL OPERATION                                                                        N/A              N/A
              ' .  ,-rs,.+_,4--+=ci..
* was      ww -e-,  s r -w eew--.-o-,yn-r-s-an    e c ew es-, . ,rm.~v**            e-- or , w., r--w es: w w.,
 
                                                                                                                                                            ~
U.S. Nudear Regulatory Commission
* B16582%n&Jirst 2Page 4                                                                                                                                        5 UNIT SHUTDOWNS AND POWER R" DUCTIONS                                                          ,
DOCKET NO.:            SQ-427 UNIT NAME:          MJistone Urvt 3 DATE:            12-01-97 COMPLETED BY:            K. W. Emmons TELEPHONE:            (860) 447-1791 X6572 REPORT MONTH: Ncvember 1997 2
No.        Date  Type'      Duration        Reason      Method of          License        System      Component          Cause & Corrective (Hours)                      Shuttrng          Event          Code'        Code'                    Action to Down Reactor'      Report
* Prevent Recurrence 96-01 03-30-96      F          720              B/D          4              96-006-00        BA              ISV      Valves inoperable due to ongmal design deficiencies, in that an vv.wm valve design dd not meet GDC 57. Corrective actum is to instatt vendor kit to modify valve drsk to meet GDC 57.
Cormnued shutdown: NRC Category til facility; NRC Confirmatory Order requiring 6t corrective action vertication; NRC Order requirmg third-party review of M.Itstone Station employee cui.co...
program; desegn basis venfH:ation for response to NRC pursuant to 10CFR50.54(fl.
'F: Forced            Reason                                            ' Method                                    'IEEE Standard 805-1984 S: Scheduled          A - Equipment Failure (Explain)                      1 - Manuai
* Recommended Practices B - Maintenance or Test                              2 - Manual Scram                            for System identification m C - Refuelmg                                        3 - Automatic Scram                          Nuclear Power Plants and D - Regulatory Restriction                          4 - Continued from Previous Month            Related Facsisties" E - Operator Training & License Examination          5 - Power Reduction (Duration = 0)
F - Admiristrative                                  6 - Other (Expiaml                        'IEEE Standard 803A-1983, G - Operational Error (Explain)                                                                  " Recommended Practices H - Other (Explain)                                                                              for Uruque identification in Power Plants and Related Facilities - Cv..w-mat Function Identifers'}}

Latest revision as of 14:30, 7 December 2021